CN111507078A - Test report control method and system - Google Patents

Test report control method and system Download PDF

Info

Publication number
CN111507078A
CN111507078A CN202010190643.2A CN202010190643A CN111507078A CN 111507078 A CN111507078 A CN 111507078A CN 202010190643 A CN202010190643 A CN 202010190643A CN 111507078 A CN111507078 A CN 111507078A
Authority
CN
China
Prior art keywords
test
data
test report
report
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010190643.2A
Other languages
Chinese (zh)
Inventor
刘栋
李宁
刘正胜
孟涛
商兵雷
陈磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinxiandai Information Industry Co ltd
Original Assignee
Jinxiandai Information Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinxiandai Information Industry Co ltd filed Critical Jinxiandai Information Industry Co ltd
Priority to CN202010190643.2A priority Critical patent/CN111507078A/en
Publication of CN111507078A publication Critical patent/CN111507078A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/21Design, administration or maintenance of databases
    • G06F16/215Improving data quality; Data cleansing, e.g. de-duplication, removing invalid entries or correcting typographical errors
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/25Integrating or interfacing systems involving database management systems
    • G06F16/254Extract, transform and load [ETL] procedures, e.g. ETL data flows in data warehouses

Landscapes

  • Engineering & Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Theoretical Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a test report management and control method and a system, in the invention, test data come from direct reading of test equipment and/or reading of data recorded by a work area client to generate primary data, further the primary data is preliminarily judged through a set rule to generate secondary data containing the primary data and a judgment result, the secondary data is sent to an approval end, and the approval end stores the secondary data. In addition, due to the unified management of the test report templates, manual screening and selection of the templates are not needed, the test report templates or the error data can not be mistaken, and the reliability of test report management and control can be ensured.

Description

Test report control method and system
Technical Field
The invention relates to a test report control method and a test report control system, which are applied to the power industry.
Background
The test is an important link in the operation and maintenance work of the power equipment and is one of effective means for ensuring the safe operation of the power system. Test data are recorded through the test report and serve as data archive of the power equipment test, the data archive is used for data checking and data analysis, and the running condition of the power equipment is effectively monitored.
In the traditional test report in the power production business, a form or a document template which is automatically compiled by each unit is directly printed and then brought to the site for testing, and partial tests need to manually collect data and record the data on a paper document; data acquisition is carried out on part of tests through a test instrument, and the acquired data are stored in a computer or are imported into the computer for storage in a memory card mode; the unit of the system is used for recording the test data into the system again for electronic archiving in part of tests.
The Chinese patent documents CN109978495A, CN110070871A, CN108536659A, CN106570105A and CN110659289A all describe the current situation that most of the current test data are manually recorded and stored by paper, point out the defects of the test report controlled by adopting the method, and further provide a corresponding solution.
The chinese patent document CN106570105A takes a paper test report as a basis, converts the paper test report into an electronic image file, converts the image file into text information by an OCR technology, and then matches a template to process into an electronic test report. The patent document still does not depart from the problem that manual intervention is too much in the process of issuing a paper test report, the current OCR technology is not perfect, the recognition rate of handwritten texts is not high, and the problem easily occurs in the management and control of the test report especially under the condition that field workers have five-degree-of-five handwritten fonts.
At present, each link of the test major in the power production industry is managed completely by depending on a WEB end and is realized through a test report management system, and the management modes of the test reports in the system are that test report compiling, test report auditing and test report filing are all completed at the WEB end. The test report preparation refers to the steps that a tester determines a plurality of test report templates in a test report management system according to test major, test properties, test equipment types and the like, selects a template corresponding to test equipment according to the test report templates, selects a corresponding test item again according to the test templates, can create a corresponding test report through a plurality of operations such as test major, properties, transformer substations, equipment, templates, items and the like, then records data collected on site and recorded on a paper document into the test report management system one by one, and submits the data to corresponding team groups for auditing after the data are recorded.
The examination and verification of the test report refers to that team personnel search corresponding test standards and test specifications according to the test report submitted by the test personnel and test equipment, examination and verification are carried out on filled test items and corresponding test data one by one, problem data are recorded, the test items are marked as unqualified, the examination and verification can be completed only through examination and verification of a plurality of items and a plurality of items of data, and a special duty is submitted for examination and verification after the examination and verification are completed.
The test report filing means that corresponding test standards and test specifications are searched again according to test equipment according to test reports submitted by team personnel, the filled test items and corresponding test data are checked one by one, unqualified data items are paid attention to again, the checking can be completed through the checking of a plurality of items and a plurality of items of data, comprehensive judgment is carried out according to the current operation condition of the test equipment and the maintenance condition of the test equipment, the next test time or maintenance time of the current equipment is determined, and the test report is filed.
Because the test report has a plurality of templates, data can be input only manually, and the test conclusion can be checked only manually, the test report of the test report management system has the problems of non-uniform test report templates, time and labor waste in data input, lack of intelligent checking, lack of trend analysis and the like.
For this reason, the chinese patent document CNCN110659289A proposes a quality test report management method for material quality detection, which first stores test data to a client and a server, respectively, where the test data includes test raw data and test data provided by a supplier. The original test data are quoted at the client side according to the detection items corresponding to the materials and a test report is generated; and transmitting the generated test report to a server for processing to verify the accuracy of the test report and the accuracy of the detection data provided by the supplier. The core of the method is to avoid the data of the supplier end and the supplier end from being faked and the operation condition of the equipment side from being evaluated.
Disclosure of Invention
The invention aims to provide a test report control method capable of effectively controlling a test report of an electric power system, and also provides a test report control system.
In an embodiment of the present invention, a test report management and control method is provided, which is applied to the power industry, and the test report management and control method includes the following steps:
test data are obtained through test equipment and/or a work area client;
importing the test data into a preset test report template to generate a test report;
checking the test data in the test report according to the initial value data and a preset corresponding test threshold value to generate a judgment result;
and sending the judgment result and the test report to an approval end together.
Optionally, for a given test report item, employing a normalized test report template;
and (4) migrating the test data in the historical test report to the current test report template aiming at the historical test report to generate a new historical test report.
Optionally, the approval end further generates a transverse judgment result, and the transverse judgment result is obtained by comparing the current data of the current test equipment with the corresponding historical data.
Optionally, the current data and the historical data generate a change curve or a change trend report, and when the change curve deteriorates based on a preset change threshold, a prompt is output.
Optionally, longitudinally comparing corresponding test data aiming at different equipment of the same equipment manufacturer or the same model to generate current statistical data of the different equipment of the same equipment manufacturer or the same model so as to form a statistical rule;
and screening out test data which do not accord with the statistical rule based on the statistical rule, and outputting a prompt.
Optionally, different devices of the same model are associated with the same model and defined by different device numbers, so as to form secondary data indexed by the model and the device number.
Optionally, the test report is further defined by test item, phase, site, test sub-item, power station, equipment type, and test date, and the fields for definition can be retrieved and invoked by the approval end.
Optionally, the approval side provides a test report template library, and updates the test report template of the subordinate node thereof in a manner of distributing or pushing the test report template to the subordinate node thereof by the approval side or obtains the update of the test report in a manner of requesting the update from the subordinate node to the approval side.
Optionally, temporarily storing test data by the test equipment and/or the work area client;
and the temporary storage test data is imported by the wholesale end, the work area client or the intermediate node between the approval end and the work area client in response to the external instruction of the selected corresponding test equipment, so as to generate a corresponding test report.
In an embodiment of the present invention, a test report management and control system is further provided, which is applied to the power industry, and the test report management and control system includes:
the extraction unit is used for acquiring test data through test equipment and/or a work area client;
the generating unit is used for importing the test data into a preset test report template to generate a test report;
the initial detection unit is used for checking the test data in the test report according to the initial value data and a preset corresponding test threshold value to generate a judgment result;
and the transmission unit is used for transmitting the judgment result and the test report to the approval end together.
In the embodiment of the invention, the test data is directly read from the test equipment and/or read from the data recorded by the client in the work area to generate primary data, the primary data is further preliminarily judged according to the set rule to generate secondary data containing the primary data and the judgment result, the secondary data is sent to the approval end, and the approval end stores the secondary data. In addition, due to the unified management of the test report templates, manual screening and selection of the templates are not needed, the test report templates or the error data can not be mistaken, and the reliability of test report management and control can be ensured.
Drawings
Fig. 1 is a topological diagram of a power system test data acquisition system in an embodiment.
Detailed Description
Regarding the test equipment of the power system, such as a loop resistance tester, a ground resistance tester, a relay protection tester, a transformation ratio tester, a direct current high voltage generator, a frequency generator, a high voltage switch dynamic characteristic tester and the like, the test equipment for testing each link of the power system is used as an instrument and meter, generally has a port connected with an upper computer, and can directly upload test data.
Some test data can be manually input by field personnel to, for example, a work area client, which can be seen in fig. 1, and in the figure, the work area client serves as a leaf node for acquiring test data of an electric power system to form an upper computer of an acquisition terminal, which is the aforementioned test equipment.
A local area network for acquiring test data is constructed by a plurality of factory clients in a certain factory area, and the local area network can be established on a wired network or a wireless network.
The local area network is connected to the external network through a core network switch, in fig. 1, the province company client forms a father node of the information internal network, and the province company client can be used as an approval end and used for monitoring test data of subordinate nodes of the province company client.
In the network constructed in fig. 1, the data server and the application server may be deployed at a lower hierarchy level, or may be deployed at a higher hierarchy level. When the system is deployed at a lower level, the number of required servers is large, and a server cluster can be constructed.
For higher levels, the test data of all the areas are collected, and the statistical characteristics of the test data are more representative.
The test data can be directly collected by the test equipment and then uploaded, and in more applications, the field equipment is provided with instruments, such as current measuring equipment, voltage measuring equipment and the like. In more applications, based on a centralized and distributed field working condition acquisition system, a monitoring system based on force control software is arranged at a power plant end, and the monitoring system can be used as a work area client.
The terminals located at higher levels in the topology shown in fig. 1 are preferably configured for BI-based experimental data analysis, presentation. Where BI is an abbreviation of Business Intelligence, Business Intelligence. Also known as business intelligence or business intelligence, refers to the realization of business value by data analysis using modern data warehouse technology, on-line analysis processing technology, data mining and data presentation technology. The concept of business intelligence was first introduced by the Gartner Group (Gartner Group) in 1996.
By adopting BI, the dimension data analysis of the test report can be realized, multiple dimensions such as date, property, profession and the like can be defined, free combination and configuration can be performed, test items and test data corresponding to the test report under different conditions can be freely displayed, and two viewing modes of a report form or a chart are supported.
For example, the chart has intuitive comparison of historical test data or sampling data of different test devices in the same time period, and is beneficial to making correct evaluation on the test data.
The method comprises the steps of adopting BI to analyze equipment dimension data, defining through multiple dimensions such as a power station, test equipment, equipment manufacturers, equipment models, equipment types and test dates, freely combining and configuring, inquiring corresponding equipment and test report data, analyzing test data of different manufacturers, models and different test items, displaying test items, phases, parts, test sub-items and the like of selected equipment under corresponding test templates, carrying out rapid contrastive analysis, and supporting two viewing modes of reports or charts.
Intelligently analyzing data, automatically analyzing report contents, verifying the normalization of test values, and reminding abnormal values; automatically checking a test value and a test result; and data trend analysis is provided, and when the data tend to be degraded, the system automatically checks and gives a prompt.
With respect to the test reports, known test reports lack the necessary regulations and the test report templates differ from region to region. Correspondingly, when the test data is additionally recorded, corresponding test templates need to be selected according to equipment, and the template names are basically similar and difficult to distinguish. Part of the test template was missing. The test, the example inspection and the first inspection before commissioning are all nonstandard and have no corresponding test template, and test data is easy to lose in a paper document.
In the embodiment of the invention, on one hand, the test report template adopts an electronic document, and data is directly imported by test equipment based on field matching to generate a corresponding test report. It will be appreciated that the test devices may be identified by their ID or by a physical ID based on the national grid, so that relevant data may be deposited for indexing by, for example, physical ID, and relevant test reports identified.
As mentioned above, some power plants, for example, have already established a relatively complete monitoring network, and use it as a work area client or use the monitoring terminal included therein as a work area client to construct a test data acquisition system. The test data can be directly obtained by the client side of the work area.
In addition, the conventional problem of manually inputting test data is mainly that the amount of test data is very large, tests of different test specialties of each device need to be input for many times, and even obvious errors in inputting are not explicitly displayed. For some data that is significantly overrun, it may be judged and reminded based on the logging threshold.
The test report template can be generated from the uppermost layer of the test data acquisition system and distributed downwards, and the test data is directly imported into the test report template to generate a test report.
In some embodiments, the generation of the test report is not limited to a certain node, for example, at a certain layer of node, the relevant person may click on the relevant test equipment, extract the relevant test data, and directly export the relevant test data to the corresponding test report template to generate the test report.
At present, because the rationality of the test value can not be judged when the test data is input, relevant standards and specifications need to be checked, and the process can be filed only by examining and verifying a plurality of personnel for a plurality of times.
In the embodiment of the invention, the range of the equipment working parameters determined by the relevant standards and specifications is recorded into the data acquisition system, so that the reasonability of the recorded data is controlled, and the limitation of manual work and manual error investigation is reduced.
The range of the working parameters can be set according to initial value data provided by a manufacturer or an expected data range, so that test data in a test report can be checked according to the initial value data and a preset corresponding test threshold to generate a judgment result.
More specifically, according to the test correspondence of the target device, the relevant standard and the standard regulation are determined, the judgment rule is compiled, the judgment rule is stored in the rule base, and when the relevant test data is checked, the rule corresponding to the test data is called from the rule base to check the test result determined by the test data.
In some embodiments, the relevant judgment rules are compiled according to, for example, national regulations, factory regulations, standard regulations, such as different voltage levels, equipment types, test specials, test properties, test items, phases, test sites, test sub-items, etc., as follows:
Figure RE-DEST_PATH_IMAGE001
according to the table, whether the content of hydrogen is over standard or not is determined, a rule is formed and stored in a rule base, when data of routine inspection of dissolved gas in casing oil is checked, a rule requesting an analysis item of the dissolved gas in the casing oil of the 220Kv main transformer is called to judge whether the test data is qualified or not, wherein the qualified data is not the data per se, but whether the electrical equipment meets the relevant rule or not. And finally, generating a judgment result, and sending the judgment result and the test report to the previous layer.
In general, for each test sub-item, there is a rule configured for it, and when the test sub-item of the electrical device needs to be tested, the corresponding rule in the rule base is called to audit the obtained test data.
And further, the judgment result or conclusion is sent to the approval end of the test report, and the related test report is simultaneously reported so as to facilitate the inspection and the total storage at the approval end.
In addition, the data stored in the total can be further transmitted to the upper layer or called by other approval ends.
Furthermore, the approval end gives a system judgment conclusion, so that the approval end can conveniently check the test result.
In addition, in some embodiments, after the test report is compiled, the test report can be submitted to an auditing link in advance, and the pre-inspection can be performed in the auditing link in advance, and can be performed manually.
Furthermore, when the test report is submitted to the pre-inspection of the auditing link, the test report can also be automatically submitted to the rule background, the rule background automatically judges the data in the report according to the preset rule, and when the auditing link is submitted to the approval end, the judgment result is pushed to the approval end.
For the test data acquisition system of the power system shown in fig. 1, the upper node controls the distribution of the test report template adapted to the lower node, and obviously, based on the tree network topology structure, the upper node is relatively necessary to serve as an approval end of the higher node to unify the relevant test report templates. Specifically, for a given test report item, a normalized test report template is employed.
It should be noted that the test report does not necessarily need to be submitted to the node at the highest level, and when a specific test report at an intermediate level is returned, the specific test report needs to be submitted to a certain node corresponding to the intermediate level, and the test report template is also generated and distributed by the node.
The original test report template and the newly added test report template are different from each other, data analysis cannot be directly carried out on the original test report template and the newly added test report template, a historical test report migration method is provided, the original test report data are migrated to the new template through registration of corresponding test items by means of certainty of the test data rather than diversity of formats of the test reports, the new test reports are automatically generated in batches, and data are guaranteed to be unified template data, so that data analysis is carried out on the aspect. Generally speaking, for historical test reports, test data in the historical test reports are migrated to the current test report template, and new historical test reports are generated.
The data of the same electrical equipment at different time intervals can fluctuate, and the fluctuation is the fluctuation on the existing operation rule, but not the fluctuation range of the operation rule. The statistical characteristics of the data can predict the risk of equipment failure, and for this reason, the approval end further generates a transverse judgment result, and the transverse judgment result is obtained by comparing the current data of the current test equipment with corresponding historical data.
And generating a change curve or a change trend report by the current data and the historical data, and outputting a prompt when the change curve is degraded based on a preset change threshold.
Aiming at different equipment of the same equipment manufacturer or the same model, longitudinal comparison of corresponding test data is carried out, current statistical data of the different equipment of the corresponding equipment manufacturer or the same model are generated, and a statistical rule is formed;
and screening out test data which do not accord with the statistical rule based on the statistical rule, and outputting a prompt.
The comparison and analysis, transverse and longitudinal comparison and auxiliary analysis of the running condition of the equipment of the test data are realized, so that the workload of the basic team is reduced, the data quality of the test report is improved, the application level of the test report is improved, and the monitoring capability of the equipment is enhanced.
For the storage of test data, firstly, the generation of the test data has obvious temporal characteristics, and then the generation of the test data is the source characteristics of the test data, and the two basic characteristics can effectively ensure the accuracy of the test data management.
In some embodiments, different devices of the same model are associated with the same model and defined with different device numbers, forming secondary data indexed by model and device number.
In some embodiments, the test equipment and/or work area client temporarily stores test data;
and the temporary storage test data is imported by the wholesale end, the work area client or the intermediate node between the approval end and the work area client in response to the external instruction of the selected corresponding test equipment, so as to generate a corresponding test report.
Based on the embodiment of the invention, the test template is perfected by combining the actual service on site according to the system management requirement, the data is normalized, the management burden brought by a large number of similar templates is reduced, and the working efficiency can be improved by adding missing test templates through upper nodes and pushing the test templates downwards.
According to the business needs, the judgment result is formed by judging the background rule, so that the automatic verification of the test report data is added in the auditing and filing links, the records which are not in the test data range are marked, the auditor is reminded to pay key attention, a standardized flow system is built, and the test data quality is guaranteed.
In addition, through the direct import of test equipment, test report data can be entered fast, has guaranteed the integrality of data, provides the support for the analysis of test data, and test data accessible test report dimension and test equipment dimension carry out trend analysis, develop intelligent analysis according to different aspects such as test item, sub-item, producer, model, and the quick analysis goes out equipment behavior, promotes intelligent level.

Claims (10)

1. A test report control method is applied to the power industry and is characterized by comprising the following steps:
test data are obtained through test equipment and/or a work area client;
importing the test data into a preset test report template to generate a test report;
checking the test data in the test report according to the initial value data and a preset corresponding test threshold value to generate a judgment result;
and sending the judgment result and the test report to an approval end together.
2. The test report management and control method according to claim 1, wherein for a given test report item, a normalized test report template is adopted;
and (4) migrating the test data in the historical test report to the current test report template aiming at the historical test report to generate a new historical test report.
3. The test report management and control method according to claim 2, wherein the approval end further generates a horizontal judgment result, and the horizontal judgment result is obtained by comparing current data of the current test equipment with corresponding historical data.
4. The test report management and control method according to claim 3, wherein a change curve or a change trend report is generated by the current data and the historical data, and when the change curve deteriorates based on a preset change threshold, a prompt is output.
5. The test report management and control method according to claim 2, wherein the longitudinal comparison of the corresponding test data is performed for different devices of the same equipment manufacturer or the same model, so as to generate the current statistical data of the different devices of the corresponding equipment manufacturer or the same model, thereby forming a statistical rule;
and screening out test data which do not accord with the statistical rule based on the statistical rule, and outputting a prompt.
6. The test report management and control method according to claim 5, wherein different devices of the same model are associated with the same model and defined by different device numbers, so as to form secondary data indexed by the model and the device number.
7. The test report management and control method according to claim 6, wherein the test report is further defined by test items, phases, sites, test sub-items, power stations, equipment types and test dates, and the defined fields can be retrieved and called by the approval end.
8. The test report management and control method according to claim 1, wherein the approval side provides a test report template library, and updates the test report template of the lower node thereof by distributing or pushing the approval side to the lower node thereof or obtains the update of the test report by requesting the lower node to update the approval side.
9. The test report management and control method according to claim 8, wherein the test equipment and/or the work area client temporarily stores the test data;
and the temporary storage test data is imported by the wholesale end, the work area client or the intermediate node between the approval end and the work area client in response to the external instruction of the selected corresponding test equipment, so as to generate a corresponding test report.
10. The utility model provides a test report management and control system, is applied to the electric power industry, its characterized in that, test report management and control system includes:
the extraction unit is used for acquiring test data through test equipment and/or a work area client;
the generating unit is used for importing the test data into a preset test report template to generate a test report;
the initial detection unit is used for checking the test data in the test report according to the initial value data and a preset corresponding test threshold value to generate a judgment result;
and the transmission unit is used for transmitting the judgment result and the test report to the approval end together.
CN202010190643.2A 2020-03-18 2020-03-18 Test report control method and system Pending CN111507078A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010190643.2A CN111507078A (en) 2020-03-18 2020-03-18 Test report control method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010190643.2A CN111507078A (en) 2020-03-18 2020-03-18 Test report control method and system

Publications (1)

Publication Number Publication Date
CN111507078A true CN111507078A (en) 2020-08-07

Family

ID=71864028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010190643.2A Pending CN111507078A (en) 2020-03-18 2020-03-18 Test report control method and system

Country Status (1)

Country Link
CN (1) CN111507078A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112308371A (en) * 2020-09-22 2021-02-02 成都飞机工业(集团)有限责任公司 Management and control system and management and control method for typical test of airplane
CN112632944A (en) * 2020-12-15 2021-04-09 深圳壹账通智能科技有限公司 Method, system, equipment and storage medium for generating inspection report

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106570105A (en) * 2016-11-01 2017-04-19 广西电网有限责任公司电力科学研究院 Structured processing method for power equipment test report
CN109635265A (en) * 2018-11-29 2019-04-16 济南荣耀合创电力科技有限公司 A kind of test report generation system based on image recognition
CN109800387A (en) * 2019-01-25 2019-05-24 武汉瑞莱保能源技术有限公司 A method of generating test report
CN110659289A (en) * 2019-09-17 2020-01-07 国网山东省电力公司莱芜供电公司 Material quality detection test report management method and system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106570105A (en) * 2016-11-01 2017-04-19 广西电网有限责任公司电力科学研究院 Structured processing method for power equipment test report
CN109635265A (en) * 2018-11-29 2019-04-16 济南荣耀合创电力科技有限公司 A kind of test report generation system based on image recognition
CN109800387A (en) * 2019-01-25 2019-05-24 武汉瑞莱保能源技术有限公司 A method of generating test report
CN110659289A (en) * 2019-09-17 2020-01-07 国网山东省电力公司莱芜供电公司 Material quality detection test report management method and system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112308371A (en) * 2020-09-22 2021-02-02 成都飞机工业(集团)有限责任公司 Management and control system and management and control method for typical test of airplane
CN112632944A (en) * 2020-12-15 2021-04-09 深圳壹账通智能科技有限公司 Method, system, equipment and storage medium for generating inspection report

Similar Documents

Publication Publication Date Title
CN106570784A (en) Integrated model for voltage monitoring
US20230369854A1 (en) Method and apparatus for checking power grid measurement data, device, storagemedium and program product
CN105606920A (en) System and method for determining the current and future state of health of a power transformer
CN104933631A (en) Power distribution network operation online analysis and evaluation system
CN110108955A (en) A kind of new-energy grid-connected performance automatic test analysis platform and detection method
CN111934274A (en) Intelligent substation protection constant value intelligent downloading method
CN109034616A (en) A kind of statistical analysis system based on intelligent substation configuration data control
CN111507078A (en) Test report control method and system
CN110806518A (en) Transformer area line loss abnormal motion analysis module and operation method thereof
CN112100992B (en) Substation site table generation and checking method
CN104851056A (en) Intelligent transformer station secondary system model standard library management system and method
US20140006398A1 (en) System and Method for Energy Management Information System Reliability Assurance
CN106022719A (en) Large-scale generator insulation data management system
CN106981876A (en) Distribution network reliability evaluation method based on line segment model
CN113705026B (en) Digital modeling and intelligent detection system for power secondary equipment
CN107146166B (en) Distribution network planning auxiliary system
CN106709059B (en) Terminal online rate index monitoring method and device based on metering automation system
CN110502257B (en) Transformer substation monitoring information management, control and checking method
CN109710669B (en) Method for improving accuracy of full power grid model data based on check rule base
CN106066860B (en) Method for managing electric energy metering device
Chow et al. Novel engineering techniques to overcoming traditional challenges in online condition monitoring systems for power transformer
CN112347089B (en) Method for checking power supply reliability data quality of multiple systems
CN114049082A (en) Power grid technical improvement overhaul cost data structuring method
CN113887754A (en) Construction method and system of power distribution terminal unified operation and maintenance platform and constructed platform
CN112398225B (en) Remote signaling monitoring method for secondary equipment of transformer substation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination