CN112411997A - Concrete building scaffold pre-embedding device - Google Patents

Concrete building scaffold pre-embedding device Download PDF

Info

Publication number
CN112411997A
CN112411997A CN202011322905.2A CN202011322905A CN112411997A CN 112411997 A CN112411997 A CN 112411997A CN 202011322905 A CN202011322905 A CN 202011322905A CN 112411997 A CN112411997 A CN 112411997A
Authority
CN
China
Prior art keywords
fixedly connected
concrete building
floor
building scaffold
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202011322905.2A
Other languages
Chinese (zh)
Other versions
CN112411997B (en
Inventor
袁媛
孙洪硕
苏丹娜
李东浩
张�杰
李帆
燕燕
侯惠军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Railway Vocational and Technical College
Original Assignee
Zhengzhou Railway Vocational and Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Railway Vocational and Technical College filed Critical Zhengzhou Railway Vocational and Technical College
Priority to CN202011322905.2A priority Critical patent/CN112411997B/en
Publication of CN112411997A publication Critical patent/CN112411997A/en
Application granted granted Critical
Publication of CN112411997B publication Critical patent/CN112411997B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/06Consoles; Brackets
    • E04G5/061Consoles; Brackets specially adapted for attachment to scaffolds

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention relates to the field of buildings, in particular to a concrete building scaffold pre-embedding device which comprises a beam rod, an insertion floor, a sharp strip, a compression column, an oil cylinder I, a rectangular frame and a square column. Insert the floor around respectively being provided with one, two insert the floor and set up two parts around the roof beam downside respectively, every two square columns of the equal fixedly connected with in upper end of inserting the floor, the roof beam is located same two square columns on inserting the floor between, two equal fixedly connected with hydro-cylinder I of upside of inserting the floor, hydro-cylinder I's upper end fixedly connected with rectangle frame, the equal fixedly connected with compression leg of downside of two rectangle frames, two compression leg voltage sharing are at the upside of roof beam. The concrete building scaffold pre-embedding device further comprises a motor, side frames, double-threaded screw rods, L-shaped stop rods and sliding sleeves, wherein the front ends and the rear ends of the beam rods are fixedly connected with the side frames, and the thread directions of the front portions and the rear portions of the double-threaded screw rods are opposite.

Description

Concrete building scaffold pre-embedding device
Technical Field
The invention relates to the field of buildings, in particular to a concrete building scaffold pre-embedding device.
Background
The utility model provides a reusable bridge drain hole pre-embedding device which is manufactured and molded by welding steel plates, and discloses a reusable bridge drain hole pre-embedding device with application number of CN 201921414232.6; the shape of the embedded device is consistent with that of the drain hole, and the external dimension of the embedded device is 5-10mm larger than that of the drain pipe; the upper end and the lower end of the embedded device along the axial direction are respectively provided with a sealing surface, and a handle is welded on the outer side of the sealing surface positioned at the upper end; the outer surface of the pre-buried device is coated with a release agent; after the bridge steel bars are bound, the embedded device is installed and fixed on the top surface of the bridge; and after the concrete is poured and solidified, taking the embedded device out of the solidified concrete to form the water drainage holes in the concrete. The bridge water outlet pre-embedding device capable of being used repeatedly is simple and convenient to construct, can be used repeatedly in a circulating mode, and is energy-saving and environment-friendly. But this patent can't make things convenient for pre-buried of scaffold.
Disclosure of Invention
The invention provides a concrete building scaffold pre-embedding device which has the beneficial effect that the pre-embedding of a scaffold can be facilitated.
The invention relates to the field of buildings, in particular to a concrete building scaffold pre-embedding device which comprises a beam rod, an insertion floor, a sharp strip, a compression column, an oil cylinder I, a rectangular frame and a square column.
Insert the floor around respectively being provided with one, two insert the floor and set up two parts around the roof beam downside respectively, every two square columns of the equal fixedly connected with in upper end of inserting the floor, the roof beam is located same two square columns on inserting the floor between, two equal fixedly connected with hydro-cylinder I of upside of inserting the floor, hydro-cylinder I's upper end fixedly connected with rectangle frame, the equal fixedly connected with compression leg of downside of two rectangle frames, two compression leg voltage sharing are at the upside of roof beam.
Concrete building scaffold puts up pre-buried device still includes the motor, the side bearer, double thread screw rod, L shape shelves pole and sliding sleeve, the equal fixedly connected with side bearer in both ends around the beam pole, the screw thread of two parts is opposite around the double thread screw rod, both ends rotate respectively and connect on two side bearers around the double thread screw rod, fixedly connected with motor on one of them side bearer, the output shaft fixed connection of motor is in the one end of double thread screw rod, the equal sliding connection in both ends has the sliding sleeve around the beam pole, two sliding sleeves are located two outsides of inserting the floor respectively, equal fixedly connected with L shape shelves pole on two sliding sleeves, two L shape shelves poles are located two inboards of inserting the floor respectively.
Concrete building scaffold puts up pre-buried device still includes perpendicular groove, the link, smooth cylinder, the push-and-pull post, wait the stock, slider and median, link fixed connection is between the upper end of two side bearers, two push-and-pull posts are sliding connection respectively on the upper portion of two side bearers in the front and back direction, the equal fixedly connected with smooth cylinder in the inner of two push-and-pull posts, be located and all be provided with perpendicular groove on two left square bearers, two smooth cylinder difference sliding connection are on two perpendicular grooves, the left side middle part fixedly connected with median of link, sliding connection has the slider on the median, the downside of slider articulates and is connected with stock such as two, the other end of two stock such as articulates respectively in the outer end of two push-and-pull posts.
The concrete building scaffold pre-embedding device further comprises an oil cylinder III and a door-shaped piece, the left part of the middle strip is fixedly connected with the oil cylinder III, the right end of the oil cylinder III is fixedly connected with the door-shaped piece, and the sliding block is located in the door-shaped piece.
Concrete building scaffold puts up pre-buried device still includes the underframe, inserts ground nail and guide pillar, and the equal fixedly connected with in four angle departments of underframe downside inserts ground nail, the equal fixedly connected with guide pillar in both ends around the underframe upside, and the both ends are vertical sliding connection respectively on two guide pillars around the roof beam pole.
Concrete building scaffold puts in place device in advance still includes bulge, door-shaped piece, fastening screw and montant, the upside right part fixedly connected with montant of underframe, the vertical sliding connection of door-shaped piece on the montant, there is fastening screw through threaded connection on the door-shaped piece, and fastening screw pushes up on the montant, the equal fixedly connected with bulge in both ends around the door-shaped piece upside.
Concrete building scaffold puts in place device in advance still includes hydro-cylinder II, trapezoidal slide rail, roll over the frame, hydro-cylinder IV, hollow post and splint, the left part of underframe is provided with the trapezoidal slide rail of direction about, the lower part sliding connection of hollow post is on trapezoidal slide rail, the left part fixedly connected with hydro-cylinder II of trapezoidal slide rail, hydro-cylinder II's expansion end fixed connection is on hollow post, vertical sliding connection has a book frame on the hollow post, roll over two splint of the right side lower part fixedly connected with of frame, the right side fixedly connected with hydro-cylinder IV of hollow post, hydro-cylinder IV's expansion end fixed connection is on rolling over the frame.
Concrete building scaffold puts up pre-buried device still includes dull and stereotyped, bent plate, bead and circular through-hole, and dull and stereotyped left part is inserted between two splint, and the equal fixedly connected with bent plate in both sides around dull and stereotyped is provided with circular through-hole on the dull and stereotyped, and dull and stereotyped downside from left to right is provided with a plurality of beads.
The concrete building scaffold pre-embedding device has the beneficial effects that:
the invention relates to a concrete building scaffold pre-embedding device which can facilitate the pre-embedding of scaffolds.
Drawings
The invention is described in further detail below with reference to the accompanying drawings and specific embodiments.
Fig. 1 is a schematic view of the overall structure of a concrete building scaffold embedded device according to the present invention;
fig. 2 is a schematic view of the overall structure of a concrete building scaffold embedded device according to the present invention;
FIG. 3 is a schematic structural view of a beam;
FIG. 4 is a first schematic view of the structure of the floorboard;
FIG. 5 is a second schematic view of the structure of the floorboard;
FIG. 6 is a schematic view of the bottom frame;
FIG. 7 is a schematic structural view of a connecting frame;
FIG. 8 is a first schematic structural diagram of a plate;
fig. 9 is a schematic structural view of a flat plate.
In the figure: a beam 1; a motor 101; a side frame 102; a double-threaded screw 103; an L-shaped stop lever 104; a sliding sleeve 105; inserting the floor 2; a tip strip 201; a compression column 202; a cylinder I203; a rectangular frame 204; a square column 205; a vertical slot 206; a bottom frame 3; an oil cylinder II 301; a trapezoidal slide rail 302; a ground pin 303 is inserted; a guide post 304; a convex circle 305; a gantry block 306; a fastening screw 307; a vertical rod 308; a connecting frame 4; a sliding cylinder 401; a push-pull post 402; an equal length rod 403; a slider 404; a middle bar 405; a cylinder III 406; a gate 407; a plate 6; a curved plate 601; a folding frame 602; a cylinder IV 603; a hollow column 604; a clamping plate 605; a rib 606; a circular through hole 607.
Detailed Description
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on those shown in the drawings, and are used only for convenience in describing the present invention and for simplicity in description, and do not indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be construed as limiting the present invention. Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
The first embodiment is as follows:
the embodiment is described below with reference to fig. 1 to 9, the invention relates to the field of construction, and more specifically to a concrete building scaffold pre-embedding device, which comprises a beam rod 1, a floor inserting plate 2, a pointed bar 201, a compression column 202, an oil cylinder I203, a rectangular frame 204 and a square column 205.
Insert floor 2 respectively to be provided with one around, insert floor 2 and set up two parts around the roof beam 1 downside respectively for two, every two square columns of the equal fixedly connected with 205 in upper end of inserting floor 2, roof beam 1 is located between two square columns 205 on same inserting floor 2, two equal fixedly connected with hydro-cylinder I203 of upside of inserting floor 2, the upper end fixedly connected with rectangle frame 204 of hydro-cylinder I203, the equal fixedly connected with compression leg 202 of the downside of two rectangle frames 204, two compression leg 202 voltage-sharing are at the upside of roof beam 1. When the two oil cylinders I203 extend, the two rectangular frames 204 can be driven to slide up and down, and then the two compression posts 202 are driven to move up and down. When two compression legs 202 compress tightly the upside at beam pole 1, can make two insert floor 2 fix on beam pole 1, adjust two intervals of inserting floor 2 to insert floor 2 in with two through two sharp strip 201 on inserting floor 2, then make two compression legs 202 leave the upside of beam pole 1 respectively, then two insert floor 2 of swing back and forth in the soil, shovel out after becoming loose two soil that insert floor 2 around, make things convenient for the pre-buried of scaffold frame.
The second embodiment is as follows:
the embodiment is described below with reference to fig. 1 to 9, where the concrete building scaffold pre-embedding device further includes a motor 101, side frames 102, double-threaded screws 103, L-shaped stoppers 104, and sliding sleeves 105, the front and rear ends of the beam 1 are both fixedly connected with the side frames 102, the thread directions of the front and rear portions of the double-threaded screws 103 are opposite, the front and rear ends of the double-threaded screws 103 are respectively rotatably connected to the two side frames 102, one of the side frames 102 is fixedly connected with the motor 101, an output shaft of the motor 101 is fixedly connected to one end of the double-threaded screws 103, the front and rear ends of the beam 1 are both slidably connected with the sliding sleeves 105, the two sliding sleeves 105 are respectively located on the outer sides of the two floors 2, the two sliding sleeves 105 are both fixedly connected with the L-shaped stoppers 104, and the two L-shaped stoppers 104 are. Motor 101 drives two screw rods 103 and drives two sliding sleeves 105 when rotating as the axle with self axis and be close to each other or keep away from on beam pole 1 simultaneously, and then drive two L shape shelves pole 104 and be close to each other or keep away from, make L shape shelves pole 104 and sliding sleeve 105 keep off the front and back both sides of inserting floor 2 in the correspondence, the range when preventing to insert floor 2 fore-and-aft movement is too big, make two swing-back that insert floor 2 is firm in the certain limit, shovel out after inserting two soil around floor 2 and becoming loose, make things convenient for the pre-buried of scaffold frame.
The third concrete implementation mode:
the embodiment is described below with reference to fig. 1 to 9, where the concrete building scaffold pre-embedding device further includes a vertical slot 206, a connecting frame 4, sliding columns 401, push-pull columns 402, equal length rods 403, sliding blocks 404 and a central bar 405, the connecting frame 4 is fixedly connected between the upper ends of the two side frames 102, the two push-pull columns 402 are respectively slidably connected to the upper portions of the two side frames 102 in the front-rear direction, the inner ends of the two push-pull columns 402 are both fixedly connected with the sliding columns 401, the two left side columns 205 are both provided with the vertical slot 206, the two sliding columns 401 are respectively slidably connected to the two vertical slots 206, the central bar 405 is fixedly connected to the left middle portion of the connecting frame 4, the sliding blocks 404 are slidably connected to the central bar 405, the lower sides of the sliding blocks 404 are hingedly connected with the two equal length rods 403, and the other ends of the two equal length rods 403. When the sliding block 404 slides left and right on the middle bar 405, the two push-pull columns 402 are respectively driven to be close to or away from each other through the two equal-length rods 403, so as to drive the two sliding columns 401 to be close to or away from each other, and then the two sliding columns 401 can drive the two square columns 205 located on the left side to swing back and forth, so as to drive the two floor inserting plates 2 to swing back and forth between the L-shaped stop rods 104 and the sliding sleeves 105.
The fourth concrete implementation mode:
the embodiment is described below with reference to fig. 1 to 9, the concrete building scaffold pre-burying device further includes a cylinder III406 and a door 407, the left portion of the middle bar 405 is fixedly connected with the cylinder III406, the right end of the cylinder III406 is fixedly connected with the door 407, and the slider 404 is located in the door 407. When the oil cylinder III406 extends and retracts, the door-shaped part 407 can be driven to move left and right, the sliding block 404 is driven to slide left and right on the middle strip 405, and the two push-pull columns 402 are driven to move close to or away from each other.
The fifth concrete implementation mode:
the embodiment is described below with reference to fig. 1 to 9, the concrete building scaffold pre-embedding device further includes a bottom frame 3, ground inserting nails 303 and guide pillars 304, the ground inserting nails 303 are fixedly connected to four corners of the lower side of the bottom frame 3, the guide pillars 304 are fixedly connected to the front and rear ends of the upper side of the bottom frame 3, and the front and rear ends of the beam rod 1 are vertically and slidably connected to the two guide pillars 304 respectively. The ground inserting nail 303 on the bottom frame 3 can make the bottom frame 3 firmly fixed on the ground, and the beam rod 1 can slide up and down along the two guide posts 304, so as to drive the two ground inserting plates 2 to be inserted into or separated from the ground.
The sixth specific implementation mode:
the embodiment is described below with reference to fig. 1 to 9, the concrete building scaffold pre-embedding device further includes a convex circle 305, a door-shaped block 306, a fastening screw 307 and a vertical rod 308, the vertical rod 308 is fixedly connected to the right portion of the upper side of the bottom frame 3, the door-shaped block 306 is vertically and slidably connected to the vertical rod 308, the fastening screw 307 is connected to the door-shaped block 306 through a thread, the fastening screw 307 abuts against the vertical rod 308, and the convex circle 305 is fixedly connected to the front end and the rear end of the upper side of the door-shaped block 306. The door-shaped block 306 is put on the upper side of the beam rod 1, and the door-shaped block 306 is driven to move downwards along the vertical rod 308 by the hammering convex circle 305, so that the beam rod 1 is driven to slide up and down along the two guide pillars 304, and the two floor insertion plates 2 are driven to be inserted into the ground. When the door-shaped block 306 is not needed, the door-shaped block 306 is moved to the upper part of the vertical rod 308 and is fixed by the fastening screw 307.
The seventh embodiment:
the embodiment is described below with reference to fig. 1 to 9, where the concrete building scaffold pre-embedding apparatus further includes an oil cylinder II301, a trapezoidal sliding rail 302, a folding frame 602, an oil cylinder IV603, a hollow column 604 and clamping plates 605, the left portion of the bottom frame 3 is provided with the trapezoidal sliding rail 302 in the left-right direction, the lower portion of the hollow column 604 is slidably connected to the trapezoidal sliding rail 302, the left portion of the trapezoidal sliding rail 302 is fixedly connected to the oil cylinder II301, the movable end of the oil cylinder II301 is fixedly connected to the hollow column 604, the hollow column 604 is vertically slidably connected to the folding frame 602, the right lower portion of the folding frame 602 is fixedly connected to the two clamping plates 605, the right side of the hollow column 604 is fixedly connected to the oil cylinder IV603, and the movable end of the oil. When the oil cylinder II301 extends, the hollow column 604 is driven to move left and right, and when the oil cylinder IV603 extends, the folding frame 602 is driven to vertically slide on the hollow column 604, so that the up-down and left-right positions of the two plates 605 are controlled.
The specific implementation mode is eight:
the embodiment is described below with reference to fig. 1 to 9, the concrete building scaffold pre-embedding device further includes a flat plate 6, curved plates 601, protruding ribs 606 and circular through holes 607, the left portion of the flat plate 6 is inserted between the two clamping plates 605, the curved plates 601 are fixedly connected to the front and rear sides of the flat plate 6, the circular through holes 607 are formed in the flat plate 6, and a plurality of protruding ribs 606 are formed on the lower side of the flat plate 6 from left to right. After soil around the two insertion floors 2 is loosened and shoveled out, the left part of the flat plate 6 is placed between the two clamping plates 605, then the flat plate 6 is moved to place the flat plate 6 in a pit, at this time, the two clamping plates 605 are pulled out, the flat plate 6 is prevented from moving left and right by the plurality of convex ribs 606, the lower part of the scaffold can be conveniently inserted by the circular through hole 607 on the flat plate 6, then the insertion floors 2 are buried by using the soil, further the lower part of the scaffold is prevented from being unstable, and the two curved plates 601 are used for being combined with the soil to prevent the flat plate 6 from moving upwards.
It is to be understood that the above description is not intended to limit the present invention, and the present invention is not limited to the above examples, and that various changes, modifications, additions and substitutions which are within the spirit and scope of the present invention and which may be made by those skilled in the art are also within the scope of the present invention.

Claims (8)

1. The utility model provides a concrete building scaffold puts in place device in advance, includes beam pole (1), inserts floor (2), sharp strip (201), compression leg (202), hydro-cylinder I (203), rectangle frame (204) and square column (205), its characterized in that: insert floor (2) respectively be provided with one around, insert floor (2) and set up two parts around beam pole (1) downside respectively for two, every inserts two square columns of equal fixedly connected with (205) in upper end on floor (2), beam pole (1) is located between same two square columns (205) of inserting on floor (2), two equal fixedly connected with hydro-cylinder I (203) of upside of inserting floor (2), the upper end fixedly connected with rectangle frame (204) of hydro-cylinder I (203), the equal fixedly connected with compression leg (202) of downside of two rectangle frames (204), two compression leg (202) pressure-sharing are at the upside of beam pole (1).
2. The concrete building scaffold pre-buried device of claim 1, wherein: the concrete building scaffold pre-embedding device further comprises a motor (101), side frames (102), double-threaded screw rods (103), L-shaped stop rods (104) and a sliding sleeve (105), wherein the front end and the rear end of the beam rod (1) are fixedly connected with the side frames (102), the thread directions of the front part and the rear part of the double-threaded screw rods (103) are opposite, the front end and the rear end of the double-threaded screw rods (103) are respectively and rotatably connected to the two side frames (102), one side frame (102) is fixedly connected with a motor (101), an output shaft of the motor (101) is fixedly connected to one end of a double-threaded screw rod (103), the front end and the rear end of a beam rod (1) are respectively connected with a sliding sleeve (105) in a sliding mode, the two sliding sleeves (105) are respectively located on the outer sides of two floor inserting plates (2), the two sliding sleeves (105) are respectively fixedly connected with an L-shaped stop lever (104), and the two L-shaped stop levers (104) are respectively located on the inner sides of the two floor inserting plates (2).
3. The concrete building scaffold pre-buried device of claim 2, wherein: the concrete building scaffold pre-embedding device also comprises a vertical slot (206), a connecting frame (4), a sliding column (401), a push-pull column (402), an isometric rod (403), a sliding block (404) and a middle bar (405), connecting frame (4) fixed connection is between the upper end of two side bearer (102), two push-pull post (402) are sliding connection respectively in the front and back direction on the upper portion of two side bearer (102), the equal fixedly connected with slide cylinder (401) in the inner of two push-pull post (402), be located and all be provided with on left two square columns (205) and erect groove (206), two slide cylinder (401) sliding connection respectively are on two perpendicular grooves (206), the left side middle part fixedly connected with median (405) of connecting frame (4), sliding connection has slider (404) on median (405), the downside of slider (404) articulates and is connected with two equal long poles (403), the other end of two equal long poles (403) articulates respectively in the outer end of two push-pull post (402).
4. The concrete building scaffold pre-buried device of claim 3, wherein: the concrete building scaffold pre-embedding device further comprises an oil cylinder III (406) and a door-shaped part (407), the left part of the middle strip (405) is fixedly connected with the oil cylinder III (406), the right end of the oil cylinder III (406) is fixedly connected with the door-shaped part (407), and the sliding block (404) is located in the door-shaped part (407).
5. The concrete building scaffold pre-buried device of claim 4, wherein: concrete building scaffold pre-buried device still includes underframe (3), inserts ground nail (303) and guide pillar (304), and the equal fixedly connected with in four angle departments of underframe (3) downside inserts ground nail (303), the equal fixedly connected with guide pillar (304) in both ends around underframe (3) upside, and the vertical sliding connection is on two guide pillars (304) respectively in both ends around roof beam pole (1).
6. The concrete building scaffold pre-buried device of claim 5, wherein: the concrete building scaffold pre-embedding device further comprises a convex circle (305), a door-shaped block (306), a fastening screw (307) and a vertical rod (308), the right part of the upper side of the bottom frame (3) is fixedly connected with the vertical rod (308), the door-shaped block (306) is vertically connected onto the vertical rod (308) in a sliding mode, the door-shaped block (306) is connected with the fastening screw (307) through threads, the fastening screw (307) abuts against the vertical rod (308), and the front end and the rear end of the upper side of the door-shaped block (306) are fixedly connected with the convex circle (305).
7. The concrete building scaffold pre-buried device of claim 6, wherein: concrete building scaffold pre-buried device still includes hydro-cylinder II (301), trapezoidal slide rail (302), roll over frame (602), hydro-cylinder IV (603), hollow post (604) and splint (605), the left part of underframe (3) is provided with left right direction's trapezoidal slide rail (302), the lower part sliding connection of hollow post (604) is on trapezoidal slide rail (302), the left part fixedly connected with hydro-cylinder II (301) of trapezoidal slide rail (302), the expansion end fixed connection of hydro-cylinder II (301) is on hollow post (604), vertical sliding connection has a roll over frame (602) on hollow post (604), roll over two splint (605) of right side lower part fixedly connected with of frame (602), the right side fixedly connected with hydro-cylinder IV (603) of hollow post (604), the expansion end fixed connection of hydro-cylinder IV (603) is on roll over frame (602).
8. The concrete building scaffold pre-buried device of claim 7, wherein: concrete building scaffold puts in place device in advance still includes dull and stereotyped (6), bent plate (601), bead (606) and circular through-hole (607), and the left part of dull and stereotyped (6) is inserted between two splint (605), and the equal fixedly connected with bent plate (601) of both sides around dull and stereotyped (6), is provided with circular through-hole (607) on dull and stereotyped (6), and the downside of dull and stereotyped (6) from left to right is provided with a plurality of beads (606).
CN202011322905.2A 2020-11-23 2020-11-23 Concrete building scaffold pre-embedding device Active CN112411997B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011322905.2A CN112411997B (en) 2020-11-23 2020-11-23 Concrete building scaffold pre-embedding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011322905.2A CN112411997B (en) 2020-11-23 2020-11-23 Concrete building scaffold pre-embedding device

Publications (2)

Publication Number Publication Date
CN112411997A true CN112411997A (en) 2021-02-26
CN112411997B CN112411997B (en) 2022-02-25

Family

ID=74777750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011322905.2A Active CN112411997B (en) 2020-11-23 2020-11-23 Concrete building scaffold pre-embedding device

Country Status (1)

Country Link
CN (1) CN112411997B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BR8300001U (en) * 2003-01-07 2004-10-26 Aquiles Vidal Junior Neves Self-adjusting metal strut used for building slabs
CN1724829A (en) * 2004-07-19 2006-01-25 深圳市特辰升降架工程有限公司 Circulating mechanical arm type lifting scaffold
CN101173521A (en) * 2007-10-14 2008-05-07 张贵生 Actuating arm big-turning machine direction side digging and vehicle arm folding B grade swivel gear
CN201068644Y (en) * 2007-07-31 2008-06-04 中国第一冶金建设有限责任公司 Dedicated scaffold stool for coke oven building
CN101543155A (en) * 2008-03-27 2009-09-30 吴小云 Electric cultivator
KR20110086904A (en) * 2010-01-25 2011-08-02 포항공과대학교 산학협력단 Electrical collector for solid oxide fuel cell using segmented flat tube structure
CN103392441A (en) * 2013-08-05 2013-11-20 徐州巧力威新型机械厂(普通合伙) Burdock stump removal machine
CN205935615U (en) * 2016-07-06 2017-02-08 福州幻科机电科技有限公司 Portable scaffold steel pipe removing surface machine
CN107650113A (en) * 2017-09-28 2018-02-02 林佳杰 A kind of multi-function robot
CN111764669A (en) * 2020-07-20 2020-10-13 哈尔滨学院 Building module installation device
CN111827023A (en) * 2020-07-15 2020-10-27 郑州铁路职业技术学院 Railway track cutting device

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BR8300001U (en) * 2003-01-07 2004-10-26 Aquiles Vidal Junior Neves Self-adjusting metal strut used for building slabs
CN1724829A (en) * 2004-07-19 2006-01-25 深圳市特辰升降架工程有限公司 Circulating mechanical arm type lifting scaffold
CN201068644Y (en) * 2007-07-31 2008-06-04 中国第一冶金建设有限责任公司 Dedicated scaffold stool for coke oven building
CN101173521A (en) * 2007-10-14 2008-05-07 张贵生 Actuating arm big-turning machine direction side digging and vehicle arm folding B grade swivel gear
CN101543155A (en) * 2008-03-27 2009-09-30 吴小云 Electric cultivator
KR20110086904A (en) * 2010-01-25 2011-08-02 포항공과대학교 산학협력단 Electrical collector for solid oxide fuel cell using segmented flat tube structure
CN103392441A (en) * 2013-08-05 2013-11-20 徐州巧力威新型机械厂(普通合伙) Burdock stump removal machine
CN205935615U (en) * 2016-07-06 2017-02-08 福州幻科机电科技有限公司 Portable scaffold steel pipe removing surface machine
CN107650113A (en) * 2017-09-28 2018-02-02 林佳杰 A kind of multi-function robot
CN111827023A (en) * 2020-07-15 2020-10-27 郑州铁路职业技术学院 Railway track cutting device
CN111764669A (en) * 2020-07-20 2020-10-13 哈尔滨学院 Building module installation device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张兴国: "《液压与气压传动》", 31 January 2017 *

Also Published As

Publication number Publication date
CN112411997B (en) 2022-02-25

Similar Documents

Publication Publication Date Title
CN111561041B (en) Cast-in-place concrete pool bottom plate and construction method thereof
JP2008138359A (en) Bar member gripping tool, its usage method and its manufacturing method
CN106760493A (en) A kind of subsided rest room fixative composition aluminum dipping form panel assembly and its mold method
CN112411997B (en) Concrete building scaffold pre-embedding device
DE1810310A1 (en) Process and device for the production of a reinforced concrete structure
CN206625260U (en) A kind of detachable late poured band support post
DE19758238A1 (en) Formwork system
CN115110685B (en) Support system of prefabricated assembly component and construction method thereof
CN215484679U (en) High-support template structure
JP3029411U (en) Formwork attachment device for forming concrete bands and lintels
CN212642113U (en) Formwork support system and construction structure
CN213359377U (en) Building templates support frame
CN211524129U (en) Reinforcing bar normal position ligature support frame
CN208604922U (en) A kind of building template
CN112096064A (en) Water stop ridge and construction method thereof
CN112962960B (en) Early formwork stripping support system of coincide floor rigid coupling independent stay
CN216689068U (en) Arch bridge concrete form strutting arrangement
DE2636168C2 (en) Buildings made from load-bearing prefabricated components
CN216476358U (en) Fixing support for building engineering template
CN220080764U (en) Concrete guide wall template
CN220747639U (en) Shaping steel trabecula structure
CN102877643A (en) Pillar plastic formwork construction method for buildings
CN219326977U (en) Template device for pouring pavement drainage ditch
CN219387162U (en) Civil engineering building pillar
CN211645932U (en) Reinforcing structure of bailey supporting platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant