CN113235874A - Mortar pasting system for building external wall insulation board - Google Patents

Mortar pasting system for building external wall insulation board Download PDF

Info

Publication number
CN113235874A
CN113235874A CN202110369972.8A CN202110369972A CN113235874A CN 113235874 A CN113235874 A CN 113235874A CN 202110369972 A CN202110369972 A CN 202110369972A CN 113235874 A CN113235874 A CN 113235874A
Authority
CN
China
Prior art keywords
plate
fixedly connected
mortar
insulation board
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110369972.8A
Other languages
Chinese (zh)
Other versions
CN113235874B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Sangu Building Materials Technology Co ltd
Original Assignee
Xiao Tingxian
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiao Tingxian filed Critical Xiao Tingxian
Priority to CN202110369972.8A priority Critical patent/CN113235874B/en
Publication of CN113235874A publication Critical patent/CN113235874A/en
Application granted granted Critical
Publication of CN113235874B publication Critical patent/CN113235874B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/06Implements for applying plaster, insulating material, or the like
    • E04F21/08Mechanical implements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/20Tools or apparatus for applying mortar

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a mortar pasting system for a building external wall insulation board, which comprises a bottom plate, wherein a clamping device for clamping the insulation board is arranged on the upper side of the bottom plate, an upright post is fixedly connected to one side above the bottom plate, a hydraulic cylinder is fixedly connected to one side of the upright post, and a telescopic end of the hydraulic cylinder is fixedly connected with a mortar smearing device. The invention has the advantages that: the thickness of the strip-shaped cement mortar on the surface of the heat insulation plate is uniform, the distance between the strip-shaped cement mortar and the heat insulation plate is the same, the smearing area meets the construction standard, the heat insulation plate is attached to a wall body and is not prone to hollowing, cracking and falling, and the mortar smearing speed is high.

Description

Mortar pasting system for building external wall insulation board
Technical Field
The invention relates to the technical field of building construction, in particular to a mortar pasting system for a building external wall insulation board.
Background
The outer wall heat insulation board is a foam type heat insulation material, a composite silicate heat insulation material, a calcium silicate product heat insulation material and a fiber heat insulation material which are commonly used in the market at present. The construction method of the heat insulation board is basically the same, and after the heat insulation board is anchored by the special anchor bolt, mortar is paved on the back of the heat insulation board for fixation. At present, the specification of a single insulation board is generally 1200 multiplied by 600mm, and according to the specification requirements, a point frame method or a strip adhesion method is mostly adopted for adhering the insulation board. When the external wall insulation board is used, the pasting area of the external wall insulation board is not less than 50% of the area of the pasted board when the external wall insulation board is applied to the external wall and sloping roof insulation engineering, and the pasting area of the external wall insulation board is not less than 60% of the area of the pasted board when the external wall insulation board is applied to the external insulation engineering of the overhead floor.
At present, when the external wall insulation board is adhered, workers paint and adhere mortar on a construction site according to experience. Adopt this mode to paste the mortar, its efficiency of pasting is very low, influence time limit for a project that can be very big, and simultaneously, the workman paints still can have the area of paining not enough, causes the phenomenon emergence that heated board hollowing, fracture, droing.
Disclosure of Invention
The invention aims to solve the defects in the prior art, and provides a mortar pasting system for an external wall insulation board of a building.
In order to achieve the purpose, the invention adopts the following technical scheme:
a mortar pasting system for a building external wall insulation board comprises a bottom plate, wherein a clamping device for clamping the insulation board is arranged on the upper side of the bottom plate, an upright post is fixedly connected to one side above the bottom plate, a hydraulic cylinder is fixedly connected to one side of the upright post, and a telescopic end of the hydraulic cylinder is fixedly connected with a mortar smearing device;
the mortar daubs the device and includes the base plate, base plate one side is equipped with the jib, jib lower extreme fixed connection obliterator, the obliterator is including daubing the board, it scribbles board one side bottom fixed connection mortar case, mortar bottom of the case portion is equipped with the discharge gate, mortar roof portion is equipped with the feed inlet, it is equipped with the cavity to paint the board center, be equipped with a plurality of first through-holes that run through the board of daubing in cavity inboard bottom, the inboard top of cavity is equipped with a plurality of second through-holes that run through the board of daubing, sliding connection foundation pillar in the second through-hole, the foundation pillar lower extreme fixed connection level the foundation rod that sets up, foundation rod downside fixed connection brush-holder stud, the brush-holder stud passes and can slide from top to bottom in first through-hole from first through-hole, be equipped with the controlling foundation pillar and follow gliding elevating gear from top to bottom in second through-hole on the foundation pillar.
Preferably, clamping device includes two parallel arrangement's riser, two risers are all fixed at the bottom plate upside, rotate between the riser and connect the pivot, be equipped with levogyration screw thread section and dextrorotation screw thread section in the pivot, the bottom plate upside is equipped with the guide way, equal sliding connection slider in every guide way, be equipped with levogyration screw hole on one of them slider, be equipped with dextrorotation screw hole on another slider, the epaxial levogyration screw thread section is at levogyration screw hole internal thread connection, the epaxial dextrorotation screw thread section is at dextrorotation screw hole internal thread connection, at the equal fixed connection splint of every slider one side, be equipped with the rotation motor on one of them riser one side, the main shaft and the coaxial fixed connection of pivot that rotate the motor.
Preferably, the upper side of the bottom plate is provided with two blanking openings.
Preferably, camber adjusting device is equipped with to the bottom plate upside, camber adjusting device includes two supports, all rotate on every support and connect the fixed block, every fixed block one side all is equipped with the mounting groove, be equipped with the elastic plate between two fixed blocks, peg graft respectively in the mounting groove at the elastic plate both ends, the fixed block top is equipped with the locking screw hole that is linked together with the mounting groove, at locking screw hole female connection locking screw, locking screw is used for fixing the elastic plate locking in the mounting groove, fixed connection crossbeam between two supports, crossbeam center department fixed connection mounting bracket, the electric telescopic handle of vertical setting is equipped with on the mounting bracket, electric telescopic handle's flexible end and the middle part fixed connection of elastic plate.
Preferably, the support comprises a top beam which is supported and fixed through a group of support shafts.
Preferably, the installation groove is fixedly connected with a guide wheel, and the elastic plate slides in the installation groove in a reciprocating manner through the guide wheel.
Preferably, a mounting plate is fixedly connected to one side of the substrate, a vertically-arranged sliding hole is formed in the mounting plate, the hanging rod is arranged in the sliding hole and can slide up and down along the sliding hole, the top of the hanging rod is fixedly connected with a first top plate, a first rotating wheel is arranged at the top of the first top plate, a first spring is sleeved on the outer side of the hanging rod, and the first spring is fixed between the mounting plate and the first top plate.
Preferably, elevating gear includes the second roof, the second roof is fixed at the pillar top, second roof top dress second rotates the wheel, the second spring is cup jointed in the pillar outside, the second spring is fixed at the second roof and is paintd between the board, pillar one side is equipped with the jack, the jack bottom is equipped with the groove of stepping down, it is equipped with the transition hole to paint board one side, the downthehole sliding connection inserted bar of transition, inserted bar one end fixed connection baffle, the third spring is cup jointed in the inserted bar outside, the third spring is fixed and is paintd between board and the baffle, the inserted bar can insert in the jack.
Preferably, the upper side of the bottom plate is fixedly connected with a first mounting column, one side of the top of the first mounting column is fixedly connected with a pressing plate, the lower surface of the pressing plate is an inclined surface, and the second rotating wheel is arranged opposite to the inclined surface.
Preferably, the bottom plate upside fixed connection second erection column, second erection column one side fixed connection ejector pin, ejector pin and inserted bar coaxial setting, the diameter of ejector pin is less than the width in groove of stepping down.
The invention has the advantages that: the thickness of the strip-shaped cement mortar on the surface of the heat insulation plate is uniform, the distance between the strip-shaped cement mortar and the heat insulation plate is the same, the smearing area meets the construction standard, the heat insulation plate is attached to a wall body and is not prone to hollowing, cracking and falling, and the mortar smearing speed is high.
Drawings
FIG. 1 is a schematic diagram of a basic structure of a mortar pasting system for an external wall insulation board of a building;
FIG. 2 is a front view of FIG. 1;
FIG. 3 is a schematic view of the mounting structure of the clamping device;
FIG. 4 is a schematic view of the basic structure of the curvature adjusting device;
FIG. 5 is a schematic diagram of the basic structure of the mortar applying device;
fig. 6 is a structural schematic view of the applicator in an operating state;
FIG. 7 is a method diagram of part A of FIG. 6;
fig. 8 is a schematic view of another operating state of the applicator.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Example 1
As shown in fig. 1-8, the mortar pasting system for the building external wall insulation board provided by the invention comprises a bottom plate 1, a plurality of support columns 11 are fixedly connected to the bottom of the bottom plate 1, a clamping device for clamping the insulation board is arranged on the upper side of the bottom plate 1, the clamping device comprises two vertical plates 73 arranged in parallel, the two vertical plates 73 are both fixed on the upper side of the bottom plate 1, a rotating shaft 74 is rotatably connected between the vertical plates 73, a left-handed thread section and a right-handed thread section are arranged on the rotating shaft 74, a guide groove is arranged on the upper side of the bottom plate 1, a sliding block 71 is slidably connected in each guide groove, a left-handed thread hole is arranged on one sliding block 71, a right-handed thread hole is arranged on the other sliding block 71, a left-handed thread section on the rotating shaft 74 is in threaded connection in the left-handed thread hole, a right-handed thread section on the rotating shaft 74 is in threaded connection in the right-handed thread hole, a clamping plate 72 is fixedly connected on one side of each sliding block 71, one side of one of the vertical plates 73 is provided with a rotating motor 75, and a main shaft of the rotating motor 75 is coaxially and fixedly connected with the rotating shaft 74. The heat insulation board 100 is placed above the bottom plate 1 and between the two clamping plates 72, and the rotating shaft 74 is driven by the rotating motor 75 to enable the two sliding blocks 71 to move towards each other, so that the heat insulation board is clamped between the two clamping plates 72. Two blanking openings 12 are formed in the upper side of the bottom plate 1, and when cement mortar is coated on the heat insulation plate 100, redundant cement mortar falls from the blanking openings 12.
A vertical column 13 is fixedly connected with one side above the bottom plate 1, a hydraulic cylinder 14 is fixedly connected with one side of the vertical column 13, a mortar smearing device 3 is fixedly connected with the telescopic end of the hydraulic cylinder 14, the mortar smearing device 3 comprises a base plate 31, a suspender 33 is arranged on one side of the base plate 31, an applicator 4 is fixedly connected with the lower end of the suspender 33, the applicator 4 comprises an applying plate 41, a mortar box 5 is fixedly connected with the bottom of one side of the applying plate 41, a discharge hole 51 is arranged at the bottom of the mortar box 5, a feed inlet is arranged at the top of the mortar box 5, a cavity 42 is arranged in the center of the applying plate 41, a plurality of first through holes 43 penetrating through the applying plate 41 are arranged at the bottom of the inner side of the cavity 42, a plurality of second through holes 44 penetrating through the applying plate 41 are arranged at the top of the inner side of the cavity 42, a base column 61 is slidably connected in the second through holes 44, a base rod 65 which is horizontally arranged is fixedly connected with the lower end of the base column 61, a brush rod 66 is fixedly connected with the lower side of the base rod 65, the brush rod 66 penetrates through the first through holes 43 and can slide up and down in the first through holes 43, the base post 61 is provided with a lifting device for controlling the base post 61 to slide up and down along the second through hole 44.
Elevating gear includes second roof 62, second roof 62 is fixed at pillar 61 top, second roof 62 top dress second rotates wheel 63, pillar 61 outside cup joints second spring 64, second spring 64 is fixed between second roof 62 and daub board 41, pillar 61 one side is equipped with jack 67, jack 67 bottom is equipped with the groove of stepping down 68, it is equipped with the transition hole to daub board 41 one side, the downthehole sliding connection inserted bar 69 of transition, inserted bar 69 one end fixed connection baffle 691, third spring 60 is cup jointed in the inserted bar 69 outside, third spring 60 is fixed and is scribbled between board 41 and the baffle 691, inserted bar 69 can insert in the jack 67. The upper side of the bottom plate 1 is fixedly connected with a first mounting column 83, one side of the top of the first mounting column 83 is fixedly connected with a pressing plate 84, the lower surface of the pressing plate 84 is an inclined surface, and the second rotating wheel 63 is arranged opposite to the inclined surface. The upper side of the bottom plate 1 is fixedly connected with a second mounting column 81, one side of the second mounting column 81 is fixedly connected with a push rod 82, the push rod 82 and the inserted rod 69 are coaxially arranged, and the diameter of the push rod 82 is smaller than the width of the abdicating groove 68.
When the mortar daubing device is used, the heat insulation plate is clamped above the bottom plate 1, cement mortar is guided into the mortar box 5 from the feeding hole, the lower surface of the brush rod 66 and the bottom surface of the daubing plate 41 are in the same horizontal plane in the initial state, the mortar daubing device 3 is driven to move through the hydraulic cylinder 14, and the cement mortar is evenly daubed on the surface of the heat insulation plate. After the coating is finished, the second rotating wheel 63 is in contact with the inclined surface of the lower surface of the pressing plate 84, so that the base column 61 is driven to move downwards, in the moving process of the base column 61, the lower surface of the brush rod 66 extends to the bottom surface of the coating plate 41, at the moment, the insertion hole 67 is overlapped with the insertion rod 69, under the action of the pulling force of the third spring 60, the insertion rod 69 is inserted into the insertion hole 67, then the hydraulic cylinder 14 drives the mortar coating device 3 to move in the reverse direction, and part of the cement mortar coated on the surface of the insulation plate is wiped. After the wiping is finished, the ejector rod 82 ejects the inserting rod 69 out of the inserting hole 67, and at the moment, the base column 61 moves upwards under the action of the elastic force of the second spring 64, so that the lower surface of the brush rod 66 and the bottom surface of the smearing plate 41 are in the same horizontal plane, and cement mortar can be conveniently coated on the subsequent heat-insulation plate. By adopting the mode to paint, the thickness of the strip-shaped cement mortar on the surface of the heat-insulation board 100 is uniform, the distance between the strip-shaped cement mortar and the heat-insulation board is the same, the painting area meets the construction standard, the heat-insulation board is not easy to bulge, crack and fall off when being pasted on a wall body, and the speed of painting the mortar is high.
Example 2
Because some walls are circular arc, and the heated board of this kind of wall is circular arc too, in order to can scribble cement mortar to circular arc heated board, be equipped with camber adjusting device 2 in bottom plate 1 upside, camber adjusting device 2 includes two supports, and the support includes back timber 22, and back timber 22 supports fixedly through two back shafts 21. Fixed connection fixed axle 15 between the support, base plate 31 one side is equipped with the fixed orifices, fixed axle 15 passes from the fixed orifices, base plate 31 can follow the slip of 15 site of fixed axle through the fixed orifices, all be equipped with hinge groove 23 on every back timber 22, all rotate in every hinge groove 23 and connect fixed block 24, every fixed block 24 one side all is equipped with the mounting groove, be equipped with elastic plate 25 between two fixed blocks 24, the elastic plate 25 both ends are pegged graft respectively in the mounting groove, fixed connection leading wheel 20 in the mounting groove, elastic plate 25 passes through leading wheel 20 and reciprocates in the mounting groove. The top of the fixing block 24 is provided with a locking threaded hole communicated with the mounting groove, the locking threaded hole is internally connected with a locking screw 29, the locking screw 29 is used for locking and fixing the elastic plate 25 in the mounting groove, the cross beam 26 is fixedly connected between the two supports, the center of the cross beam 26 is fixedly connected with a mounting frame 27, the mounting frame 27 is provided with an electric telescopic rod 28 with vertical arrangement, and the telescopic end of the electric telescopic rod 28 is fixedly connected with the middle of the elastic plate 25.
The mounting plate 32 is fixedly connected to one side of the base plate 31, a vertically arranged sliding hole is formed in the mounting plate 32, the suspension rod 33 is arranged in the sliding hole and can slide up and down along the sliding hole, the top of the suspension rod 33 is fixedly connected with the first top plate 34, the top of the first top plate 34 is provided with the first rotating wheel 35, the first rotating wheel 35 is arranged opposite to the elastic plate 25, the outer side of the suspension rod 33 is sleeved with the first spring 36, and the first spring 36 is fixed between the mounting plate 32 and the first top plate 34. When the thermal insulation board is used, the curvature of the elastic board 25 is adjusted according to the arc shape of the thermal insulation board 100, the specific adjustment method is to loosen the locking screw 29, the electric telescopic rod 28 controls the middle part of the elastic board 25 to move upwards or downwards to adjust the curvature of the elastic board 25, and the locking screw 29 is locked after the adjustment is finished. Therefore, in the brushing process, the brushing track is similar to the curvature of the elastic plate 25, and the circular arc-shaped heat insulation plate is used.

Claims (10)

1. The mortar pasting system for the building external wall insulation board is characterized by comprising a bottom plate (1), wherein a clamping device for clamping the insulation board is arranged on the upper side of the bottom plate (1), an upright post (13) is fixedly connected to one side above the bottom plate (1), a hydraulic cylinder (14) is fixedly connected to one side of the upright post (13), and a telescopic end of the hydraulic cylinder (14) is fixedly connected with a mortar smearing device (3);
the mortar smearing device (3) comprises a base plate (31), a hanging rod (33) is arranged on one side of the base plate (31), an smearing device (4) is fixedly connected with the lower end of the hanging rod (33), the smearing device (4) comprises a smearing plate (41), a mortar box (5) is fixedly connected with the bottom of one side of the smearing plate (41), a discharge hole (51) is formed in the bottom of the mortar box (5), a feed inlet is formed in the top of the mortar box (5), a cavity (42) is formed in the center of the smearing plate (41), a plurality of first through holes (43) penetrating through the smearing plate (41) are formed in the bottom of the inner side of the cavity (42), a plurality of second through holes (44) penetrating through the smearing plate (41) are formed in the top of the inner side of the cavity (42), a base column (61) is connected in the second through holes (44) in a sliding mode, and a base rod (65) is fixedly connected with the lower end of the base column (61) and horizontally arranged, the brush rod (66) is fixedly connected to the lower side of the base rod (65), the brush rod (66) penetrates through the first through hole (43) and can slide up and down in the first through hole (43), and a lifting device for controlling the base column (61) to slide up and down along the second through hole (44) is arranged on the base column (61).
2. The mortar pasting system for the external wall insulation board of the building as claimed in claim 1, wherein: the clamping device comprises two vertical plates (73) which are arranged in parallel, the two vertical plates (73) are both fixed on the upper side of the bottom plate (1), a rotating shaft (74) is rotatably connected between the vertical plates (73), a left-handed thread section and a right-handed thread section are arranged on the rotating shaft (74), the upper side of the bottom plate (1) is provided with a guide groove, a sliding block (71) is connected in each guide groove in a sliding way, one of the slide blocks (71) is provided with a left-handed threaded hole, the other slide block (71) is provided with a right-handed threaded hole, the left-handed thread section on the rotating shaft (74) is in threaded connection in the left-handed thread hole, the right-handed thread section on the rotating shaft (74) is in threaded connection in the right-handed thread hole, one side of each sliding block (71) is fixedly connected with a clamping plate (72), one side of one vertical plate (73) is provided with a rotating motor (75), and the main shaft of the rotating motor (75) is coaxially and fixedly connected with the rotating shaft (74).
3. The mortar pasting system for the external wall insulation board of the building as claimed in claim 1, wherein: two blanking openings (12) are arranged on the upper side of the bottom plate (1).
4. The mortar pasting system for the external wall insulation board of the building as claimed in claim 1, wherein: the curvature adjusting device (2) is arranged on the upper side of the bottom plate (1), the curvature adjusting device (2) comprises two brackets, each bracket is rotatably connected with a fixed block (24), one side of each fixed block (24) is provided with a mounting groove, an elastic plate (25) is arranged between the two fixed blocks (24), two ends of the elastic plate (25) are respectively inserted in the mounting grooves, the top of the fixing block (24) is provided with a locking threaded hole communicated with the mounting grooves, a locking screw (29) is connected with the locking thread hole in a threaded manner, the locking screw (29) is used for locking and fixing the elastic plate (25) in the mounting groove, a cross beam (26) is fixedly connected between the two brackets, the center of the cross beam (26) is fixedly connected with a mounting frame (27), an electric telescopic rod (28) which is vertically arranged is arranged on the mounting frame (27), the telescopic end of the electric telescopic rod (28) is fixedly connected with the middle part of the elastic plate (25).
5. The mortar pasting system for the external wall insulation board of the building as claimed in claim 4, wherein: the support comprises a top beam (22), and the top beam (22) is supported and fixed through a group of support shafts (21).
6. The mortar pasting system for the external wall insulation board of the building as claimed in claim 4, wherein: the mounting groove is internally and fixedly connected with a guide wheel (20), and the elastic plate (25) slides in the mounting groove in a reciprocating manner through the guide wheel (20).
7. The mortar pasting system for the external wall insulation board of the building as claimed in claim 4, wherein: base plate (31) one side fixed connection mounting panel (32), be equipped with the slide opening of vertical setting on mounting panel (32), jib (33) set up slide from top to bottom in the slide opening and can follow the slide opening, the first roof of jib (33) top fixed connection (34), first roof (34) top is equipped with first rotation wheel (35) jib (33) outside cup joints first spring (36), first spring (36) are fixed between mounting panel (32) and first roof (34).
8. The mortar pasting system for the external wall insulation board of the building as claimed in claim 1, wherein: the lifting device comprises a second top plate (62), the second top plate (62) is fixed on the top of the base column (61), a second rotating wheel (63) is arranged at the top of the second top plate (62), a second spring (64) is sleeved outside the base column (61), the second spring (64) is fixed between the second top plate (62) and the smearing plate (41), one side of the base column (61) is provided with an insertion hole (67), the bottom of the insertion hole (67) is provided with a yielding groove (68), one side of the smearing plate (41) is provided with a transition hole, the transition hole is connected with an insertion rod (69) in a sliding way, one end of the insertion rod (69) is fixedly connected with a baffle plate (691), the outer side of the insert rod (69) is sleeved with a third spring (60), the third spring (60) is fixed between the smearing plate (41) and the baffle plate (691), and the insert rod (69) can be inserted into the insert hole (67).
9. The mortar pasting system for the external wall insulation board of the building as claimed in claim 1, wherein: the upper side of the bottom plate (1) is fixedly connected with a first mounting column (83), one side of the top of the first mounting column (83) is fixedly connected with a pressing plate (84), the lower surface of the pressing plate (84) is an inclined surface, and the second rotating wheel (63) and the inclined surface are arranged oppositely.
10. The mortar pasting system for the external wall insulation board of the building as claimed in claim 9, wherein: bottom plate (1) upside fixed connection second erection column (81), second erection column (81) one side fixed connection ejector pin (82), ejector pin (82) with inserted bar (69) coaxial setting, the diameter of ejector pin (82) is less than the width of groove of stepping down (68).
CN202110369972.8A 2021-04-07 2021-04-07 Mortar pasting system for building external wall insulation board Active CN113235874B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110369972.8A CN113235874B (en) 2021-04-07 2021-04-07 Mortar pasting system for building external wall insulation board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110369972.8A CN113235874B (en) 2021-04-07 2021-04-07 Mortar pasting system for building external wall insulation board

Publications (2)

Publication Number Publication Date
CN113235874A true CN113235874A (en) 2021-08-10
CN113235874B CN113235874B (en) 2022-09-30

Family

ID=77131147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110369972.8A Active CN113235874B (en) 2021-04-07 2021-04-07 Mortar pasting system for building external wall insulation board

Country Status (1)

Country Link
CN (1) CN113235874B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116423646A (en) * 2023-06-02 2023-07-14 济南鸿广建筑设备安装有限公司 GRC light partition board processing and forming process capable of uniformly distributing slurry

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010053419A1 (en) * 2000-05-01 2001-12-20 Ruha David J. Applicator head
HU0900219V0 (en) * 2009-11-11 2010-01-28 Gyurica Gabor Apparatus for applying adhesive on tiles
KR20130020200A (en) * 2011-08-19 2013-02-27 박상수 Apparatus for supplying mortar
CN106368338A (en) * 2016-08-25 2017-02-01 陕西建工第建设集团有限公司 Construction method of external thermal insulation system of foam cement thermal insulation board outer wall
CN208202487U (en) * 2018-01-20 2018-12-07 浙江高光数控科技有限公司 A kind of automatic emulsion coating machine
CN109235857A (en) * 2018-11-07 2019-01-18 季炜杰 A kind of wall tile buttering ancillary equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010053419A1 (en) * 2000-05-01 2001-12-20 Ruha David J. Applicator head
HU0900219V0 (en) * 2009-11-11 2010-01-28 Gyurica Gabor Apparatus for applying adhesive on tiles
KR20130020200A (en) * 2011-08-19 2013-02-27 박상수 Apparatus for supplying mortar
CN106368338A (en) * 2016-08-25 2017-02-01 陕西建工第建设集团有限公司 Construction method of external thermal insulation system of foam cement thermal insulation board outer wall
CN208202487U (en) * 2018-01-20 2018-12-07 浙江高光数控科技有限公司 A kind of automatic emulsion coating machine
CN109235857A (en) * 2018-11-07 2019-01-18 季炜杰 A kind of wall tile buttering ancillary equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116423646A (en) * 2023-06-02 2023-07-14 济南鸿广建筑设备安装有限公司 GRC light partition board processing and forming process capable of uniformly distributing slurry

Also Published As

Publication number Publication date
CN113235874B (en) 2022-09-30

Similar Documents

Publication Publication Date Title
CN111974579B (en) Production of intermediate layer cavity glass is with binding material coating equipment
CN211548622U (en) Be used for building wall spraying device
CN113235874B (en) Mortar pasting system for building external wall insulation board
CN113216659B (en) Applicator for building external wall insulation board
CN214575426U (en) Mortar spraying, scraping and plastering device
CN112761370A (en) Laminating machine for maintaining cast-in-place concrete wall surface
CN112593686A (en) Mortar spraying, scraping and plastering device
CN206888486U (en) A kind of Novel floor brick laying device
CN113107170B (en) Construction method for joint filling and seam beautifying of building outer wall dry-hanging stone curtain wall
CN205577367U (en) Full -automatic bionical white washed wall machine
CN113107103A (en) Curvature adjusting device for building external wall insulation board
CN112411968B (en) A ceramic tile construction equipment for tunnel inner wall
CN111622463B (en) Wall gluing device for decoration engineering and working method thereof
CN111042466B (en) Coating treatment process for waterproof agent before construction of building decoration dry-hanging stone
CN113216577A (en) Auxiliary machine for laying ceramic tiles on external wall of house building
CN206752986U (en) Outer surface of wall sprays the mounting structure of dolly and track
CN2358146Y (en) Automatic plastering machine
CN219424796U (en) Mould for rapidly coating decorative brick adhesive
CN218492983U (en) Construction equipment of heat preservation decoration integration outer wall
CN215354278U (en) Flat wire mold with adjustable function
CN220909023U (en) Plastering machine
CN217602191U (en) Take beat gluey mechanism with adjustable angle
CN113863086B (en) Airport special-shaped complex area isolation layer paving device and construction method
CN219003433U (en) Spraying device for steel structure machining
CN111359562B (en) Intelligent porcelain removing and repairing device for glass lining equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20220915

Address after: 437000 within the high tech Zone of Xianning City, Hubei Province

Applicant after: Hubei Sangu Building Materials Technology Co.,Ltd.

Address before: 510000 Tianhe Science and Technology Park, 1039 Gaopu Road, Tianhe District, Guangzhou City, Guangdong Province

Applicant before: Xiao Tingxian

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant