CN112098698B - Meter-loading wiring pay-off device - Google Patents

Meter-loading wiring pay-off device Download PDF

Info

Publication number
CN112098698B
CN112098698B CN202010974476.0A CN202010974476A CN112098698B CN 112098698 B CN112098698 B CN 112098698B CN 202010974476 A CN202010974476 A CN 202010974476A CN 112098698 B CN112098698 B CN 112098698B
Authority
CN
China
Prior art keywords
lifting
paying
box
fixedly arranged
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010974476.0A
Other languages
Chinese (zh)
Other versions
CN112098698A (en
Inventor
刁培松
王妮妮
李玉林
董尧杰
刁颖馨
张亚婷
盛琳洋
王晓刚
于芳
李晓庆
杨永杰
刘姿秀
温少娜
方伟萍
宋林浩
刘希荣
李丽
王敬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shandong Electric Power Co Zhaoyuan City Power Supply Co
Original Assignee
State Grid Shandong Electric Power Co Zhaoyuan City Power Supply Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shandong Electric Power Co Zhaoyuan City Power Supply Co filed Critical State Grid Shandong Electric Power Co Zhaoyuan City Power Supply Co
Priority to CN202010974476.0A priority Critical patent/CN112098698B/en
Publication of CN112098698A publication Critical patent/CN112098698A/en
Application granted granted Critical
Publication of CN112098698B publication Critical patent/CN112098698B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/02Constructional details
    • G01R11/04Housings; Supporting racks; Arrangements of terminals
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H49/00Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
    • B65H49/38Skips, cages, racks, or containers, adapted solely for the transport or storage of bobbins, cops, or the like
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/34Handled filamentary material electric cords or electric power cables
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/82Recycling of waste of electrical or electronic equipment [WEEE]

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Packaging Of Annular Or Rod-Shaped Articles, Wearing Apparel, Cassettes, Or The Like (AREA)
  • Workshop Equipment, Work Benches, Supports, Or Storage Means (AREA)

Abstract

The invention relates to the technical field of meter installation wiring, in particular to a meter installation wiring paying-off device, which comprises a base, wherein a paying-off box is fixedly arranged on the base, a plurality of sliding seats are fixedly arranged on the paying-off box at equal intervals, the sliding seats are respectively and slidably connected with a mounting seat, the mounting seats are respectively and rotatably connected with a plug-in column, a plurality of arc clamping plates are arranged at equal angles of the plug-in column, the mounting seats are respectively and fixedly provided with a pressing component, guide columns are symmetrically and fixedly arranged on the base, lifting plates are respectively and slidably connected with two guide columns, paying-off box doors are symmetrically and rotatably connected with the paying-off box, a storage box is symmetrically and fixedly arranged on the paying-off box, a tool box is fixedly arranged on the two storage boxes, and a plurality of wire outlet holes are symmetrically and equidistantly arranged on the paying-off box. The invention is provided with the clamping, arranging, storing and moving fixing function device on the basis of the common paying-off device, thereby improving convenience and effectively avoiding the phenomena of time waste and wire waste caused by knotting of the wire.

Description

Meter-loading wiring pay-off device
Technical Field
The invention relates to the technical field of meter assembling and wiring, in particular to a meter assembling, wiring and paying-off device.
Background
The meter-mounting power-on device is a professional meter-mounting power-on device and comprises safety measures, power production, tool and instrument use maintenance, an electric energy metering device, configuration of the electric energy metering device, wiring of the electric energy metering device, high-low voltage user power-on and electric device, meter-mounting power-on and internal line engineering installation, debugging, acceptance, fault analysis and the like. At present, the frequency of the meter-loading wiring training, the evaluation and the competition is very high, and the staff engaged in the related teams of metering marketing work, such as meter-loading power-on teams, power grid metering teams and large client metering teams, all receive the skill training and the evaluation of the meter-loading wiring.
However, when wiring, no fixed program and special appliances are required for the classification and the taking of the wires, the wire materials are placed in disorder and have no chapter, the taking is inconvenient, and after the wires are knotted, the time is wasted and the wires are wasted easily.
Disclosure of Invention
To solve the problems set forth in the background art. The invention provides a meter-mounting wiring paying-off device which has the functions of clamping, arranging, storing and moving and fixing, and solves the problems that the taking is inconvenient, the wires are knotted, the time is wasted and the wires are wasted easily.
In order to achieve the above purpose, the present invention adopts the following technical scheme:
the utility model provides a dress table wiring pay-off, includes the base, the fixed unwrapping wire case that is equipped with in centre of base upper surface, the fixed baffle that is equipped with of inner wall of unwrapping wire case, the fixed a plurality of slides that are equipped with of inner wall symmetry equidistance of unwrapping wire case, the equal sliding connection of slide is equipped with the mount pad, the equal swivelling joint of mount pad is equipped with the jack post, jack post equiangular degree is equipped with a plurality of arc splint, a plurality of fixed being equipped with between arc splint and the jack post makes its clamping assembly that produces the displacement, the equal fixed friction rubber pad that is equipped with in surface of arc splint, the equal fixed subassembly that is equipped with in one side of mount pad, the equal fixed spring that is equipped with in one side of mount pad, the one side that is kept away from of spring is all fixed with of mount pad is equipped with the drawing drum, the inner wall symmetry of base is equipped with the guide post, two guide post sliding connection is equipped with the lifter plate, the lower fixed surface of lifter plate is equipped with four universal wheels, fixed being equipped with between lifter plate and the base inner wall top and making its lift assembly that produces the displacement, one side of unwrapping wire case is equipped with through the swivelling joint hinge, the equal fixed face of door, the equal fixed face of the box that is equipped with of a plurality of face boxes and the unwrapping wire case, the fixed side of being equipped with the fixed tag is equipped with the fixed with the box.
Preferably, the clamping assembly comprises two movable seats, the movable seats are all in sliding connection with the plug-in columns, the plug-in columns are symmetrically provided with sliding grooves, sliding blocks corresponding to the sliding grooves are symmetrically and fixedly arranged on the inner walls of the movable seats, a plurality of clamping fixing blocks are fixedly arranged on the movable seats at equal angles, the clamping fixing blocks are all rotationally connected with a clamping connecting plate, one side, far away from the clamping fixing blocks, of the clamping connecting plate is rotationally connected with a clamping block, the clamping blocks are respectively fixedly connected with the arc-shaped clamping plates, clamping springs are fixedly arranged between the movable seats, and the clamping springs are sleeved with the plug-in columns.
Preferably, the compressing assembly comprises a compressing installation frame, the compressing installation frame is fixedly connected with an installation seat, the inner wall of the compressing installation frame is symmetrically and rotationally connected with a double-threaded screw rod, one end of the double-threaded screw rod penetrates through the compressing installation frame and is fixedly provided with an inner hexagonal sleeve, the surface of the double-threaded screw rod is symmetrically and spirally connected with a compressing block, and the compressing block is symmetrically and fixedly provided with an arc friction rubber block.
Preferably, the lifting assembly comprises two lifting double-thread screw rods, the two ends of each lifting connecting column are rotationally connected with the inner wall of the base, lifting moving blocks are symmetrically and rotationally connected with the surfaces of the lifting double-thread screw rods and are provided with lifting moving blocks, lifting connecting plates are rotationally connected with the lifting moving blocks, one sides of the lifting connecting plates, which are far away from the lifting moving blocks, are rotationally connected with lifting fixing blocks, the lifting fixing blocks are fixedly connected with lifting plates, lifting worm wheels are fixedly arranged on the lifting double-thread screw rods, lifting worm rods are fixedly arranged on one sides of the lifting worm wheels in a toothed manner, lifting transmission rods are fixedly arranged on the lifting worm rods, the two ends of each lifting transmission rod are rotationally connected with the inner wall of the base, one ends of each lifting transmission rod penetrate through the base and are fixedly provided with transmission discs, and one sides of the transmission discs are rotationally connected with rocker arms.
Preferably, the storage box comprises a storage box main body, a plurality of storage partition plates are fixedly arranged on the inner wall of the storage box main body, and one side of the storage box main body is rotatably connected with a storage box door through a hinge.
Preferably, the tool box comprises a tool box main body, and a plurality of storage drawers are inserted into the tool box main body.
Preferably, one side of the mounting seat is fixedly provided with an L-shaped connecting plate, one side of the L-shaped connecting plate, which is far away from the mounting seat, is fixedly provided with a guide seat, and the inner wall of the guide seat is fixedly provided with a friction rubber ring.
Preferably, the lower surface of the base is provided with four through grooves corresponding to the universal wheels, and the lower surface of the base is fixedly provided with an anti-skid rubber pad.
Compared with the prior art, the invention has the beneficial effects that: can improve the joint strength between arc splint and the drum under the effect of clamping assembly, simultaneously with friction rubber pad matched with can further promote stability, pass the friction rubber circle on the guide holder with the end of a thread on the drum and pass out from the wire outlet, can effectually prevent to appear the phenomenon that the electric wire scatters and twines each other when taking the coil, be convenient for the staff directly get the electric wire under the instruction of label, convenient and fast, can make the inside of the drum direct receipts of installing the completion pay off box under the elasticity effect of spring, the convenience has been promoted, under lifting assembly's drive, the staff of being convenient for removes and fixes the invention, and stability is higher, under compressing tightly the effect of subassembly, can effectually avoid because inertia makes the drum continue to rotate when taking the electric wire, lead to the phenomenon that the electric wire scatters, through setting up the storage box, can deposit the coil, be convenient for the staff in time change the instrument of staff in time after the electric wire is used, accomodate the instrument storage of staff of being convenient for.
None of the parts of the device are the same as or can be implemented using prior art.
Drawings
The accompanying drawings are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate the invention and together with the embodiments of the invention, serve to explain the invention. In the drawings:
FIG. 1 is a front view of a meter-loading, wire-connecting and wire-releasing device according to the present invention;
FIG. 2 is a side view of a meter-loading wire paying-off device according to the present invention;
FIG. 3 is a cross-sectional view of a meter-loading wire paying-off device according to the present invention;
FIG. 4 is a front view of a clamping assembly of a meter-loading wire paying-off device according to the present invention;
fig. 5 is a front view of a lifting assembly of the meter-loading wire-connecting paying-off device provided by the invention.
In the figure: 1 base, 2 pay-off box, 3 partition, 4 slide, 5 mount, 6 plug-in column, 7 arc clamp plate, 8 clamping component, 9 friction rubber pad, 10L-shaped connecting plate, 11 guide holder, 12 friction rubber ring, 13 pressing component, 14 spring, 15 pull disc, 16 guide post, 17 lifting plate, 18 universal wheel, 19 lifting component, 20 pay-off box door, 21 handle, 22 storage box, 23 toolbox, 24 wire hole, 25 label, 801 moving seat, 802 chute, 803 clamping fixed block, 804 clamping connecting plate, 805 clamping block, 806 clamping spring, 1301 pressing mounting frame, 1302 double-threaded screw rod, 1303 inner hexagon sleeve, 1304 pressing block, 1305 arc friction rubber block, 1901 lifting double-threaded screw rod, 1902 lifting moving block, 1903 lifting connecting plate, 1904 lifting fixed block, 1905 lifting turbine, 1906 lifting worm, 1907 lifting transmission rod, 1908 driving disc, 1909 rocker arm, 2201 storage box main body, 2202 storage box partition plate, 2203 storage box door, 2301 toolbox main body, 2302 storage drawer.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to figures 1-5, a meter-loading wiring paying-off device comprises a base 1, a paying-off box 2 is fixedly arranged in the middle of the upper surface of the base 1, a partition plate 3 is fixedly arranged on the inner wall of the paying-off box 2, a plurality of sliding seats 4 are symmetrically and equidistantly arranged on the inner wall of the paying-off box 2, the sliding seats 4 are all in sliding connection with a mounting seat 5, the mounting seat 5 is all in rotary connection with a splicing column 6, a plurality of arc clamping plates 7 are arranged at equal angles of the splicing column 6, clamping assemblies 8 for enabling the arc clamping plates 7 to displace are fixedly arranged between the arc clamping plates 7 and the splicing column 6, friction rubber pads 9 are fixedly arranged on the surfaces of the arc clamping plates 7, a pressing assembly 13 is fixedly arranged on one side of the mounting seat 5, springs 14 are fixedly arranged on one side of the mounting seat 5, one end of each spring 14 away from the mounting seat 5 is fixedly connected with the inner wall of the paying-off box 2, the mount pad 5 is kept away from the fixed drawing dish 15 that is equipped with of one side of spring 14, the inner wall symmetry of base 1 is fixed and is equipped with guide post 16, two guide post 16 sliding connection are equipped with lifter plate 17, the fixed four universal wheels 18 that are equipped with of lower surface of lifter plate 17, fixed lifting unit 19 that makes its production displacement between lifter plate 17 and the base 1 inner wall top, one side symmetry of unwrapping wire case 2 is equipped with unwrapping wire chamber door 20 through hinge swivelling joint, unwrapping wire chamber door 20 is all fixed and is equipped with handle 21, unwrapping wire case 2 symmetry is fixed and is equipped with storage case 22, and storage case 22 and base 1 fixed connection, the fixed toolbox 23 that is equipped with in top of two storage cases 22, one side symmetry equidistance of unwrapping wire case 2 is equipped with a plurality of wire holes 24, one side symmetry equidistance of unwrapping wire case 2 is fixed and is equipped with a plurality of labels 25, and label 25 are located directly over wire hole 24 respectively.
Specifically, the clamping assembly 8 comprises two movable seats 801, the movable seats 801 are all in sliding connection with the plug-in columns 6, the plug-in columns 6 are symmetrically provided with sliding grooves 802, sliding blocks corresponding to the sliding grooves 802 are symmetrically and fixedly arranged on the inner walls of the movable seats 801, a plurality of clamping fixing blocks 803 are fixedly arranged at equal angles of the movable seats 801, the clamping fixing blocks 803 are all rotationally connected with a clamping connecting plate 804, one side, far away from the clamping fixing blocks 803, of the clamping connecting plate 804 is rotationally connected with a clamping block 805, the clamping blocks 805 are respectively fixedly connected with the arc clamping plates 7, clamping springs 806 are fixedly arranged between the two movable seats 801, and the clamping springs 806 are sleeved with the plug-in columns 6.
Specifically, the compressing assembly 13 includes compressing installation frame 1301, compressing installation frame 1301 and mount pad 5 fixed connection, compressing installation frame 1301's inner wall symmetry rotation is connected and is equipped with double-thread lead screw 1302, and double-thread lead screw 1302's one end all runs through compressing installation frame 1301 and fixed the being equipped with hexagon socket 1303, and double-thread lead screw 1302's the equal symmetry threaded connection in surface is equipped with compact heap 1304, and four compact heap 1304 symmetry are fixed and are equipped with arc friction rubber piece 1305.
Specifically, the lifting assembly 19 includes two lifting double-thread screw rods 1901, the both ends of lifting connection column 1901 are all connected with the inner wall rotation of base 1, lifting double-thread screw rods 1901 surface equal symmetry threaded connection is equipped with lift movable block 1902, lift movable block 1902 equal rotation connection is equipped with lift connecting plate 1903, one side that lift movable block 1902 was kept away from to lift connecting plate 1903 is all rotated and is connected and is equipped with lift fixed block 1904, four lift fixed blocks 1904 and lifter 17 fixed connection, lifting double-thread screw rods 1901 all are fixed and are equipped with lifting turbine 1905, one side of lifting turbine 1905 all is toothed and is equipped with lifting worm 1906, two lifting worm 1906 are fixed and are equipped with lifting transmission rod 1907, lifting transmission rod 1907's both ends are connected with the inner wall rotation of base 1, and one end of lifting transmission rod 1907 runs through base 1 and is fixed and is equipped with driving disk 1908, one side rotation connection of driving disk 1908 is equipped with rocking arm 1909.
Specifically, the storage box 22 includes a storage box main body 2201, a plurality of storage partitions 2202 are fixedly provided on an inner wall of the storage box main body 2201, and a storage box door 2203 is rotatably connected to one side of the storage box main body 2201 through a hinge.
Specifically, the tool box 23 includes a tool box main body 2301, and a plurality of storage drawers 2302 are inserted in the tool box main body 2301.
Specifically, the L-shaped connecting plate 10 is fixedly arranged on one side of the mounting seat 5, the guide seat 11 is fixedly arranged on one side, far away from the mounting seat 5, of the L-shaped connecting plate 10, and the friction rubber ring 12 is fixedly arranged on the inner wall of the guide seat 11.
Specifically, four through grooves corresponding to the universal wheels 18 are formed in the lower surface of the base 1, and an anti-skid rubber pad is fixedly arranged on the lower surface of the base 1.
The application principle and the application flow of the invention are as follows: in use, the invention is moved to a designated position through the universal wheel 18, then the rocker arm 1909 is rocked to enable the transmission disc 1908 to drive the lifting transmission rod 1907 to start rotating, the lifting double-thread screw rod 1901 is driven by the lifting worm 1906 and the lifting turbine 1905 to start rotating, the lifting moving block 1902 moves in the opposite direction along with the lifting double-thread screw rod 1901, the lifting plate 17 is driven by the lifting connecting plate 1903 and the lifting fixed block 1904 to drive the universal wheel 18 to move upwards until the lower surface of the base 1 is attached to the ground, then the storage box door 2203 is opened to take out a wire coil required on the storage baffle 2202, then the paying-off box door 20 is opened, the mounting seat 5 is pulled out through the pulling disc 15, then the plurality of arc clamping plates 7 on the mounting seat 5 are extruded, then the wire coil is inserted into and released from the arc clamping plates 806, and the elastic force is released accordingly, the movable seat 801 moves in opposite directions, the lifting plate 17 is pushed to start moving under the cooperation of the clamping fixing block 803, the clamping connecting plate 804 and the clamping block 805 until the friction rubber pad 9 is tightly attached to the inner wall of the wire coil, one end of the wire passes through the friction rubber ring 12 on the guide seat 11, then a tool is taken out from the storage drawer 2302, is inserted into the inner hexagon sleeve 1303 and is rotated to start rotating the double-threaded screw 1302, the pressing block 1304 drives the arc friction rubber block 1305 to start moving, the inserting column 6 is properly pressed, the pull disc 15 is loosened to reset the mounting seat 5 under the action of the spring 14, the wire end passes through the wire outlet hole 24 under the action of the guide seat 11, and a worker takes the wire according to the instruction of the label 25.
Finally, it should be noted that: the foregoing description is only a preferred embodiment of the present invention, and the present invention is not limited thereto, but it is to be understood that modifications and equivalents of some of the technical features described in the foregoing embodiments may be made by those skilled in the art, although the present invention has been described in detail with reference to the foregoing embodiments. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a dress table wiring pay-off, includes base (1), its characterized in that, the fixed unwrapping wire case (2) that are equipped with in centre of base (1) upper surface, the fixed baffle (3) that are equipped with of inner wall of unwrapping wire case (2), the fixed a plurality of slide (4) that are equipped with of inner wall symmetry equidistance of unwrapping wire case (2), slide (4) equal sliding connection are equipped with mount pad (5), mount pad (5) equal swivelling joint are equipped with spliced pole (6), spliced pole (6) equiangular degree is equipped with a plurality of arc splint (7), a plurality of arc splint (7) and spliced pole (6) between the fixed clamp assembly (8) that make arc splint (7) produce the displacement that are equipped with, the surface of arc splint (7) is all fixed and is equipped with friction rubber pad (9), one side of mount pad (5) is all fixed and is equipped with compression assembly (13), one side of mount pad (5) is all fixed and is equipped with spring (14), one side that spring (14) is kept away from mount pad (5) one end all with inner wall fixed connection of unwrapping wire case (2), mount pad (5) equiangular degree is equipped with arc splint (7) and fixed connection (16) are equipped with two guide plates (16), four universal wheels (18) are fixedly arranged on the lower surface of the lifting plate (17), lifting assemblies (19) which enable the lifting plate (17) to generate displacement are fixedly arranged between the lifting plate and the top of the inner wall of the base (1), one side of the paying-off box (2) is symmetrically connected with a paying-off box door (20) through a hinge in a rotating mode, the paying-off box doors (20) are fixedly provided with handles (21), the paying-off box (2) is symmetrically fixedly provided with a storage box (22), the storage box (22) is fixedly connected with the base (1), the tops of the two storage boxes (22) are fixedly provided with tool boxes (23), one side of the paying-off box (2) is symmetrically provided with a plurality of wire outlet holes (24) in an equidistant mode, a plurality of labels (25) are symmetrically and fixedly arranged on one side of the paying-off box (2), and the labels (25) are respectively located right above the wire outlet holes (24);
the clamping assembly (8) comprises two movable seats (801), the movable seats (801) are all in sliding connection with the plug-in columns (6), the plug-in columns (6) are symmetrically provided with sliding grooves (802), sliding blocks corresponding to the sliding grooves (802) are symmetrically and fixedly arranged on the inner walls of the movable seats (801), a plurality of clamping fixing blocks (803) are fixedly arranged on the movable seats (801) at equal angles, the clamping fixing blocks (803) are all rotationally connected with clamping connecting plates (804), clamping blocks (805) are rotationally connected with one sides, far away from the clamping fixing blocks (803), of the clamping connecting plates (804), the clamping blocks (805) are respectively and fixedly connected with arc clamping plates (7), clamping springs (806) are fixedly arranged between the two movable seats (801), and the clamping springs (806) are sleeved with the plug-in columns (6);
the utility model discloses a compression assembly (13), including compressing tightly installing frame (1301), compress tightly installing frame (1301) and mount pad (5) fixed connection, the inner wall symmetry of compressing tightly installing frame (1301) rotates to be connected and is equipped with double-thread screw (1302), the one end of double-thread screw (1302) all runs through and compresses tightly installing frame (1301) and fixedly is equipped with hexagon socket head cap (1303), the equal symmetrical threaded connection in surface of double-thread screw (1302) is equipped with compact heap (1304), four compact heap (1304) symmetry is fixed and is equipped with arc friction rubber piece (1305).
2. The meter-loading wiring pay-off device according to claim 1, wherein the lifting assembly (19) comprises two lifting double-threaded lead screws (1901), two ends of each lifting double-threaded lead screw (1901) are rotationally connected with the inner wall of the base (1), lifting moving blocks (1902) are symmetrically and threadedly connected on the surfaces of each lifting double-threaded lead screw (1901), lifting connecting plates (1903) are rotationally connected with the lifting moving blocks (1902), one side, far away from each lifting moving block (1902), of each lifting connecting plate (1903) is rotationally connected with a lifting fixed block (1904), four lifting fixed blocks (1904) are fixedly connected with a lifting plate (17), lifting worm gears (1905) are fixedly arranged on each lifting double-threaded lead screw (1901), lifting worm gears (1906) are toothed on one side of each lifting worm gear (1905), two lifting worm gears (1906) are fixedly provided with lifting transmission rods (1907), two ends of each lifting transmission rods (1907) are rotationally connected with the inner wall of the base (1), one side (1908) of the lifting transmission rods (1908) are connected with one side (1908) of the rocking arm (8).
3. The meter-loading wiring pay-off device according to claim 1, wherein the storage box (22) comprises a storage box main body (2201), a plurality of storage partition plates (2202) are fixedly arranged on the inner wall of the storage box main body (2201), and a storage box door (2203) is rotatably connected to one side of the storage box main body (2201) through a hinge.
4. The meter-loading wire paying-off device according to claim 1, wherein the tool box (23) comprises a tool box body (2301), and the tool box body (2301) is provided with a plurality of storage drawers (2302) in a plugging manner.
5. The meter-mounting wiring paying-off device according to claim 1, wherein one side of the mounting seat (5) is fixedly provided with an L-shaped connecting plate (10), one side of the L-shaped connecting plate (10) far away from the mounting seat (5) is fixedly provided with a guide seat (11), and the inner wall of the guide seat (11) is fixedly provided with a friction rubber ring (12).
6. The meter-mounting wiring paying-off device according to claim 1, wherein four through grooves corresponding to the universal wheels (18) are formed in the lower surface of the base (1), and an anti-skid rubber pad is fixedly arranged on the lower surface of the base (1).
CN202010974476.0A 2020-09-16 2020-09-16 Meter-loading wiring pay-off device Active CN112098698B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010974476.0A CN112098698B (en) 2020-09-16 2020-09-16 Meter-loading wiring pay-off device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010974476.0A CN112098698B (en) 2020-09-16 2020-09-16 Meter-loading wiring pay-off device

Publications (2)

Publication Number Publication Date
CN112098698A CN112098698A (en) 2020-12-18
CN112098698B true CN112098698B (en) 2023-07-18

Family

ID=73759292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010974476.0A Active CN112098698B (en) 2020-09-16 2020-09-16 Meter-loading wiring pay-off device

Country Status (1)

Country Link
CN (1) CN112098698B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112886431A (en) * 2021-02-26 2021-06-01 郑州合新力信息技术有限公司 Electrical equipment protector convenient to installation
CN113993334B (en) * 2021-10-28 2023-04-07 安徽理工大学 General erection equipment of big data server

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN208672696U (en) * 2018-08-10 2019-03-29 贵州电网有限责任公司 A kind of metering device installation assembly
CN110031946A (en) * 2019-03-18 2019-07-19 合肥鎏通网络科技有限公司 A kind of optical cable telecommunication line unwrapping wire positioning device
CN110371770A (en) * 2019-07-15 2019-10-25 安徽诚德刷业有限公司 A kind of stubborn rope actinobacillus device of industrial brush
WO2020062323A1 (en) * 2018-09-28 2020-04-02 江苏天南电力器材有限公司 Wire pre-twisted damper
CN210558559U (en) * 2019-08-08 2020-05-19 湖南大洋机械制造有限公司 Wire mechanism that coiling machine was used
CN211351489U (en) * 2020-03-13 2020-08-25 孝感市光源电力集团有限责任公司 Electric power installation tensioner bullwheel

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10065668B2 (en) * 2015-05-29 2018-09-04 Lake Cable, Llc Cable dispensing system and apparatus

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN208672696U (en) * 2018-08-10 2019-03-29 贵州电网有限责任公司 A kind of metering device installation assembly
WO2020062323A1 (en) * 2018-09-28 2020-04-02 江苏天南电力器材有限公司 Wire pre-twisted damper
CN110031946A (en) * 2019-03-18 2019-07-19 合肥鎏通网络科技有限公司 A kind of optical cable telecommunication line unwrapping wire positioning device
CN110371770A (en) * 2019-07-15 2019-10-25 安徽诚德刷业有限公司 A kind of stubborn rope actinobacillus device of industrial brush
CN210558559U (en) * 2019-08-08 2020-05-19 湖南大洋机械制造有限公司 Wire mechanism that coiling machine was used
CN211351489U (en) * 2020-03-13 2020-08-25 孝感市光源电力集团有限责任公司 Electric power installation tensioner bullwheel

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘玖林 ; 熊秋龙 ; .恒张力放线存在的问题及解决方案.电气化铁道.2008,(第06期),第34-35页. *
莫芳华 ; 王凌纤 ; 刘超逸 ; 刘添 ; 方浩 ; .互感器现场校验测试线集成线箱的研发.电工技术.2018,(第07期),第125-127页. *

Also Published As

Publication number Publication date
CN112098698A (en) 2020-12-18

Similar Documents

Publication Publication Date Title
CN112098698B (en) Meter-loading wiring pay-off device
CN208835345U (en) A kind of communication engineering network cable socket
CN109106071A (en) A kind of student's field sketching draft holder
CN208587667U (en) A kind of outdoor LED display screen support frame
CN208955707U (en) One kind of multiple output mobile power supplys
CN209448264U (en) A kind of base used specially of regulated power supply cabinet
CN204319239U (en) TCM nursing network reason is logical knocks device for rehabilitation
CN114131561A (en) Two-way dismouting device of construction machinery allen key
CN211936961U (en) Efficient intelligent redundant constant temperature device
CN209267102U (en) A kind of parallel groove clamp
CN208954411U (en) A kind of internet product exploitation teaching training apparatus
CN208432384U (en) A kind of shatter-resistant of laptop and wear-resisting device for detecting performance
CN111064146A (en) Equipment fastener convenient to fixed electric wire
CN221087077U (en) Flexible clamp of inductance forming tool
CN221227356U (en) Prevent cracked power adapter of interface
CN211204115U (en) ESA gas energy-saving appliance convenient to installation
CN217639174U (en) PD power adapter test jig
CN219564249U (en) Compaction device for eye shadow preparation
CN209482845U (en) A kind of handle with wave sawtooth chain wheel structure
CN214989311U (en) High-speed cone winder of dismouting portable
CN210774463U (en) Spring torsion experiment machine
CN218415040U (en) Grounding device for electrical test
CN218771117U (en) Outdoor performance circuit protective structure
CN209578743U (en) One kind inhaling the device that screws based on vacuum
CN212935367U (en) Novel wire clamping device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant