CN112681043A - 路基拼接拓宽结构及施工方法 - Google Patents

路基拼接拓宽结构及施工方法 Download PDF

Info

Publication number
CN112681043A
CN112681043A CN202011503519.3A CN202011503519A CN112681043A CN 112681043 A CN112681043 A CN 112681043A CN 202011503519 A CN202011503519 A CN 202011503519A CN 112681043 A CN112681043 A CN 112681043A
Authority
CN
China
Prior art keywords
roadbed
layer
transition section
new
old
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202011503519.3A
Other languages
English (en)
Other versions
CN112681043B (zh
Inventor
杨仁平
熊捷
程阳
张亮
程双喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Provincial Road & Bridge Co ltd
Original Assignee
Hubei Provincial Road & Bridge Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Provincial Road & Bridge Co ltd filed Critical Hubei Provincial Road & Bridge Co ltd
Priority to CN202011503519.3A priority Critical patent/CN112681043B/zh
Publication of CN112681043A publication Critical patent/CN112681043A/zh
Application granted granted Critical
Publication of CN112681043B publication Critical patent/CN112681043B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

本发明涉及路基拼接拓宽结构,包括透水路面层、新旧路基过渡段、透水级配层和透水路面层;所述新旧路基过渡段通长设置于路基拼接处,新旧路基过渡段通过引孔设置锚筋与原有路基固定相连,所述新旧路基过渡段内部间隔设有竖向水通,新旧路基过渡段下方间隔设有内侧桩和外侧桩;所述透水级配层沿路基纵向通长设置于竖向水通下方及内外桩之间,透水级配层靠外侧桩一侧的底部与间隔设置的横向排水盲沟一端相连。本发明的有益效果是:本发明采用不规则的新旧路基过渡段有效减少自重和成本,采用锚筋与原有路基连接紧密,且底部设有桩基,结构稳固,有效防止沉降位移,整体性强,经济技术效益明显。

Description

路基拼接拓宽结构及施工方法
技术领域
本发明涉及公路工程技术领域,特别涉及一种路基拼接拓宽结构及施工方法。
背景技术
近年来,随着我国经济腾飞,不管是城市建设还是农村建设都得到了空前发展,配套的交通网也日益发达。为了应对日益增长的交通运输量,需要对以前修建的公路进行重建或者升级改造。为了节约成本,对原有公路比较完好路段的改造,采取老路加宽改建的设计及实施方案。
公路工程分为路基和路面两个重要组成部分,其中路基是主要的承载结构,公路的路面的行车荷载和车道荷载均线传递给路基,再由路基传递到地下持力层,因此要求路基有足够的强度、刚度和稳定性。由于新老路基结合部存在道路施工时间的差异、沉降差异、不同地质条件下地基承载力差异等问题,因此可能引起结合部出现裂缝、破损、高差、行车不舒适等现象,影响公路安全及造成服务水平的降低。现有新老路基拼接处施工往往采用开挖台阶、设置土工格珊、加强新路基地基处理等措施。虽然能一定程度上减少不均匀沉降和变形,但是效果不是很理想,且一旦遇到下雨天气,雨水还会浸透到路基里面进而使得老路基受到损害,严重时还会加剧病害。
因此,目前亟需寻求一种结构稳固,整体性强且防排结合,有效防止水侵蚀路基的路基拼接拓宽结构及施工方法显得十分重要。
发明内容
本发明的目的是克服现有技术中的不足,提供一种路基拼接拓宽结构及施工方法。
这种路基拼接拓宽结构,包括透水路面层、新旧路基过渡段、透水级配层和透水路面层;所述新旧路基过渡段通长设置于路基拼接处,新旧路基过渡段通过引孔设置锚筋与原有路基固定相连,所述新旧路基过渡段内部间隔设有竖向水通,新旧路基过渡段下方间隔设有内侧桩和外侧桩;所述透水级配层沿路基纵向通长设置于竖向水通下方及内外桩之间,透水级配层靠外侧桩一侧的底部与间隔设置的横向排水盲沟一端相连,所述横向排水盲沟另一端与外部的排水***相连,所述透水级配层和横向排水盲沟的底部设有底面防水层;所述透水路面层设置于新旧路基过渡段上方,并与原路面层和新建的普通路面层相连,所述普通路面层下方设有不透水层,所述不透水层下方设有回填压实层,所述回填压实层内部设有土工格栅加筋层,土工格栅加筋层与回填压实层侧边的边坡之间设有侧面防水层。
作为优选:所述的新旧路基过渡段为现浇钢筋混凝土结构,与原有路基进行反向台阶搭接。
作为优选:所述的内侧桩和外侧桩为预制钢筋混凝土桩。
作为优选:所述的底面防水层和侧面防水层为刚柔材料结合的防水层。
这种路基拼接拓宽结构的施工方法,包括以下步骤:
1)施工前将原有路基边坡表面浮土、植被、树根及其它建筑垃圾清理干净,沿原边坡浮土清理彻底;对结合部位原有老路土路肩边坡采用挖掘机进行削坡,垂直削至地基设计标高,然后沿原有路基断面间隔打设相互平行的内侧桩和外侧桩;
2)同时在原有路基断面修筑反向土质台阶,利用钻机在台阶上开设引孔,用来安装锚筋,然后绑扎新旧路基过渡段的钢筋,并与锚筋以及内侧桩和外侧桩的顶部钢筋搭接绑扎一起,将竖向水通预埋安装在钢筋网中,搭设模板,浇筑混凝土,形成新旧路基过渡段;
3)在地基底部铺设施工底面防水层,最后在内侧桩和外侧桩之间回填级配碎石至内侧桩顶部并压实形成透水级配层;在透水级配层靠外侧桩一侧,间隔安装横向排水盲沟,将横向排水盲沟外端与外部的排水***相连;
4)分层回填压实路基填料形成回填压实层;当回填压实层高度达到透水级配层顶部后,用U型钉固定铺设一道土工格栅加筋层,土工格栅加筋层一侧利用锚固钉与新旧路基过渡段固定连接;根据路基的高度在回填压实层内部设置一道或多道土工格栅加筋层;当回填压实层高度达到设计值后,在路基侧面进行削坡,铺设施工侧面防水层与底面防水层搭接,在回填压实层顶面施工不透水层与侧面防水层搭接,然后在回填压实层侧边回填修筑边坡;
5)在新旧路基过渡段上方靠原路面层侧,修筑一段通长的透水路面层,其余路面层均采用普通路面层施工,并在原路面层、透水路面层和普通路面层间做好止水措施,最终完成路基拼接拓宽结构的施工。
本发明的有益效果是:
1、与传统技术相比,本发明的路基拼接拓宽结构设置了地下防排水和地表排水相结合的排水***,地基内防水层能有效防止积水进入路基范围内,设置的竖向水通、透水级配层配合横向排水盲沟,也能有效快速排出地基内积水,技术优势明显。
2、本发明采用不规则的新旧路基过渡段有效减少自重和成本,采用锚筋与原有路基连接紧密,且底部设有桩基,结构稳固,有效防止沉降位移,整体性强,经济技术效益明显。
3、本发明设置的土工格栅加筋层,抗拉强度比较高,伸长率比较低,加上不容易变形等优点,很容易全面的和土体连接在一块,这样便能加大和土体之间的摩擦,进而可以防止土体出现侧向位移,另外土工格栅网格和粗颗粒填料能够有效结合在一起,可以最大限度的将路基承载力以及稳定性提高。
附图说明
图1是路基拼接拓宽结构的示意图;
图2是内侧桩和外侧桩的布置图;
图3是图2的俯视图;
图4是新旧路基过渡段的示意图;
图5是防排水***的布置图;
图6是回填压实层的示意图。
附图标记说明:1——原有路基;2——原路面层;3——透水路面层;4——竖向水通;5——普通路面层;6——不透水层;7——引孔;8——锚筋;9——新旧路基过渡段;10——透水级配层;11——内侧桩;12——外侧桩;13——底面防水层;14——横向排水盲沟;15——回填压实层;16——土工格栅加筋层;17——侧面防水层。
具体实施方式
下面结合实施例对本发明做进一步描述。下述实施例的说明只是用于帮助理解本发明。应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以对本发明进行若干改进和修饰,这些改进和修饰也落入本发明权利要求的保护范围内。
实施例一
所述的路基拼接拓宽结构,包括通长设置于路基拼接处的新旧路基过渡段9,通过引孔7设置锚筋8与原有路基1固定相连,所述新旧路基过渡段9内部间隔设有竖向水通4,下方间隔设有内侧桩11和外侧桩12;沿路基纵向通长设置于竖向水通4下方及内外桩之间的透水级配层10,靠外侧桩12一侧的底部与间隔设置的横向排水盲沟14相连,所述横向排水盲沟14另一端与外部的排水***相连,所述透水级配层10和横向排水盲沟14的底部设有底面防水层13;设置于新旧路基过渡段9上方的透水路面层3,并与原路面层2和新建的普通路面层5相连并做好防水,所述普通路面层5下方设有不透水层6,所述不透水层6下方设有回填压实层15,所述回填压实层15内部设有土工格栅加筋层16,与边坡18之间设有侧面防水层17。
所述的新旧路基过渡段9为现浇钢筋混凝土结构,与原有路基1进行反向台阶搭接。
所述的内侧桩11和外侧桩12为预制钢筋混凝土桩。
所述的底面防水层13和侧面防水层17为刚柔材料结合的防水层。
实施例二
所述的路基拼接拓宽结构的施工方法,包括以下步骤:
1)如图2、图3所示,施工前将原有路基1边坡表面浮土、植被、树根及其它建筑垃圾清理干净,沿原边坡浮土清理彻底。对结合部位原有老路土路肩边坡采用挖掘机进行削坡,垂直削至地基设计标高,然后沿原有路基1断面间隔打设相互平行的内侧桩11和外侧桩12。
2)如图4所示,同时在原有路基1断面修筑反向土质台阶,利用钻机在台阶上开设引孔7,用来安装锚筋8,然后绑扎新旧路基过渡段9的钢筋,并与锚筋8以及内侧桩11和外侧桩12的顶部钢筋搭接绑扎一起,将竖向水通4预埋安装在钢筋网中,搭设模板,浇筑混凝土,形成新旧路基过渡段9。
3)如图5所示,在地基底部铺设施工底面防水层13,最后在内侧桩11和外侧桩12之间回填级配碎石至内侧桩11顶部并压实形成透水级配层10。在透水级配层10靠外侧桩12一侧,间隔安装横向排水盲沟14,将横向排水盲沟14另一端与外部的排水***相连。
4)如图6所示,分层回填压实路基填料形成回填压实层15。当回填压实层15高度达到透水级配层10顶部后,用U型钉固定铺设一道土工格栅加筋层16,土工格栅一侧利用锚固钉与新旧路基过渡段9固定连接。根据路基的高度可在回填压实层15设置一道或多道土工格栅加筋层16。当回填压实层15高度达到设计值后,在路基侧面进行削坡,铺设施工侧面防水层17与底面防水层13搭接,在回填压实层15顶面施工不透水层6与侧面防水层17搭接,然后回填修筑边坡18。
5)如图1所示,在新旧路基过渡段9上方靠原路面层2侧,修筑一段通长的透水路面层3,其余路面层均采用普通路面层5施工,并在原路面层2、透水路面层3和普通路面层5间做好止水措施,最终完成路基拼接拓宽结构的施工。

Claims (5)

1.一种路基拼接拓宽结构,其特征在于:包括透水路面层(3)、新旧路基过渡段(9)、透水级配层(10)和透水路面层(3);所述新旧路基过渡段(9)通长设置于路基拼接处,新旧路基过渡段(9)通过引孔(7)设置锚筋(8)与原有路基(1)固定相连,所述新旧路基过渡段(9)内部间隔设有竖向水通(4),新旧路基过渡段(9)下方间隔设有内侧桩(11)和外侧桩(12);所述透水级配层(10)沿路基纵向通长设置于竖向水通(4)下方及内外桩之间,透水级配层(10)靠外侧桩(12)一侧的底部与间隔设置的横向排水盲沟(14)一端相连,所述横向排水盲沟(14)另一端与外部的排水***相连,所述透水级配层(10)和横向排水盲沟(14)的底部设有底面防水层(13);所述透水路面层(3)设置于新旧路基过渡段(9)上方,并与原路面层(2)和新建的普通路面层(5)相连,所述普通路面层(5)下方设有不透水层(6),所述不透水层(6)下方设有回填压实层(15),所述回填压实层(15)内部设有土工格栅加筋层(16),土工格栅加筋层(16)与回填压实层(15)侧边的边坡(18)之间设有侧面防水层(17)。
2.根据权利要求1所述的路基拼接拓宽结构,其特征在于:所述的新旧路基过渡段(9)为现浇钢筋混凝土结构,与原有路基(1)进行反向台阶搭接。
3.根据权利要求1所述的路基拼接拓宽结构,其特征在于:所述的内侧桩(11)和外侧桩(12)为预制钢筋混凝土桩。
4.根据权利要求3所述的路基拼接拓宽结构,其特征在于:所述的底面防水层(13)和侧面防水层(17)为刚柔材料结合的防水层。
5.一种基于权利要求1所述的路基拼接拓宽结构的施工方法,其特征在于,包括以下步骤:
1)施工前将原有路基(1)边坡表面浮土、植被、树根及其它建筑垃圾清理干净,沿原边坡浮土清理彻底;对结合部位原有老路土路肩边坡采用挖掘机进行削坡,垂直削至地基设计标高,然后沿原有路基(1)断面间隔打设相互平行的内侧桩(11)和外侧桩(12);
2)同时在原有路基(1)断面修筑反向土质台阶,利用钻机在台阶上开设引孔(7),用来安装锚筋(8),然后绑扎新旧路基过渡段(9)的钢筋,并与锚筋(8)以及内侧桩(11)和外侧桩(12)的顶部钢筋搭接绑扎一起,将竖向水通(4)预埋安装在钢筋网中,搭设模板,浇筑混凝土,形成新旧路基过渡段(9);
3)在地基底部铺设施工底面防水层(13),最后在内侧桩(11)和外侧桩(12)之间回填级配碎石至内侧桩(11)顶部并压实形成透水级配层(10);在透水级配层(10)靠外侧桩(12)一侧,间隔安装横向排水盲沟(14),将横向排水盲沟(14)外端与外部的排水***相连;
4)分层回填压实路基填料形成回填压实层(15);当回填压实层(15)高度达到透水级配层(10)顶部后,用U型钉固定铺设一道土工格栅加筋层(16),土工格栅加筋层(16)一侧利用锚固钉与新旧路基过渡段(9)固定连接;根据路基的高度在回填压实层(15)内部设置一道或多道土工格栅加筋层(16);当回填压实层(15)高度达到设计值后,在路基侧面进行削坡,铺设施工侧面防水层(17)与底面防水层(13)搭接,在回填压实层(15)顶面施工不透水层(6)与侧面防水层(17)搭接,然后在回填压实层(15)侧边回填修筑边坡(18);
5)在新旧路基过渡段(9)上方靠原路面层(2)侧,修筑一段通长的透水路面层(3),其余路面层均采用普通路面层(5)施工,并在原路面层(2)、透水路面层(3)和普通路面层(5)间做好止水措施,最终完成路基拼接拓宽结构的施工。
CN202011503519.3A 2020-12-18 2020-12-18 路基拼接拓宽结构及施工方法 Active CN112681043B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011503519.3A CN112681043B (zh) 2020-12-18 2020-12-18 路基拼接拓宽结构及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011503519.3A CN112681043B (zh) 2020-12-18 2020-12-18 路基拼接拓宽结构及施工方法

Publications (2)

Publication Number Publication Date
CN112681043A true CN112681043A (zh) 2021-04-20
CN112681043B CN112681043B (zh) 2022-08-23

Family

ID=75449625

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011503519.3A Active CN112681043B (zh) 2020-12-18 2020-12-18 路基拼接拓宽结构及施工方法

Country Status (1)

Country Link
CN (1) CN112681043B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113308956A (zh) * 2021-05-17 2021-08-27 浙大城市学院 桩承式锚杆泡沫混凝土路堤结构的施工方法
CN113389150A (zh) * 2021-07-22 2021-09-14 山东省交通规划设计院集团有限公司 一种针对扩孔桥梁路段的高速公路改扩建施工方法

Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT8703404A0 (it) * 1987-03-20 1987-03-20 Trevi Spa Procedimento per realizzare l'allargamento di una sede stradale, in particoalre di un'autostrada ed elementi strutturali per l'esecuzione di tale procedimento
US20080019770A1 (en) * 2006-07-19 2008-01-24 Shaw Lee A Aquifer replenishment system
CN102493303A (zh) * 2011-12-16 2012-06-13 何晓英 一种路基镶嵌拓宽方法
CN103422414A (zh) * 2013-07-24 2013-12-04 福建士联建设有限公司 一种环保装饰透水路面结构及其施工方法
CN104278608A (zh) * 2013-07-05 2015-01-14 杭州华水市政工程有限公司 一种新型公路路堤拓宽结构及施工方法
CN204728165U (zh) * 2015-06-10 2015-10-28 远洋园林工程有限公司 生态透水路面
CN105780618A (zh) * 2016-03-24 2016-07-20 杭州江润科技有限公司 一种预制板对拉直立式无坡路堤及施工方法
CN106988178A (zh) * 2017-04-14 2017-07-28 华中科技大学 一种软土地区路基拓宽结构及其施工方法
CN207295358U (zh) * 2017-09-08 2018-05-01 中冶南方城市建设工程技术有限公司 一种防治桥头跳车的台背及路面排水结构
CN207619765U (zh) * 2017-12-01 2018-07-17 深圳市力浦建设实业有限公司 一种透水地坪
CN108486976A (zh) * 2018-04-30 2018-09-04 安徽省公路桥梁工程有限公司 山区公路填挖交界处路基结构及其施工方法
CN108625244A (zh) * 2018-06-26 2018-10-09 中建五局土木工程有限公司 一种路基组合结构及其施工方法
WO2018214985A1 (zh) * 2017-05-24 2018-11-29 中建钢构有限公司 一种自行车高速路钢梁铺装结构及其路面铺装方法
CN208250844U (zh) * 2018-05-25 2018-12-18 山西省交通规划勘察设计院 一种新型路面加宽结构
CN208293343U (zh) * 2018-05-10 2018-12-28 浙江赫元建设有限公司 一种园林透水路面
CN208415019U (zh) * 2018-04-28 2019-01-22 中国铁建港航局集团有限公司 一种拓宽路堤边坡地基加固***
CN209907134U (zh) * 2019-01-09 2020-01-07 湖南华达工程有限公司 一种路基拓宽结构
CN111576127A (zh) * 2020-06-18 2020-08-25 湖南交通国际经济工程合作有限公司 一种公路工程新旧路面拼接结构及其施工方法
CN211596246U (zh) * 2019-12-31 2020-09-29 黄河交通学院 一种透水路面结构
CN214459270U (zh) * 2020-12-18 2021-10-22 湖北省路桥集团有限公司 路基拼接拓宽结构

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT8703404A0 (it) * 1987-03-20 1987-03-20 Trevi Spa Procedimento per realizzare l'allargamento di una sede stradale, in particoalre di un'autostrada ed elementi strutturali per l'esecuzione di tale procedimento
US20080019770A1 (en) * 2006-07-19 2008-01-24 Shaw Lee A Aquifer replenishment system
CN102493303A (zh) * 2011-12-16 2012-06-13 何晓英 一种路基镶嵌拓宽方法
CN104278608A (zh) * 2013-07-05 2015-01-14 杭州华水市政工程有限公司 一种新型公路路堤拓宽结构及施工方法
CN103422414A (zh) * 2013-07-24 2013-12-04 福建士联建设有限公司 一种环保装饰透水路面结构及其施工方法
CN204728165U (zh) * 2015-06-10 2015-10-28 远洋园林工程有限公司 生态透水路面
CN105780618A (zh) * 2016-03-24 2016-07-20 杭州江润科技有限公司 一种预制板对拉直立式无坡路堤及施工方法
CN106988178A (zh) * 2017-04-14 2017-07-28 华中科技大学 一种软土地区路基拓宽结构及其施工方法
WO2018214985A1 (zh) * 2017-05-24 2018-11-29 中建钢构有限公司 一种自行车高速路钢梁铺装结构及其路面铺装方法
CN207295358U (zh) * 2017-09-08 2018-05-01 中冶南方城市建设工程技术有限公司 一种防治桥头跳车的台背及路面排水结构
CN207619765U (zh) * 2017-12-01 2018-07-17 深圳市力浦建设实业有限公司 一种透水地坪
CN208415019U (zh) * 2018-04-28 2019-01-22 中国铁建港航局集团有限公司 一种拓宽路堤边坡地基加固***
CN108486976A (zh) * 2018-04-30 2018-09-04 安徽省公路桥梁工程有限公司 山区公路填挖交界处路基结构及其施工方法
CN208293343U (zh) * 2018-05-10 2018-12-28 浙江赫元建设有限公司 一种园林透水路面
CN208250844U (zh) * 2018-05-25 2018-12-18 山西省交通规划勘察设计院 一种新型路面加宽结构
CN108625244A (zh) * 2018-06-26 2018-10-09 中建五局土木工程有限公司 一种路基组合结构及其施工方法
CN209907134U (zh) * 2019-01-09 2020-01-07 湖南华达工程有限公司 一种路基拓宽结构
CN211596246U (zh) * 2019-12-31 2020-09-29 黄河交通学院 一种透水路面结构
CN111576127A (zh) * 2020-06-18 2020-08-25 湖南交通国际经济工程合作有限公司 一种公路工程新旧路面拼接结构及其施工方法
CN214459270U (zh) * 2020-12-18 2021-10-22 湖北省路桥集团有限公司 路基拼接拓宽结构

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张建仁,严新平,王炜等: "《中国交通研究与探索》", 31 October 2003, 人民交通出版社 *
黄淑森: "《铁路路基基床病害与整治》", 31 January 2005, 中国铁道出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113308956A (zh) * 2021-05-17 2021-08-27 浙大城市学院 桩承式锚杆泡沫混凝土路堤结构的施工方法
CN113389150A (zh) * 2021-07-22 2021-09-14 山东省交通规划设计院集团有限公司 一种针对扩孔桥梁路段的高速公路改扩建施工方法

Also Published As

Publication number Publication date
CN112681043B (zh) 2022-08-23

Similar Documents

Publication Publication Date Title
CN103334357B (zh) 一种高架桥下桩基承台伸入路基的路堤结构及施工方法
CN103628378A (zh) 一种临水公路拓宽路堤结构及施工方法
CN109750571B (zh) 一种道路塌方应急与永久支挡一体化结构及施工方法
CN112681043B (zh) 路基拼接拓宽结构及施工方法
CN110080051B (zh) 一种土工袋桥式路堤结构及其施工方法
CN113308953B (zh) 利用既有挡墙的泡沫混凝土拼宽路堤的施工方法
CN212427080U (zh) 一种桩板式无土路基
CN103790151B (zh) 一种软土路基排水预压后封堵结构及施工方法
CN108221528B (zh) 路基建筑搭接结构及施工方法
CN203334154U (zh) 一种高架桥下桩基承台伸入路基的路堤结构
CN214459270U (zh) 路基拼接拓宽结构
CN113106799A (zh) 一种路桥工程的路基结构及其施工方法
CN112575638B (zh) 一种采用钢筋笼石笋桩的路基加固结构及其施工工艺
CN212895900U (zh) 一种重力式u型桥台台后排水结构
CN212128696U (zh) 一种路桥衔接段气泡混合轻质土路基结构
CN203639772U (zh) 一种临水公路拓宽路堤结构
CN107858886B (zh) 一种高架桥梁基础周边地面道路及其施工方法
CN113308957A (zh) 挡墙轻质土拼宽路堤的施工方法
CN111636290A (zh) 一种改进型漫水桥结构
CN214939086U (zh) 一种用于既有黄土路基的侧向约束加固结构
CN215629078U (zh) 一种高速公路气泡轻质土拼宽路基结构
CN216972999U (zh) 新老路基连接处修复结构
CN216838791U (zh) 一种位于临堤管道上的路基路面结构
CN114922017B (zh) 一种新建悬臂式挡土墙-既有桩板墙路基帮宽组合结构
CN219032816U (zh) 一种用于刚性台秤的沥青路面快速维修结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Structure and Construction Method for Widening Roadbed Splicing

Effective date of registration: 20230927

Granted publication date: 20220823

Pledgee: Industrial Bank Limited by Share Ltd. Wuhan branch

Pledgor: HUBEI PROVINCIAL ROAD & BRIDGE Co.,Ltd.

Registration number: Y2023980059401