CN112960568A - Vertical transportation cantilever crane for curtain wall plate - Google Patents

Vertical transportation cantilever crane for curtain wall plate Download PDF

Info

Publication number
CN112960568A
CN112960568A CN202110393231.3A CN202110393231A CN112960568A CN 112960568 A CN112960568 A CN 112960568A CN 202110393231 A CN202110393231 A CN 202110393231A CN 112960568 A CN112960568 A CN 112960568A
Authority
CN
China
Prior art keywords
steel
cantilever crane
curtain wall
wire rope
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110393231.3A
Other languages
Chinese (zh)
Inventor
刘树鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Fangda Building Technology Group Co ltd
Original Assignee
Shenzhen Fangda Building Technology Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Fangda Building Technology Group Co ltd filed Critical Shenzhen Fangda Building Technology Group Co ltd
Priority to CN202110393231.3A priority Critical patent/CN112960568A/en
Publication of CN112960568A publication Critical patent/CN112960568A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/20Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
    • B66C23/201Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures with supporting couples provided from above, e.g. by ceilings of buildings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/20Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
    • B66C23/202Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures with supporting couples provided from below, e.g. by floors of buildings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/72Counterweights or supports for balancing lifting couples
    • B66C23/78Supports, e.g. outriggers, for mobile cranes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a vertical transportation cantilever crane for curtain wall plates, which comprises: the steel frame system, the steel frame bottom foot, the rail cantilever steel beam, the winch, the counterweight and the steel wire rope; the steel frame footing is arranged on a construction site, and the steel frame system is fixedly connected with the steel frame footing through a connecting bolt; the winch and the counterweight are arranged at the rear end of the steel frame system; the rear end of the rail overhanging steel beam is fixedly connected to the steel frame system through a fixing bolt, and the front end of the rail overhanging steel beam is arranged in an overhanging way; the upper part of the front end of the rail overhanging steel beam is connected with the lower end of a steel wire rope, and the upper end of the steel wire rope is fixed on the upper-layer structural beam; the lower part of the front end of the rail overhanging steel beam is welded with a pulley device for fixing a steel wire rope of a winch or a steel plate fixing piece of an electric hoist. The cantilever crane has a reasonable shape, meets the stress requirement, is suitable for standardized production, facilitates on-site transportation and displacement, facilitates repeated assembly and disassembly, can be repeatedly utilized, and meets the requirements of construction or transportation.

Description

Vertical transportation cantilever crane for curtain wall plate
Technical Field
The invention belongs to the technical field of building curtain wall construction, and relates to a vertical transportation hoisting device for building curtain wall plates, in particular to a vertical transportation cantilever crane for curtain wall plates.
Background
In the building curtain wall industry, the application of unit curtain walls is more and more extensive, and in the construction measures of the curtain walls of related unit plates, the construction measures of vertical transportation of curtain wall plates are carried out by matching a cantilever crane with a cableway, so that the curtain wall plate has the advantages of easy position moving on site, convenience and quickness in assembly and the like, and is more and more adopted on the premise of meeting the safe use.
In order to better enable the cantilever crane and related components thereof to become standardized products for production and cyclic utilization, and to be more conveniently used for each construction site and adapt to transportation, assembly and use of conventional construction elevators, it is necessary to design a standardized cantilever crane which has a reasonable shape and meets the requirements of structural stress, and the standardized cantilever crane can be repeatedly used in each project and can be flexibly moved to transport plates on the construction site.
Disclosure of Invention
The invention aims to provide a vertical transportation cantilever crane for curtain wall plates, which has a reasonable shape, meets the stress requirement in structure, is suitable for standardized production, is convenient for on-site transportation and displacement, is convenient for repeated assembly and disassembly, and can be recycled to meet the construction or transportation requirements.
In order to achieve the purpose, the technical scheme adopted by the invention is as follows: a vertical transport cantilever crane for curtain wall panels, comprising: the steel frame system, the steel frame bottom foot, the rail cantilever steel beam, the winch, the counterweight and the steel wire rope; the steel frame footing is arranged on a construction site, and the steel frame system is fixedly connected with the steel frame footing through a connecting bolt; the winch and the counterweight are arranged at the rear end of the steel frame system; the rear end of the rail overhanging steel beam is fixedly connected to the steel frame system through a fixing bolt, and the front end of the rail overhanging steel beam is arranged in an overhanging manner; the upper part of the front end of the rail overhanging steel beam is connected with the lower end of the steel wire rope, and the upper end of the steel wire rope is fixed on the upper-layer structural beam; the steel plate fixing piece is welded to the lower portion of the front end of the rail overhanging steel beam and used for fixing a pulley device of a steel wire rope of a winch or an electric hoist.
Furthermore, the steel frame system is formed by welding a bottom steel through frame, an upper steel through frame, 4 vertical steel through pipes at the front end and 2 oblique steel through pipes at the rear end.
Further, the bottom steel through frame comprises: the frame is formed by welding 2 longitudinal steel tubes and 4 transverse steel tubes, and 6 steel tube bases are welded at the bottom of the frame; the steel leads to the base at the building site scene with the steelframe footing carries out the assembled joint through connecting bolt.
Further, the frame is led to the upper portion steel is led to by 2 vertical steel and 2 horizontal steel and is led to the welding and constitute, the frame is led to the upper portion steel the girder steel position of encorbelmenting of track is provided with 2 fixed steel parts of cantilever beam, the fixed steel part of cantilever beam is used for the on-the-spot equipment the girder steel of encorbelmenting of trapped orbit.
Further, the front end upper portion welding of girder steel is encorbelmented to the track has the auricle, is used for supplementary safety the lower extreme of wire rope connect in the auricle.
Furthermore, the winch is connected with the steel frame system safely and reliably through a connecting steel piece and a bolt, and the connection meets the stress requirement.
Further, still include steel part stabilizing brace rod, the lower extreme of steel part stabilizing brace rod support the top and connect in steel frame system, the upper end then support the top and connect in upper structure roof beam.
According to the technical scheme, the embodiment of the invention has the following advantages:
the related components of the cantilever crane can become standardized products for production and cyclic utilization, and can be more conveniently used for each construction site and adapt to transportation, assembly and use of conventional construction elevators. The cantilever crane is a standardized cantilever crane which is reasonable in shape and capable of meeting the requirements of structural stress, facilitates field transportation and displacement, facilitates repeated assembly and disassembly, can be repeatedly utilized in all projects, and can transport plates at flexibly moved positions on a construction field so as to meet the requirements of construction or transportation.
Drawings
In order to more clearly illustrate the technical solution of the embodiment of the present invention, the following briefly introduces the embodiment and the drawings used in the description of the prior art.
FIG. 1 is a front view of a vertical transport cantilever crane for curtain wall panels according to an embodiment of the present invention;
FIG. 2 is a top view of a vertical transport jib crane for curtain wall panels according to an embodiment of the present invention;
FIG. 3 is a front view of a steel frame system in an embodiment of the present invention;
FIG. 4 is a top view of a steel frame system in an embodiment of the present invention;
fig. 5 is a bottom view of a steel frame system in an embodiment of the invention.
Detailed Description
In order to make the technical solutions of the present invention better understood, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The following will explain details by way of specific examples.
Referring to fig. 1 and 2, an embodiment of the present invention provides a vertical transportation cantilever crane (hereinafter referred to as a cantilever crane) for curtain wall panels, which is used for vertical transportation or simple hoisting of curtain wall panels.
The cantilever crane of this embodiment includes: the steel frame system 1, steel frame footing 2, rail cantilever girder steel 3, hoist engine 4, counter weight 5 and wire rope 6. The steel frame footing 2 is arranged on the site, and the steel frame system 1 is fixedly connected with the steel frame footing 2 through a connecting bolt 7. The winch 4 and the counterweight 5 are arranged at the rear end of the steel frame system 1. The rear end of the rail overhanging steel beam 3 is fixedly connected to the steel frame system 1 through a fixing bolt 8, and the front end of the rail overhanging steel beam is arranged in an overhanging mode. The upper portion of the front end of the rail cantilever steel beam 3 is connected with the lower end of the steel wire rope 6, the upper end of the steel wire rope 6 is fixed on the upper-layer structural beam, and the steel wire rope 6 is tensioned. The steel plate fixing piece 301 is welded to the lower portion of the front end of the rail overhanging steel beam 3, and the steel plate fixing piece 301 is used for fixing a pulley device or an electric hoist of a steel wire rope of a winch.
Referring to fig. 3 to 5, the steel frame system 1 may be formed by welding a bottom steel through frame 101, an upper steel through frame 102, a plurality of vertical steel through frames 103, and a plurality of oblique steel through frames 104. The bottom steel through frame 101 and the upper steel through frame 102 can be formed by welding a plurality of transverse steel through and longitudinal steel through in a combined manner. Namely, the steel frame system 1 may be formed by combining and welding a plurality of steel pipes.
Optionally, the bottom steel through frame 101 includes a frame composed of 2 longitudinal steel through and 4 transverse steel through, and 6 steel through bases 105 are welded to the bottom of the frame, and the steel through bases 105 are used for being assembled and connected with the steel frame footing 2 through connecting bolts 7 on the site of a construction site.
Optionally, the upper steel through frame 102 is composed of 2 longitudinal steel through and 2 transverse steel through. The upper steel through frame 101 can be provided with 2 cantilever beam fixing steel parts 106 at the position of the rail cantilever steel beam, and is used for assembling and fixing the rail cantilever steel beam 3 on site. The rear end of the rail cantilever steel beam 3 can be fixedly connected with a long waist hole 107 arranged on the 2 cantilever beam fixing steel parts 106 through 2 fixing bolts 8.
Optionally, the bottom steel through frame 101 and the upper steel through frame 102 are welded to form a steel frame system 1 through 4 vertical steel through holes 103 at the front end and 2 diagonal steel through holes 104 at the rear end. Whole steel frame system 1 forms standardized product, can carry out batch production in the mill, transports the building site again and uses, and the relevant size can adapt to the building site construction elevator commonly used and transport in a flexible way and assemble.
Optionally, the rear end of the rail cantilever steel beam 3 can be connected with the steel frame system 1 through the fixing bolts 8 at the two fulcrums (cantilever beam fixing steel parts). The steel plate fixing piece 301 is welded on the lower portion of the front end of the rail overhanging steel beam 3 and used for fixing a pulley device of a steel wire rope of a winch and also used for fixedly mounting construction facilities such as an electric hoist.
Optionally, a steel ear plate 302 is welded to the upper portion of the front end of the rail cantilever steel beam 3, and is used for fixing the auxiliary safe steel wire rope 6. The lower end of the steel wire rope 6 is connected to the steel ear plate 302 at the front end of the cantilever steel beam, the upper end of the steel wire rope can be fixed on the upper-layer structural beam by the hanging steel part 9, and the steel wire rope 6 is tensioned and fixed to play a role of safety assistance.
The electric device winch 4 of the cantilever crane system can be installed at the rear end of the steel frame system 1 and is connected with the steel frame system 1 safely and reliably through a connecting steel piece and a bolt, and the stress requirement is met through connection. The selected winch 4 is required to meet the plate stress requirement of the engineering project.
Further, for oversized or overweight plates, the vertical support stable steel part stabilizing support rod 11 can be added under the action of the counterweight, so that the stability of the whole system in the hoisting process is enhanced. The lower end of the steel part stabilizing brace 11 is connected to the steel frame system 1 in a propping manner, and the upper end of the steel part stabilizing brace is connected to the upper-layer structural beam in a propping manner.
Further, a plurality of pulleys 106 can be installed at the bottom of the steel frame system 1 to facilitate movement.
According to the cantilever crane, the rear end of the cantilever crane is provided with the steel frame system capable of placing the counter weight, the corresponding counter weight can be conveniently placed after the cantilever crane is moved in place on site, and the stress requirement of the cantilever crane during plate hoisting is stabilized.
The embodiment of the invention discloses a vertical transportation cantilever crane for curtain wall plates.
This steel frame system of cantilever crane can carry out batch production in the mill, transports the building site again and assembles the use, and the relevant size can adapt to the building site construction elevator commonly used and transport in a flexible way and assemble.
The steel frame system of the cantilever crane can be flexibly moved to a proper position in a floor through the pulleys, is connected with the steel frame bottom feet through the connecting bolts, is fixed to the position of a plate to be hoisted in the structural floor, and is provided with the winch and the rear end counterweight at the rear end of the steel frame system, the counterweight needs to meet the stress of engineering plate hoisting, and the connection of the winch needs to firmly meet the stress requirement of plate hoisting.
The rail cantilever steel beam of the cantilever crane is connected to a cantilever crane steel frame system through the fixing bolt, and the assembly, disassembly and reuse of the combination are facilitated by adopting bolt connection. The upper part of the front end of the rail overhanging steel beam is fixed on the upper-layer structural beam by adopting a steel wire rope, and the safety protection effect in the plate hoisting process is achieved. The steel plate fixing piece is arranged on the lower portion of the front end of the rail overhanging steel beam and can be used for fixing a pulley device of a steel wire rope of a winch and also can be used for fixedly mounting construction facilities such as an electric hoist.
The structure system and the combination of the cantilever crane are characterized in that related components can become standardized products for production and recycling, can be more conveniently used for each construction site and adapt to transportation, assembly and use of conventional construction elevators, are the standardized cantilever crane with proper shape and size and structure stress meeting requirements, can be repeatedly used in each project, and can be used for transporting plates at flexibly moving positions of the construction site.
The technical solution of the present invention is explained in detail by the specific embodiments above. In the above embodiments, the descriptions of the respective embodiments have respective emphasis, and for parts that are not described in detail in a certain embodiment, reference may be made to the related descriptions of other embodiments.
It should be understood that the above embodiments are only used for illustrating the technical solutions of the present invention, and not for limiting the same; the technical solutions described in the above embodiments can be modified or part of the technical features can be equivalently replaced by those skilled in the art; and the modifications or the substitutions do not make the essence of the corresponding technical solutions depart from the spirit and the scope of the technical solutions of the embodiments of the present invention.

Claims (7)

1. A vertical transportation cantilever crane for curtain wall plates is characterized in that,
the method comprises the following steps: the steel frame system, the steel frame bottom foot, the rail cantilever steel beam, the winch, the counterweight and the steel wire rope;
the steel frame footing is arranged on a construction site, and the steel frame system is fixedly connected with the steel frame footing through a connecting bolt; the winch and the counterweight are arranged at the rear end of the steel frame system;
the rear end of the rail overhanging steel beam is fixedly connected to the steel frame system through a fixing bolt, and the front end of the rail overhanging steel beam is arranged in an overhanging manner;
the upper part of the front end of the rail overhanging steel beam is connected with the lower end of the steel wire rope, and the upper end of the steel wire rope is fixed on the upper-layer structural beam;
the steel plate fixing piece is welded to the lower portion of the front end of the rail overhanging steel beam and used for fixing a pulley device of a steel wire rope of a winch or an electric hoist.
2. The vertical transport cantilever crane of a curtain wall panel block of claim 1,
the steel frame system is formed by welding a bottom steel through frame, an upper steel through frame, 4 vertical steel through frames and 2 oblique steel through frames.
3. The vertical transport cantilever crane of a curtain wall panel block of claim 2,
the bottom steel leads to the shelf includes: the frame is formed by welding 2 longitudinal steel tubes and 4 transverse steel tubes, and 6 steel tube bases are welded at the bottom of the frame; the steel leads to the base at the building site scene with the steelframe footing carries out the assembled joint through connecting bolt.
4. The vertical transport cantilever crane of a curtain wall panel block of claim 2,
the upper portion steel leads to the shelf and leads to the welding by 2 vertical steel of root and 2 horizontal steel and form, the upper portion steel leads to the shelf and is in the girder steel position of encorbelmenting of track is provided with 2 fixed steel parts of cantilever beam, the fixed steel part of cantilever beam is used for the on-the-spot equipment the girder steel of encorbelmenting of trapped orbit.
5. The vertical transport cantilever crane of a curtain wall panel block of claim 1,
the upper portion of the front end of the rail cantilever steel beam is welded with a steel ear plate, and the lower end of the steel wire rope is connected with the steel ear plate.
6. The vertical transport cantilever crane of a curtain wall panel block of claim 1,
the winch is connected with the steel frame system safely and reliably through the connecting steel piece and the bolt, and the connection meets the stress requirement.
7. The vertical transport cantilever crane of a curtain wall panel block of claim 1,
the steel part stabilizing support rod is characterized by further comprising a steel part stabilizing support rod, the lower end of the steel part stabilizing support rod is connected to the steel frame system in an abutting mode, and the upper end of the steel part stabilizing support rod is connected to the upper-layer structural beam in an abutting mode.
CN202110393231.3A 2021-04-13 2021-04-13 Vertical transportation cantilever crane for curtain wall plate Pending CN112960568A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110393231.3A CN112960568A (en) 2021-04-13 2021-04-13 Vertical transportation cantilever crane for curtain wall plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110393231.3A CN112960568A (en) 2021-04-13 2021-04-13 Vertical transportation cantilever crane for curtain wall plate

Publications (1)

Publication Number Publication Date
CN112960568A true CN112960568A (en) 2021-06-15

Family

ID=76280233

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110393231.3A Pending CN112960568A (en) 2021-04-13 2021-04-13 Vertical transportation cantilever crane for curtain wall plate

Country Status (1)

Country Link
CN (1) CN112960568A (en)

Similar Documents

Publication Publication Date Title
CN101696598B (en) Wholly lifted construction external frame
CN114412158B (en) Aluminum alloy-steel combined attached lifting scaffold and installation method thereof
CN112502474B (en) Dismantling device and method for indoor large-scale steel framework
CN107399656B (en) Outdoor elevator and construction method thereof
CN204662931U (en) Roof decorations base plate retractility sliding support frame
CN215160470U (en) Vertical transportation cantilever crane for curtain wall plate
CN104790644A (en) Extending and contracting sliding support frame for roof decorative bottom boards
CN219280494U (en) Tower beam temporary consolidation supporting structure for bridge tower stability control
CN112960568A (en) Vertical transportation cantilever crane for curtain wall plate
CN112502473B (en) Supporting bearing capacity conversion device and method for dismantling large steel framework by using same
CN112502475B (en) Supporting bearing capacity conversion device and using method thereof
CN112376947A (en) Support frame capable of being adjusted in lifting mode and using method thereof
CN103743581A (en) Internal climbing tower crane test platform device and test method
CN109516390B (en) Flat-head tower crane convenient for manual carrying and installation and field installation method
CN113668831A (en) Movable overhanging scaffold
CN214885842U (en) Support frame capable of being adjusted in lifting mode
CN217326383U (en) Parapet hanging basket structure
CN219973857U (en) Super high parapet does not have counter weight hanging flower basket suspension
CN219771544U (en) Hoisting construction equipment
CN214615362U (en) A collapsible flexible intelligence is climbed for heterotypic outer contour line building
CN218912194U (en) Portable safe operation platform for elevator shaft of high-rise building
CN215331380U (en) Rail type suspension platform
CN216305332U (en) Guide rail upright post for building construction
CN220845069U (en) Dedicated balance gallows of prefabricated component
CN215926791U (en) I-steel truss is from hoisting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination