CN105297782A
CN105297782A CN201510808554.9A CN201510808554A CN105297782A CN 105297782 A CN105297782 A CN 105297782A CN 201510808554 A CN201510808554 A CN 201510808554A CN 105297782 A CN105297782 A CN 105297782A
Authority
CN
China
Prior art keywords
shrinkage joint
galvanized steel
expansion joint
rubber plate
plain sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510808554.9A
Other languages
Chinese (zh)
Inventor
刘家彬
管秀发
尹航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201510808554.9A priority Critical patent/CN105297782A/en
Publication of CN105297782A publication Critical patent/CN105297782A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses an expansion joint seepage treatment structure, constructed through a waterstop strip, of an underground concrete structure and a construction method of the expansion joint seepage treatment structure. Firstly, a slant grouting pipe is buried in one side of the seeping expansion joint to below the original buried waterstop strip, and foaming waterstop agents are injected for temporary water stopping; secondly, horizontal galvanized grouting pipes used subsequently are buried on the surface of the other side of the seeping expansion joint at intervals; thirdly, a galvanized steel plate and a sealing rubber plate which each correspond to an opening and are each provided with a V-shaped folding notch are customized, the waterstop sealing rubber plate, the galvanized steel plate and a gasket and a nut of a chemical bolt are sequentially installed, and the steel plate and the rubber plate are fixed in a screwed mode so that the expansion joint can be sealed; and finally, high-viscosity non-cured rubber liquid is injected into the expansion joint with high pressure, and a high-viscosity large-deformation waterproof layer is formed. According to the treatment method, three waterproof layers are formed, the structural design is scientific and ingenious, the construction process is simple, and the cost low. Therefore leakage can be completely prevented, the deformation function of the expansion joint is reserved, and the existing problem of seepage of the expansion joint is effectively solved.

Description

A kind of underground concrete structure shrinkage joint administration structure and construction method
Technical field
The present invention relates to the shrinkage joint treating seepage of underground concrete structure, belong to concrete structure engineering construction field.
Background technology
Along with the fast development of Building Trade in China, the underground space scale of building is increasing, for the temperature in solution Underground Extra-long concrete structure or roof structure construction and use procedure, shrinkage stress, the problems such as sedimentation, and structural seismic requirement, according to relevant specification requirement, general about 50m needs to arrange shrinkage joint, so shrinkage joint gets more and more in underground structure, expansion joint structure adopts rubber fastening band sealing substantially, in work progress, requirement must be very careful, just easily seepage is caused if there is construction error, current execution control is difficult to meet the demands, simultaneously after coming into operation, because variations in temperature, waterstop are aging, the differential settlement of ground, the durability of waterstop material and the impact of other factors, capital causes distortion and the material aging of concrete extension joint, thus cause original expansion joint water stop tear or disconnect, cause shrinkage joint seepage, and the treating seepage at shrinkage joint is the problem being difficult in engineering thoroughly solve always.
By retrieval, find following Patents document: the mending-leakage processing method (CN103924694A) of a kind of waterproof concrete shrinkage joint seam, its step is as follows: by smooth for concrete removing surface clean impulse-free robustness; Floating ash above cleaning concrete, keeps the neat and tidy of concrete upstream face; On concrete, plane lays external labeling type rubber fastening band, at rubber fastening band upper berth cartridge plate, and uniform interval expandable implant bolt on steel plate; Ensure the neat and tidy of steel plate and external labeling type rubber fastening band contact surface, and carry out preservative treatment at upstream face brushing rustproof paint; At steel plate for sealing water both sides formwork erection, then with the tight shutoff of high-strength grout; Template and concrete interval loss circulation material are smeared tightly, and the expansion bolt head brush rustproof paint leaked outside is carried out preservative treatment.Structure of the present invention is simple, reasonable in design, and use material few, cost is lower, simple to operate, and efficiency of construction is high.Contrasted by technical characteristic, above-mentioned patent document and the present patent application are completely not identical.
Summary of the invention
The object of the invention is the percolating water phenomenon for adopting waterstop concrete structure shrinkage joint, overcome the deficiencies in the prior art, provide one can ensure the original distortion in shrinkage joint function, leak-stopping thoroughly, strong adaptability and lower-cost underground concrete shrinkage joint administration structure and construction method.
The technical solution used in the present invention is: a kind of underground concrete structure shrinkage joint administration structure, comprises shrinkage joint, uncured rubber liquid, immediate effervescence water-stop, sealed rubber plate, high-strength cement mortar, uncured rubber liquid grout pipe, former middle buried water stop, galvanized steel plain sheet, chemical anchor bolts and immediate effervescence Grouting Pipe;
Be provided with former middle buried water stop in described shrinkage joint, the below of former middle buried water stop is provided with immediate effervescence water-stop, and the top of former middle buried water stop is provided with uncured rubber liquid; Side, shrinkage joint concrete surface is provided with immediate effervescence Grouting Pipe, and lead to immediate effervescence water-stop, shrinkage joint opposite side concrete surface is provided with uncured rubber liquid grout pipe, and leads to uncured rubber liquid, is provided with high-strength cement mortar above uncured rubber liquid grout pipe;
The surface at described shrinkage joint is provided with sealed rubber plate, and sealed rubber plate is provided with galvanized steel plain sheet, and sealed rubber plate and galvanized steel plain sheet are fixed by chemical anchor bolts, and seal shrinkage joint.
As preferably, described uncured rubber liquid grout pipe adopts coating steel pipe, and two sections of car silks adopt and are threaded, and Grouting Pipe distributes according to certain intervals and is furnished with plug.
As preferably, described galvanized steel plain sheet thickness is about 2mm, according to deformation design requirement, the dark V Origuchi in middle part, simultaneously in sealed rubber plate installation process also with galvanized steel plain sheet self-assembling formation V-type Origuchi, so meet the needs of shrinkage joint distortion.
Adopt a construction method for above-mentioned underground concrete structure shrinkage joint administration structure, comprise the following steps:
1), in the side at the shrinkage joint of seepage bury underground below oblique immediate effervescence Grouting Pipe to former middle buried water stop, and injection transient foaming water-stop temporary leaking water, administer for shrinkage joint and create execution conditions;
2), the one fixed width scope inner concrete topping of both sides, shrinkage joint concrete surface or interior rendering layer are rooted out;
3) the level uncured rubber liquid grout Guan Bingyong that the opposite side fluting, at shrinkage joint buries follow-up use underground makes high-strength cement mortar shutoff;
4), both sides, shrinkage joint are carried out necessary repairing and are polished flat;
5), customization galvanized steel plain sheet and sealed rubber plate, by steel plate hole position at the concrete surface boring of both sides, shrinkage joint, injecting glue, bury chemical drift bolt screw underground;
6), after the solidification of chemical anchor bolts colloid, repair even curface brushwork epoxy resin in both sides, shrinkage joint, sealed rubber plate, galvanized steel plain sheet, the packing ring of chemical anchor bolts, nut be tightened galvanized steel plain sheet and sealed rubber plate have been installed successively to seal shrinkage joint;
7), to the full-bodied uncured rubber liquid of shrinkage joint inner high voltage perfusion, final formation uncured rubber liquid, sealed rubber plate, galvanized steel plain sheet three road waterproofing course, both can play leak stopping effect, can ensure again that the function at shrinkage joint was constant;
8), will exceed the chemical anchor bolts head excision of nut, galvanized steel sheet surface is cleaned out.
As preferably, described step 7) in pouring squence: pour into successively along direction, shrinkage joint, to adjacent perfusing hole pulp, as poured into from the bottom up for vertical expansion joint, and use plug shutoff successively.
Chemical anchor bolts of the present invention distribute according to about certain intervals, and on described galvanized steel plain sheet and sealed rubber plate, corresponding position arranges bolt hole simultaneously.Described uncured rubber has the character such as self-healing property, stickiness, pliability, chemical resistance, heat-resisting cold resistance, thus can ensure that uncured rubber forms waterproofing course that is stable, integral seamless, simultaneously and both sides, shrinkage joint concrete be bonded together securely.
Beneficial effect: the present invention compared with prior art, has the following advantages:
(1) the present invention takes the method for dark V Origuchi, uncured rubber filling in the middle part of the galvanized steel plain sheet at covering shrinkage joint, thoroughly stops the seepage that shrinkage joint goes out, remains the original distortion function in shrinkage joint;
(2) construction technology of the present invention is simple, design science, rationally, finally forms uncured rubber, sealed rubber plate and galvanized steel plain sheet three layers of waterproof, and regulation effect is obvious, and application life is longer;
(3) construction technology of the present invention adopts galvanized steel plain sheet as the cover plate at shrinkage joint, neat and artistic;
(4) practicality of the present invention is comparatively strong, and easy construction, easily promotes.
Accompanying drawing explanation
Fig. 1 is structural front view of the present invention;
Fig. 2 is that the A-A of Fig. 1 is to cross-sectional view;
Fig. 3 is that the B-B of Fig. 1 is to cross-sectional view.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is further illustrated.
As Figure 1-3, a kind of underground concrete structure shrinkage joint administration structure, comprises shrinkage joint, uncured rubber liquid 1, immediate effervescence water-stop 2, sealed rubber plate 3, high-strength cement mortar 4, uncured rubber liquid grout pipe 5, former middle buried water stop 6, galvanized steel plain sheet 7, chemical anchor bolts 8 and immediate effervescence Grouting Pipe 9;
Be provided with former middle buried water stop 6 in described shrinkage joint, the below of former middle buried water stop 6 is provided with immediate effervescence water-stop 2, and the top of former middle buried water stop 6 is provided with uncured rubber liquid 1; Side, shrinkage joint concrete surface is provided with immediate effervescence Grouting Pipe 9, and lead to immediate effervescence water-stop 2, shrinkage joint opposite side concrete surface is provided with uncured rubber liquid grout pipe 5, and leads to uncured rubber liquid 1, is provided with high-strength cement mortar 4 above uncured rubber liquid grout pipe 5;
The surface at described shrinkage joint is provided with sealed rubber plate 3, and sealed rubber plate 3 is provided with galvanized steel plain sheet 7, and sealed rubber plate 3 and galvanized steel plain sheet 7 are fixed by chemical anchor bolts 8, and seal shrinkage joint.
Described uncured rubber liquid grout pipe 5 adopts coating steel pipe, and two sections of car silks adopt and are threaded, and Grouting Pipe distributes according to certain intervals and is furnished with plug.Described galvanized steel plain sheet 7 thickness is about 2mm, according to deformation design requirement, the dark V Origuchi in middle part, simultaneously in sealed rubber plate 3 installation process also with galvanized steel plain sheet self-assembling formation V-type Origuchi, so meet the needs of shrinkage joint distortion.
A construction method for above-mentioned underground concrete structure shrinkage joint administration structure, comprises the following steps:
1), in the side at the shrinkage joint of seepage bury underground below oblique immediate effervescence agent Grouting Pipe 9 to former middle buried water stop 6, and injection transient foaming water-stop 2 temporary leaking water, administer for shrinkage joint and create execution conditions;
2), the one fixed width scope inner concrete topping of both sides, shrinkage joint concrete surface or interior rendering layer are rooted out;
3) the opposite side fluting, at shrinkage joint buries the horizontal coating steel pipe of follow-up use underground, and as uncured rubber liquid grout pipe 5 and with making high-strength cement mortar 4 shutoff, uncured rubber liquid grout pipe 5 distributes according to certain intervals;
4), both sides, shrinkage joint are carried out necessary repairing and are polished flat;
5), the galvanized steel plain sheet 7 of customization band V-type Origuchi and sealed rubber plate 3, by steel plate hole position at the concrete surface boring of both sides, shrinkage joint, injecting glue, bury chemical anchor bolts 8 screw rod underground;
6), after the solidification of chemical anchor bolts 8 colloid, repair even curface brushwork epoxy resin in both sides, shrinkage joint, sealed rubber plate 3, galvanized steel plain sheet 7, the packing ring of chemical anchor bolts 8, nut be tightened galvanized steel plain sheet 7 and sealed rubber plate 3 have been installed successively to seal shrinkage joint;
7), to the full-bodied uncured rubber liquid 1 of shrinkage joint inner high voltage perfusion, final formation uncured rubber liquid 1, sealed rubber plate 3, galvanized steel plain sheet 7 three road waterproofing course, both can play leak stopping effect, can ensure again that the function at shrinkage joint was constant; Pouring squence: pour into successively along direction, shrinkage joint, to adjacent perfusing hole pulp, as poured into from the bottom up for body of wall vertical expansion joint, and uses plug shutoff successively;
8), will exceed chemical anchor bolts 8 excision of nut, galvanized steel plain sheet 7 removing surface is clean.
Below by reference to the accompanying drawings embodiments of the present invention are described in detail, but the present invention is not limited to described embodiment.For those of ordinary skill in the art, in the scope of principle of the present invention and technological thought, multiple change, amendment, replacement and distortion are carried out to these embodiments and still falls within the scope of protection of the present invention.

Claims (5)

1. a underground concrete structure shrinkage joint administration structure, is characterized in that: comprise shrinkage joint, uncured rubber liquid, immediate effervescence water-stop, sealed rubber plate, high-strength cement mortar, uncured rubber liquid grout pipe, former middle buried water stop, galvanized steel plain sheet, chemical anchor bolts and immediate effervescence Grouting Pipe;
Be provided with former middle buried water stop in described shrinkage joint, the below of former middle buried water stop is provided with immediate effervescence water-stop, and the top of former middle buried water stop is provided with uncured rubber liquid; Side, shrinkage joint concrete surface is provided with immediate effervescence Grouting Pipe, and lead to immediate effervescence water-stop, shrinkage joint opposite side concrete surface is provided with uncured rubber liquid grout pipe, and leads to uncured rubber liquid, is provided with high-strength cement mortar above uncured rubber liquid grout pipe;
The surface at described shrinkage joint is provided with sealed rubber plate, and sealed rubber plate is provided with galvanized steel plain sheet, and sealed rubber plate and galvanized steel plain sheet are fixed by chemical anchor bolts, and seal shrinkage joint.
2. a kind of underground concrete structure shrinkage joint according to claim 1 administration structure, is characterized in that: described uncured rubber liquid grout pipe adopts coating steel pipe, and is furnished with plug.
3. a kind of underground concrete structure shrinkage joint according to claim 1 administration structure, is characterized in that: the dark V Origuchi in middle part of described galvanized steel plain sheet and sealed rubber plate.
4. adopt a construction method for the underground concrete structure shrinkage joint administration structure of the claims 1,2 or 3, it is characterized in that: comprise the following steps:
1), in the side at the shrinkage joint of seepage bury underground below oblique immediate effervescence Grouting Pipe to former middle buried water stop, and injection transient foaming water-stop temporary leaking water, administer for shrinkage joint and create execution conditions;
2), the one fixed width scope inner concrete topping of both sides, shrinkage joint concrete surface or interior rendering layer are rooted out;
3) the level uncured rubber liquid grout Guan Bingyong that the opposite side fluting, at shrinkage joint buries follow-up use underground makes high-strength cement mortar shutoff;
4), both sides, shrinkage joint are carried out necessary repairing and are polished flat;
5), customization galvanized steel plain sheet and sealed rubber plate, by steel plate hole position at the concrete surface boring of both sides, shrinkage joint, injecting glue, bury chemical drift bolt screw underground;
6), after the solidification of chemical anchor bolts colloid, repair even curface brushwork epoxy resin in both sides, shrinkage joint, sealed rubber plate, galvanized steel plain sheet, the packing ring of chemical anchor bolts, nut be tightened galvanized steel plain sheet and sealed rubber plate have been installed successively to seal shrinkage joint;
7), to the full-bodied uncured rubber liquid of shrinkage joint inner high voltage perfusion, final formation uncured rubber liquid, sealed rubber plate, galvanized steel plain sheet three road waterproofing course, both can play leak stopping effect, can ensure again that the function at shrinkage joint was constant;
8), will exceed the chemical anchor bolts head excision of nut, galvanized steel sheet surface is cleaned out.
5. the construction method of a kind of underground concrete structure shrinkage joint according to claim 4 administration structure, it is characterized in that: the pouring squence in described step 7): pour into successively along direction, shrinkage joint, to adjacent perfusing hole pulp, as poured into from the bottom up for vertical expansion joint, and use plug shutoff successively.
CN201510808554.9A 2015-11-19 2015-11-19 Underground concrete structure expansion joint treatment structure and construction method thereof Pending CN105297782A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510808554.9A CN105297782A (en) 2015-11-19 2015-11-19 Underground concrete structure expansion joint treatment structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510808554.9A CN105297782A (en) 2015-11-19 2015-11-19 Underground concrete structure expansion joint treatment structure and construction method thereof

Publications (1)

Publication Number Publication Date
CN105297782A true CN105297782A (en) 2016-02-03

Family

ID=55195543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510808554.9A Pending CN105297782A (en) 2015-11-19 2015-11-19 Underground concrete structure expansion joint treatment structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN105297782A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088364A (en) * 2016-07-25 2016-11-09 浙江万达建设集团有限公司 A kind of Novel underground room antiseep attachment structure and construction method thereof
CN107938720A (en) * 2017-11-22 2018-04-20 中建三局第二建设工程有限责任公司 A kind of basement bottom board water seepage treatment device and construction method
CN109235504A (en) * 2018-09-04 2019-01-18 中国十九冶集团有限公司 Deformation joint waterproof structure and deformation joint repairing method
CN109487756A (en) * 2018-01-20 2019-03-19 深圳市深水水务咨询有限公司 The repairing structure and its construction method at the expansion joint of pressurized water transmission box culvert
CN111156025A (en) * 2020-01-14 2020-05-15 福建陆海工程勘察设计有限公司 Highway tunnel lining overrun crack repairing combined treatment method
CN112921842A (en) * 2021-01-27 2021-06-08 天津市管道工程集团有限公司 Water-stopping and leaking-stopping construction method for concrete culvert pipe
CN113339008A (en) * 2021-06-17 2021-09-03 中铁建大桥工程局集团第六工程有限公司 Method for installing subway deformation joint water-stopping steel plate with rear side plugging on back surface
CN113719147A (en) * 2021-07-29 2021-11-30 孙淮伟 City piping lane seepage expansion joint repair system
CN113944193A (en) * 2021-11-19 2022-01-18 王福州 Expansion joint redundancy sealing device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202248308U (en) * 2011-09-22 2012-05-30 常州市鼎达建筑新技术有限公司 Anti-seepage device for deformation joint of concrete structure
CN103015538A (en) * 2011-09-22 2013-04-03 江苏鼎达建筑新技术有限公司 Leakage prevention device and leakage treatment method for concrete structure deformation joint
JP2013060781A (en) * 2011-09-15 2013-04-04 Masato Sugano Wall surface waterproof method and bulkhead
CN205242454U (en) * 2015-11-19 2016-05-18 东南大学 Underground concrete structure expansion joint administration structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013060781A (en) * 2011-09-15 2013-04-04 Masato Sugano Wall surface waterproof method and bulkhead
CN202248308U (en) * 2011-09-22 2012-05-30 常州市鼎达建筑新技术有限公司 Anti-seepage device for deformation joint of concrete structure
CN103015538A (en) * 2011-09-22 2013-04-03 江苏鼎达建筑新技术有限公司 Leakage prevention device and leakage treatment method for concrete structure deformation joint
CN205242454U (en) * 2015-11-19 2016-05-18 东南大学 Underground concrete structure expansion joint administration structure

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088364A (en) * 2016-07-25 2016-11-09 浙江万达建设集团有限公司 A kind of Novel underground room antiseep attachment structure and construction method thereof
CN106088364B (en) * 2016-07-25 2019-01-25 浙江万达建设集团有限公司 A kind of basement antiseep connection structure and its construction method
CN107938720A (en) * 2017-11-22 2018-04-20 中建三局第二建设工程有限责任公司 A kind of basement bottom board water seepage treatment device and construction method
CN109487756A (en) * 2018-01-20 2019-03-19 深圳市深水水务咨询有限公司 The repairing structure and its construction method at the expansion joint of pressurized water transmission box culvert
CN109235504A (en) * 2018-09-04 2019-01-18 中国十九冶集团有限公司 Deformation joint waterproof structure and deformation joint repairing method
CN111156025A (en) * 2020-01-14 2020-05-15 福建陆海工程勘察设计有限公司 Highway tunnel lining overrun crack repairing combined treatment method
CN111156025B (en) * 2020-01-14 2021-03-30 福建陆海工程勘察设计有限公司 Highway tunnel lining overrun crack repairing combined treatment method
CN112921842A (en) * 2021-01-27 2021-06-08 天津市管道工程集团有限公司 Water-stopping and leaking-stopping construction method for concrete culvert pipe
CN113339008A (en) * 2021-06-17 2021-09-03 中铁建大桥工程局集团第六工程有限公司 Method for installing subway deformation joint water-stopping steel plate with rear side plugging on back surface
CN113719147A (en) * 2021-07-29 2021-11-30 孙淮伟 City piping lane seepage expansion joint repair system
CN113944193A (en) * 2021-11-19 2022-01-18 王福州 Expansion joint redundancy sealing device

Similar Documents

Publication Publication Date Title
CN105297782A (en) Underground concrete structure expansion joint treatment structure and construction method thereof
CN110878700B (en) Tunnel waterproof structure and construction method thereof
CN108411939A (en) The spliced prefabricated pipe gallery of one kind and its construction method
CN205557856U (en) Leakage structure is prevented at building expansion joint
CN107859064B (en) Waterproof structure for connection of prefabricated pipe gallery and cast-in-situ pipe gallery and construction method
CN201713830U (en) Plugging device for underground-structure deformation joint
CN103015538A (en) Leakage prevention device and leakage treatment method for concrete structure deformation joint
CN108442412A (en) Deformation joint seepage waterproof construction method
CN211547827U (en) Waterproof structure at joint of concrete bottom plates of new and old buildings
CN106930330A (en) A kind of blocking method for shaking disturbance crack in underground engineering
CN105220713A (en) The waterproof construction of outer wall of basement settlement joint
CN101418641A (en) Obligate pore construction method for construction floor
CN207904991U (en) A kind of underground engineering repairing concrete crack construction
CN105780940B (en) building expansion joint anti-leakage structure
CN203654328U (en) Assembly type water stop structure
CN110541431A (en) waterproof structure of pipe gallery and construction method thereof
CN202689047U (en) Waterproof structure applied to construction joint in fabricated tube section of immersed tube
CN205242454U (en) Underground concrete structure expansion joint administration structure
CN103205986A (en) Concrete raft foundation construction-joint grouting device and construction method
CN113789816A (en) Basement high-water-level precast pile head waterproof structure and construction method thereof
CN109667607A (en) A kind of tunnel partitioning waterproofing construction technology
CN208870199U (en) A kind of side wall waterproof structure for deformation seams
CN103806412A (en) Water leakage repair structure for water pool expansion joint
CN217579825U (en) Prefabricated pin-connected panel rainwater box culvert suitable for integrative machine of strutting
CN202148539U (en) Composite waterproof structure using underground engineering waterproof leaking stoppage treatment and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160203