CN112734563A - Data management method and system based on fund flow - Google Patents

Data management method and system based on fund flow Download PDF

Info

Publication number
CN112734563A
CN112734563A CN202110028926.1A CN202110028926A CN112734563A CN 112734563 A CN112734563 A CN 112734563A CN 202110028926 A CN202110028926 A CN 202110028926A CN 112734563 A CN112734563 A CN 112734563A
Authority
CN
China
Prior art keywords
information
project
application information
obtaining
fund
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110028926.1A
Other languages
Chinese (zh)
Inventor
韦佳
刘盼盼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Handpal Information Technology Service Co ltd
Original Assignee
Shanghai Handpal Information Technology Service Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Handpal Information Technology Service Co ltd filed Critical Shanghai Handpal Information Technology Service Co ltd
Priority to CN202110028926.1A priority Critical patent/CN112734563A/en
Publication of CN112734563A publication Critical patent/CN112734563A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/03Credit; Loans; Processing thereof
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • General Business, Economics & Management (AREA)
  • Accounting & Taxation (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • Finance (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Technology Law (AREA)
  • Data Mining & Analysis (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

The invention discloses a data management method and a system based on fund flow, which are applied to a fund management system, wherein the method comprises the following steps: a first customer manager fills information according to a first request payment application task generated by the fund management system, and submits the first project application information to a first operation supervisor after obtaining the first project application information; the system judges whether the first project application information can be submitted or not according to the first balance distribution information and the first project classification; if the first project application information can be submitted, the first operation supervisor performs checking, and submits the first project application information to a first fund department for examination and approval; and if the first fund department passes the approval, updating the state of the first project application information and ending the first request task. The method solves the technical problems that the fund flow data is lost and the working efficiency is low because the application of the money request flow in the prior art is not realized on line.

Description

Data management method and system based on fund flow
Technical Field
The invention relates to the field of fund flows, in particular to a data management method and a data management system based on fund flows.
Background
The process of applying for the payment is an important link of capital expenditure, at present, the operation initiates application in a work group every day, and the payment is released after the examination of a capital department, and the online realization is not realized. Therefore, key information is lost in the system, incomplete fund flow data is caused, and therefore the process is urgently needed to be online, blanks are made up, meanwhile, the fund-requesting work flow is optimized, and work efficiency is improved.
In the process of implementing the technical scheme of the invention in the embodiment of the present application, the inventor of the present application finds that the above-mentioned technology has at least the following technical problems:
the application of the money requisition flow does not realize online, which causes the loss of data of the fund flow and has low working efficiency.
Disclosure of Invention
The embodiment of the application solves the technical problems that the fund flow data is lost and the working efficiency is low because the application of the fund flow is not realized on line in the prior art, and realizes the technical purpose of improving the accuracy and the efficiency of the fund flow work flow by ensuring the integrity of the fund flow data operation and the timeliness of updating the data.
The embodiment of the application provides a data management method based on fund flow, which is applied to a fund management system, wherein the method comprises the following steps: obtaining a first request for payment application task; filling information by a first customer manager according to the first payment application task to obtain first project application information; acquiring a first submission instruction, and submitting the first project application information to a first operation supervisor according to the first submission instruction; obtaining first balance distribution information of the bonus pool; obtaining a first project classification of the first project application information; judging whether the first project application information can be submitted according to the first balance distribution information and the first project classification; if the first project application information can be submitted, the first operation supervisor carries out checking, a second submission instruction is obtained, and the first project application information is submitted to a first fund department for examination and approval; if the first fund part passes the approval, obtaining a first updating instruction for updating the state of the first project application information; and obtaining a first termination instruction, and ending the first request payment application task.
In another aspect, the present application further provides a data management system based on fund flow, wherein the system includes: the first obtaining unit is used for obtaining a first request payment application task; a second obtaining unit, configured to perform information filling by a first customer manager according to the first request payment application task, and obtain first project application information; a third obtaining unit, configured to obtain a first submission instruction, and submit the first project application information to a first operation supervisor according to the first submission instruction; a fourth obtaining unit for obtaining first balance allocation information of a bonus pool; a fifth obtaining unit, wherein the fifth obtaining unit obtains the first item classification of the first item application information; a first judging unit, configured to judge whether the first item application information can be submitted according to the first balance allocation information and the first item classification; a sixth obtaining unit, configured to, if the first project application information can be submitted, perform checking by the first operator, obtain a second submission instruction, and submit the first project application information to a first fund department for approval; a seventh obtaining unit, configured to obtain a first update instruction, if the first fund department passes the approval, and update a state of the first project application information; and the eighth obtaining unit is used for obtaining a first termination instruction and ending the first request payment application task.
On the other hand, an embodiment of the present application further provides a data management system based on a fund flow, including a memory, a processor, and a computer program stored on the memory and executable on the processor, where the processor implements the steps of the method according to the first aspect when executing the program.
One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
because the fund management system is adopted to control the fund application process, the fund application task is automatically generated on the working day of the client manager, the client manager submits the application after filling the information of the required fund, the operation supervisor submits the approval of the fund part after the approval, and the process is ended after the fund part passes. The fund management system automatically checks the fund request information and the applied amount, gives an early warning in time, updates the state information of the fund flow in real time, and achieves the technical aim of improving the accuracy and the efficiency of the fund request work flow by ensuring the integrity of the operation of the fund flow data and the timeliness of the updated data.
The foregoing is a summary of the present disclosure, and embodiments of the present disclosure are described below to make the technical means of the present disclosure more clearly understood.
Drawings
Fig. 1 is a schematic flowchart of a data management method based on a fund flow according to an embodiment of the present application;
FIG. 2 is a schematic structural diagram of a data management system based on fund flow according to an embodiment of the present application;
fig. 3 is a schematic structural diagram of an exemplary electronic device according to an embodiment of the present application.
Description of reference numerals: a first obtaining unit 11, a second obtaining unit 12, a third obtaining unit 13, a fourth obtaining unit 14, a fifth obtaining unit 15, a first judging unit 16, a sixth obtaining unit 17, a seventh obtaining unit 18, an eighth obtaining unit 19, a bus 300, a receiver 301, a processor 302, a transmitter 303, a memory 304, and a bus interface 305.
Detailed Description
The embodiment of the application solves the technical problems that the fund flow data is lost and the working efficiency is low because the application of the fund flow is not realized on line in the prior art, and realizes the technical purpose of improving the accuracy and the efficiency of the fund flow work flow by ensuring the integrity of the fund flow data operation and the timeliness of updating the data. Hereinafter, example embodiments of the present application will be described in detail with reference to the accompanying drawings. It should be apparent that the described embodiments are merely some embodiments of the present application and not all embodiments of the present application, and it should be understood that the present application is not limited to the example embodiments described herein.
Summary of the application
The process of applying for the payment is an important link of capital expenditure, at present, the operation initiates application in a work group every day, and the payment is released after the examination of a capital department, and the online realization is not realized. Therefore, key information is lost in the system, incomplete fund flow data is caused, and therefore the process is urgently needed to be online, blanks are made up, meanwhile, the fund-requesting work flow is optimized, and work efficiency is improved. The technical problems of fund flow data loss and low working efficiency caused by the fact that online application of the money request flow is not realized in the prior art also exist.
In view of the above technical problems, the technical solution provided by the present application has the following general idea:
the embodiment of the application provides a data management method based on fund flow, which is applied to a fund management system, wherein the method comprises the following steps: obtaining a first request for payment application task; filling information by a first customer manager according to the first payment application task to obtain first project application information; acquiring a first submission instruction, and submitting the first project application information to a first operation supervisor according to the first submission instruction; obtaining first balance distribution information of the bonus pool; obtaining a first project classification of the first project application information; judging whether the first project application information can be submitted according to the first balance distribution information and the first project classification; if the first project application information can be submitted, the first operation supervisor carries out checking, a second submission instruction is obtained, and the first project application information is submitted to a first fund department for examination and approval; if the first fund part passes the approval, obtaining a first updating instruction for updating the state of the first project application information; and obtaining a first termination instruction, and ending the first request payment application task.
Having thus described the general principles of the present application, various non-limiting embodiments thereof will now be described in detail with reference to the accompanying drawings.
Example one
As shown in fig. 1, an embodiment of the present application provides a data management method based on fund flow, which is applied to a fund management system, wherein the method includes:
step S100: obtaining a first request for payment application task;
further, step S100 in the embodiment of the present application further includes:
step S101: obtaining first working calendar information of the first customer manager;
step S102: obtaining first date information;
step S103: judging whether the first calendar information is the working day of the first customer manager or not according to the first working calendar information;
step S104: and if the first date information is the working day of the first customer manager, automatically generating the first request payment application task by the fund management system.
Specifically, the fund management system acquires the working calendar of the first customer manager, and by judging whether the current date is the working day of the first customer manager or not, if so, the fund management system automatically generates the first money application task, and if the first customer manager clicks the money application task in the working calendar, a new money application page is popped up.
Step S200: filling information by a first customer manager according to the first payment application task to obtain first project application information;
specifically, the first customer manager inputs the item information applied in the first money application task and uploads the item information to the fund management system, so as to obtain the first item application information, wherein the first item application information comprises an item number, an item name, a fund type and an application amount.
Step S300: acquiring a first submission instruction, and submitting the first project application information to a first operation supervisor according to the first submission instruction;
specifically, after the first customer manager uploads the first project application information to the fund management system, a record list of all projects to be applied is obtained, the application information to be submitted is selected, a 'submitting and approving' button is clicked, a request and approval process is initiated, the request and approval information is submitted to an operation manager for approval, and after the request and approval, the application record state of the first project application information is updated to be in 'approval'.
Further, the application record status of the operation interface of the first customer manager is shown in table 1 below:
TABLE 1
Status of state Description of the invention Button authority
To be submitted Record the initial state after import Submitting approval, editing and deleting
In the examination and approval Post-submission approval status
Approval pass The approval of the fund department is passed, and the process is ended
Close off The operation supervisor closes the record and the process is finished
Has been split OperationMain recording state after splitting main pipe
Step S400: obtaining first balance distribution information of the bonus pool;
specifically, after a financing agreement is established, the system automatically establishes or associates a fund pool according to a fund management mode in the financing agreement, or respectively establishes different fund pools according to the fund. The fund pool is associated with the client contract, the maximum amount of used funds is set (if the maximum amount of used funds is not set, the upper limit of used funds is not considered to be set), and the used amount and the remaining amount of the project corresponding to the contract are recorded. The first balance distribution information of the bonus pool is balance distribution information of the bonus pool corresponding to the first project application information, and comprises used amount and residual amount information.
Step S500: obtaining a first project classification of the first project application information;
specifically, the first item category includes a payment item, a prepay item. The first items are classified differently and the funds are analyzed differently.
Step S600: judging whether the first project application information can be submitted according to the first balance distribution information and the first project classification;
specifically, when the first item is classified as prepaid, determining whether the first item application information can be submitted by checking an item balance; and when the first project is classified as payment, checking whether the first project application information can be submitted by checking project distribution balance and the fund pool available amount. And when the total amount of the applied money of the first project application information is less than the remaining available amount, the first project application information is acquiescent to be capable of being submitted.
Step S700: if the first project application information can be submitted, the first operation supervisor carries out checking, a second submission instruction is obtained, and the first project application information is submitted to a first fund department for examination and approval;
specifically, the fund management system classifies the first project application information submitted by the first customer manager according to the corresponding fund pool, and displays the total amount applied and available in the corresponding bonus pool. When the first project application information meets the submittable condition, the first operation supervisor can carry out checking, the total amount of application and the total amount of available use are recalculated according to the checking item, after the first operation supervisor carries out checking, a 'submission approval' button is clicked, and the checked record can be submitted to the first fund department for approval.
The description of the application record state of the first operation administration page is shown in the following table 2:
TABLE 2
Figure BDA0002890608500000091
Step S800: if the first fund part passes the approval, obtaining a first updating instruction for updating the state of the first project application information;
specifically, after the first operator administration submits and approves the first project application information, the authority personnel related to the first fund department receive an approval task, click the approval task, and enter an approval interface. The application of the bedding project and the prepaid project are separately displayed on the page, the capital staff check the record needing to be submitted to the approval of the capital department on the bedding project or the prepaid project page, and the total amount of the application and the total amount of the available are recalculated according to the check items. If the 'submitting approval' button is clicked, the selected records can be submitted to the fund department for approval, and the page pop-up box prompts: "successful submission approval". The recorded state is 'approved', and the state of the first project application information of the first operation supervisor and the first customer manager page is 'approved' by synchronous updating by the fund management system; if click "refute" button, need fill in the reason of refuting, confirm the suggestion of back bullet frame: and the state of the first project application information is set as 'reject', and the fund management system synchronously updates the record state submitted by the operation supervisor.
The application record status of the first fund part page is shown in the following table 3:
TABLE 3
Status of state Description of the invention Button authority
To be examined and approved The state of the capital personnel receiving the approval record submitted by the operation supervisor Approval pass or refute
Approval pass The capital personnel passes the approval and the process is ended
Refute and refute After the fund personnel refutes the application
Has been split Master record status of operator supervisor split
Step S900: and obtaining a first termination instruction, and ending the first request payment application task.
Specifically, if the authority person related to the first fund department clicks a "submit approval" button, the first fund application task is ended and the fund application process is terminated through the fund application approval of the first project application information.
Further, step S200 in the embodiment of the present application further includes:
step S201: acquiring first application template information;
step S202: the first customer manager acquires the first project application information by downloading and filling the first application template information;
step S203: acquiring a first import instruction, and importing the first project application information into the fund management system according to the first import instruction;
step S204: obtaining a first check rule, and checking the first project application information according to the first check rule;
step S205: if the verification is passed, first data information of the first project application information is obtained;
step S206: and obtaining a second updating instruction for updating the state of the first project application information.
Specifically, the first customer manager clicks a "template download" button on a page of the first request task automatically generated by the fund management system, a template for uploading a file can be downloaded, and after completion of filling, clicks a "file upload" button, and imports a file of a requested request item, that is, the first item application information. When the file is uploaded, the system needs to verify the first project application information according to the first verification rule. The first verification rule comprises: checking whether the item number exists in the item table, if not, failing to import, prompting' import failure! # item number # not present! "; checking whether the item number has a corresponding fund pool or not by the bedding item, and prompting' import failure! Item number # no corresponding fund pool! ". If the file passes the verification, the uploading is successful, the imported file data information, namely the first data information, is displayed in a page list, and the list field comprises: application ID, project number, project name, fund type, application amount, remark, state, creation time and operation. And updating the state of the first item application information to be 'to be submitted'.
Further, step S600 in the embodiment of the present application further includes:
step S601: obtaining a first detail list of the first project application information;
step S602: obtaining first state information of the first project application information from the first detail list;
step S603: judging whether first state information of the first project application information meets a preset state threshold value or not;
step S604: and if so, acquiring a first authority, wherein the first authority is that the first project application information can be submitted and approved.
Specifically, the operation executive page displays the first detail list of the first project application information (by default, detail data is not displayed). If the first item application information is a payment-for-placement item, the list field comprises: fund pool name, application ID, project number, project name, application amount, remark, project score, applicant, application time, state and operation; if the first item application information is a prepaid item, the application list shows: application ID, item number, item name, application amount, remark, remaining available amount, applicant, application time, status, operation. Judge whether first state information of first project application information satisfies and predetermines the state threshold value, first project application information only the state is "pending approval", "refute" and just can submit the examination and approval, and when including remaining available amount < application amount record, perhaps contain the record of other states, then first operation person in charge can not click "submit the examination and approval" button, first project application information is unsatisfied first authority.
Further, step S601 in the embodiment of the present application further includes:
step S6011: obtaining first application amount information of the first project application information;
step S6012: judging whether the first application amount information exceeds a preset amount threshold value or not;
step S6013: if the first application amount information exceeds the preset amount threshold value, first early warning information is obtained;
step S6014: and obtaining a first forbidding instruction, wherein the first forbidding instruction is used for forbidding the first item application information to obtain the first authority.
Specifically, if the first operation supervisor submits the approval, the total amount of the first item application information exceeds the available total amount (the application amount in the approval needs to be deducted when the available total amount is calculated), the system pops up the frame to prompt that the application amount exceeds the amount! If yes, the first forbidding instruction is obtained, the first project application information is forbidden to obtain the first authority, and submission is carried out.
Further, step S603 in the embodiment of the present application further includes:
step S6031: acquiring a second authority, wherein the second authority is a splitting authority of the first project application information;
step S6032: acquiring first splitting information, and splitting the first project application information;
step S6033: acquiring first sub-record information, wherein the first sub-record information is record information obtained by splitting the first project application information;
step S6034: acquiring a first association instruction, and associating the first sub-record information with the first project application information;
step S6035: and obtaining a third updating instruction for updating the state of the first project application information.
Particularly, if first project application information state is "pending approval", "refute", satisfies when presetting the state threshold value, "split" button split application that first project application information clickable operation was listed up plays the frame suggestion and fills in the split amount of money, will apply for the project and split after confirming. And generating two sub-records in the original application record, wherein one sub-record is the filled split amount, and the other sub-record is the residual amount. And according to the first association instruction, associating the first sub-record information with the first project application information, and then updating the state of the first project application information to be 'split' by the fund management system.
Further, step S6034 in this embodiment of the present application further includes:
step S60341: obtaining a first synchronization instruction;
step S60342: and synchronizing the first splitting information to the first fund application task.
Specifically, after the fund management system associates the first sub-record information with the first project application information, the "split state" of the first project application information is updated to the first money application task, so that the first customer manager can also inquire in the money application task that the record is split.
To sum up, the data management method based on the fund flow provided by the embodiment of the application has the following technical effects:
because the fund management system is adopted to control the fund application process, the fund application task is automatically generated on the working day of the client manager, the client manager submits the application after filling the information of the required fund, the operation supervisor submits the approval of the fund part after the approval, and the process is ended after the fund part passes. The fund management system automatically checks the fund request information and the applied amount, gives an early warning in time, updates the state information of the fund flow in real time, and achieves the technical aim of improving the accuracy and the efficiency of the fund request work flow by ensuring the integrity of the operation of the fund flow data and the timeliness of the updated data.
Example two
Based on the same inventive concept as the method for managing data based on fund flow in the foregoing embodiment, the present invention further provides a system for managing data based on fund flow, as shown in fig. 2, where the system includes:
a first obtaining unit 11, where the first obtaining unit 11 is configured to obtain a first request for payment application task;
a second obtaining unit 12, where the second obtaining unit 12 is configured to perform information filling by a first customer manager according to the first request payment application task, and obtain first project application information;
a third obtaining unit 13, where the third obtaining unit 13 is configured to obtain a first submission instruction, and submit the first project application information to a first operation supervisor according to the first submission instruction;
a fourth obtaining unit 14, wherein the fourth obtaining unit 14 is configured to obtain the first balance allocation information of the bonus pool;
a fifth obtaining unit 15, where the fifth obtaining unit 15 obtains the first item classification of the first item application information;
a first judging unit 16, where the first judging unit 16 is configured to judge whether the first item application information can be submitted according to the first balance allocation information and the first item classification;
a sixth obtaining unit 17, where the sixth obtaining unit 17 is configured to, if the first project application information can be submitted, perform checking by the first operator, obtain a second submission instruction, and submit the first project application information to the first fund department for approval;
a seventh obtaining unit 18, where the seventh obtaining unit 18 is configured to obtain a first update instruction, if the first fund department approves, and the first update instruction is used to update the state of the first project application information;
an eighth obtaining unit 19, where the eighth obtaining unit 19 is configured to obtain a first termination instruction, and end the first request payment application task.
Further, the system further comprises:
a ninth obtaining unit, configured to obtain first working calendar information of the first customer manager;
a tenth obtaining unit configured to obtain the first date information;
a second judging unit, configured to judge whether the first calendar information is a working day of the first customer manager according to the first working calendar information;
an eleventh obtaining unit, configured to, if the first date information is a working day of the first customer manager, automatically generate, by the fund management system, the first request for payment application task.
Further, the system further comprises:
a twelfth obtaining unit, configured to obtain first application template information;
a thirteenth obtaining unit, configured to obtain the first project application information by the first customer manager by downloading and filling in the first application template information;
a fourteenth obtaining unit, configured to obtain a first import instruction, and import the first item application information to the fund management system according to the first import instruction;
a fifteenth obtaining unit, configured to obtain a first verification rule, and verify the first item application information according to the first verification rule;
a sixteenth obtaining unit, configured to obtain first data information of the first item application information if the verification passes;
a seventeenth obtaining unit, configured to obtain a second update instruction, where the second update instruction is used to update a state of the first item application information.
Further, the system further comprises:
an eighteenth obtaining unit that obtains a first list of details for obtaining the first project application information;
a nineteenth obtaining unit, configured to obtain, from the first detail list, first state information of the first item application information;
a third judging unit, configured to judge whether first state information of the first item application information satisfies a preset state threshold;
a twentieth obtaining unit, configured to obtain a first right if the first right is satisfied, where the first right is the first project application information submittable and approvable.
Further, the system further comprises:
a twenty-first obtaining unit, configured to obtain first application amount information of the first item application information;
a fourth judging unit, configured to judge whether the first application amount information exceeds a preset amount threshold;
a twenty-second obtaining unit, configured to obtain first warning information if the first application amount information exceeds the preset amount threshold;
a twenty-third obtaining unit, configured to obtain a first prohibition instruction, where the first prohibition instruction is used to prohibit the first item application information from obtaining the first right.
Further, the system further comprises:
a twenty-fourth obtaining unit, configured to obtain a second permission, where the second permission is a splitting permission of the first project application information;
a twenty-fifth obtaining unit, configured to obtain first splitting information, and split the first project application information;
a twenty-sixth obtaining unit, configured to obtain first sub-record information, where the first sub-record information is record information obtained by splitting the first project application information;
a twenty-seventh obtaining unit, configured to obtain a first association instruction, and associate the first sub-record information with the first project application information;
a twenty-eighth obtaining unit, configured to obtain a third update instruction, configured to update a state of the first project application information.
Further, the system further comprises:
a twenty-ninth obtaining unit to obtain a first synchronization instruction;
and the first synchronization instruction is used for synchronizing the first splitting information to the first fund application task.
Various changes and specific examples of the data management method based on the fund flow in the first embodiment of fig. 1 are also applicable to the data management system based on the fund flow in the present embodiment, and a person skilled in the art can clearly know the data management system based on the fund flow in the present embodiment through the foregoing detailed description of the data management method based on the fund flow, so for the brevity of the description, detailed descriptions are omitted here.
Exemplary electronic device
The electronic device of the embodiment of the present application is described below with reference to fig. 3.
Fig. 3 illustrates a schematic structural diagram of an electronic device according to an embodiment of the present application.
Based on the inventive concept of a data management method based on a fund flow in the foregoing embodiments, the present invention further provides a data management system based on a fund flow, on which a computer program is stored, which when executed by a processor implements the steps of any one of the foregoing data management methods based on a fund flow.
Where in fig. 3 a bus architecture (represented by bus 300), bus 300 may include any number of interconnected buses and bridges, bus 300 linking together various circuits including one or more processors, represented by processor 302, and memory, represented by memory 304. The bus 300 may also link together various other circuits such as peripherals, voltage regulators, power management circuits, and the like, which are well known in the art, and therefore, will not be described any further herein. A bus interface 305 provides an interface between the bus 300 and the receiver 301 and transmitter 303. The receiver 301 and the transmitter 303 may be the same element, i.e., a transceiver, providing a means for communicating with various other apparatus over a transmission medium.
The processor 302 is responsible for managing the bus 300 and general processing, and the memory 304 may be used for storing data used by the processor 302 in performing operations.
The embodiment of the application provides a data management method based on fund flow, which is applied to a fund management system, wherein the method comprises the following steps: obtaining a first request for payment application task; filling information by a first customer manager according to the first payment application task to obtain first project application information; acquiring a first submission instruction, and submitting the first project application information to a first operation supervisor according to the first submission instruction; obtaining first balance distribution information of the bonus pool; obtaining a first project classification of the first project application information; judging whether the first project application information can be submitted according to the first balance distribution information and the first project classification; if the first project application information can be submitted, the first operation supervisor carries out checking, a second submission instruction is obtained, and the first project application information is submitted to a first fund department for examination and approval; if the first fund part passes the approval, obtaining a first updating instruction for updating the state of the first project application information; and obtaining a first termination instruction, and ending the first request payment application task.
As will be appreciated by one skilled in the art, embodiments of the present invention may be provided as a method, system, or computer program product. Accordingly, the present invention may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present invention may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
The present invention is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems) and computer program products according to embodiments of the invention. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create a system for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including an instruction system which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks. While preferred embodiments of the present invention have been described, additional variations and modifications in those embodiments may occur to those skilled in the art once they learn of the basic inventive concepts. Therefore, it is intended that the appended claims be interpreted as including preferred embodiments and all such alterations and modifications as fall within the scope of the invention.
It will be apparent to those skilled in the art that various changes and modifications may be made in the present invention without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (9)

1. A data management method based on fund flow is applied to a fund management system, wherein the method comprises the following steps:
obtaining a first request for payment application task;
filling information by a first customer manager according to the first payment application task to obtain first project application information;
acquiring a first submission instruction, and submitting the first project application information to a first operation supervisor according to the first submission instruction;
obtaining first balance distribution information of the bonus pool;
obtaining a first project classification of the first project application information;
judging whether the first project application information can be submitted according to the first balance distribution information and the first project classification;
if the first project application information can be submitted, the first operation supervisor carries out checking, a second submission instruction is obtained, and the first project application information is submitted to a first fund department for examination and approval;
if the first fund part passes the approval, obtaining a first updating instruction for updating the state of the first project application information;
and obtaining a first termination instruction, and ending the first request payment application task.
2. The method of claim 1, wherein a first requisition task is obtained, the method further comprising:
obtaining first working calendar information of the first customer manager;
obtaining first date information;
judging whether the first calendar information is the working day of the first customer manager or not according to the first working calendar information;
and if the first date information is the working day of the first customer manager, automatically generating the first request payment application task by the fund management system.
3. The method of claim 1, wherein the information is filled in by the first customer manager in accordance with the first request for payment task, the method further comprising:
acquiring first application template information;
the first customer manager acquires the first project application information by downloading and filling the first application template information;
acquiring a first import instruction, and importing the first project application information into the fund management system according to the first import instruction;
obtaining a first check rule, and checking the first project application information according to the first check rule;
if the verification is passed, first data information of the first project application information is obtained;
and obtaining a second updating instruction for updating the state of the first project application information.
4. The method of claim 1, wherein determining whether the first project application information is submittable is based on the first balance allocation information and the first project classification, the method further comprising:
obtaining a first detail list of the first project application information;
obtaining first state information of the first project application information from the first detail list;
judging whether first state information of the first project application information meets a preset state threshold value or not;
and if so, acquiring a first authority, wherein the first authority is that the first project application information can be submitted and approved.
5. The method of claim 4, wherein after obtaining the first detailed list of the first project application information, the method further comprises:
obtaining first application amount information of the first project application information;
judging whether the first application amount information exceeds a preset amount threshold value or not;
if the first application amount information exceeds the preset amount threshold value, first early warning information is obtained;
and obtaining a first forbidding instruction, wherein the first forbidding instruction is used for forbidding the first item application information to obtain the first authority.
6. The method of claim 4, wherein if the first status information of the first item application information satisfies a predetermined status threshold, the method further comprises:
acquiring a second authority, wherein the second authority is a splitting authority of the first project application information;
acquiring first splitting information, and splitting the first project application information;
acquiring first sub-record information, wherein the first sub-record information is record information obtained by splitting the first project application information;
acquiring a first association instruction, and associating the first sub-record information with the first project application information;
and obtaining a third updating instruction for updating the state of the first project application information.
7. The method of claim 6, wherein a first correlation instruction is obtained, the method further comprising:
obtaining a first synchronization instruction;
and synchronizing the first splitting information to the first fund application task.
8. A data management system based on a flow of funds, wherein the system comprises:
the first obtaining unit is used for obtaining a first request payment application task;
a second obtaining unit, configured to perform information filling by a first customer manager according to the first request payment application task, and obtain first project application information;
a third obtaining unit, configured to obtain a first submission instruction, and submit the first project application information to a first operation supervisor according to the first submission instruction;
a fourth obtaining unit for obtaining first balance allocation information of a bonus pool;
a fifth obtaining unit, wherein the fifth obtaining unit obtains the first item classification of the first item application information;
a first judging unit, configured to judge whether the first item application information can be submitted according to the first balance allocation information and the first item classification;
a sixth obtaining unit, configured to, if the first project application information can be submitted, perform checking by the first operator, obtain a second submission instruction, and submit the first project application information to a first fund department for approval;
a seventh obtaining unit, configured to obtain a first update instruction, if the first fund department passes the approval, and update a state of the first project application information;
and the eighth obtaining unit is used for obtaining a first termination instruction and ending the first request payment application task.
9. A system for fund flow-based data management, comprising a memory, a processor and a computer program stored on the memory and executable on the processor, wherein the processor implements the steps of the method of any one of claims 1 to 7 when executing the program.
CN202110028926.1A 2021-01-11 2021-01-11 Data management method and system based on fund flow Pending CN112734563A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110028926.1A CN112734563A (en) 2021-01-11 2021-01-11 Data management method and system based on fund flow

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110028926.1A CN112734563A (en) 2021-01-11 2021-01-11 Data management method and system based on fund flow

Publications (1)

Publication Number Publication Date
CN112734563A true CN112734563A (en) 2021-04-30

Family

ID=75590075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110028926.1A Pending CN112734563A (en) 2021-01-11 2021-01-11 Data management method and system based on fund flow

Country Status (1)

Country Link
CN (1) CN112734563A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107026815A (en) * 2016-01-29 2017-08-08 华为技术有限公司 A kind of payment transaction processing method, paying server, relevant device and system
CN109784681A (en) * 2018-12-26 2019-05-21 中国大唐集团科学技术研究院有限公司 Power engineering project investment management system
CN109978504A (en) * 2019-03-25 2019-07-05 金在(北京)金融信息服务有限公司 Processing method, device, equipment and the storage medium of financial data
CN110969408A (en) * 2019-11-08 2020-04-07 国网辽宁省电力有限公司 Material settlement full-process integrated management platform generation system and method
CN111080227A (en) * 2019-11-07 2020-04-28 杭州真内控科技有限公司 Internal control approval system for economic activity business
CN111985828A (en) * 2020-08-26 2020-11-24 北京中电普华信息技术有限公司 Control method, device and equipment for fund payment budget and computer storage medium

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107026815A (en) * 2016-01-29 2017-08-08 华为技术有限公司 A kind of payment transaction processing method, paying server, relevant device and system
CN109784681A (en) * 2018-12-26 2019-05-21 中国大唐集团科学技术研究院有限公司 Power engineering project investment management system
CN109978504A (en) * 2019-03-25 2019-07-05 金在(北京)金融信息服务有限公司 Processing method, device, equipment and the storage medium of financial data
CN111080227A (en) * 2019-11-07 2020-04-28 杭州真内控科技有限公司 Internal control approval system for economic activity business
CN110969408A (en) * 2019-11-08 2020-04-07 国网辽宁省电力有限公司 Material settlement full-process integrated management platform generation system and method
CN111985828A (en) * 2020-08-26 2020-11-24 北京中电普华信息技术有限公司 Control method, device and equipment for fund payment budget and computer storage medium

Similar Documents

Publication Publication Date Title
CN110263024B (en) Data processing method, terminal device and computer storage medium
WO2020259035A1 (en) Service code generating and executing methods and devices
CN104937618A (en) Risk control method and system for Internet financing funds and project progress
CN115050450A (en) Method and device for processing medicine purchasing request
CN114565255B (en) Enterprise cluster cooperation supply chain management method and system
CN113010443B (en) Database test data generation method and device based on financial core transaction scene
CN114155109A (en) Asset configuration method, device, equipment and medium
US12026650B1 (en) Business decision management system to operational decision management adaptor
CN112651716A (en) Data processing method, device and storage medium
CN112734563A (en) Data management method and system based on fund flow
CN114971893B (en) Loan deduction mode flexible configuration method and system
CN111027977A (en) Data verification method and device and electronic equipment
CN114742409A (en) Financial reimbursement processing method, device, equipment and medium
JP6058620B2 (en) Loan transaction automatic execution system and method
CA3135121A1 (en) Valuable-rewards-related-data processing method, apparutus, computer device and storage medium
CN114240588A (en) Annuity plan reconciliation method, device, equipment and medium based on block chain
CN112184499A (en) Contract generation method and system based on multi-system cooperation
CN112487780A (en) Order data typesetting optimization method and system
CN112085601A (en) Annuity data processing method, device, medium and electronic equipment
CN112950371B (en) Data processing method, device, equipment and readable storage medium
CN111882294B (en) Method and device for flow approval
CN116362900B (en) Method and system for processing insurance information of vehicle insurance
CN115935330B (en) Function authorization method, device, equipment and medium of chromatographic analysis system software
CN115797043A (en) Method, device, storage medium and processor for adjusting payment plan
CN117710088A (en) Post-loan inspection method, device, equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210430