CN113241788B - 风电***异步采样实时削峰填谷控制方法、装置及存储介质 - Google Patents

风电***异步采样实时削峰填谷控制方法、装置及存储介质 Download PDF

Info

Publication number
CN113241788B
CN113241788B CN202110626854.0A CN202110626854A CN113241788B CN 113241788 B CN113241788 B CN 113241788B CN 202110626854 A CN202110626854 A CN 202110626854A CN 113241788 B CN113241788 B CN 113241788B
Authority
CN
China
Prior art keywords
power
energy storage
storage system
wind
offset
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110626854.0A
Other languages
English (en)
Other versions
CN113241788A (zh
Inventor
徐若晨
曹传钊
刘明义
刘大为
曹曦
朱勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Clean Energy Research Institute
Huaneng Longdong Energy Co Ltd
Original Assignee
Huaneng Clean Energy Research Institute
Huaneng Longdong Energy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaneng Clean Energy Research Institute, Huaneng Longdong Energy Co Ltd filed Critical Huaneng Clean Energy Research Institute
Priority to CN202110626854.0A priority Critical patent/CN113241788B/zh
Publication of CN113241788A publication Critical patent/CN113241788A/zh
Application granted granted Critical
Publication of CN113241788B publication Critical patent/CN113241788B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/004Generation forecast, e.g. methods or systems for forecasting future energy generation
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/466Scheduling the operation of the generators, e.g. connecting or disconnecting generators to meet a given demand
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/28The renewable source being wind energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

本发明公开了一种风电***异步采样实时削峰填谷控制方法、装置及存储介质,属于风力发电技术领域。利用风储联合发电***中的储能***实施以下控制策略,首先设定储能***的运行时间间隔并启动储能***,然后获取当前时刻储能***向电网的输送功率和风电***的原始输出功率,计算当前时刻电力变换装置的功率,最后计算得到下一时刻储能***的指令功率,循环上述步骤,直至储能***停止运行。本发明不依赖于负载和风电出力预测,又不需要未来数据,降低基于功率预测的一类算法带来的计算压力、提高控制的实时性,具有良好的应用前景。

Description

风电***异步采样实时削峰填谷控制方法、装置及存储介质
技术领域
本发明属于风力发电技术领域,具体涉及一种风电***异步采样实时削峰填谷控制方法、装置及存储介质。
背景技术
风力发电作为可再生能源的主力,在风资源丰富的国家地区得到了大规模的应用。而其时间分布不均匀和出力不稳定的特点也给风电的并网利用带来了极大的困扰。为减少风力并网发电***发电功率的波动对电网造成的影响,提高风电渗透率,结合储能***进行风力发电出力的实时调度是非常必要的。
削峰填谷,是风储联合发电***的重要功能之一,大容量的电池储能***可以在较长的时间跨度内,改变风电出力特性。目前常用的调度控制策略,存在两类问题:在线运行的调度策略,极大的依赖对风电出力和负载功率的预测,然后基于预测值来设定储能***的充放电动作,预测准确度越高,则调度效果越好,这就将调度的难度转移到了预测过程,并未真正解决调度的准确性问题;最优调度策略,需要掌握全部时间段内的风电出力数据,然后基于成本函数来求解最优的充放电策略,这显然难以用于实时控制。
发明内容
为了解决上述问题,本发明的目的在于提供一种风电***异步采样实时削峰填谷控制方法、装置及存储介质,不依赖于负载和风电出力预测,又不需要未来数据,降低基于功率预测的一类算法带来的计算压力、提高控制的实时性。
本发明是通过以下技术方案来实现:
一种风电***异步采样实时削峰填谷控制方法,利用风储联合发电***中的储能***实施以下控制策略,包括:
S1:设定储能***的运行时间间隔并启动储能***;
S2:获取当前时刻风储联合发电***向电网的输送功率和风电***的原始输出功率;
S3:计算当前时刻储能***电力变换装置的功率;
S4:计算下一时刻储能***的指令功率;
S5:循环S2~S4,直至储能***停止运行。
优选地,S1中,运行时间间隔包括短间隔t和长间隔T,T=nt,n为大于等于1的整数或有理数。
进一步优选地,S3中,当前时刻k电力变换装置的功率Pconv(k)=Pgrid(k)-Pwind(k),其中,Pgrid(k)为当前时刻风储联合发电***向电网的输送功率,Pwind(k)为风电***的原始输出功率,Pconv(k)>0表示放电,Pconv(k)<0表示充电。
进一步优选地,S4中,下一时刻k+1储能***的指令功率为:
Figure GDA0003857675540000021
其中,Pwind(T)为当前时刻的长间隔T中,风电***的输出平均功率;Plim(T)为在当前的长间隔T中的功率限制值,超过此功率限制值的多余功率充入储能***;Poffset是功率补偿量;Tpass是在当前时刻的长间隔T中,已经度过的时间长度(0<Tpass<T)。
进一步优选地,Plim(T)根据电网的要求选取固定值或变化值。
进一步优选地,功率补偿量Poffset采用二分查找算法确定,具体为:
1)确定功率补偿量Poffset的上下限,并确定该算法的运行总次数;
2)设定储能***的放电功率Pdis,并假设储能***容量Enorm无限大;
3)采用二分查找法确定功率补偿量Poffset的试探值Ptest
4)设定储能***的充电功率Pcha
5)令功率补偿量Poffset=Ptest,执行S1~S5的步骤;如果满足控制策略要求,则Poffset=Pmax=Ptest;如果不满足控制策略要求,则Pmin=Ptest;Pmax为功率补偿量Poffset的上限值。
进一步优选地,步骤1)中,运行总次数为idx,其中Pmin=0,Pmax=Ppeak-Plim
Figure GDA0003857675540000031
ceil为向上取整,ΔPoffset为功率补偿量Poffset的变化步长,Ppeak为风电***的功率极值;步骤2)中,放电功率Pdis=Ppeak-Plim+Poffset;步骤3)中,功率补偿量Poffset的试探值
Figure GDA0003857675540000032
步骤4)中,充电功率
Figure GDA0003857675540000033
Cdis和Ccha分别为储能***的放电和充电倍率;步骤5)中,满足控制策略要求时,Pgrid≤Plim,此时Pmax=Poffset=Ptest;不满足控制策略要求时,Pgrid>Plim,此时Pmin=Ptest
进一步优选地,循环进行步骤2)~5),直至循环次数大于运行总次数idx,计算储能***的容量Enorm
Figure GDA0003857675540000034
其中,max{Ebat}和min{Ebat}是储能***在整个运行时间内的最大和最小值,SoCmax和SoCmin是储能***荷电状态在整个运行时间内的上限和下限。
本发明还公开了一种计算机设备,包括存储器、处理器以及存储在存储器中并可在处理器上运行的计算机程序,处理器执行计算机程序时实现上述风电***异步采样实时削峰填谷控制方法的步骤。
本发明还公开了一种计算机可读存储介质,计算机可读存储介质存储有计算机程序,计算机程序被处理器执行时实现上述风电***异步采样实时削峰填谷控制方法的步骤。
与现有技术相比,本发明具有以下有益的技术效果:
本发明公开的风电***异步采样实时削峰填谷控制方法,对风储联合发电***中的储能***实施以下控制策略,首先设定储能***的运行时间间隔(预测间隔)并启动储能***,然后获取当前时刻储能***向电网的输送功率和风电***的原始输出功率,计算当前时刻电力变换装置的功率,之后通过实时计算补偿功率以及基于补偿功率来修正储能***的出力功率,最后计算得到下一时刻储能***的指令功率,在储能***的整个运行控制过程中,循环进行上述步骤,计算其指令功率。本发明通过把每一个较长的预测间隔进一步划分为多个短的时间间隔,并在短间隔内使用实时的补偿功率查找算法进行补偿功率的计算并在当前长间隔内进行调整,使整个计算过程能够在设定的时间间隔内完成,保证了计算的实时性,亦实现了不依赖负载和风电出力预测以即不需要未来预测数据的特点,并且能降低基于功率预测的一类算法带来的计算压力,实现实时计算,有助于提高整个储能***控制的实时性,具有广泛的应用前景和较高的实用价值。
进一步地,采用二分查找算法确定功率补偿量,降低了算法复杂度,提高了计算效率。
更进一步地,二分查找算法还可以确定储能***的容量,能够在***设计阶段根据已有运行数据来确定合理的储能容量,且二分查找算法复杂度低,计算负荷更小,因此查找效率更高。
附图说明
图1为本发明确定功率补偿量和储能***容量两个参数的算法流程图。
具体实施方式
下面以附图和具体实施例对本发明做进一步的详细说明,所述是对本发明的解释而不是限定。
本发明的风电***异步采样实时削峰填谷控制方法,利用风储联合发电***中的储能***实施以下控制策略,包括:
S1:设定储能***的运行时间间隔并启动储能***;运行时间间隔包括短间隔t和长间隔T,T=nt,n为大于等于1的整数或有理数。
S2:获取当前时刻风储联合发电***向电网的输送功率和风电***的原始输出功率;
S3:计算当前时刻储能***电力变换装置的功率;当前时刻k电力变换装置的功率Pconv(k)=Pgrid(k)-Pwind(k),其中,Pgrid(k)为当前时刻风储联合发电***向电网的输送功率,Pwind(k)为风电***的原始输出功率,Pconv(k)>0表示放电,Pconv(k)<0表示充电。
S4:计算下一时刻储能***的指令功率;
下一时刻k+1储能***的指令功率为:
Figure GDA0003857675540000051
其中,Pwind(T)为当前时刻的长间隔T中,风电***的输出平均功率;Plim(T)为在当前的长间隔T中的功率限制值,超过此功率限制值的多余功率充入储能***;Poffset是功率补偿量;Tpass是在当前时刻的长间隔T中,已经度过的时间长度(0<Tpass<T)。Plim(T)根据电网的要求选取固定值或变化值。
功率补偿量Poffset采用二分查找算法确定,具体为:
1)确定功率补偿量Poffset的上下限,并确定该算法的运行总次数;
2)设定储能***的放电功率Pdis,并假设储能***容量Enorm无限大;
3)采用二分查找法确定功率补偿量Poffset的试探值Ptest
4)设定储能***的充电功率Pcha
5)令功率补偿量Poffset=Ptest,执行S1~S5的步骤;如果满足控制策略要求,则Poffset=Pmax=Ptest;如果不满足控制策略要求,则Pmin=Ptest;Pmax为功率补偿量Poffset的上限值。
步骤1)中,运行总次数为idx,其中Pmin=0,Pmax=Ppeak-Plim
Figure GDA0003857675540000061
ceil为向上取整,ΔPoffset为功率补偿量Poffset的变化步长,Ppeak为风电***的功率极值;步骤2)中,放电功率Pdis=Ppeak-Plim+Poffset;步骤3)中,功率补偿量Poffset的试探值
Figure GDA0003857675540000062
步骤4)中,充电功率
Figure GDA0003857675540000063
Cdis和Ccha分别为储能***的放电和充电倍率;步骤5)中,满足控制策略要求时,Pgrid≤Plim,此时Pmax=Poffset=Ptest;不满足控制策略要求时,Pgrid>Plim,此时Pmin=Ptest
循环进行步骤2)~5),直至循环次数大于运行总次数idx,计算储能***的容量Enorm
Figure GDA0003857675540000064
其中,max{Ebat}和min{Ebat}是储能***在整个运行时间内的最大和最小值,SoCmax和SoCmin是储能***荷电状态在整个运行时间内的上限和下限。
S5:循环S2~S4,直至储能***停止运行。
下面以一个具体实施例来对本发明进行进一步的解释说明:
设定初始参数,短间隔t=1min,长间隔T=15min,获取在程序运行之前的一个长间隔内,风电功率的极值Ppeak,同时指定削峰填谷策略所要求的功率极限值Plim,设定功率补偿量的上下限初值:Pmin=0,Pmax=Ppeak-Plim
确定功率补偿算法中循环的运行总次数
Figure GDA0003857675540000065
ceil是向上取整,ΔPoffset是功率补偿值Poffset的变化步长,可以根据精度需求按Poffset的百分比来自行设定,同时设定循环技术变量i=0;
确定功率补偿值的试探值
Figure GDA0003857675540000066
确定储能***放电功率Pdis=Ppeak-Plim+Ptest
确定储能***充电功率
Figure GDA0003857675540000067
其中Cdis和Ccha分别为放电和充电倍率,根据储能***类型和运行条件自行设置;
开始运行实时削峰填谷控制策略,以下具体描述:
当前时刻为k时刻,k时刻向电网输送功率为Pgrid(k),风力发电输出功率为:Pwind(k);
当前时刻电力变换装置功率为Pconv(k)=Pgrid(k)-Pwind(j),其中,Pconv(k)>0表示放电,Pconv(j)<0表示充电;
计算k+1时刻的储能***指令功率:
Figure GDA0003857675540000071
其中,Pwind(T)为当前的大间隔T中,风电平均功率,Plim(T)则是在当前的大间隔T中,功率限值,超过此功率,则多余功率充入储能***,Poffset是功率补偿量;Tpass是在当前的大时间间隔中,已经度过的时间长度(0<Tpass<T)。
若在k+1时刻,满足Pgrid(k+1)≤Plim(T),此时Pmax=Poffset=Ptest,如果不满足,即Pgrid(k+1)>Plim(T),此时Pmin=Ptest。i=i+1,继续进行上述步骤1~步骤6的循环,直至i≥idx;
计算储能***容量为Enorm
Figure GDA0003857675540000072
max{Ebat}和min{Ebat}是储能***在整个运行时间内的最大和最小值,SoCmax和SoCmin是储能***荷电状态在整个运行时间内的上限和下限。
本发明还提供一种计算机设备,包括存储器、处理器以及存储在所述存储器中并可在所述处理器上运行的计算机程序,所述处理器执行所述计算机程序时实现本发明所述风电***异步采样实时削峰填谷控制方法的步骤。
本发明风电***异步采样实时削峰填谷控制方法可采用完全硬件实施例、完全软件实施例或结合软件和硬件方面的实施例的形式。而且,本发明可采用在一个或多个其中包含有计算机可用程序代码的计算机可用存储介质(包括但不限于磁盘存储器、CD-ROM、光学存储器等)上实施的计算机程序产品的形式。本发明风电***异步采样实时削峰填谷控制方法如果以软件功能单元的形式实现并作为独立的产品销售或使用时,可以存储在一个计算机可读取存储介质中。
基于这样的理解,在示例性实施例中,还提供了一种计算机可读存储介质,本发明实现上述实施例方法中的全部或部分流程,也可以通过计算机程序来指令相关的硬件来完成,所述的计算机程序可存储于该计算机可读存储介质中,该计算机程序在被处理器执行时,可实现上述各个方法实施例的步骤。其中,所述计算机程序包括计算机程序代码,所述计算机程序代码可以为源代码形式、对象代码形式、可执行文件或某些中间形式等。计算机可读存储介质包括永久性和非永久性、可移动和非可移动媒体可以由任何方法或技术来实现信息存储。信息可以是计算机可读指令、数据结构、程序的模块或其他数据。需要说明的是,所述计算机可读介质包含的内容可以根据司法管辖区内立法和专利实践的要求进行适当的增减,例如在某些司法管辖区,根据立法和专利实践,计算机可读介质不包括电载波信号和电信信号。其中,所述计算机存储介质可以是计算机能够存取的任何可用介质或数据存储设备,包括但不限于磁性存储器(例如软盘、硬盘、磁带、磁光盘(MO)等)、光学存储器(例如CD、DVD、BD、HVD等)、以及半导体存储器(例如ROM、EPROM、EEPROM、非易失性存储器(NANDFLASH)、固态硬盘(SSD))等。
在示例性实施例中,还提供计算机设备,包括存储器、处理器以及存储在所述存储器中并可在所述处理器上运行的计算机程序,所述处理器执行所述计算机程序时实现所述风电***异步采样实时削峰填谷控制方法的步骤。处理器可能是中央处理单元(CentralProcessingUnit,CPU),还可以是其他通用处理器、数字信号处理器(DigitalSignalProcessor、DSP)、专用集成电路(ApplicationSpecificIntegratedCircuit,ASIC)、现成可编程门阵列(Field-ProgrammableGateArray,FPGA)或者其他可编程逻辑器件、分立门或者晶体管逻辑器件、分立硬件组件等。
需要说明的是,以上所述仅为本发明实施方式的一部分,根据本发明所描述的***所做的等效变化,均包括在本发明的保护范围内。本发明所属技术领域的技术人员可以对所描述的具体实例做类似的方式替代,只要不偏离本发明的结构或者超越本权利要求书所定义的范围,均属于本发明的保护范围。

Claims (7)

1.一种风电***异步采样实时削峰填谷控制方法,其特征在于,利用风储联合发电***中的储能***实施以下控制策略,包括:
S1:设定储能***的运行时间间隔并启动储能***;运行时间间隔包括短间隔t和长间隔T,T=nt,n为大于等于1的整数或有理数;
S2:获取当前时刻风储联合发电***向电网的输送功率和风电***的原始输出功率;
S3:计算当前时刻储能***电力变换装置的功率;当前时刻k电力变换装置的功率Pconv(k)=Pgrid(k)-Pwind(k),其中,Pgrid(k)为当前时刻风储联合发电***向电网的输送功率,Pwind(k)为风电***的原始输出功率,Pconv(k)>0表示放电,Pconv(k)<0表示充电;
S4:计算下一时刻储能***的指令功率;下一时刻k+1储能***的指令功率为:
Figure FDA0003857675530000011
其中,Pwind(T)为当前时刻的长间隔T中,风电***的输出平均功率;Plim(T)为在当前的长间隔T中的功率限制值,超过此功率限制值的多余功率充入储能***;Poffset是功率补偿量;Tpass是在当前时刻的长间隔T中,已经度过的时间长度,0<Tpass<T;S5:循环S2~S4,直至储能***停止运行。
2.如权利要求1所述的风电***异步采样实时削峰填谷控制方法,其特征在于,Plim(T)根据电网的要求选取固定值或变化值。
3.如权利要求1所述的风电***异步采样实时削峰填谷控制方法,其特征在于,功率补偿量Poffset采用二分查找算法确定,具体为:
1)确定功率补偿量Poffset的上下限,并确定该算法的运行总次数;
2)设定储能***的放电功率Pdis,并假设储能***容量Enorm无限大;
3)采用二分查找法确定功率补偿量Poffset的试探值Ptest
4)设定储能***的充电功率Pcha
5)令功率补偿量Poffset=Ptest,执行S1~S5的步骤;满足控制策略要求时,Pgrid≤Plim,此时Pmax=Poffset=Ptest;不满足控制策略要求时,Pgrid>Plim,此时Pmin=Ptest;Pmax为功率补偿量Poffset的上限值。
4.如权利要求3所述的风电***异步采样实时削峰填谷控制方法,其特征在于,步骤1)中,运行总次数为idx,其中Pmin=0,Pmax=Ppeak-Plim
Figure FDA0003857675530000021
ceil为向上取整,ΔPoffset为功率补偿量Poffset的变化步长,Ppeak为风电***的功率极值;步骤2)中,放电功率Pdis=Ppeak-Plim+Poffset;步骤3)中,功率补偿量Poffset的试探值
Figure FDA0003857675530000022
步骤4)中,充电功率
Figure FDA0003857675530000023
Cdis和Ccha分别为储能***的放电和充电倍率。
5.如权利要求4所述的风电***异步采样实时削峰填谷控制方法,其特征在于,循环进行步骤2)~5),直至循环次数大于运行总次数idx,计算储能***的容量Enorm
Figure FDA0003857675530000024
其中,max{Ebat}和min{Ebat}是储能***在整个运行时间内的最大和最小值,SoCmax和SoCmin是储能***荷电状态在整个运行时间内的上限和下限。
6.一种计算机设备,其特征在于,包括存储器、处理器以及存储在所述存储器中并可在所述处理器上运行的计算机程序,所述处理器执行所述计算机程序时实现如权利要求1至5任一项所述的风电***异步采样实时削峰填谷控制方法的步骤。
7.一种计算机可读存储介质,所述计算机可读存储介质存储有计算机程序,其特征在于,所述计算机程序被处理器执行时实现如权利要求1至5任一项所述的风电***异步采样实时削峰填谷控制方法的步骤。
CN202110626854.0A 2021-06-04 2021-06-04 风电***异步采样实时削峰填谷控制方法、装置及存储介质 Active CN113241788B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110626854.0A CN113241788B (zh) 2021-06-04 2021-06-04 风电***异步采样实时削峰填谷控制方法、装置及存储介质

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110626854.0A CN113241788B (zh) 2021-06-04 2021-06-04 风电***异步采样实时削峰填谷控制方法、装置及存储介质

Publications (2)

Publication Number Publication Date
CN113241788A CN113241788A (zh) 2021-08-10
CN113241788B true CN113241788B (zh) 2022-11-15

Family

ID=77136860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110626854.0A Active CN113241788B (zh) 2021-06-04 2021-06-04 风电***异步采样实时削峰填谷控制方法、装置及存储介质

Country Status (1)

Country Link
CN (1) CN113241788B (zh)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104167750A (zh) * 2014-08-18 2014-11-26 国家电网公司 一种配网削峰填谷的分布式储能功率分配及协调控制方法
CN109245135A (zh) * 2018-08-15 2019-01-18 国网河南节能服务有限公司 电池储能参与电网削峰填谷调度的方法及装置
CN111934365A (zh) * 2020-08-07 2020-11-13 中国华能集团清洁能源技术研究院有限公司 一种能源基地储能***及其工作方法

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8373309B2 (en) * 2009-08-19 2013-02-12 Schweitzer Engineering Laboratories Inc Systems and methods for asynchronous sampling data conversion
US8965594B2 (en) * 2012-01-19 2015-02-24 General Compression, Inc. System and method for conserving energy resources through storage and delivery of renewable energy
CN102570505B (zh) * 2012-02-01 2014-08-06 中国电力科学研究院 用于风电“部分削峰填谷”的电池储能***控制方法
EP2973932A4 (en) * 2013-03-15 2016-11-16 Bosch Gmbh Robert SYSTEM AND METHOD FOR DISTRIBUTION OF ENERGY
US10211638B2 (en) * 2013-09-30 2019-02-19 Board Of Regents, The University Of Texas System Power quality of service optimization for microgrids
CN105846461B (zh) * 2016-04-28 2022-01-28 中国电力科学研究院 一种大规模储能电站自适应动态规划的控制方法和***
CN111628503B (zh) * 2020-06-20 2021-11-30 东北电力大学 考虑广义储能与火电联合调峰的优化调度方法
CN111756059A (zh) * 2020-07-30 2020-10-09 中国华能集团清洁能源技术研究院有限公司 一种实时平抑风电波动的电-氢-电转换***和方法
CN112003311A (zh) * 2020-08-20 2020-11-27 内蒙古工业大学 一种风电***功率波动平抑方法、装置以及风电***
CN112736901B (zh) * 2020-12-23 2022-11-01 国网湖南省电力有限公司 配网中多源异步采样混合数据的同步方法及***

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104167750A (zh) * 2014-08-18 2014-11-26 国家电网公司 一种配网削峰填谷的分布式储能功率分配及协调控制方法
CN109245135A (zh) * 2018-08-15 2019-01-18 国网河南节能服务有限公司 电池储能参与电网削峰填谷调度的方法及装置
CN111934365A (zh) * 2020-08-07 2020-11-13 中国华能集团清洁能源技术研究院有限公司 一种能源基地储能***及其工作方法

Also Published As

Publication number Publication date
CN113241788A (zh) 2021-08-10

Similar Documents

Publication Publication Date Title
CN102377248B (zh) 平滑可再生能源发电输出波动的储能***容量优化方法
CN111799844B (zh) 一种虚拟同步发电机控制方法、装置及终端设备
Meng et al. Energy storage auxiliary frequency modulation control strategy considering ACE and SOC of energy storage
CN112952862B (zh) 平抑风电功率波动的混合储能分频协调控制器及实现方法
CN112165109B (zh) 多类型储能***即插即用并网运行协调控制方法及***
CN117691630A (zh) 一种基于vmd-ceemd的新型电力***调频方法和***
CN109787221B (zh) 一种微电网电能安全经济调度方法和***
CN112687969A (zh) 基于储能***的同期退役协同控制方法、***及介质
CN107994593A (zh) 复合储能***容量配置方法及终端设备
CN112542845A (zh) 一种计及频率支撑能力的储能电站参与调峰控制方法
CN116454914A (zh) 一种多类型资源复合调频模型的构建方法及装置
CN108053112A (zh) 一种储能***规划的方法及***
CN111106628A (zh) 基于发电机和储能***的调频控制方法、装置及终端设备
CN113241788B (zh) 风电***异步采样实时削峰填谷控制方法、装置及存储介质
CN111525597B (zh) 一种风储联合***中双电池不平衡状态优化方法
CN112736944A (zh) 一种电化学储能电站有功功率调度方法和***
CN115065075B (zh) 风储集群中储能站优化调度方法、***及存储介质
CN113904352A (zh) 混合储能***功率分配优化方法及终端
CN114447963A (zh) 储能电池功率控制方法及***
CN112838605A (zh) 一种基于多智能体粒子群优化的储能电站协调控制与能量管理与运行方法
CN112769150B (zh) 一种调频用混合储能装置的功率分配方法、***和介质
CN112418566B (zh) 一种混合储能***集群响应调频市场方法
CN118153736A (zh) 一种多能源电网联络线控制性能提升指数预测方法
CN117639012A (zh) 用于风电场的混合储能***容量配置方法、介质及***
CN118040727A (zh) 一种适于风储***的功率调整方法及装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant