CN112100992B - Substation site table generation and checking method - Google Patents
Substation site table generation and checking method Download PDFInfo
- Publication number
- CN112100992B CN112100992B CN202010819253.7A CN202010819253A CN112100992B CN 112100992 B CN112100992 B CN 112100992B CN 202010819253 A CN202010819253 A CN 202010819253A CN 112100992 B CN112100992 B CN 112100992B
- Authority
- CN
- China
- Prior art keywords
- point table
- substation
- description
- point
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 31
- 238000012544 monitoring process Methods 0.000 claims abstract description 17
- 238000002407 reforming Methods 0.000 claims abstract description 6
- 238000004590 computer program Methods 0.000 claims description 7
- 230000008569 process Effects 0.000 claims description 6
- 230000009466 transformation Effects 0.000 claims description 5
- 238000012423 maintenance Methods 0.000 abstract description 5
- 230000011664 signaling Effects 0.000 description 9
- 230000006870 function Effects 0.000 description 4
- 230000007547 defect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000003287 optical effect Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 239000013307 optical fiber Substances 0.000 description 1
- 239000000047 product Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- 238000010200 validation analysis Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F40/00—Handling natural language data
- G06F40/10—Text processing
- G06F40/166—Editing, e.g. inserting or deleting
- G06F40/177—Editing, e.g. inserting or deleting of tables; using ruled lines
- G06F40/18—Editing, e.g. inserting or deleting of tables; using ruled lines of spreadsheets
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F40/00—Handling natural language data
- G06F40/10—Text processing
- G06F40/166—Editing, e.g. inserting or deleting
- G06F40/186—Templates
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- General Health & Medical Sciences (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- General Engineering & Computer Science (AREA)
- Computational Linguistics (AREA)
- Audiology, Speech & Language Pathology (AREA)
- Artificial Intelligence (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Data Mining & Analysis (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Primary Health Care (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The invention discloses a method for generating and checking a substation site table, which comprises the steps of firstly providing a point table template with typical monitoring information specifications for substations of various voltage levels; then forming a point table generation/check rule base through a rule configurator based on the point table template; finally, judging the type of the transformer substation of which the point table needs to be generated, and generating a standard point table for the newly-built transformer substation based on the rule base; for the existing inventory transformer substation, the standardization and the integrity check of the alarm information description are realized through the reforming and checking of the monitoring information description based on a rule base. The method of the invention can automatically generate a new point table and check the existing point table, thereby reducing the workload of operation and maintenance personnel.
Description
Technical Field
The invention relates to the technical field of power automation, in particular to a power transformation station table generating and checking method.
Background
The point table is an information point table and comprises names, definitions and an order list of remote measuring/remote signaling collected by various devices in the transformer substation, and names, definitions and an order list of remote control defined for operating devices. The former is often referred to as a "telemetry (telemetry)" point table, and the latter is often referred to as a "telemetry" point table. The point table is typically provided by a technician at the substation automation system manufacturer. In theory, the point table of the IEC61850 substation is self-describing, and in engineering practice, is converted into a traditional point table. A complete and standard-describing point table has important significance for master station side scheduling automation and other systems. The current point table still has some defects, and is highlighted in the following two aspects:
(1) the points are incomplete, and some points are collected but not collected;
(2) the dot description is not canonical.
Disclosure of Invention
In view of the above, the present invention provides a substation site table generating and checking method. Can overcome the defects in the prior art.
The purpose of the first aspect of the invention is realized by the following technical scheme:
the invention discloses a power transformation station table generating and checking method, which comprises the following steps:
step S1: providing a point table template of typical monitoring information specifications for the transformer substations of each voltage class;
step S2: forming a point table generation/check rule base through a rule configurator based on the point table template;
step S3: judging the type of the transformer substation needing to generate the point table, and generating a standard point table for the newly-built transformer substation based on the rule base; for the existing stock transformer substation, the standardization and integrity check of the alarm information description are realized through the reforming and checking of the monitoring information description based on the rule base.
Specifically, in step S3, when the stock quantity substation cannot modify the primary site description, a second description is required; the point may be automatically associated with the second description or manually associated.
Specifically, in step S2, when the rule is set, the specification of the first level selection voltage level, the second level selection device, and the third level configuration point describes the rule and whether the configuration point is selectable or not is possible.
Specifically, in step S3, the step of describing reforming and checking through the monitoring information based on the rule base includes:
normalizing the point description;
filling a device list which comprises a number, a device description, a device type and a device ID, wherein the device description can be derived from the master station;
confirming an applicable transformer substation typical monitoring information template based on the transformer substation voltage grade;
and taking the equipment list as an input to generate a typical point table.
Specifically, the process of the second description is performed as follows:
establishing a corresponding relation between the second description and the point ID, namely performing second description association;
deriving an original number scale of the corresponding plant station from the master station;
configuring keywords for typical numerical values of each equipment by using a template;
and carrying out automatic association, and adopting manual association for the points which fail to be automatically associated.
In particular, the point table templates comprise a '35 kV substation typical point table template', a '110 kV substation typical point table template', a '220 kV substation typical point table template' and a '500 kV substation typical point table template'.
It is an object of a second aspect of the invention to provide a computer arrangement comprising a memory, a processor and a computer program stored on the memory and executable on the processor, the processor implementing the method as described above when executing the computer program.
It is an object of a third aspect of the invention to provide a computer-readable storage medium, on which a computer program is stored which, when being executed by a processor, carries out the method as set forth above.
The invention has the beneficial effects that: the method can automatically generate a new point table, can check the existing point table, and has corresponding processing modes no matter a new substation site or an inventory substation site, thereby reducing the workload of operation and maintenance personnel.
Additional advantages, objects, and features of the invention will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the invention. The objectives and other advantages of the present invention will be realized and attained by the structure particularly pointed out in the written description and claims hereof as well as the appended drawings.
Drawings
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be further described in detail with reference to the accompanying drawings, in which:
FIG. 1 is a schematic diagram of automatic generation and checking of a point table;
FIG. 2 is a schematic representation of remote stations in the examples;
fig. 3 is a schematic diagram of a remote signaling point in the embodiment.
Detailed Description
Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. It should be understood that the preferred embodiments are illustrative of the invention only and are not limiting upon the scope of the invention.
As shown in fig. 1, a method for generating and checking a substation site table according to the present invention includes the following steps:
step S1: providing a point table template of typical monitoring information specifications for the transformer substations of each voltage class;
step S2: forming a point table generation/check rule base through a rule configurator based on the point table template;
step S3: judging the type of the transformer substation needing to generate the point table, and generating a standard point table for the newly-built transformer substation based on the rule base; for the existing stock transformer substation, the standardization and integrity check of the alarm information description are realized through the reforming and checking of the monitoring information description based on the rule base.
Example one
The process of creating the standard point table for the newly-built substation site is as follows:
1. the equipment list is received as follows:
TABLE 1 Equipment sheet (example)
Numbering | Description of the invention | Type of | Voltage class | |
1 | 10kV east line 701 switch | | 10kV | |
2 | 1# main transformer high-voltage side 2201 switch | Main | 220kV | |
3 | …… | …… | …… |
2. Obtaining a list of substation devices (the data may be from a device manufacturer or an existing database)
1) And (4) completing the equipment list supplement, including the number, the equipment description, the equipment type and the voltage grade. Wherein "type of device"
Can and can only come from the template, i.e. normalized;
2) and submitting the equipment list.
3. Typical monitoring information table
(1) On the basis of the equipment list, the equipment type check is finished (the existing software provided by a master station manufacturer can be utilized);
(2) the device description validation is done with two jobs:
first, detecting out-of-compliance descriptions (available with existing software provided by the Master station vendor);
secondly, the positive unconventional description is modified;
4. generating a point table by taking the equipment list as input; taking telemetry and telemetry as an example, the generation of the point table is shown in tables 2 and 3 below:
TABLE 2 typical monitoring information Table (remote signaling example)
TABLE 3 typical monitoring information Table (telemetry example)
5. Canonical point table generation
The point table is confirmed and generated by the integrated equipment provider:
(1) as shown in tables 2 and 3, each point is filled with the collection point number (coefficient, remote control number). Determining points which cannot be acquired, wherein the number of the acquired points is null;
(2) appending points not specified in the typical monitoring information template and explicitly identifying;
(3) the point table submission is automated;
(4) checking the validity of the point table by using software provided by a main station manufacturer; the operation is mainly performed by automatic operation and maintenance personnel of a power transformation management station and a system operation part of a power supply bureau, the power transformation management station is the automatic operation and maintenance personnel of a plant station, the system operation part is the automatic operation and maintenance personnel of a main station, and various telemetering and remote signaling of the plant station are remotely transmitted to the main station.
(5) Automatically submitting the new acquisition point type to regulation and control professional examination and confirmation, and adding a template if necessary;
(6) and automatically sending the order form to the master station manufacturer.
Example two
The stock point table checks the stock substation to standardize the point description (taking remote signaling as an example below), and prompts the point of missed mining.
1. The equipment is shown in table 4:
TABLE 4 Equipment sheet
Numbering | Description of the invention | Type (B) | Description of the Specification (second) | |
1 | 10kV east line 701 switch | 10kV line switch | 9726 | |
2 | 1# main transformer high-voltage side 2201 switch | Main transformer 35kV side switch | 1978 | |
3 | …… | …… |
2. Automatically providing a substation equipment list:
1) and filling a device list, including the number, the device description, the device type and the device ID. The device description may be derived from the master station.
2) When the equipment list is automatically prepared, the specification description is filled.
3. A typical telecommand table is generated as shown in table 5:
TABLE 5 typical Telecommunications watch
The master station manufacturer takes the equipment list and generates a typical telecommand table:
1) confirming an applicable transformer substation typical monitoring information template based on the transformer substation voltage grade;
2) and taking the equipment list as input, and automatically generating a typical remote signaling table by using software.
EXAMPLE III
In step S3, when the inventory substation cannot modify the primary site description, a second description is required; the point may be automatically associated with the second description or manually associated.
1. The second description association is a process of establishing a corresponding relationship between the second description and the point ID, and the input result is as shown in table 6 below.
Table 6 second description association table
2. Exporting a telecommand table: the raw number scale derived from the master station for the corresponding plant is shown in the following table:
TABLE 7 original telecommand table
3. Configuring keywords
With the use of the template, a key is configured for a typical numerical quantity of each device. One typical keyword example is as follows:
4. automatic association
Automatic association is the use of a program to complete the association.
5. Artificial association
And for the point of failure of automatic association, providing unmatched remote signaling columns and standard description columns, and realizing concise manual association.
One specific example is shown in tables 8 and 9, where manual association is easily achieved by comparing the upper and lower columns. With the description of table 9, table 8 is filled with the relevant second description.
TABLE 8
Device ID | Point ID | Description of points | Second description |
9726 | 4580 | 10kV east return control short wire | |
9726 | 4581 | 10kV east spring-controlled spring energy | |
9726 | 4582 | Oriental SF6 low 10kV |
TABLE 9
Device ID | Second description |
9726 | Disconnection of switch control loop of 10kV east line 701 |
9726 | 10kV east 701 switch spring non-stored energy |
9726 | 10kV east line 701 switch SF6 low alarm |
6. Import second description
And automatically importing a second description of the plant station, and returning remote signaling without the second description. For the remote signaling not configured with the second description, it may be configured as a matter, and the alarm is not generated any more. The automatic association or manual association work is completed off line, and the step is to lead in the operation system to really take effect and play a role.
In addition, in step S2, when the rule is set, the specification of the first level selection voltage class, the second level selection device, and the third level configuration point describes the rule and whether the set point is selectable or not is possible.
The application of the method can help to realize the following goals:
1) based on national, industrial and enterprise specifications, compiling typical point table templates for the transformer substations of all voltage levels;
2) designing a point table rule configurator according to the voltage grades and the equipment types based on the typical point table templates of the transformer substations of the voltage grades to form a point table generation and checking rule base;
3) newly building a transformer substation, and forming a standard and complete point table by using rules;
4) and the stock transformer substation realizes point table description standardization and integrity check by using rules.
Any process or method descriptions in flow charts or otherwise herein may be understood as representing modules, segments, or portions of code which include one or more executable instructions for implementing specific logical functions or steps in the process, and alternate implementations are included within the scope of the preferred embodiment of the present invention in which functions may be executed out of order from that shown or discussed, including substantially concurrently or in reverse order, depending on the functionality involved, as would be understood by those reasonably skilled in the art of the present invention.
The logic and/or steps represented in the flowcharts or otherwise described herein, e.g., an ordered listing of executable instructions that can be considered to implement logical functions, can be embodied in any computer-readable medium for use by or in connection with an instruction execution system, apparatus, or device, such as a computer-based system, processor-containing system, or other system that can fetch the instructions from the instruction execution system, apparatus, or device and execute the instructions. For the purposes of this description, a "computer-readable medium" can be any means that can contain, store, communicate, propagate, or transport the program for use by or in connection with the instruction execution system, apparatus, or device. More specific examples (a non-exhaustive list) of the computer-readable medium would include the following: an electrical connection (electronic device) having one or more wires, a portable computer diskette (magnetic device), a Random Access Memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disc read-only memory (CDROM). Additionally, the computer-readable medium could even be paper or another suitable medium upon which the program is printed, as the program can be electronically captured, via for instance optical scanning of the paper or other medium, then compiled, interpreted or otherwise processed in a suitable manner if necessary, and then stored in a computer memory.
It should be understood that portions of the present invention may be implemented in hardware, software, firmware, or a combination thereof. In the above embodiments, the various steps or methods may be implemented in software or firmware stored in memory and executed by a suitable instruction execution system. For example, if implemented in hardware, as in another embodiment, any one or combination of the following techniques, which are known in the art, may be used: a discrete logic circuit having a logic gate circuit for implementing a logic function on a data signal, an application specific integrated circuit having an appropriate combinational logic gate circuit, a Programmable Gate Array (PGA), a Field Programmable Gate Array (FPGA), or the like.
It will be understood by those skilled in the art that all or part of the steps carried by the method for implementing the above embodiments may be implemented by hardware related to instructions of a program, and the program may be stored in a computer readable storage medium, and when executed, the program includes one or a combination of the steps of the method embodiments.
In addition, functional units in the embodiments of the present invention may be integrated into one processing module, or each unit may exist alone physically, or two or more units are integrated into one module. The integrated module can be realized in a hardware mode, and can also be realized in a software functional module mode. The integrated module, if implemented in the form of a software functional module and sold or used as a stand-alone product, may also be stored in a computer readable storage medium.
The storage medium mentioned above may be a read-only memory, a magnetic or optical disk, etc.
In the description herein, references to the description of the term "one embodiment," "some embodiments," "an example," "a specific example," or "some examples," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
Although embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention, and that variations, modifications, substitutions and alterations can be made in the above embodiments by those of ordinary skill in the art without departing from the principle and spirit of the present invention.
Finally, although the present invention has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that various changes and modifications may be made therein without departing from the spirit and scope of the invention as defined by the appended claims.
Claims (5)
1. A power transformation station table generating and checking method is characterized by comprising the following steps: the method comprises the following steps:
step S1: providing a point table template of typical monitoring information specifications for the transformer substations of each voltage class;
step S2: forming a point table generation/check rule base through a rule configurator based on the point table template;
step S3: judging the type of the transformer substation needing to generate the point table, and generating a standard point table for the newly-built transformer substation based on the rule base; for the existing stock transformer substation, the standardization and integrity check of the alarm information description are realized through the reforming and checking of the monitoring information description based on a rule base;
in step S3, the step of describing reforming and checking by monitoring information based on the rule base includes:
normalizing the point description;
filling a device list which comprises a number, a device description, a device type and a device ID, wherein the device description can be derived from the master station;
confirming an applicable transformer substation typical monitoring information template based on the transformer substation voltage grade;
generating a typical point table by taking the equipment list as input;
in step S3, when the inventory substation cannot modify the primary site description, a second description is needed, and the process of performing the second description is as follows:
establishing a corresponding relation between the second description and the point ID, namely performing second description association;
deriving an original number scale of the corresponding plant station from the master station;
configuring keywords for typical numerical values of each equipment by using a template;
and carrying out automatic association, and adopting manual association for the points with failure automatic association.
2. The substation site table generating and checking method according to claim 1, wherein the substation site table generating and checking method comprises the following steps: in step S2, when the rule is set, the first stage selects the voltage class, the second stage selects the device, and the third stage configuration point, which describes the rule and may set whether the point is selectable.
3. The substation site table generating and checking method according to claim 1, wherein the substation site table generating and checking method comprises the following steps: the point table template comprises a 35kV substation typical point table template, a 110kV substation typical point table template, a 220kV substation typical point table template and a 500kV substation typical point table template.
4. A computer apparatus comprising a memory, a processor, and a computer program stored on the memory and operable on the processor, wherein: the processor, when executing the computer program, implements the method of any of claims 1-3.
5. A computer-readable storage medium having stored thereon a computer program, characterized in that: the computer program, when executed by a processor, implements the method of any one of claims 1-3.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010819253.7A CN112100992B (en) | 2020-08-14 | 2020-08-14 | Substation site table generation and checking method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010819253.7A CN112100992B (en) | 2020-08-14 | 2020-08-14 | Substation site table generation and checking method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112100992A CN112100992A (en) | 2020-12-18 |
CN112100992B true CN112100992B (en) | 2022-07-01 |
Family
ID=73753753
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010819253.7A Active CN112100992B (en) | 2020-08-14 | 2020-08-14 | Substation site table generation and checking method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112100992B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113159729B (en) * | 2021-05-08 | 2023-04-18 | 国网青海省电力公司西宁供电公司 | Point table checking system and method for shortening point table checking time |
CN113392145A (en) * | 2021-06-16 | 2021-09-14 | 贵州电网有限责任公司 | Automatic generation device and generation method for distribution network terminal point table |
CN114819565B (en) * | 2022-04-14 | 2024-03-22 | 中国南方电网有限责任公司 | Verification method of system specification description file, control equipment and intelligent substation |
CN114818626B (en) * | 2022-05-06 | 2023-10-24 | 国网安徽省电力有限公司亳州供电公司 | Substation monitoring information point table generation method, device, equipment and storage medium |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105427041A (en) * | 2015-11-18 | 2016-03-23 | 国网山西省电力公司 | Standardized maintenance method for reconstruction and extension information point table of running substation |
CN105809260A (en) * | 2016-05-12 | 2016-07-27 | 国网辽宁省电力有限公司鞍山供电公司 | Method for intelligently generating monitoring information point list of dispatching automation system |
CN106681974A (en) * | 2016-12-26 | 2017-05-17 | 国网河北省电力公司电力科学研究院 | Method for automatically and movably simulating master station information point table solidification |
CN107450445A (en) * | 2017-09-05 | 2017-12-08 | 国网山东省电力公司 | A kind of unified check of electric power supervisory control signal multistation and acceptance method |
CN108449133A (en) * | 2018-03-20 | 2018-08-24 | 贵州电网有限责任公司六盘水供电局 | A kind of intelligent substation luminous power test method |
CN110705965A (en) * | 2019-09-30 | 2020-01-17 | 国网冀北电力有限公司张家口供电公司 | Method for automatically compiling monitoring information point table |
CN110705969A (en) * | 2019-10-12 | 2020-01-17 | 许昌许继软件技术有限公司 | Transformer substation monitoring system, main station and method for automatically associating measuring point ID |
CN110784020A (en) * | 2019-11-13 | 2020-02-11 | 四川洪辉电力科技有限公司 | Automatic checking and accepting equipment, system and method for monitoring information |
CN110971452A (en) * | 2019-11-13 | 2020-04-07 | 云南电网有限责任公司普洱供电局 | Automatic checking system and method for three remote signals of electric power information |
CN111061920A (en) * | 2019-11-20 | 2020-04-24 | 广东电网有限责任公司 | Signal description correctness checking method for equipment parameter inheritance |
CN111262346A (en) * | 2020-04-26 | 2020-06-09 | 国网江西省电力有限公司电力科学研究院 | Integrated automatic acceptance system and method for transformer substation |
CN111524031A (en) * | 2020-04-24 | 2020-08-11 | 内蒙古电力(集团)有限责任公司包头供电局 | Implementation method and system for intelligently generating operation steps based on analysis operation tasks |
-
2020
- 2020-08-14 CN CN202010819253.7A patent/CN112100992B/en active Active
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105427041A (en) * | 2015-11-18 | 2016-03-23 | 国网山西省电力公司 | Standardized maintenance method for reconstruction and extension information point table of running substation |
CN105809260A (en) * | 2016-05-12 | 2016-07-27 | 国网辽宁省电力有限公司鞍山供电公司 | Method for intelligently generating monitoring information point list of dispatching automation system |
CN106681974A (en) * | 2016-12-26 | 2017-05-17 | 国网河北省电力公司电力科学研究院 | Method for automatically and movably simulating master station information point table solidification |
CN107450445A (en) * | 2017-09-05 | 2017-12-08 | 国网山东省电力公司 | A kind of unified check of electric power supervisory control signal multistation and acceptance method |
CN108449133A (en) * | 2018-03-20 | 2018-08-24 | 贵州电网有限责任公司六盘水供电局 | A kind of intelligent substation luminous power test method |
CN110705965A (en) * | 2019-09-30 | 2020-01-17 | 国网冀北电力有限公司张家口供电公司 | Method for automatically compiling monitoring information point table |
CN110705969A (en) * | 2019-10-12 | 2020-01-17 | 许昌许继软件技术有限公司 | Transformer substation monitoring system, main station and method for automatically associating measuring point ID |
CN110784020A (en) * | 2019-11-13 | 2020-02-11 | 四川洪辉电力科技有限公司 | Automatic checking and accepting equipment, system and method for monitoring information |
CN110971452A (en) * | 2019-11-13 | 2020-04-07 | 云南电网有限责任公司普洱供电局 | Automatic checking system and method for three remote signals of electric power information |
CN111061920A (en) * | 2019-11-20 | 2020-04-24 | 广东电网有限责任公司 | Signal description correctness checking method for equipment parameter inheritance |
CN111524031A (en) * | 2020-04-24 | 2020-08-11 | 内蒙古电力(集团)有限责任公司包头供电局 | Implementation method and system for intelligently generating operation steps based on analysis operation tasks |
CN111262346A (en) * | 2020-04-26 | 2020-06-09 | 国网江西省电力有限公司电力科学研究院 | Integrated automatic acceptance system and method for transformer substation |
Non-Patent Citations (8)
Title |
---|
The Research of Power Secondary Anti-disoperation Function in Dispatching Control Center Based on The Mode of Full Remote Control and Integrated Dispatching and Control;Wenbin Lin等;《IOP Conference Series Materials Science and Engineering》;20181222;1-11 * |
一种基于模板的配电终端信息点表自动生成方案;韦戈山等;《电子技术与软件工程》;20200102;65-66 * |
一种智能变电站设备监控信息点表自动配置方法的研究与实现;贺延峰等;《自动化应用》;20191125;78-81 * |
一种调度监控信息点表自动规范及校验的***和方法;曹德发等;《通讯世界》;20191225;233-234 * |
变电站自动化***信息点表管理方法浅谈;徐韬等;《数字通信世界》;20181201;273-274 * |
四川省调监控信息智能决策专家***的设计与实现;高剑等;《工程科技Ⅱ辑》;20160315;I140-141 * |
基于正则表达式的变电站监控信息点表校核方法的研究与应用;曹恒妍等;《电工技术》;20190325;正文第1、3.1节 * |
基于电力设备的监控业务一体化管理方法;王洪哲等;《东北电力技术》;20170820;第38卷(第8期);24-28 * |
Also Published As
Publication number | Publication date |
---|---|
CN112100992A (en) | 2020-12-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112100992B (en) | Substation site table generation and checking method | |
CN109034616B (en) | Statistical analysis system based on intelligent substation configuration data management and control | |
CN107749811B (en) | Power distribution terminal access adaptive debugging analysis method based on power distribution master station | |
CN105809260A (en) | Method for intelligently generating monitoring information point list of dispatching automation system | |
CN111934274A (en) | Intelligent substation protection constant value intelligent downloading method | |
CN114123482A (en) | Main plant station information joint debugging decoupling method | |
CN107146165B (en) | Distribution network planning data management method and system | |
CN112101916B (en) | Method and device for rapidly standardizing monitoring information point table and computer-readable storage medium | |
CN112949228B (en) | Automatic SCD file configuration method and device for intelligent substation | |
CN103700024A (en) | Automatic importing method of provincial and prefectural integrated telecontrol information based on D5000 system | |
CN107146166B (en) | Distribution network planning auxiliary system | |
CN107169180A (en) | A kind of power grid regulation model center system of two-stage deployment | |
CN111507078A (en) | Test report control method and system | |
CN116826709A (en) | Automatic matching method, device and storage medium for adjustable load resource and scheduling master station model | |
CN116186192A (en) | SCD file verification method and device based on standard virtual terminal loop expert database | |
CN109617025A (en) | A kind of automatic generation method and device of site conservative management unit main wiring diagram | |
CN104376614A (en) | One-key ticket outlet method for substation operation tickets | |
CN110705965B (en) | Method for automatically compiling monitoring information point table | |
CN111402077A (en) | Power grid primary equipment model interaction method based on unified coding | |
CN109977388B (en) | Remote signaling point table automatic generation method and tool based on electric main wiring diagram identification | |
CN114019284A (en) | Monitoring information checking system and method for access of new generation master station to transformer substation | |
Yunguang et al. | Research on secondary circuit identification technology and condition-based maintenance mode of intelligent substation | |
CN111695332A (en) | Method for automatically generating CIME file based on transformer substation monitoring information table | |
CN116316404A (en) | Power grid protection fixed value checking system | |
CN110942159B (en) | Maintenance and verification method for responsibility area of master network OCS system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |