CN101876172A - Method for forming holes of square and rectangular cast-in place piles - Google Patents
Method for forming holes of square and rectangular cast-in place piles Download PDFInfo
- Publication number
- CN101876172A CN101876172A CN 201010163340 CN201010163340A CN101876172A CN 101876172 A CN101876172 A CN 101876172A CN 201010163340 CN201010163340 CN 201010163340 CN 201010163340 A CN201010163340 A CN 201010163340A CN 101876172 A CN101876172 A CN 101876172A
- Authority
- CN
- China
- Prior art keywords
- square
- pilot hole
- hole
- rectangle
- stake
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The invention provides a method for forming holes of square and rectangular cast-in place piles. The method comprises the following steps of: determining the size of a way-type drilling unit and the diameter of a pilot hole according to the cross section dimensions of the square and rectangular cast-in place piles, wherein the depth of the pilot hole is equal to the depth of a designed pile; constructing the pilot hole by adopting an engineering driller or a rotary drilling rig according to the pilot hole diameter determined in the last step; inserting and placing a reverse circulation spraying conduit and the way-type drilling unit determined in the first step along the center of the dug pilot hole; and finishing the hole forming of the square and rectangular cast-in place piles at a time by adopting a hole forming trolley. The method has the advantages that on the premise of finishing the pilot hole, the hole forming work of the square and rectangular cast-in place piles is finished at a time, thus the hole forming quality and the verticality are obviously improved; and a hole forming cross section type has larger bending modulus compared with a traditional cross section, thereby saving the wall protection slurry and realizing the win-win-win of the work efficiency, the quality and the cost.
Description
Technical field
The present invention relates to a kind of method of pouring pile hole, particularly a kind of method of square, rectangle bored pile hole.
Background technology
Along with the reform and opening-up fast development of national economy, domestic each port is to satisfy the requirement that boats and ships maximize, and builds the large-sized deep water berth one after another.The PORT OF TONGXHAN is to serve as a main model who builds the port at the aleuritic texture seashore with diaphragm wall sheet pile harbour, sheet-pile wharf structure as one of three big dock structure patterns has but run into great difficulty in the process of harbour deep waterization, maximization, mainly be that the sheet pile section is difficult to satisfy the moment of flexure requirement that deepwater wharf sharply increases.
General traditional way mainly contains:
1. the anti-grooving worker method that circulates of conduit gaslift
Traditional side's stake, rectangle stake pore-forming worker method are to have continued to use the proprietary anti-grooving technology that circulates of conduit gaslift of my company, have applied to after it is transformed a little in the construction of square stake, rectangle stake pore-forming.Operation equals pilot hole square, rectangle stake minor face size for boring one with single head diving drill machine or rotary drilling rig earlier, lay spray conduit, twin tip drill then, creep into along a direction, creep into finish after, change and to repair the traverse drill tool and the soil body that does not machine away is carried out the reaming cutting repair groove.Repair behind the trough end finish as stated above along other direction creep into, reaming repaiies the groove operation.Carry out scarfing cinder at last and change slurry, finish the drilling construction of whole stake.Its square or rectangle stake pore-forming operation and technological process are as follows:
Elder generation is construction one pilot hole in stake cross section, side, the anti-groover that circulates of lifting twin tip drill gaslift carries out construction operation along a direction in stake cross section, lifting impact reaming is repaiied the traverse drill tool and is carried out hole wall trimming construction operation, adjust the anti-groover construction direction that circulates of twin tip drill gaslift and carry out construction operation along the other direction in stake cross section, lifting is impacted reaming and is repaiied the traverse drill tool and carry out hole wall trimming construction operation.Form the pile body cross section that adheres to specification through above operation, the anti-groover that circulates of lifting twin tip drill gaslift carries out construction operation along a direction in stake cross section, lifting impact reaming is repaiied the traverse drill tool and is carried out hole wall trimming construction operation, adjust the anti-groover construction direction that circulates of twin tip drill gaslift and carry out construction operation along the other direction in stake cross section, lifting impact reaming is repaiied the traverse drill tool and is carried out hole wall trimming construction operation, forms the pile body cross section that adheres to specification through above operation.
Traditional handicraft trenching construction process: pilot hole construction, the construction in place of lifting pore-forming, through the twin tip drill pore-forming, hole for hoist is repaiied the construction in place of wall complete machine tool, the construction of finishing facility, lifting pore-forming facility tune construction, through the twin tip drill pore-forming, hole for hoist is repaiied the construction in place of wall complete machine tool again, the construction of finishing facility, change slurry through scarfing cinder, drilling construction finishes.
There is following shortcoming in this worker's method:
Because traditional worker's method transplants in continuous wall trench underground technology, and side's stake, rectangle stake exist the characteristics that quantity is big, the cross section is little, pile body is long.In square stake, rectangle pile driving construction, continue to use the construction technology of continuous wall trench underground, needing lifting repeatedly to lay spray conduit, twin tip drill and repair construction equipment such as traverse drill tool just can the side of finishing or the creeping into and cutting operation of rectangle stake pile body, therefore except that progress can not completely require, its hole quality also was difficult to guarantee.By statistical analysis as can be seen, accounted for half time of hoisting machine tool equipment, caused the pore-forming time longer, efficient is lower.
2. hydraulic grab method: the same with the method for hydraulic grab grooving, adopt hydraulic grab to carry out drilling construction square, the rectangle bored pile.Require the appearance and size of grab bucket consistent with the cross dimensions of stake, the grab bucket pore-forming is accomplished one-shot forming.Pore-forming efficiency is higher, but practical application is subjected to great limitation:
1. unit cost height: actual efficiency is compared with the unit cost and is caused operating expenses to improve, and construction cost strengthens.
2. bad adaptability: the stake section is ever-changing with structure stress, layout, and grab bucket must be supporting with it.Because of hydraulic grab bucket body processed complex, processing cost are bigger, the situation that makes it to adapt to a section variation is relatively poor.
3. less as the stake section, the monobucket body is grabbed the hole and is implemented relatively difficulty.
In order to solve the difficult problem of this long-term puzzlement marine traffic engineering circle, CCCC First Harbor Consultants Co., Ltd. is together with scientific research, monitoring, unit in charge of construction, design half blind type under owner's support energetically, blind type, separate discharging type sheet-pile wharf new construction, how to realize sheet-pile wharf structure deep water technology is broken through, " device of device for guiding tube reverse-circulation grooving method of underground continuous wall " (patent No.: patented technology 87102552.3) and " square; rectangle drilling pouring pile hole way-type drilling unit " (patent No.: 200720099780.5) patented technology of utilizing my company once to obtain, adopted the good rectangle of a large amount of stress performances in the structure, the bored pile of square cross-section, and research and develop a kind of job practices of adaptable sheet-pile wharf new structure type.
Summary of the invention
The objective of the invention is to adapt to the extensive use of sheet-pile wharf new structure type, be square, rectangle Bored Pile Construction in a large number, provide a kind of easy, quick, efficient, that compliance is strong, cost is low is square, the method for rectangle drilling pouring pile hole.The bored pile of this kind sectional form not only is confined to sheet-pile wharf, also can use widely in the architecture basics of other field.
For achieving the above object, the invention provides a kind of method of square, rectangle drilling pouring pile hole, this method includes following steps:
1. according to cross dimensions square, the rectangle bored pile, determine the diameter of way-type drilling unit size and pilot hole; Described pilot hole is the pilot hole that is less than or equal to described side's stake, rectangle drill-pouring pile body minor face at center injection one diameter of described side's stake, rectangle bored pile, and it is dark that this guide's hole depth equals the design stake;
2. the pilot hole diameter of 1. determining according to step adopts engineering driller or rotary drilling rig construction pilot hole;
3. insert along the center of the pilot hole that digs and lay anti-circulation spray conduit and the 1. definite way-type drilling unit of step, adopt the pore-forming chassis once to finish pore-forming square, the rectangle bored pile; Described pore forming process is to be fixed on many bench drills machine on the way-type drilling unit along the spray conduit descending rotary cutting soil body by symmetry, and in descending rotary course, remaining soil body cutting is formed the stake pile body cross section, side that adheres to specification by the cutting tip that is embedded on the way-type drilling unit.
Effect of the present invention be this method because adopted square, rectangle drilling pouring pile hole way-type drilling unit and " device for guiding tube reverse-circulation grooving method " and integrated application, pore-forming operation square, the rectangle bored pile is simplified greatly, finish pore-forming work square, the rectangle bored pile in the prerequisite of finishing pilot hole, hole quality, verticality are greatly improved next time.The raising of work efficiency and the improvement of technology saved the consumption of slurry coat method, realized three wins of work efficiency, quality, cost.It has broken the simple pattern of the unique circular cross-section of conventional borehole castinplace pile, is adapted to the pore-forming of multiple patterns such as square, square-section bored pile.This cross section type has bigger composite bending modulus than the conventional version cross section, more becomes rationally for the bored pile sectional form of horizontal force resistant, has better cost performance.Current construction field does not have a kind of special equipment can adapt to square, rectangle drilling pouring pile hole construction, and the birth of this invention is an important breakthrough to conventional borehole filling pile construction worker method.
Description of drawings
Fig. 1 is square, a rectangle drilling pouring pile hole procedure chart of the present invention---form pilot hole;
Fig. 2 is square, a rectangle drilling pouring pile hole procedure chart of the present invention---determine the size of way-type drilling unit;
Fig. 3 is square, a rectangle drilling pouring pile hole procedure chart of the present invention---finish pore-forming work square, the rectangle bored pile.
The specific embodiment
Below in conjunction with accompanying drawing method utilization square, the rectangle drilling pouring pile hole of the present invention is further specified.
The method of square, rectangle drilling pouring pile hole of the present invention based on principle be: adopt " square, rectangle drilling pouring pile hole way-type drilling unit " (patent No.: 200720099780.5) patented technology, the anti-worker's of the circulation method of conduit gaslift is improved, drilling and forming hole and hole wall finishing two procedures are united two into one, twin tip drill changes bull into and bores, and around middle spray conduit symmetric arrangement.In drilling and forming hole, be located at bull and bore that the vertical cut blade cuts periphery and four jiaos of remaining soil bodys simultaneously on the drilling cramp, the pore-forming operation of the so once side's of finishing stake, rectangle stake.
The method of square, rectangle drilling pouring pile hole of the present invention, this method includes following steps:
1. according to cross dimensions square, the rectangle bored pile, determine the diameter of way-type drilling unit size and pilot hole; Described pilot hole is the pilot hole that is less than or equal to described side's stake, rectangle drill-pouring pile body minor face at center injection one diameter of described side's stake, rectangle bored pile, and it is dark that this guide's hole depth equals the design stake;
2. the pilot hole diameter of 1. determining according to step adopts engineering driller or rotary drilling rig construction pilot hole;
3. insert along the center of the pilot hole that digs and lay anti-circulation spray conduit and the 1. definite way-type drilling unit of step, adopt the pore-forming chassis once to finish pore-forming square, the rectangle bored pile; Described pore forming process is to be fixed on many bench drills machine on the way-type drilling unit along the spray conduit descending rotary cutting soil body by symmetry, and in descending rotary course, remaining soil body cutting is formed the stake pile body cross section, side that adheres to specification by the cutting tip that is embedded on the way-type drilling unit.
Method detailed construction step square, the rectangle drilling pouring pile hole of the present invention is as follows:
1. wall construction is buried or led to casing underground: bury underground on the stake position shift to an earlier date ready steel casing or on the axis of stake position construction lead wall, leading wall can be to be that unit arranges with every pile independently, also can be along the elongated wall of leading of stake axis construction, if when pilespacing is nearer.Casing and to lead wall mainly be to play to prevent caving in, holds and storing up mud and reinforcing bar is laid effects such as location of aperture in the pore forming process.If the top layer is loose, soft layer, still needs to carry out the top layer changed and tamp the real processing that waits.
2. guide hole construction: determining the diameter of pilot hole according to cross dimensions square, the rectangle bored pile, is center construction guide hole with the centre of form of stake section, and hole depth is with dark consistent.It is dark to the design stake to adopt single hole rigs such as engineering driller or rotary drilling rig to construct under the prerequisite of mud off to get out a diameter to be less than or equal to the single hole of rectangle stake minor face, as shown in Figure 1.
3. way-type drilling unit determining dimensions: determine the size of way-type drilling unit and the size of way-type drilling unit drill bit according to the diameter of stake cross dimensions and pilot hole, as shown in Figure 2, make the area minimum of the dash area among the figure to be beneficial to the cutting of way-type drilling unit.The characteristics of way-type drilling unit are: simple in structure, handling ease is quick, with low cost, the variation field machining that adapts to the stake section is made.
4. laying track, lay the pore-forming chassis, lay spray conduit and way-type drilling unit in pilot hole, way-type drilling unit is once finished square, the pore-forming of rectangle bored pile, cutwork under the controlling of pore-forming chassis, finish square, the construction of square type pouring pile hole, as shown in Figure 3.The detailed process of drilling construction is: symmetry is fixed on many bench drills machine on the way-type drilling unit along the spray conduit descending rotary cutting soil body, and in descending rotary course, remaining soil body cutting is formed the stake pile body cross section, side that adheres to specification by the cutting tip that is embedded on the way-type drilling unit.
5. leave standstill, clear hole changes slurry, detects mud index and sediment, satisfies the construction of carrying out next process after standard and the designing requirement.
Because the simplification of pore-forming operation, efficiency of construction improves greatly, simultaneously because the one-shot forming of the pore-forming of square, rectangle bored pile, hole quality, verticality are significantly improved, the raising of work efficiency and the improvement of technology, save the consumption of slurry coat method, realized three wins of work efficiency, quality, cost.
The extensive use of the present invention in engineering construction, improved the efficiency of construction of " square, rectangular cross section is square, rectangle bored pile " greatly, not only guaranteed quality but also reduced construction cost, the support of construction technology aspect also is provided for the innovation of design new construction simultaneously.
Claims (1)
1. the method for square, a rectangle drilling pouring pile hole, this method includes following steps:
1. according to cross dimensions square, the rectangle bored pile, determine the diameter of way-type drilling unit size and pilot hole; Described pilot hole is the pilot hole that is less than or equal to described side's stake, rectangle drill-pouring pile body minor face at center injection one diameter of described side's stake, rectangle bored pile, and it is dark that this guide's hole depth equals the design stake;
2. the pilot hole diameter of 1. determining according to step adopts engineering driller or rotary drilling rig construction pilot hole;
3. insert along the center of the pilot hole that digs and lay anti-circulation spray conduit and the 1. definite way-type drilling unit of step, adopt the pore-forming chassis once to finish pore-forming square, the rectangle bored pile; Described pore forming process is to be fixed on many bench drills machine on the way-type drilling unit along the spray conduit descending rotary cutting soil body by symmetry, and in descending rotary course, remaining soil body cutting is formed the stake pile body cross section, side that adheres to specification by the cutting tip that is embedded on the way-type drilling unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010163340 CN101876172A (en) | 2010-05-06 | 2010-05-06 | Method for forming holes of square and rectangular cast-in place piles |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010163340 CN101876172A (en) | 2010-05-06 | 2010-05-06 | Method for forming holes of square and rectangular cast-in place piles |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101876172A true CN101876172A (en) | 2010-11-03 |
Family
ID=43018840
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010163340 Pending CN101876172A (en) | 2010-05-06 | 2010-05-06 | Method for forming holes of square and rectangular cast-in place piles |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101876172A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493762A (en) * | 2011-12-23 | 2012-06-13 | 上海港务工程公司 | Rectangular cast-in-place pile slotting combined drilling rig |
CN102561941A (en) * | 2011-12-07 | 2012-07-11 | 北京市三一重机有限公司 | Rotary drilling rig and pore-forming state detection device thereof |
CN106759282A (en) * | 2016-12-30 | 2017-05-31 | 安徽省建筑科学研究设计院 | A kind of mechanical hole building method of super-large diameter hard rock bored concrete pile half |
CN107642084A (en) * | 2017-09-21 | 2018-01-30 | 中国建筑土木建设有限公司 | A kind of rectangle stake holes manufacturing process and building mortion |
CN109681116A (en) * | 2019-01-31 | 2019-04-26 | 四川省交通运输厅交通勘察设计研究院 | A kind of square pile rotary drilling device and its rotary digging method for realizing rectangular pore-forming |
CN113529759A (en) * | 2021-08-31 | 2021-10-22 | 中铁三局集团有限公司 | Construction method for mechanically excavating pile plate wall |
CN114482078A (en) * | 2022-01-27 | 2022-05-13 | 四川省地质工程勘察院集团有限公司 | Hole forming construction method for square slide-resistant pile |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4212565A (en) * | 1978-04-17 | 1980-07-15 | The Shimizu Construction Co., Ltd. | Method and apparatus for forming a continuous row of cast-in-place piles to form a wall |
CN1127819A (en) * | 1995-09-15 | 1996-07-31 | 孙新河 | Internal thread bored and cast-in-place pile series and construction method and equipment thereof |
JPH0941369A (en) * | 1995-08-03 | 1997-02-10 | Rootarii Consultant:Kk | Method of remodeling and reinforcing construction of pile |
JP2729863B2 (en) * | 1991-05-20 | 1998-03-18 | 新日本製鐵株式会社 | Auger for soil cement composite pile |
JP2004239014A (en) * | 2003-02-10 | 2004-08-26 | Nippon Koatsu Concrete Kk | Immersion method for pile and its device |
CN201095748Y (en) * | 2007-09-28 | 2008-08-06 | 天津深基工程有限公司 | Rectangular and square filling pile pore-forming combined drilling tool |
-
2010
- 2010-05-06 CN CN 201010163340 patent/CN101876172A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4212565A (en) * | 1978-04-17 | 1980-07-15 | The Shimizu Construction Co., Ltd. | Method and apparatus for forming a continuous row of cast-in-place piles to form a wall |
JP2729863B2 (en) * | 1991-05-20 | 1998-03-18 | 新日本製鐵株式会社 | Auger for soil cement composite pile |
JPH0941369A (en) * | 1995-08-03 | 1997-02-10 | Rootarii Consultant:Kk | Method of remodeling and reinforcing construction of pile |
CN1127819A (en) * | 1995-09-15 | 1996-07-31 | 孙新河 | Internal thread bored and cast-in-place pile series and construction method and equipment thereof |
JP2004239014A (en) * | 2003-02-10 | 2004-08-26 | Nippon Koatsu Concrete Kk | Immersion method for pile and its device |
CN201095748Y (en) * | 2007-09-28 | 2008-08-06 | 天津深基工程有限公司 | Rectangular and square filling pile pore-forming combined drilling tool |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561941A (en) * | 2011-12-07 | 2012-07-11 | 北京市三一重机有限公司 | Rotary drilling rig and pore-forming state detection device thereof |
CN102493762A (en) * | 2011-12-23 | 2012-06-13 | 上海港务工程公司 | Rectangular cast-in-place pile slotting combined drilling rig |
CN106759282A (en) * | 2016-12-30 | 2017-05-31 | 安徽省建筑科学研究设计院 | A kind of mechanical hole building method of super-large diameter hard rock bored concrete pile half |
CN106759282B (en) * | 2016-12-30 | 2018-03-20 | 安徽省建筑科学研究设计院 | A kind of mechanical hole building method of super-large diameter hard rock bored concrete pile half |
CN107642084A (en) * | 2017-09-21 | 2018-01-30 | 中国建筑土木建设有限公司 | A kind of rectangle stake holes manufacturing process and building mortion |
CN109681116A (en) * | 2019-01-31 | 2019-04-26 | 四川省交通运输厅交通勘察设计研究院 | A kind of square pile rotary drilling device and its rotary digging method for realizing rectangular pore-forming |
CN113529759A (en) * | 2021-08-31 | 2021-10-22 | 中铁三局集团有限公司 | Construction method for mechanically excavating pile plate wall |
CN114482078A (en) * | 2022-01-27 | 2022-05-13 | 四川省地质工程勘察院集团有限公司 | Hole forming construction method for square slide-resistant pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101876172A (en) | Method for forming holes of square and rectangular cast-in place piles | |
CN201095748Y (en) | Rectangular and square filling pile pore-forming combined drilling tool | |
CN101736755B (en) | Clean water hole pile foundation constructing method | |
CN102561361A (en) | Ultra-deep T-shaped trench-wall pile in soft-toped hard-bottomed soil layer and trench forming method | |
CN104047542B (en) | Embedding rock taper pile impacts drilling pipe hammer system and embedding rock taper pile impacts construction method | |
CN102182399B (en) | Construction method and equipment for reverse circulation drill to drill hole, hammer to form hole, expand hole and remove slag | |
CN110984133A (en) | Construction method for foundation of deep-water shallow-covering-layer trestle | |
CN110984132B (en) | Construction method for grooving underground diaphragm wall under complex geological condition | |
CN203584301U (en) | Hole guide equipment | |
CN114215049A (en) | Construction method for main steel casing of bored pile under deep water foundation and bare rock environment | |
CN106677166A (en) | Flow construction method for forming cast-in-place bored pile for gravel-decomposed rock stratum in double-machine combined mode | |
CN103953027B (en) | Method for constructing underground continuous wall in base rock | |
CN108442362B (en) | Hole forming construction process for coastal drilled pile penetrating riprap layer | |
CN202519695U (en) | Ultra-deep T-shaped slot wall pile used for soil layer with soft top and hard bottom and slot structure thereof | |
CN109610439A (en) | The construction method of underground obstacle ultra-deep underground continuous wall grooving | |
CN112901074A (en) | Rock-socketed drilling pore-forming process of marine large-diameter inclined pile rotary excavator | |
CN102561454B (en) | Water intake method utilizing pipe jacking vertically | |
CN216640561U (en) | Novel combined type enclosure structure | |
CN204690772U (en) | A kind of pile foundation in deep water location, guide frame | |
CN103195053B (en) | A kind of construction method of the piling strtucture with stake shoulder | |
CN212477725U (en) | Pile machine of split combined type full-pile casing | |
CN212614533U (en) | Rotary drilling rig for fishing method construction | |
CN204626439U (en) | A kind of ruggedized construction of existing sole plate | |
CN114370234A (en) | Bare rock riverbed steel pipe pile construction equipment and construction method | |
CN106759377A (en) | The construction method of recyclable building enclosure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20101103 |