CN1127819A - Internal thread bored and cast-in-place pile series and construction method and equipment thereof - Google Patents

Internal thread bored and cast-in-place pile series and construction method and equipment thereof Download PDF

Info

Publication number
CN1127819A
CN1127819A CN 95115749 CN95115749A CN1127819A CN 1127819 A CN1127819 A CN 1127819A CN 95115749 CN95115749 CN 95115749 CN 95115749 A CN95115749 A CN 95115749A CN 1127819 A CN1127819 A CN 1127819A
Authority
CN
China
Prior art keywords
inside spin
pile
boring
stake
job practices
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 95115749
Other languages
Chinese (zh)
Inventor
孙新河
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 95115749 priority Critical patent/CN1127819A/en
Publication of CN1127819A publication Critical patent/CN1127819A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The series filling piles using internal auger drilling include filling pile, pedstal pile and ribbed pile, and technically features that twist drill is used to drill hole and a spiral conveying system for discharging earth has an external tube (sleeve tube) in which there is an auger stem. It is suitable for long pile with big diameter.

Description

Inside spin drill-pouring pile series and job practices thereof and construction equipment
The present invention relates to the foundation pile and the band flank stake that is used for pattern foundation pit supporting structure of construction work.
Existing auger boring equipment has advantages such as speed of fulfiling hole is fast, noiselessness, friction, mud-less pollution.But because equipment dynamic restriction, the long and stake footpath of the stake of augered pile is very limited.The present invention will add upper exterior tube and adopt the major diameter drill bit to address this problem at the minor diameter auger stem.The pattern foundation pit supporting structure and the antiseepage problem of existing building are more and more important.The present invention loads onto high compression set spray apparatus on the outer tube of inside spin drilling equipment, can make flank on the band of castinplace pile side.Band flank soldier pile not only can reduce cost but also can reach anti-seepage effect.In order further to improve the bearing capacity of foundation pile, the present invention can be provided with enlarged body on castinplace pile, and together constitutes the expansion stake with castinplace pile, thereby further improves the supporting capacity of foundation pile.
The objective of the invention is to propose inside spin drill-pouring pile series and job practices thereof and construction equipment.
Inside spin drill-pouring pile series of the present invention comprises that inside spin bored pile, inside spin boring enlarge stake and the stake of inside spin boring band flank.
The inside spin bored pile comprises non-solid wall stake and solid wall stake.
The non-solid wall stake of inside spin bored pile is identical with the structure of existing castinplace pile, and solid wall stake is the composite pile that is made of jointly solid parietal layer of hole wall and inner pile body.Gu parietal layer can or distribute one section at least along the distribution of boring total length.
It is that the enlarged body that pile body and high-pressure injection by auger boring pouring pile form constitutes jointly that inside spin boring enlarges stake, and contains an enlarged body at least.
The stake of inside spin boring band flank is to be made of jointly the pile body of inside spin bored pile and the mixture that adopts high compression set spray on this pile body side, its pile body is made up of a kind of material at least, be made up of concrete than epimere pile body in sending out, the hypomere pile body is made up of the mixture of clay and cement.
The pile body hole forming method of inside spin drill-pouring pile series is to fetch earth with augers, fails soil with auger stem and the helical conveyer system that is enclosed within its outer outer tube composition.
The one-tenth holes protecting wall mode of inside spin drill-pouring pile series is divided into no retaining wall pore-forming and the retaining wall pore-forming is arranged
When soil layer need not retaining wall, the direct pore-forming of available inside spin drilling equipment
There is the retaining wall pore-forming to be divided into slurries retaining wall pore-forming, pillar retaining wall pore-forming and solid wall retaining wall pore-forming
Slurries are meant mud or stabilizing solution, have sealing to be meant between the bottom of inside spin drilling equipment and the hole wall and are sealed.Not having sealing is meant between the bottom of inside spin drilling equipment and the hole wall and does not establish sealing.
Pillar retaining wall pore-forming be outside auger stem or the inside spin drilling equipment outside have pillar, this pillar directly contacts with the soil body, to prevent the soil body hole of collapsing
Gu wall retaining wall pore-forming is in the inside spin boring procedure, and is with cementing material that drill hole wall is fixed, to prevent the hole of collapsing.
After finishing boring, concrete method for filling can be divided into: 1, directly the concrete example is gone in the boring.2, concrete perfusion in pillar.3, with conduit concrete perfusion or concrete is pressed in the boring by rigidity or flexible conduit in boring with pump.4, carry drilling rod to boring inner edge compressed water slurry limit, after after proposing drilling rod, in boring, pouring stone into or pour stone into, be pressed into mortar in the boring with the mortar conduit again and put and draw out cement paste, or the limit pours stone into, mortar is injected with the mortar conduit of band vibrating device in the limit.
Gu the job practices of wall retaining wall: but from the churning mouth of outside of sleeve or have grouting port and telescopic stirring vane or sleeve pipe outside, in soil layer or hole, inject at least a cementing material, the rapidly solidified hole wall of this cementing material energy among then the grouting port.
The job practices of enlarged body: but one of method is with the high-pressure injection cementing material, but the soil body is mixed with cementing material, mix enlarged body thereby constitute.Two of method be with high-pressure spray cut soil and the native sucking-off hole that will be cut with pump outside, thereby constitute expansion space.This expansion space promptly constitutes the perfusion enlarged body after being filled by concrete.Three of method is because loosened soil or sediment are often arranged at the bottom of perfusion enlarged body, thereby influences bearing capacity.This method is to spray cementing material among loosened soil or sediment, and this part soil body is mixed with cementing material.Its top is still expansion space, mixes enlarged body thereby constitute perfusion.
The job practices of band flank stake: in the inside spin boring procedure, spray slurry with the high compression set spray shower nozzle that is located at sleeve bottom in the soil body, thereby make the slurry and the soil body constitute mixture, this mixture is the flank of band flank stake, after treating that pore-forming is finished, can carry out the pile body construction of castinplace pile.
The construction equipment of inside spin drill-pouring pile series: have pile frame, running gear, control system and have a cover jacking system and a dynamical system at least.It is characterized in that drilling equipment is to have outer tube in the auger stem outside and its outer tube can be sleeve pipe or pillar, auger stem can be latus rectum or reducing, outer tube all is set or is provided with one section at least along auger stem is elongated, when outer tube did not contact with the unit head part, outer tube should be fixed together with auger stem.
When need are more constructed the solid wall stake of inside spin boring or inside spin boring expansion stake or the stake of inside spin boring band flank, a medium channel should be set at least on the inside spin drilling equipment then
With accompanying drawing some embodiment among the present invention are described:
Fig. 1: inside spin rig schematic diagram;
Fig. 2: the inside spin drilling equipment schematic diagram of band pillar;
Fig. 3: be with pillar but uncased inside spin drilling equipment schematic diagram;
Fig. 4: by the boring of Gu Bi;
Fig. 5: by the boring of Gu Bi;
Fig. 6: by the boring of Gu Bi;
Fig. 7: the mortar tremie placing concrete schematic diagram of band vibrating device;
Fig. 8: inside spin boring enlarges stake;
Fig. 9: inside spin boring enlarges stake;
Figure 10: band flank stake schematic diagram;
Figure 11: two band flank stake combination schematic cross-sectional view;
Figure 12: enlarge the stake schematic diagram Gu wall type mixes;
In Fig. 1-12, (A) be pile frame; (B) be the inside spin drilling equipment; (C) be boring; (1) is auger stem; (2) be the outer tube of auger stem (1); (3) be soil body outlet; (4) be the outer tube of medium channel; (5) be unit head; (6) be drill bit; (7) be pillar; (8) be hollow tube as medium channel; (9) be hole wall; (10) be solid wall mixture; (11) be solid wall body in the hole; (12) be the mortar conduit; (13) be vibrator; (14) be concrete; (15) be enlarged body; (16) flank of band flank stake; (17) castinplace pile; (18) mix enlarged body.
The present invention has not only solved long-spiral drilling machine can not carry out the construction problem of the long stake of major diameter, and can carry out the enlarged body construction, thereby further improves the supporting capacity of stake, and the stake of band flank can solve pattern foundation pit supporting structure and antiseepage problem.

Claims (8)

1, inside spin drill-pouring pile series and job practices thereof and construction equipment, internal thread drill-pouring pile series comprises that inside spin bored pile, inside spin boring enlarge stake and the stake of inside spin boring band flank, it is characterized in that the solid wall stake of inside spin boring is the composite pile that is made of jointly solid parietal layer of hole wall and inner pile body, it is that the enlarged body that pile body and high-pressure injection by auger boring pouring pile form constitutes jointly that inside spin boring enlarges.The stake of inside spin boring band flank is to be made of jointly the pile body of inside spin bored pile and the mixture that adopts high compression set spray on this pile body side.
2, according to inside spin drill-pouring pile series and the job practices and the construction equipment of claim 1, the pile body hole forming method that it is characterized in that inside spin drill-pouring pile series is to fetch earth with augers, fails soil with auger stem and the helical conveyer system that is enclosed within its outer outer tube composition.
3, according to inside spin drill-pouring pile series and the job practices and the construction equipment of claim 1 or 2, the job practices that it is characterized in that solid wall retaining wall is from the churning mouth of outside of sleeve or but from having grouting port and telescopic stirring vane or inject at least a cementing material in soil layer or hole among the grouting port of outside of sleeve, this cementing material can rapidly solidified hole wall.
4, according to inside spin drill-pouring pile series and the job practices and the construction equipment of claim 1 or 2, one of job practices that it is characterized in that enlarged body is to use the high-pressure injection cementing material, the soil body is mixed with cementing material, and this mixing portion constitutes the mixing enlarged body.Two of method be with high-pressure spray cut soil and the native sucking-off hole that will be cut with pump outside, thereby constitute expansion space.Three of method is that loosened soil or the sediment to the expansion space bottom sprays fixed material material, and this part soil body is mixed with cementing material.
5, according to inside spin drill-pouring pile series and the job practices and the construction equipment of claim 1 or 2, it is characterized in that the job practices with the flank stake is in the inside spin boring procedure, with the high compression set spray shower nozzle that is located at sleeve bottom in the soil body, spray can be fixed slurry, thereby make the slurry and the soil body constitute mixture, after treating that pore-forming is finished, can carry out the pile body construction of castinplace pile.
6, according to the auger boring of claim 1 perfusion pile series and job practices and construction equipment, the drilling equipment that it is characterized in that rig is to have outer tube in the auger stem outside and outer tube can be sleeve pipe or pillar.
7, according to inside spin drill-pouring pile series and the job practices and the construction equipment of claim 1 or 6, it is characterized in that when the solid wall stake of needs construction inside spin boring or auger boring expansion stake or the stake of inside spin boring band flank, a medium channel being set at least on the inside spin drilling equipment then.
8, according to inside spin drill-pouring pile series and the job practices and the construction equipment of claim 1 or 7, it is characterized in that for after finishing boring, carry drilling rod to boring inner edge compressed water slurry limit, after proposing drilling rod, stone is poured on the limit into, and mortar is injected with the mortar conduit of band vibrating device in the limit.
CN 95115749 1995-09-15 1995-09-15 Internal thread bored and cast-in-place pile series and construction method and equipment thereof Pending CN1127819A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 95115749 CN1127819A (en) 1995-09-15 1995-09-15 Internal thread bored and cast-in-place pile series and construction method and equipment thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 95115749 CN1127819A (en) 1995-09-15 1995-09-15 Internal thread bored and cast-in-place pile series and construction method and equipment thereof

Publications (1)

Publication Number Publication Date
CN1127819A true CN1127819A (en) 1996-07-31

Family

ID=5080642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 95115749 Pending CN1127819A (en) 1995-09-15 1995-09-15 Internal thread bored and cast-in-place pile series and construction method and equipment thereof

Country Status (1)

Country Link
CN (1) CN1127819A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101876172A (en) * 2010-05-06 2010-11-03 天津深基工程有限公司 Method for forming holes of square and rectangular cast-in place piles
CN102685874A (en) * 2012-04-12 2012-09-19 中兴通讯股份有限公司 Method, system and device for calibrating deviation between multiple access points
CN103967016A (en) * 2013-02-06 2014-08-06 上海城地建设股份有限公司 Novel vertical pit support structure and construction method thereof
CN104088285A (en) * 2014-07-24 2014-10-08 上海强劲地基工程股份有限公司 Method for constructing cement soil mixing pile and concrete pile meshed foundation pit supporting structure
CN106639915A (en) * 2017-01-11 2017-05-10 中国化学工程重型机械化公司 Construction device for long-spiral filling pile and construction process thereof
CN111851479A (en) * 2020-07-30 2020-10-30 陕西龙海新创基础工程有限公司 Method for constructing immersed tube rammed cast-in-place pile in sand layer or gravel layer

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101876172A (en) * 2010-05-06 2010-11-03 天津深基工程有限公司 Method for forming holes of square and rectangular cast-in place piles
CN102685874A (en) * 2012-04-12 2012-09-19 中兴通讯股份有限公司 Method, system and device for calibrating deviation between multiple access points
CN103967016A (en) * 2013-02-06 2014-08-06 上海城地建设股份有限公司 Novel vertical pit support structure and construction method thereof
CN104088285A (en) * 2014-07-24 2014-10-08 上海强劲地基工程股份有限公司 Method for constructing cement soil mixing pile and concrete pile meshed foundation pit supporting structure
CN106639915A (en) * 2017-01-11 2017-05-10 中国化学工程重型机械化公司 Construction device for long-spiral filling pile and construction process thereof
CN111851479A (en) * 2020-07-30 2020-10-30 陕西龙海新创基础工程有限公司 Method for constructing immersed tube rammed cast-in-place pile in sand layer or gravel layer

Similar Documents

Publication Publication Date Title
CN1111230C (en) Making method for non-annular borehole cast-in-place pile
CN1137312C (en) Foundation grouting apparatus and method thereof
CN100402759C (en) Screw-thread bored concrete pile piling method
CN1309909C (en) Follow-up mud jacking rotary digging drilling hole bored concrete pile technology
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN108729440A (en) Wing stirring base expanding and base expanding stiff composite pile, its construction method and drilling machine are expanded in the spray of spiral height
CN1177109C (en) Pile end mortar pre-pressing construction method and apparatus for long screw auger drilling deposited pile and CFG pile
CN112323560B (en) Roadbed construction settlement control system in complex soft foundation environment
CN106996104A (en) Injection forming club-footed pile and its construction method
CN1208102A (en) Deposited pile and its construction
CN1127819A (en) Internal thread bored and cast-in-place pile series and construction method and equipment thereof
CN106049463B (en) The construction method and its drilling tool of a kind of earth-squeezing hole-enlarging stake and the earth-squeezing hole-enlarging stake
CN1029518C (en) Super fluidized concrete, the method and drilling machine for pile forming using such concret
CN104846820A (en) End-bearing type threaded displacement pile forming equipment and pile forming construction method
CN100374657C (en) Construction method employing threaded stirring shaft to decrease ambient foundation deformation
CN110318392A (en) A kind of major diameter cement earth pile method of construction
CN107642093B (en) Stake holes slip casting adjustment structure
CN105672329A (en) Deep foundation pit large-size prefabricated envelop enclosure and construction method
CN206034417U (en) A integrated system is split in high extrusion of deep soft base drilling cream thick liquid
CN200999592Y (en) Gyroscope drill and piling machine with gyroscope drill
CN1115819A (en) Serial pile of screw drilling pouring pile of and their construction process and apparatus
CN106939596A (en) A kind of cast-in-place slub type slurry drilled pile
CN208201858U (en) Wing stirring base expanding and base expanding stiff composite pile and drilling machine are expanded in the spray of spiral height
CN111910615A (en) Paste drilling, filling, impact extrusion and enlarged footing anchor rod structure system and construction method thereof
CN107489153B (en) A kind of casting tube for the injection of stake holes concrete grout

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication