CN112127246A - Plastic film equipment is pasted with road to road construction - Google Patents

Plastic film equipment is pasted with road to road construction Download PDF

Info

Publication number
CN112127246A
CN112127246A CN202011006965.3A CN202011006965A CN112127246A CN 112127246 A CN112127246 A CN 112127246A CN 202011006965 A CN202011006965 A CN 202011006965A CN 112127246 A CN112127246 A CN 112127246A
Authority
CN
China
Prior art keywords
rod
rotating
plate
motor
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202011006965.3A
Other languages
Chinese (zh)
Inventor
谢志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Qingya Decoration Engineering Co ltd
Original Assignee
Hefei Qingya Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Qingya Decoration Engineering Co ltd filed Critical Hefei Qingya Decoration Engineering Co ltd
Priority to CN202011006965.3A priority Critical patent/CN112127246A/en
Publication of CN112127246A publication Critical patent/CN112127246A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/03Arrangements for curing paving; Devices for applying curing means; Devices for laying prefabricated underlay, e.g. sheets, membranes; Protecting paving under construction or while curing, e.g. use of tents
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01HSTREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
    • E01H1/00Removing undesirable matter from roads or like surfaces, with or without moistening of the surface
    • E01H1/02Brushing apparatus, e.g. with auxiliary instruments for mechanically loosening dirt
    • E01H1/05Brushing apparatus, e.g. with auxiliary instruments for mechanically loosening dirt with driven brushes
    • E01H1/053Brushing apparatus, e.g. with auxiliary instruments for mechanically loosening dirt with driven brushes having vertical axes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/34Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with bucket-arms, i.e. a pair of arms, e.g. manufacturing processes, form, geometry, material of bucket-arms directly pivoted on the frames of tractors or self-propelled machines
    • E02F3/3402Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with bucket-arms, i.e. a pair of arms, e.g. manufacturing processes, form, geometry, material of bucket-arms directly pivoted on the frames of tractors or self-propelled machines the arms being telescopic

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • General Engineering & Computer Science (AREA)
  • Road Paving Machines (AREA)

Abstract

The invention relates to the technical field of road construction, in particular to road plastic film pasting equipment for road construction, which comprises a frame main body, a bearing plate, a feeding device, a fixing device, a conveying device, a soil shoveling device, a cleaning device, a flattening device and four rollers, wherein the frame main body is arranged at the tops of the four rollers, the bearing plate is arranged at the top of the frame main body, the feeding device is arranged on the side wall in the frame main body, the fixing device is arranged at the bottom of the bearing plate, the conveying device is arranged on the side wall in the frame main body and is positioned beside the fixing device, the soil shoveling device is arranged on the frame main body and is in sliding fit with the frame main body, the cleaning device is arranged at the top of the bearing plate, and the flattening device is arranged at the bottom of the bearing plate To give a title.

Description

Plastic film equipment is pasted with road to road construction
Technical Field
The invention relates to the technical field of road construction, in particular to road plastic film pasting equipment for road construction.
Background
The road is the infrastructure that supplies various trackless vehicles and pedestrian to pass, and along with city development is more and more rapid, the vehicle that drives on the road is more and more, and the requirement to the road is higher and higher, when being under construction to the road, need paste the plastic film to the road surface, then pour the muddy earth to the road surface.
However, the existing road plastic film sticking equipment for road construction has the following defects: the condition of construction road can not be dealt with through the regulation to the plastic film in the work progress and the road surface degree of depth clean prevents the insecure problem when pasting the plastic film.
Disclosure of Invention
The invention aims to solve the technical problem of providing road plastic film pasting equipment for road construction so as to solve the problems that in the prior art, the condition of a constructed road cannot be met by adjusting a plastic film in the construction process, and the road surface is deeply cleaned and is not firm when the plastic film is pasted.
In order to solve the technical problems, the invention provides the following technical scheme: the embodiment of the invention provides road plastic film pasting equipment for road construction, which comprises a frame main body, a bearing plate, a feeding device, a fixing device, a conveying device, a soil shoveling device, a cleaning device, a flattening device and four rollers, wherein the frame main body is arranged at the tops of the four rollers, the bearing plate is arranged at the top of the frame main body, the feeding device is arranged on the side wall in the frame main body, the fixing device is arranged at the bottom of the bearing plate and is in sliding fit with the feeding device, the conveying device is arranged on the side wall in the frame main body and is positioned beside the fixing device, the soil shoveling device is arranged on the frame main body and is in sliding fit with the frame main body, the cleaning device is arranged at the top of the bearing plate, and the flattening device is arranged at the bottom of the bearing plate.
Further, the feeding device comprises a working motor, a working motor seat, a rotary rod, a rotary disk, a limiting plate, a fixing rod, a limiting shaft, a rotary shaft, a feeding rod, a limiting block, a tension spring and a feeding frame, wherein the working motor seat is installed on the side wall in the frame main body, the working motor is installed on the working motor seat, one end of the rotary rod is installed on a main shaft of the working motor and is in transmission fit with the main shaft of the working motor, the rotary disk is installed on the rotary rod and is in rotation fit with the rotary rod, the limiting plate is installed on the two side walls in the frame main body, the fixing rod is installed on the limiting plate and is in rotation fit with the limiting plate, the limiting shaft is installed on the fixing rod, the feeding rod is installed on the limiting shaft, the rotary shaft is installed on the feeding rod and is in rotation fit with the rotary disk, one end of the tension spring is mounted on the limiting block, the other end of the tension spring is mounted on the feeding rod, and the feeding frame is mounted on the feeding rod.
Further, the fixing device comprises a fixing box, a moving rod, a first fixing component, a second fixing component, two moving blocks, two bolts and two adjusting springs, the fixing box is installed at the bottom of the bearing plate, a clamping groove is formed in the fixing box, the two moving blocks are installed in the clamping groove in the fixing box, two ends of the moving rod are installed on the two moving blocks respectively, the two bolts are installed on the two moving blocks respectively, two ends of the two adjusting springs are connected with the top in the clamping groove in the fixing box and the top of the moving block respectively, the first fixing component and the second fixing component are arranged on the side wall in the fixing box in the same structure, the first fixing component comprises a driving motor and a rotating rod, the driving motor is installed on the side wall of the fixing box, one end of the rotating rod is installed on the main shaft of the driving motor and is in rotating fit with the main shaft of the driving motor, the other end of the rotating rod is connected with the fixed box.
Further, the conveying device comprises a rotating motor, a rotating motor seat, two placing boxes, two rolling rods, two compression rollers, two spiral rods, two conveying springs and four sleeves, wherein the two placing boxes are symmetrically arranged on two side walls in the frame main body, the four sleeves are respectively symmetrically arranged on the two placing boxes in pairs, the sleeves positioned on the upper parts of the placing boxes are in sliding fit with the placing boxes, two ends of each rolling rod are respectively arranged on the two sleeves on the two corresponding placing boxes at two ends, two ends of each rolling rod are respectively in rotating connection with the two sleeves, the two compression rollers are respectively sleeved on the two rolling rods and are fixedly connected with the two rolling rods, the two conveying springs are respectively arranged in the two placing boxes, two ends of each conveying spring are respectively connected with the inner top of the placing boxes and the top of the sleeves positioned on the upper parts in the placing boxes, the rotary motor seat is installed on one of the side walls of the placement box, the rotary motor is installed on the rotary motor seat, a main shaft of the rotary motor is in transmission fit with one end of one of the rolling rods, the top of the placement box is connected with a spiral rod in threaded connection with the top of the placement box, and the spiral rod is fixedly connected with a sleeve positioned on the upper portion of the placement box.
Further, the shovel native device includes, promotes electric jar, slurcam, drive electric jar seat, tensile frame, shovel native board, work bar, two articulated framves and two tension bars, promote electric jar and install in the frame main part, the slurcam install promote electric jar flexible serve and with frame main part sliding fit, two articulated frame symmetry is installed at the top of slurcam, two the one end of tension bar is installed respectively in one of two articulated frames, the shovel native board is installed at the other end of two tension bars, the work bar install in shovel native inboard and with shovel native board normal running fit, drive electric jar seat is installed on a lateral wall of slurcam, drive electric jar is installed on drive electric jar seat, tensile frame is installed and is served and be connected with the other end of two articulated frames at the flexible of drive electric jar.
Further, the cleaning device comprises a lifting motor, a driving rod, a placing plate, a first lifting assembly, a second lifting assembly, a supporting seat, a cleaning motor seat, a first rotating gear, a second rotating gear, a rotating toothed plate, a toothed rod, a rotating frame, a swinging frame and a scourer, wherein the first lifting assembly and the second lifting assembly are symmetrically arranged on the top of the bearing plate in the same structure, the first lifting assembly comprises a first bevel gear, a second bevel gear, a lifting seat, a sliding seat, a lifting plate and a driving screw rod, the first bevel gear is arranged on the driving rod and is in rotating fit with the driving rod, the second bevel gear is meshed with the first bevel gear, the placing plate is arranged on the top of the bearing plate, the driving screw rod is arranged on the second bevel gear and penetrates through the lifting seat and the placing plate to be vertically upwards arranged, the sliding seat is arranged on the top of the placing plate, the lifting plate is installed on the sliding seat and is in sliding fit with the sliding seat, the driving lead screw is in threaded fit with the lifting plate, the lifting motor is installed at the top of the bearing plate, the lifting seat is installed at the top of the placing plate, and the driving rod is installed on a main shaft of the lifting motor and is in transmission fit with the main shaft of the lifting motor.
Further, the top at the supporting seat is installed to the clearance seat, the clearance motor cabinet is installed on the clearance seat, the clearance motor is installed on the clearance motor cabinet, first rotating gear install on the main shaft of clearance motor and with clearance motor main shaft normal running fit, it establishes on the main shaft of clearance motor to rotate the toothed plate cover, first rotating gear and rotation toothed plate meshing, the ratch is installed on the clearance seat, second rotating gear installs the one end at the ratch and meshes with first rotating gear, the other end at the ratch is installed to the one end of swivel mount, the other end at the swivel mount is installed to the scourer.
Further, flattening device includes lead screw slip table, mount and flattening roller, the lead screw slip table is installed in the bottom of frame main part, the mount is installed on the slip table of lead screw slip table, the flattening roller is installed at the other end of mount and with mount normal running fit.
Compared with the prior art, the invention has the beneficial effects that:
the automatic feeding device comprises a feeding frame, a rotary disc, a rotary rod, a rotary disc, a rotary shaft, a tension spring, a rotary disc, a feeding rod, a plastic film feeding frame and a plastic film feeding frame.
And secondly, when the plastic film is fixedly conveyed, the driving motor operates to drive the rotating rod to rotate, the rotating rod rotates to drive the plastic film to operate forwards, and the adjusting bolt enables the moving block to move to drive the moving rod to move in the clamping groove to adjust the looseness according to actual conditions during movement of the plastic film.
And thirdly, when the plastic film is guided out, the rotating motor rotates to drive the rolling rod to rotate, the rolling rod rotates to drive the press roller to rotate, the plastic film is fixedly guided out, the two conveying springs can be adjusted according to the thickness of the plastic film to be guided out, and the plastic film can be adjusted according to actual operation.
Fourth, when carrying out the pad pasting to the construction road reason, at first carry out the clearance of silt to the construction road, promote electric jar function and drive the slurcam and function forward, the slurcam operates forward and drives the shovel native board and extend to outside the frame main part, drive electric jar function and drive tensile frame function, tensile frame function drives two articulated framves and takes place to deflect, two articulated framves take place to deflect and drive two tension bar functions, the tension bar drives shovel native board and operates downwards on the working rod, carry out the shovel to silt on the construction road and accomplish the operation.
Fifthly, the cleaning motor operates to drive the first rotating gear to rotate, the first rotating gear rotates to drive the rotating toothed plate to rotate, the rotating toothed plate rotates to drive the second rotating gear to rotate, the second rotating gear rotates to drive the toothed bar to rotate, the toothed bar rotates to drive the rotating frame to rotate, the rotating frame rotates to drive the swinging frame to rotate, and the swinging frame rotates to drive the scourer to swing back and forth on the construction pavement to clean the pavement to complete the operation.
Drawings
FIG. 1 is a first perspective view of the present invention;
FIG. 2 is a schematic perspective view of the loading device of the present invention;
FIG. 3 is a schematic perspective view of a fixing device according to the present invention;
FIG. 4 is a perspective view of the conveying device of the present invention;
FIG. 5 is a schematic perspective view of the present invention;
FIG. 6 is a schematic perspective view of the cleaning device of the present invention;
FIG. 7 is a partial perspective view of the present invention;
the reference numbers in the figures are:
the frame body 1, the support plate 2, the loading device 3, the working motor 31, the working motor base 32, the rotating rod 33, the rotating disk 34, the limit plate 35, the fixing rod 36, the limit shaft 37, the rotating shaft 38, the loading rod 39, the limit block 391, the tension spring 392, the loading frame 393, the fixing device 4, the fixing box 41, the moving rod 42, the first fixing component 43, the driving motor 431, the rotating rod 432, the second fixing component 44, the moving block 45, the bolt 46, the adjusting spring 47, the conveying device 5, the rotating motor 51, the rotating motor base 52, the placing box 53, the rolling rod 54, the pressing roller 55, the spiral rod 56, the conveying spring 57, the sleeve 58, the soil shoveling device 6, the pushing electric cylinder 61, the pushing plate 62, the driving electric cylinder 63, the driving electric cylinder base 64, the stretching frame 65, the soil shoveling plate 66, the working rod 67, the hinge frame 68, the tension rod 69, the cleaning device 7, the lifting motor 71, the driving rod, the device comprises a placing plate 73, a first lifting assembly 74, a first bevel gear 741, a second bevel gear 742, a lifting seat 743, a sliding seat 744, a lifting plate 745, a driving screw 746, a second lifting assembly 75, a supporting seat 76, a cleaning seat 77, a cleaning motor 78, a cleaning motor seat 79, a first rotating gear 791, a second rotating gear 792, a rotating toothed plate 793, a toothed bar 794, a rotating frame 795, a swinging frame 796, a scourer 797, a flattening device 8, a screw rod sliding table 81, a fixing frame 82, a flattening roller 83 and a roller 9.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
In the description of the present invention, it is to be understood that the terms "longitudinal", "lateral", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on those shown in the drawings, are merely for convenience of description of the present invention, and do not indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be construed as limiting the present invention.
Referring to fig. 1 to 7, an embodiment of the present invention provides a road plastic film pasting device for road construction, which includes a frame body 1, a supporting plate 2, a feeding device 3, a fixing device 4, a conveying device 5, a soil shoveling device 6, a cleaning device 7, a flattening device 8 and four rollers 9, the frame body 1 is arranged on the tops of the four rollers 9, the supporting plate 2 is arranged on the top of the frame body 1, the feeding device 3 is arranged on the side wall in the frame main body 1, the fixing device 4 is arranged at the bottom of the supporting plate 2 and is in sliding fit with the feeding device 3, the conveying device 5 is arranged on the side wall in the frame body 1 and is positioned beside the fixing device 4, the scraper device 6 is installed on the frame main body 1 and is in sliding fit with the frame main body 1, the cleaning device 7 is installed at the top of the bearing plate 2, and the flattening device 8 is installed at the bottom of the bearing plate 2.
Specifically, the feeding device 3 includes a working motor 31, a working motor base 32, a rotating rod 33, a rotating disc 34, a limiting plate 35, a fixing rod 36, a limiting shaft 37, a rotating shaft 38, a feeding rod 39, a limiting block 391, a tension spring 392 and a feeding frame 393, the working motor base 32 is installed on a side wall in the frame main body 1, the working motor 31 is installed on the working motor base 32, one end of the rotating rod 33 is installed on a main shaft of the working motor 31 and is in transmission fit with the main shaft of the working motor 31, the rotating disc 34 is installed on the rotating rod 33 and is in rotation fit with the rotating rod 33, the limiting plate 35 is installed on two side walls in the frame main body 1, the fixing rod 36 is installed on the limiting plate 35 and is in rotation fit with the limiting plate 35, the limiting shaft 37 is installed on the fixing rod 36, the feeding rod 39 is installed on the limiting shaft 37, the rotating shaft 38 is installed on the feeding rod 39 and, the limiting blocks 391 are mounted on two side walls in the frame main body 1, one end of the tension spring 392 is mounted on the limiting blocks 391, the other end of the tension spring 392 is mounted on the feeding rod 39, and the feeding frame 393 is mounted on the feeding rod 39; when road construction is carried out, when plastic films are loaded, the working motor 31 rotates to drive the rotating rod 33 to rotate, the rotating rod 33 rotates to drive the rotating disc 34 to rotate, the rotating disc 34 rotates to drive the rotating shaft 38 to rotate, the rotating shaft 38 rotates to enable the loading rod 39 to swing, the tension spring 392 enables the loading rod 39 to reset, and the plastic films are placed on the loading frame 393.
Specifically, the fixing device 4 includes a fixing box 41, a moving rod 42, a first fixing assembly 43, a second fixing assembly 44, two moving blocks 45, two bolts 46 and two adjusting springs 47, the fixing box 41 is installed at the bottom of the supporting plate 2, a slot is provided on the fixing box 41, the two moving blocks 45 are installed in the slot on the fixing box 41, two ends of the moving rod 42 are installed on the two moving blocks 45 respectively, the two bolts 46 are installed on the two moving blocks 45 respectively, two ends of the two adjusting springs 47 are connected with the top of the slot on the fixing box 41 and the top of the moving block 45 respectively, the first fixing assembly 43 and the second fixing assembly 44 are arranged on the side wall in the fixing box 41 in the same structure, the first fixing assembly 43 includes a driving motor 431 and a rotating rod 432, the driving motor 431 is installed on the side wall of the fixing box 41, one end of the rotating rod 432 is installed on the main shaft of the driving motor 431 and is in rotating fit with the main shaft of the driving motor 431, and the other end of the rotating rod 432 is connected with the fixed box 41; when the plastic film is fixedly conveyed, the driving motor 431 operates to drive the rotating rod 432 to rotate, the rotating rod 432 rotates to drive the plastic film to operate forwards, and the adjusting bolt 46 enables the moving block 45 to move to drive the moving rod 42 to move in the clamping groove to adjust the looseness of the plastic film according to actual conditions.
Specifically, the conveying device 5 includes a rotating motor 51, a rotating motor base 52, two placing boxes 53, two rolling rods 54, two pressing rollers 55, two spiral rods 56, two conveying springs 57 and four sleeves 58, wherein the two placing boxes 53 are symmetrically installed on two side walls in the frame main body 1, the four sleeves 58 are respectively installed on the two placing boxes 53 in a pairwise symmetry manner, the sleeves 58 located on the upper portion of the placing boxes 53 are in sliding fit with the placing boxes 53, two ends of each rolling rod 54 are respectively installed on the two sleeves 58 on the two corresponding placing boxes 53, two ends of each rolling rod 54 are respectively connected with the two sleeves 58 in a rotating manner, the two pressing rollers 55 are respectively sleeved on the two rolling rods 54 and fixedly connected with the two rolling rods 54, the two conveying springs 57 are respectively installed in the two placing boxes 53, and two ends of each conveying spring 57 are respectively connected with the inner top of the placing boxes 53 and the top of the sleeves 58 located on the upper portion of the placing boxes 53 The rotating motor base 52 is installed on the side wall of one of the placing boxes 53, the rotating motor 51 is installed on the rotating motor base 52, the main shaft of the rotating motor 51 is in transmission fit with one end of one of the rolling rods 54, the top of each placing box 53 is connected with a screw rod 56 in threaded connection with the top, and each screw rod 56 is fixedly connected with a sleeve 58 positioned at the upper part in the placing box 53; when the plastic film is led out, the rotating motor 51 rotates to drive the rolling rod 54 to rotate, the rolling rod 54 rotates to drive the press roller 55 to rotate, the plastic film is fixedly led out, and the two conveying springs 57 can be adjusted and led out according to the thickness of the plastic film and can be adjusted according to actual operation.
Specifically, the soil shoveling device 6 comprises an electric pushing cylinder 61, a pushing plate 62, an electric driving cylinder 63, an electric driving cylinder seat 64, a stretching frame 65, a soil shoveling plate 66, a working rod 67, two hinged frames 68 and two tension rods 69, the electric pushing cylinder 61 is mounted on the frame body 1, the pushing plate 62 is mounted on the telescopic end of the electric pushing cylinder 61 and is in sliding fit with the frame body 1, the two hinged brackets 68 are symmetrically mounted on the top of the pushing plate 62, one end of each of the two tension rods 69 is mounted on one end of each of the two hinged brackets 68, the shoveling plate 66 is arranged at the other end of the two tension rods 69, the working rod 67 is arranged in the shoveling plate 66 and is in running fit with the shoveling plate 66, the driving cylinder base 64 is installed on one side wall of the push plate 62, the driving cylinder 63 is installed on the driving cylinder base 64, the stretching frame 65 is arranged on the telescopic end of the driving electric cylinder 63 and is connected with the other ends of the two hinge frames 68; when carrying out the pad pasting to the construction reason, at first carry out the clearance of silt to the construction road, promote electric cylinder 61 function and drive the slurcam 62 and function forward, the slurcam 62 functions forward and drives shovel native board 66 and extend to frame main part 1 outward, drive electric cylinder 63 and function and drive tensile frame 65 and function, tensile frame 65 functions and drives two articulated frames 68 and take place to deflect, two articulated frames 68 take place to deflect and drive two tension bars 69 and function, tension bar 69 drives shovel native board 66 and operates downwards on work bar 67, carry out the shovel to the silt on the construction road and accomplish the operation.
Specifically, the cleaning device 7 includes a lifting motor 71, a driving rod 72, a placing plate 73, a first lifting assembly 74, a second lifting assembly 75, a supporting seat 76, a cleaning seat 77, a cleaning motor 78, a cleaning motor seat 79, a first rotating gear 791, a second rotating gear 792, a rotating toothed plate 793, a toothed bar 794, a rotating frame 795, a swinging frame 796 and a scrubber 797, the first lifting assembly 74 and the second lifting assembly 75 are symmetrically arranged on the top of the supporting plate 2 in the same structure, the first lifting assembly 74 includes a first bevel gear 741, a second bevel gear 742, a lifting seat 743, a sliding seat 744, a lifting plate 745 and a driving screw 746, the first bevel gear 741 is mounted on the driving rod 72 and rotationally matched with the driving rod 72, the second bevel gear 742 is meshed with the first bevel gear 741, the placing plate 73 is mounted on the top of the supporting plate 746 2, the driving screw is mounted on the second bevel gear 742 and vertically upwards arranged through the lifting seat 743 and the placing plate 73, the sliding seat 744 is installed on the top of the placing plate 73, the lifting plate 745 is installed on the sliding seat 744 and is in sliding fit with the sliding seat 744, the driving screw 746 is in threaded fit with the lifting plate 745, the lifting motor 71 is installed on the top of the supporting plate 2, the lifting seat 743 is installed on the top of the placing plate 73, and the driving rod 72 is installed on the spindle of the lifting motor 71 and is in transmission fit with the spindle of the lifting motor 71; after the silt is removed, the cleaning device 7 operates the lifting motor 71 to operate to drive the driving rod 72 to rotate, the driving rod 72 rotates to drive the first bevel gear 741 to rotate, the first bevel gear 741 rotates to drive the second bevel gear 742 to rotate, the second bevel gear 742 rotates to drive the driving screw 746 to operate, and the driving screw 746 operates to drive the lifting plate 745 to move up and down in the sliding seat 744 to be adjusted to a proper position.
Specifically, the cleaning base 77 is mounted on the top of the supporting base 76, the cleaning motor base 79 is mounted on the cleaning base 77, the cleaning motor 78 is mounted on the cleaning motor base 79, the first rotating gear 791 is mounted on a main shaft of the cleaning motor 78 and is in rotating fit with the main shaft of the cleaning motor 78, the rotating toothed plate 793 is sleeved on the main shaft of the cleaning motor 78, the first rotating gear 791 is meshed with the rotating toothed plate 793, the toothed rod 794 is mounted on the cleaning base 77, the second rotating gear 792 is mounted at one end of the toothed rod 794 and is meshed with the first rotating gear 791, one end of the rotating frame 795 is mounted at the other end of the toothed rod 794, one end of the swinging frame 796 is mounted at the other end of the rotating frame 795, and the scrubber 797 is mounted at the other end of the swinging frame 796; the operation of clearance motor 78 drives first rotating gear 791 and rotates, first rotating gear 791 rotates and drives the rotation pinion rack 793 and rotates, it rotates to rotate pinion rack 793 and drives second rotating gear 792 and rotates, second rotating gear 792 rotates and drives ratch 794 and rotates, ratch 794 rotates and drives swivel mount 795 and rotates, the swivel mount 795 is rotatory to be driven the swing span 796 and is rotated, the swing span 796 is rotatory to drive scourer 797 and carries out the swing back and forth on the construction road surface and carry out the clean completion operation on the road surface.
Specifically, the flattening device 8 comprises a screw rod sliding table 81, a fixing frame 82 and a flattening roller 83, the screw rod sliding table 81 is installed at the bottom of the frame main body 1, the fixing frame 82 is installed on the sliding table of the screw rod sliding table 81, and the flattening roller 83 is installed at the other end of the fixing frame 82 and is in rotating fit with the fixing frame 82; when the road surface is clean, the screw rod sliding table 81 operates to drive the fixing frame 82 to operate downwards, the fixing frame 82 operates downwards to drive the flattening roller 83 to move downwards, and the flattening roller 83 drives the plastic film to perform film pasting on the ground to complete the operation.
The working principle is as follows: when the construction method is used for film pasting, firstly, the construction road is cleaned, the electric cylinder 61 is pushed to operate to drive the push plate 62 to operate forwards, the push plate 62 operates forwards to drive the soil shoveling plate 66 to extend to the outside of the frame main body 1, the electric cylinder 63 is driven to operate to drive the stretching frame 65 to operate, the stretching frame 65 operates to drive the two hinged frames 68 to deflect, the two hinged frames 68 deflect to drive the two tension rods 69 to operate, the tension rods 69 drive the soil shoveling plate 66 to operate downwards on the working rods 67, the construction road is shoveled to complete the operation, after the soil is shoveled, the cleaning device 7 operates the lifting motor 71 to drive the driving rod 72 to rotate, the driving rod 72 rotates to drive the first bevel gear 741 to rotate, the first bevel gear 741 rotates to drive the second bevel gear 742 to rotate, the screw 742 rotates to drive the screw 746 to operate, the screw 746 drives the lifting plate 745 to move upwards and downwards in the sliding seat 744, when the cleaning operation is finished, the soil shoveling device 6 is withdrawn, the feeding device 3 operates, the working motor 31 rotates to drive the rotating rod 33 to rotate, the rotating rod 33 rotates to drive the rotating disc 34 to rotate, the rotating disc 34 rotates to drive the rotating shaft 38 to rotate, the rotating shaft 38 rotates to swing the feeding rod 39, the tension spring 392 resets the feeding rod 39, a plastic film is placed on the feeding frame 393, when the plastic film is fixedly conveyed, the driving motor 431 operates to drive the rotating rod 432 to rotate, the rotating rod 432 rotates to drive the plastic film to operate forwards, the moving block 45 is moved through the adjusting bolt 46 to drive the moving rod 42 to move in the clamping groove to adjust the looseness of the plastic film in movement according to actual conditions, when the plastic film is guided out, the rotating motor 51 rotates to drive the rolling rod 54 to rotate, the rolling rod 54 rotates to drive the pressing roller 55 to rotate, the plastic film is fixedly guided out, the two conveying springs 57 can adjust and guide the plastic film according to the thickness of the plastic film, the adjustment can be carried out according to actual operation, the screw rod sliding table 81 operates to drive the fixing frame 82 to operate downwards, the fixing frame 82 operates downwards to drive the flattening roller 83 to move downwards, and the flattening roller 83 drives the plastic film to carry out film pasting operation on the ground.

Claims (8)

1. The utility model provides a road pastes plastic film equipment for road construction which characterized in that: comprises a frame main body (1), a bearing plate (2), a feeding device (3), a fixing device (4), a conveying device (5), a soil shoveling device (6), a cleaning device (7), a flattening device (8) and four rollers (9), wherein the frame main body (1) is arranged at the tops of the four rollers (9), the bearing plate (2) is arranged at the top of the frame main body (1), the feeding device (3) is arranged on the side wall in the frame main body (1), the fixing device (4) is arranged at the bottom of the bearing plate (2) and is in sliding fit with the feeding device (3), the conveying device (5) is arranged on the side wall in the frame main body (1) and is positioned at the side of the fixing device (4), the soil shoveling device (6) is arranged on the frame main body (1) and is in sliding fit with the frame main body (1), the cleaning device (7) is arranged at the top of the bearing plate (2), the flattening device (8) is arranged at the bottom of the bearing plate (2).
2. The road plastic film pasting equipment for road construction according to claim 1, characterized in that: the feeding device (3) comprises a working motor (31), a working motor base (32), a rotating rod (33), a rotating disk (34), a limiting plate (35), a fixing rod (36), a limiting shaft (37), a rotating shaft (38), a feeding rod (39), a limiting block (391), a tension spring (392) and a feeding frame (393), wherein the working motor base (32) is installed on the side wall in the frame main body (1), the working motor (31) is installed on the working motor base (32), one end of the rotating rod (33) is installed on a main shaft of the working motor (31) and is in transmission fit with the main shaft of the working motor (31), the rotating disk (34) is installed on the rotating rod (33) and is in running fit with the rotating rod (33), the limiting plate (35) is installed on two side walls in the frame main body (1), the fixing rod (36) is installed on the limiting plate (35) and is in running fit with the limiting plate (35), the limiting shaft (37) is mounted on the fixing rod (36), the feeding rod (39) is mounted on the limiting shaft (37), the rotating shaft (38) is mounted on the feeding rod (39) and is in running fit with the rotating disc (34), the limiting blocks (391) are mounted on two side walls in the frame main body (1), one end of the tension spring (392) is mounted on the limiting blocks (391), the other end of the tension spring (392) is mounted on the feeding rod (39), and the feeding frame (393) is mounted on the feeding rod (39).
3. The road plastic film pasting equipment for road construction according to claim 1, characterized in that: the fixing device (4) comprises a fixing box (41), a moving rod (42), a first fixing component (43), a second fixing component (44), two moving blocks (45), two bolts (46) and two adjusting springs (47), the fixing box (41) is installed at the bottom of the supporting plate (2), clamping grooves are formed in the fixing box (41), the two moving blocks (45) are installed in the clamping grooves in the fixing box (41), two ends of the moving rod (42) are installed on the two moving blocks (45) respectively, the two bolts (46) are installed on the two moving blocks (45) respectively, two ends of the two adjusting springs (47) are connected with the top of the clamping grooves in the fixing box (41) and the top of the moving blocks (45) respectively, the first fixing component (43) and the second fixing component (44) are arranged on the side wall in the fixing box (41) in the same structure, first fixed subassembly (43) include driving motor (431) and dwang (432), driving motor (431) are installed on the lateral wall of fixed case (41), the one end of dwang (432) install on the main shaft of driving motor (431) and with driving motor (431) main shaft normal running fit, the other end and the fixed case (41) of dwang (432) are connected.
4. The road plastic film pasting equipment for road construction according to claim 1, characterized in that: the conveying device (5) comprises a rotary motor (51), a rotary motor base (52), two placing boxes (53), two rolling rods (54), two pressing rollers (55), two spiral rods (56), two conveying springs (57) and four sleeves (58), wherein the two placing boxes (53) are symmetrically arranged on two side walls in the frame main body (1), the four sleeves (58) are symmetrically arranged on the two placing boxes (53) in pairs respectively, the sleeve (58) positioned on the upper part of the placing box (53) is in sliding fit with the placing box (53), two ends of each rolling rod (54) are respectively arranged on the two sleeves (58) on the two end placing boxes (53) corresponding to the rolling rod (54), two ends of each rolling rod (54) are respectively rotatably connected with the two sleeves (58), the two pressing rollers (55) are respectively sleeved on the two rolling rods (54) and are fixedly connected with the two rolling rods (54), two conveying springs (57) are respectively installed in two placing boxes (53), two ends of each conveying spring (57) are respectively connected with the inner top of the placing box (53) and the top of a sleeve (58) located at the inner upper part of the placing box (53), a rotating motor base (52) is installed on the side wall of one placing box (53), a rotating motor (51) is installed on the rotating motor base (52), a main shaft of the rotating motor (51) is in transmission fit with one end of one rolling rod (54), the top of the placing box (53) is connected with a spiral rod (56) in threaded connection with the top of the placing box (53), and each spiral rod (56) is fixedly connected with the sleeve (58) located at the inner upper part of the placing box (53).
5. The road plastic film pasting equipment for road construction according to claim 1, characterized in that: the soil shoveling device (6) comprises a pushing electric cylinder (61), a pushing plate (62), a driving electric cylinder (63), a driving electric cylinder seat (64), a stretching frame (65), a soil shoveling plate (66), a working rod (67), two hinged frames (68) and two tension rods (69), wherein the pushing electric cylinder (61) is installed on a frame main body (1), the pushing plate (62) is installed on the stretching end of the pushing electric cylinder (61) and is in sliding fit with the frame main body (1), the two hinged frames (68) are symmetrically installed at the top of the pushing plate (62), one ends of the two tension rods (69) are respectively installed on one end of the two hinged frames (68), the soil shoveling plate (66) is installed at the other end of the two tension rods (69), the working rod (67) is installed in the soil shoveling plate (66) and is in rotating fit with the soil shoveling plate (66), the driving electric cylinder seat (64) is installed on one side wall of the pushing plate (62), the driving electric cylinder (63) is installed on the driving electric cylinder seat (64), and the stretching frame (65) is installed on the telescopic end of the driving electric cylinder (63) and connected with the other ends of the two hinged frames (68).
6. The road plastic film pasting equipment for road construction according to claim 1, characterized in that: the cleaning device (7) comprises a lifting motor (71), a driving rod (72), a placing plate (73), a first lifting assembly (74), a second lifting assembly (75), a supporting seat (76), a cleaning seat (77), a cleaning motor (78), a cleaning motor seat (79), a first rotating gear (791), a second rotating gear (792), a rotating toothed plate (793), a toothed rod (794), a rotating frame (795), a swinging frame (796) and a scourer (797), wherein the first lifting assembly (74) and the second lifting assembly (75) are same in structure and are symmetrically arranged at the top of the bearing plate (2), the first lifting assembly (74) comprises a first bevel gear (741), a second bevel gear (742), a lifting seat (743), a sliding seat (744), a lifting plate (745) and a driving screw rod (746), the first bevel gear (741) is mounted on the driving rod (72) and is in rotating fit with the driving rod (72), the second bevel gear (742) is meshed with the first bevel gear (741), the placing plate (73) is installed at the top of the supporting plate (2), the driving screw rod (746) is installed on the second bevel gear (742) and penetrates through the lifting seat (743) and the placing plate (73) to be vertically arranged upwards, the sliding seat (744) is installed at the top of the placing plate (73), the lifting plate (745) is installed on the sliding seat (744) and is in sliding fit with the sliding seat (744), the driving screw rod (746) is in threaded fit with the lifting plate (745), the lifting motor (71) is installed at the top of the supporting plate (2), the lifting seat (743) is installed at the top of the placing plate (73), and the driving rod (72) is installed on a main shaft of the lifting motor (71) and is in transmission fit with the main shaft of the lifting motor (71).
7. The road plastic film pasting equipment for road construction as claimed in claim 6, wherein: the cleaning seat (77) is arranged at the top of the supporting seat (76), the cleaning motor seat (79) is arranged on the cleaning seat (77), the cleaning motor (78) is arranged on the cleaning motor base (79), the first rotating gear (791) is arranged on a main shaft of the cleaning motor (78) and is in running fit with the main shaft of the cleaning motor (78), the rotating toothed plate (793) is sleeved on a main shaft of the cleaning motor (78), the first rotating gear (791) is meshed with the rotating toothed plate (793), the rack bar (794) is installed on the cleaning seat (77), the second rotating gear (792) is installed at one end of the rack bar (794) and is engaged with the first rotating gear (791), one end of the rotating frame (795) is installed at the other end of the rack bar (794), one end of the swinging frame (796) is installed at the other end of the rotating frame (795), and the scourer (797) is installed at the other end of the swinging frame (796).
8. The road plastic film pasting equipment for road construction according to claim 1, characterized in that: flattening device (8) include lead screw slip table (81), mount (82) and flattening roller (83), the bottom in frame main part (1) is installed in lead screw slip table (81), install on the slip table of lead screw slip table (81) mount (82), flattening roller (83) install the other end at mount (82) and with mount (82) normal running fit.
CN202011006965.3A 2020-09-23 2020-09-23 Plastic film equipment is pasted with road to road construction Withdrawn CN112127246A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011006965.3A CN112127246A (en) 2020-09-23 2020-09-23 Plastic film equipment is pasted with road to road construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011006965.3A CN112127246A (en) 2020-09-23 2020-09-23 Plastic film equipment is pasted with road to road construction

Publications (1)

Publication Number Publication Date
CN112127246A true CN112127246A (en) 2020-12-25

Family

ID=73842670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011006965.3A Withdrawn CN112127246A (en) 2020-09-23 2020-09-23 Plastic film equipment is pasted with road to road construction

Country Status (1)

Country Link
CN (1) CN112127246A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112850347A (en) * 2020-12-30 2021-05-28 广东成功自动化设备有限公司 VCP coil-to-coil feeding device
CN114232436A (en) * 2021-12-14 2022-03-25 中建八局第二建设有限公司 Concrete curing device of double-layer water retention system and construction method
CN118065374A (en) * 2024-04-24 2024-05-24 四川省建筑科学研究院有限公司 Geomembrane laying device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4894680A (en) * 1987-06-08 1990-01-16 Brother Kogyo Kabushiki Kaisha Image recording apparatus
CN108342962A (en) * 2018-01-25 2018-07-31 衷小聪 A kind of laminating material film device of road construction road
CN209128858U (en) * 2018-11-10 2019-07-19 广东泽森建设有限公司 A kind of municipal works road maintenance device
CN210122675U (en) * 2019-05-23 2020-03-03 赵宝军 Special film paving device for highway engineering construction

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4894680A (en) * 1987-06-08 1990-01-16 Brother Kogyo Kabushiki Kaisha Image recording apparatus
CN108342962A (en) * 2018-01-25 2018-07-31 衷小聪 A kind of laminating material film device of road construction road
CN209128858U (en) * 2018-11-10 2019-07-19 广东泽森建设有限公司 A kind of municipal works road maintenance device
CN210122675U (en) * 2019-05-23 2020-03-03 赵宝军 Special film paving device for highway engineering construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112850347A (en) * 2020-12-30 2021-05-28 广东成功自动化设备有限公司 VCP coil-to-coil feeding device
CN114232436A (en) * 2021-12-14 2022-03-25 中建八局第二建设有限公司 Concrete curing device of double-layer water retention system and construction method
CN118065374A (en) * 2024-04-24 2024-05-24 四川省建筑科学研究院有限公司 Geomembrane laying device

Similar Documents

Publication Publication Date Title
CN112127246A (en) Plastic film equipment is pasted with road to road construction
CN217264642U (en) Material clamping device for stacking machine
CN212828510U (en) Transfer device is used in production of plastic film book that facilitates use
CN110331418B (en) Electrode bar cleaning device for electrolytic aluminum
CN112401491A (en) Height-adjustable student desk
CN212494658U (en) Slotting and bending device for aluminum-plastic plate machining
CN111843765A (en) Surface grinding device is used in aluminum products production
CN217143381U (en) Pipe joint conveying device for polishing outer longitudinal joint of steel pipe pile
CN216883075U (en) Edging device is used in furniture processing
CN217019955U (en) Automatic lifting device for fixed-thickness roller of sanding machine
CN214530118U (en) Pavement cutting device
CN114166543B (en) Tunnel engineering structure safety testing device and method
CN216043776U (en) Trolley auxiliary mechanism convenient for laying waterproof board
CN113530249B (en) Concrete floating device for civil engineering that less bubble produced
CN211028001U (en) Plain bumper
CN112356776A (en) Automobile seat
CN115302218A (en) Mounting auxiliary structure for vehicle power device
CN109590548B (en) Material cutting device is used in building site construction
CN112429527A (en) Sheet placing device for door and window glass processing
CN219406517U (en) Solar photovoltaic panel transferring and installing device
CN113371436B (en) Hemming unit material loading turn-over device
CN218693190U (en) Automobile support die convenient to move
CN219212580U (en) Edge grinding device for PCB
CN217917246U (en) Polyurethane sleeve pipe surface scale line printing device
CN220621097U (en) Auxiliary positioning frame for anti-collision guardrail steel bars

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20201225