CN112098698A - Wire laying device for meter installation and wiring - Google Patents

Wire laying device for meter installation and wiring Download PDF

Info

Publication number
CN112098698A
CN112098698A CN202010974476.0A CN202010974476A CN112098698A CN 112098698 A CN112098698 A CN 112098698A CN 202010974476 A CN202010974476 A CN 202010974476A CN 112098698 A CN112098698 A CN 112098698A
Authority
CN
China
Prior art keywords
lifting
fixedly arranged
symmetrically
clamping
wiring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010974476.0A
Other languages
Chinese (zh)
Other versions
CN112098698B (en
Inventor
刁培松
王妮妮
李玉林
董尧杰
刁颖馨
张亚婷
盛琳洋
王晓刚
于芳
李晓庆
杨永杰
刘姿秀
温少娜
方伟萍
宋林浩
刘希荣
李丽
王敬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shandong Electric Power Co Zhaoyuan City Power Supply Co
Original Assignee
State Grid Shandong Electric Power Co Zhaoyuan City Power Supply Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shandong Electric Power Co Zhaoyuan City Power Supply Co filed Critical State Grid Shandong Electric Power Co Zhaoyuan City Power Supply Co
Priority to CN202010974476.0A priority Critical patent/CN112098698B/en
Publication of CN112098698A publication Critical patent/CN112098698A/en
Application granted granted Critical
Publication of CN112098698B publication Critical patent/CN112098698B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/02Constructional details
    • G01R11/04Housings; Supporting racks; Arrangements of terminals
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H49/00Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
    • B65H49/38Skips, cages, racks, or containers, adapted solely for the transport or storage of bobbins, cops, or the like
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/34Handled filamentary material electric cords or electric power cables
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/82Recycling of waste of electrical or electronic equipment [WEEE]

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Packaging Of Annular Or Rod-Shaped Articles, Wearing Apparel, Cassettes, Or The Like (AREA)
  • Workshop Equipment, Work Benches, Supports, Or Storage Means (AREA)

Abstract

The invention relates to the technical field of wiring of a wiring meter, in particular to a wiring device for wiring the wiring meter, which comprises a base, wherein a wiring box is fixedly arranged on the base, a plurality of sliding seats are symmetrically and equidistantly fixedly arranged on the wiring box, the sliding seats are respectively and slidably connected with an installation seat, each installation seat is respectively and rotatably connected with an insertion column, a plurality of arc-shaped clamping plates are arranged at equal angles on the insertion columns, a pressing assembly is fixedly arranged on each installation seat, guide columns are symmetrically and fixedly arranged on the base, lifting plates are slidably connected with the two guide columns, wiring box doors are symmetrically and rotatably connected with the wiring box, storage boxes are symmetrically and fixedly arranged on the wiring box, tool boxes are fixedly arranged on the two storage boxes, and a plurality of wire outlet holes are symmetrically and equidistantly arranged on the wiring box. The invention is provided with the clamping, arranging, accommodating and moving fixing functional devices on the basis of the common pay-off device, thereby improving the convenience and effectively avoiding the phenomenon of time waste and electric wire waste caused by knotting of the wires.

Description

Wire laying device for meter installation and wiring
Technical Field
The invention relates to the technical field of meter mounting and wiring, in particular to a meter mounting and wiring pay-off device.
Background
The meter installation and power connection is a major including safety measures, electric power production, tool and meter use and maintenance, an electric energy metering device, configuration of the electric energy metering device, wiring of the electric energy metering device, high-low voltage user power connection and electric devices, meter installation and power connection, installation, debugging, acceptance and fault analysis of interior wiring engineering and the like. At present, the frequency of the training, evaluation and match of wiring of the watch is very high, and workers engaged in related groups of the metering and marketing work, such as the watch-on electric duty, the power grid metering duty and the large client metering duty, all need to receive the skill training and evaluation of wiring of the watch.
However, during wiring, no fixed program or special device is used for classification and taking of the wires, the wires are placed in disorder without seal, taking is inconvenient, and after the wires are knotted, the time and the wires are wasted easily.
Disclosure of Invention
To solve the problems set forth in the background art described above. The invention provides a wiring and paying-off device for meter installation, which has the functions of clamping, arranging, containing and moving and fixing and solves the problems of inconvenient taking and use, knotting of a wire, time waste and easy wire waste.
In order to achieve the purpose, the invention adopts the following technical scheme:
the utility model relates to a wiring and paying-off device for a wiring meter, which comprises a base, wherein a wire-releasing box is fixedly arranged in the middle of the upper surface of the base, a partition plate is fixedly arranged on the inner wall of the wire-releasing box, a plurality of slide seats are symmetrically and equidistantly fixedly arranged on the inner wall of the wire-releasing box, the slide seats are respectively and slidably connected with an installation seat, the installation seats are respectively and rotatably connected with an insertion column, the insertion column is provided with a plurality of arc-shaped clamp plates at equal angles, a clamping assembly for generating displacement is fixedly arranged between the arc-shaped clamp plates and the insertion column, friction rubber pads are respectively and fixedly arranged on the surfaces of the arc-shaped clamp plates, a pressing assembly is respectively and fixedly arranged on one side of the installation seat, a spring is respectively and fixedly arranged on one side of the installation seat, one end of the spring, far away from the installation seat, is respectively and fixedly connected with the inner wall of, two guide post sliding connection is equipped with the lifter plate, the lower fixed surface of lifter plate is equipped with four universal wheels, the fixed lifting unit who makes it produce the displacement that is equipped with between lifter plate and the base inner wall top, a lateral symmetry of unwrapping wire case is connected through the hinge rotation and is equipped with the unwrapping wire chamber door, the unwrapping wire chamber door is all fixed and is equipped with the handle, the fixed storage box that is equipped with of unwrapping wire case symmetry, and storage box and base fixed connection, two the fixed toolbox that is equipped with in top of storage box, a lateral symmetry equidistance of unwrapping wire case is equipped with a plurality of wire holes, a lateral symmetry equidistance of unwrapping wire case is fixed and is equipped with a plurality of labels, and the label is located the wire hole respectively.
Preferably, clamping component includes that two move the seat, move the seat all with insertion column sliding connection, insertion column symmetry is equipped with the spout, the fixed slider that is equipped with corresponding with the spout of inner wall symmetry that moves the seat, it is equipped with a plurality of tight fixed blocks of clamp to move the seat equiangular fixation, it is equipped with clamping connection board to press from both sides tight fixed block and all rotate the connection, one side that clamping connection board kept away from and presss from both sides tight fixed block all rotates to be connected and is equipped with and presss from both sides tight piece, and is a plurality of press from both sides tight piece respectively with arc splint fixed connection, two it is fixed to be equipped with clamping spring to move between the seat, and clamping.
Preferably, compress tightly the subassembly including compressing tightly the installing frame, compress tightly installing frame and mount pad fixed connection, the inner wall symmetry that compresses tightly the installing frame rotates to be connected and is equipped with two screw lead screws, the one end of two screw lead screws all runs through and compresses tightly the installing frame and fixedly be equipped with the hexagon socket head cap sleeve, the equal symmetrical threaded connection in surface of two screw lead screws is equipped with compact heap, four the fixed arc friction rubber piece that is equipped with of compact heap symmetry.
Preferably, the lifting assembly comprises two lifting double-thread lead screws, the two ends of the lifting connecting column are rotatably connected with the inner wall of the base, the lifting double-thread lead screws are symmetrically and threadedly connected with lifting moving blocks on the surfaces of the lifting double-thread lead screws, the lifting moving blocks are rotatably connected with lifting connecting plates, lifting fixing blocks and four lifting fixing plates are rotatably connected to one sides, away from the lifting moving blocks, of the lifting connecting plates, the lifting fixing blocks and the lifting plates are fixedly connected, lifting turbines are fixedly arranged on the lifting double-thread lead screws, lifting worms are arranged on one sides of the lifting turbines in a toothed connection mode, lifting transmission rods are fixedly arranged on the lifting worms, the two ends of the lifting transmission rods are rotatably connected with the inner wall of the base, one ends of the lifting transmission rods penetrate through the base and are fixedly provided with transmission discs, and rocker.
Preferably, the storage box comprises a storage box main body, a plurality of storage partition plates are fixedly arranged on the inner wall of the storage box main body, and a storage box door is rotatably connected to one side of the storage box main body through a hinge.
Preferably, the tool box comprises a tool box main body, and the tool box main body is provided with a plurality of storage drawers in an inserted manner.
Preferably, one side of the mounting seat is fixedly provided with an L-shaped connecting plate, one side of the L-shaped connecting plate, which is far away from the mounting seat, is fixedly provided with a guide seat, and the inner wall of the guide seat is fixedly provided with a friction rubber ring.
Preferably, the lower surface of base is equipped with four and the corresponding through grooves of universal wheel, and the lower fixed skid-proof rubber pad that is equipped with of base.
Compared with the prior art, the invention has the beneficial effects that: the connecting strength between the arc-shaped clamping plate and the wire coil can be improved under the action of the clamping assembly, meanwhile, the stability can be further improved by matching with the friction rubber pad, the wire head on the wire coil penetrates through the friction rubber ring on the guide seat and is transmitted out from the wire outlet hole, the phenomena of wire scattering and mutual winding can be effectively prevented when the wire coil is taken, workers can conveniently and directly take and use the wire under the indication of a label, the convenience is improved, the installed wire coil can be directly taken and placed into the wire releasing box under the elastic action of the spring, the convenience is improved, the workers can conveniently move and fix the wire coil under the driving of the lifting assembly, the stability is higher, the splicing column can be compressed under the action of the compressing assembly, and the wire coil can be effectively prevented from continuously rotating due to inertia when the wire is taken and used, the phenomenon that leads to the electric wire to scatter through setting up the storage box, can deposit the drum, and the staff of being convenient for in time changes after the electric wire is used up, through setting up the toolbox, is convenient for accomodate the storage to staff's instrument.
The parts of the device not involved are the same as or can be implemented using prior art.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention. In the drawings:
FIG. 1 is a front view of a meter-mounting wire-connecting and wire-releasing device according to the present invention;
FIG. 2 is a side view of a meter-mounting wire-connecting and wire-releasing device according to the present invention;
FIG. 3 is a cross-sectional view of a meter-mounting wire-connecting and wire-releasing device according to the present invention;
FIG. 4 is a front view of a clamping assembly of a meter-mounting, wire-connecting and wire-releasing device according to the present invention;
FIG. 5 is a front view of a lifting assembly of a meter-mounting, wire-connecting and wire-releasing device according to the present invention.
In the figure: 1 base, 2 wire laying boxes, 3 clapboards, 4 sliding seats, 5 mounting seats, 6 plug columns, 7 arc-shaped clamping plates, 8 clamping components, 9 friction rubber pads, 10L-shaped connecting plates, 11 guide seats, 12 friction rubber rings, 13 pressing components, 14 springs, 15 pull discs, 16 guide columns, 17 lifting plates, 18 universal wheels, 19 lifting components, 20 wire laying box doors, 21 handles, 22 storage boxes, 23 tool boxes, 24 wire outlet holes, 25 labels, 801 moving seats, 802 sliding grooves, 803 clamping fixing blocks, 804 clamping connecting plates, 805 clamping blocks, 806 clamping springs, 1301 pressing mounting frames, 1302 double-thread screw rods, 1303 inner hexagonal sleeves, 1304 pressing blocks, 1305 arc-shaped friction rubber blocks, 1901 lifting double-thread screw rods, 1902 lifting moving blocks, 1903 lifting connecting plates, 1904 lifting fixing blocks, 1905 lifting turbines, 1906 lifting worms, 1907 lifting transmission rods, 1908 discs, 1909 rocker arms, 2201 storage box main bodies, 2202 storage compartment door, 2203 storage compartment door, 2301 tool box main body, 2302 storage drawer.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-5, a wiring and paying-off device for meter installation comprises a base 1, a wire-laying box 2 is fixedly arranged in the middle of the upper surface of the base 1, a partition plate 3 is fixedly arranged on the inner wall of the wire-laying box 2, a plurality of sliding seats 4 are symmetrically and equidistantly fixedly arranged on the inner wall of the wire-laying box 2, mounting seats 5 are respectively arranged on the sliding seats 4 in a sliding connection manner, insertion columns 6 are respectively arranged on the mounting seats 5 in a rotating connection manner, a plurality of arc-shaped clamping plates 7 are arranged at equal angles on the insertion columns 6, clamping components 8 for enabling the insertion columns to generate displacement are fixedly arranged between the arc-shaped clamping plates 7 and the insertion columns 6, friction rubber pads 9 are respectively fixedly arranged on the surfaces of the arc-shaped clamping plates 7, pressing components 13 are respectively fixedly arranged on one sides of the mounting seats 5, springs 14 are respectively fixedly arranged on one sides of the mounting seats 5, one ends of the springs 14 far away from the, the inner wall symmetry of base 1 is fixed and is equipped with guide post 16, two guide post 16 sliding connection are equipped with lifter plate 17, the lower fixed surface of lifter plate 17 is equipped with four universal wheels 18, it produces the lifting unit 19 of displacement to be equipped with between lifter plate 17 and the base 1 inner wall top to make it produce, one side symmetry of unwrapping wire case 2 is connected through the hinge rotation and is equipped with unwrapping wire chamber door 20, unwrapping wire chamber door 20 all fixes and is equipped with handle 21, unwrapping wire case 2 symmetry is fixed and is equipped with storage box 22, and storage box 22 and base 1 fixed connection, the fixed toolbox 23 that is equipped with in top of two storage box 22, one side symmetry equidistance of unwrapping wire case 2 is equipped with a plurality of wire holes 24, one side symmetry equidistance of unwrapping wire case 2 is fixed and is equipped with a plurality of labels.
Specifically, clamping assembly 8 includes two removal seats 801, remove seat 801 all with insertion column 6 sliding connection, insertion column 6 symmetry is equipped with spout 802, the fixed slider that is equipped with corresponding with spout 802 of inner wall symmetry that removes seat 801, it is equipped with a plurality of tight fixed blocks 803 of clamp to remove the fixed angle such as seat 801, it is equipped with clamping connection board 804 to press from both sides tight fixed block 803 and all rotate to connect, clamping connection board 804 keeps away from one side that presss from both sides tight fixed block 803 and all rotates to connect and is equipped with and presss from both sides tight piece 805, a plurality of tight pieces 805 of clamp respectively with arc splint 7 fixed connection, two remove and fixedly be equipped with clamping spring 806 between the seat 801, and clamping spring 806 cup joints mutually with.
Specifically, compress tightly subassembly 13 including compressing tightly the installing frame 1301, compress tightly installing frame 1301 and mount pad 5 fixed connection, the inner wall symmetry that compresses tightly installing frame 1301 rotates to be connected and is equipped with double thread lead screw 1302, and the one end of double thread lead screw 1302 all runs through compresses tightly installing frame 1301 and fixed hexagonal socket 1303 that is equipped with, and the equal symmetrical threaded connection in surface of double thread lead screw 1302 is equipped with compact heap 1304, and four compact heaps 1304 symmetry are fixed and are equipped with arc friction rubber piece 1305.
Specifically, the lifting assembly 19 comprises two lifting double-thread screws 1901, two ends of a lifting connecting column 1901 are rotatably connected with the inner wall of the base 1, lifting moving blocks 1902 are symmetrically and threadedly connected on the surfaces of the lifting double-thread screws 1901, lifting connecting plates 1903 are rotatably connected with the lifting moving blocks 1902, lifting fixed blocks 1904 are rotatably connected with one side of each lifting connecting plate 1903 away from the lifting moving blocks 1902, four lifting fixed blocks 1904 are fixedly connected with a lifting plate 17, lifting turbines 1905 are fixedly arranged on the lifting double-thread screws 1901, lifting worms 1906 are respectively in toothed connection with one side of each lifting turbine 1905, lifting transmission rods 1907 are fixedly arranged on the two lifting worms 1906, two ends of each lifting transmission rod 1907 are rotatably connected with the inner wall of the base 1, and one end of the lifting transmission rod 1907 penetrates through the base 1 and is fixedly provided with a transmission disc 1908, and one side of the transmission disc 1908 is rotatably connected with a rocker arm 1909.
Specifically, the storage box 22 includes a storage box main body 2201, a plurality of storage partition plates 2202 are fixedly disposed on an inner wall of the storage box main body 2201, and a storage box door 2203 is rotatably connected to one side of the storage box main body 2201 through a hinge.
Specifically, the tool box 23 comprises a tool box main body 2301, and a plurality of storage drawers 2302 are inserted into the tool box main body 2301.
Specifically, one side of the mounting seat 5 is fixedly provided with an L-shaped connecting plate 10, one side of the L-shaped connecting plate 10, which is far away from the mounting seat 5, is fixedly provided with a guide seat 11, and the inner wall of the guide seat 11 is fixedly provided with a friction rubber ring 12.
Specifically, the lower surface of the base 1 is provided with four through grooves corresponding to the universal wheels 18, and the lower surface of the base 1 is fixedly provided with an anti-skid rubber pad.
The use principle and the use flow of the invention are as follows: when the device is used, the device is moved to a specified position through the universal wheel 18, then the rocker arm 1909 is shaken to enable the transmission disc 1908 to drive the lifting transmission rod 1907 to start rotating, the lifting double-thread screw rod 1901 starts rotating under the transmission of the lifting worm 1906 and the lifting worm wheel 1905, the lifting moving block 1902 moves in the opposite direction along with the lifting transmission rod, the lifting plate 17 drives the universal wheel 18 to move upwards under the pulling of the lifting connecting plate 1903 and the lifting fixing block 1904 until the lower surface of the base 1 is attached to the ground, then the storage box door 2203 is opened to take out a required wire coil on the storage partition 2202, then the pay-off box door 20 is opened, the mounting seat 5 is pulled out through the pull disc 15, then the plurality of arc-shaped clamping plates 7 on the mounting seat 5 are pressed, then the wire coil is inserted into and loosened from the arc-shaped clamping plates 7, the clamping spring 806 starts to release the elastic force along, The clamping connection plate 804 and the clamping block 805 are matched to push the lifting plate 17 to move until the friction rubber pad 9 is tightly attached to the inner wall of the wire coil, one end of the wire passes through the friction rubber ring 12 on the guide seat 11, then a tool is taken out of the storage drawer 2302 and inserted into the inner hexagonal sleeve 1303 and rotated to enable the double-thread screw rod 1302 to rotate, the pressing block 1304 drives the arc-shaped friction rubber block 1305 to move along with the tool, the inserting column 6 is appropriately pressed, then the pull disc 15 is loosened to enable the mounting seat 5 to reset under the action of the spring 14, one end of the wire passes through the wire outlet hole 24 under the action of the guide seat 11, and the worker takes the wire according to the indication of the label 25.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. A wiring and paying-off device for meter installation comprises a base (1) and is characterized in that a wire placing box (2) is fixedly arranged in the middle of the upper surface of the base (1), a partition plate (3) is fixedly arranged on the inner wall of the wire placing box (2), a plurality of sliding seats (4) are symmetrically and equidistantly fixedly arranged on the inner wall of the wire placing box (2), mounting seats (5) are respectively arranged on the sliding seats (4) in a sliding connection mode, inserting columns (6) are respectively arranged on the mounting seats (5) in a rotating connection mode, a plurality of arc-shaped clamping plates (7) are arranged at equal angles on the inserting columns (6), clamping assemblies (8) for enabling the arc-shaped clamping plates to generate displacement are fixedly arranged between the arc-shaped clamping plates (7) and the inserting columns (6), friction rubber pads (9) are respectively fixedly arranged on the surfaces of the arc-shaped clamping plates (7), a pressing assembly (13) is respectively fixedly arranged on one side of the mounting seat (5), and springs (, one end, far away from a mounting seat (5), of the spring (14) is fixedly connected with the inner wall of the pay-off box (2), one side, far away from the spring (14), of the mounting seat (5) is fixedly provided with a pull disc (15), the inner wall of the base (1) is symmetrically and fixedly provided with guide columns (16), two guide columns (16) are slidably connected with a lifting plate (17), the lower surface of the lifting plate (17) is fixedly provided with four universal wheels (18), a lifting assembly (19) for enabling the lifting plate (17) to generate displacement is fixedly arranged between the lifting plate (17) and the top of the inner wall of the base (1), one side of the pay-off box (2) is symmetrically and rotatably connected with a pay-off box door (20) through a hinge, the pay-off box door (20) is fixedly provided with a handle (21), the pay-off box (2) is symmetrically and fixedly provided with a storage box (22), and the storage box (22), the tool box (23) is fixedly arranged at the top of the storage box (22), a plurality of wire outlet holes (24) are symmetrically and equidistantly arranged on one side of the wire releasing box (2), a plurality of labels (25) are symmetrically and equidistantly arranged on one side of the wire releasing box (2), and the labels (25) are respectively positioned right above the wire outlet holes (24).
2. A watch wire payoff device according to claim 1, characterized in that said clamping assembly (8) comprises two mobile seats (801), the movable seats (801) are all connected with the plug-in columns (6) in a sliding manner, the plug-in columns (6) are symmetrically provided with sliding grooves (802), the inner wall of the movable seat (801) is symmetrically and fixedly provided with sliding blocks corresponding to the sliding grooves (802), a plurality of clamping fixed blocks (803) are fixedly arranged on the moving seat (801) at equal angles, the clamping fixed blocks (803) are all rotationally connected with a clamping connecting plate (804), one side of the clamping connecting plate (804) far away from the clamping fixing block (803) is rotatably connected with clamping blocks (805), the clamping blocks (805) are fixedly connected with the arc-shaped clamping plate (7) respectively, two clamping springs (806) are fixedly arranged between the moving seats (801), and the clamping springs (806) are sleeved with the inserting columns (6).
3. The meter-mounting wiring pay-off device as claimed in claim 1, wherein the pressing assembly (13) comprises a pressing mounting frame (1301), the pressing mounting frame (1301) is fixedly connected with the mounting base (5), double-threaded screws (1302) are symmetrically and rotatably connected to the inner wall of the pressing mounting frame (1301), one ends of the double-threaded screws (1302) penetrate through the pressing mounting frame (1301) and are fixedly provided with inner hexagonal sleeves (1303), pressing blocks (1304) are symmetrically and threadedly connected to the surfaces of the double-threaded screws (1302), and arc-shaped friction rubber blocks (1305) are symmetrically and fixedly arranged on the four pressing blocks (1304).
4. The meter-mounting wiring pay-off device according to claim 1, wherein the lifting assembly (19) comprises two lifting double-threaded lead screws (1901), two ends of the lifting connecting post (1901) are rotatably connected with the inner wall of the base (1), the surfaces of the lifting double-threaded lead screws (1901) are symmetrically and threadedly connected with lifting moving blocks (1902), the lifting moving blocks (1902) are rotatably connected with lifting connecting plates (1903), one sides of the lifting connecting plates (1903) far away from the lifting moving blocks (1902) are rotatably connected with lifting fixed blocks (1904), four lifting fixed blocks (1904) are fixedly connected with a lifting plate (17), the lifting double-threaded lead screws (1901) are fixedly provided with lifting turbines (1905), one sides of the lifting turbines (1905) are respectively in toothed connection with lifting worms (1906), two lifting drive rods (1907) are fixedly provided with the lifting worm screws (1906), the both ends of lift transfer line (1907) are rotated with the inner wall of base (1) and are connected, and the one end of lift transfer line (1907) runs through base (1) and fixed being equipped with driving disc (1908), one side of driving disc (1908) is rotated to connect and is equipped with rocking arm (1909).
5. The apparatus according to claim 1, wherein the storage box (22) comprises a storage box main body (2201), a plurality of storage partitions (2202) are fixedly arranged on the inner wall of the storage box main body (2201), and a storage box door (2203) is rotatably connected to one side of the storage box main body (2201) through a hinge.
6. The meter-mounting wiring pay-off device as claimed in claim 1, wherein the tool box (23) comprises a tool box main body (2301), and the tool box main body (2301) is provided with a plurality of storage drawers (2302) in an inserted manner.
7. The meter-mounting wiring pay-off device as claimed in claim 1, wherein an L-shaped connecting plate (10) is fixedly arranged on one side of the mounting seat (5), a guide seat (11) is fixedly arranged on one side of the L-shaped connecting plate (10) far away from the mounting seat (5), and a friction rubber ring (12) is fixedly arranged on the inner wall of the guide seat (11).
8. The meter-mounting wiring pay-off device as claimed in claim 1, wherein the lower surface of the base (1) is provided with four through grooves corresponding to the universal wheels (18), and the lower surface of the base (1) is fixedly provided with an anti-skid rubber pad.
CN202010974476.0A 2020-09-16 2020-09-16 Meter-loading wiring pay-off device Active CN112098698B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010974476.0A CN112098698B (en) 2020-09-16 2020-09-16 Meter-loading wiring pay-off device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010974476.0A CN112098698B (en) 2020-09-16 2020-09-16 Meter-loading wiring pay-off device

Publications (2)

Publication Number Publication Date
CN112098698A true CN112098698A (en) 2020-12-18
CN112098698B CN112098698B (en) 2023-07-18

Family

ID=73759292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010974476.0A Active CN112098698B (en) 2020-09-16 2020-09-16 Meter-loading wiring pay-off device

Country Status (1)

Country Link
CN (1) CN112098698B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112886431A (en) * 2021-02-26 2021-06-01 郑州合新力信息技术有限公司 Electrical equipment protector convenient to installation
CN113993334A (en) * 2021-10-28 2022-01-28 安徽理工大学 General erection equipment of big data server

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160347573A1 (en) * 2015-05-29 2016-12-01 Lake Cable, Llc Cable dispensing system and apparatus
CN208672696U (en) * 2018-08-10 2019-03-29 贵州电网有限责任公司 A kind of metering device installation assembly
CN110031946A (en) * 2019-03-18 2019-07-19 合肥鎏通网络科技有限公司 A kind of optical cable telecommunication line unwrapping wire positioning device
CN110371770A (en) * 2019-07-15 2019-10-25 安徽诚德刷业有限公司 A kind of stubborn rope actinobacillus device of industrial brush
WO2020062323A1 (en) * 2018-09-28 2020-04-02 江苏天南电力器材有限公司 Wire pre-twisted damper
CN210558559U (en) * 2019-08-08 2020-05-19 湖南大洋机械制造有限公司 Wire mechanism that coiling machine was used
CN211351489U (en) * 2020-03-13 2020-08-25 孝感市光源电力集团有限责任公司 Electric power installation tensioner bullwheel

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160347573A1 (en) * 2015-05-29 2016-12-01 Lake Cable, Llc Cable dispensing system and apparatus
CN208672696U (en) * 2018-08-10 2019-03-29 贵州电网有限责任公司 A kind of metering device installation assembly
WO2020062323A1 (en) * 2018-09-28 2020-04-02 江苏天南电力器材有限公司 Wire pre-twisted damper
CN110031946A (en) * 2019-03-18 2019-07-19 合肥鎏通网络科技有限公司 A kind of optical cable telecommunication line unwrapping wire positioning device
CN110371770A (en) * 2019-07-15 2019-10-25 安徽诚德刷业有限公司 A kind of stubborn rope actinobacillus device of industrial brush
CN210558559U (en) * 2019-08-08 2020-05-19 湖南大洋机械制造有限公司 Wire mechanism that coiling machine was used
CN211351489U (en) * 2020-03-13 2020-08-25 孝感市光源电力集团有限责任公司 Electric power installation tensioner bullwheel

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘玖林;熊秋龙;: "恒张力放线存在的问题及解决方案" *
莫芳华;王凌纤;刘超逸;刘添;方浩;: "互感器现场校验测试线集成线箱的研发" *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112886431A (en) * 2021-02-26 2021-06-01 郑州合新力信息技术有限公司 Electrical equipment protector convenient to installation
CN113993334A (en) * 2021-10-28 2022-01-28 安徽理工大学 General erection equipment of big data server

Also Published As

Publication number Publication date
CN112098698B (en) 2023-07-18

Similar Documents

Publication Publication Date Title
CN112098698A (en) Wire laying device for meter installation and wiring
CN205565026U (en) Machinery pressing mode drainage fastener
CN216847870U (en) Motor tester fixture device
CN206583607U (en) A kind of adapter type isolator test fixture
CN109888667B (en) Overhead line clamp insulation shield dismounting device
CN210890696U (en) Fixing device for clinical examination analytical instrument
CN209267102U (en) A kind of parallel groove clamp
CN207398626U (en) A kind of sliding bottom of interim power distribution cabinet
CN207474937U (en) A kind of high intensity high-low pressure cabinet cabinet door
CN219224847U (en) Inverter test board convenient to quick centre gripping
CN218675225U (en) Motor comprehensive performance test detection equipment
CN218782328U (en) Wiring equipment of electric energy meter
CN206992535U (en) One kind is used to prevent distribution network operation misoperation apparatus
CN220022299U (en) Switching device for power distribution line
CN104597291A (en) High-altitude wiring and clamping device
CN210865958U (en) Switch panel with fixing function
CN218036957U (en) Safety measure device of secondary hard pressing plate
CN220359518U (en) Plug-in power supply device
CN219267919U (en) Quick termination of industrial controller
CN208922257U (en) A kind of computer cabinet socket clamping device
CN219891801U (en) Power line wiring simulator
CN218383113U (en) Electronic component switches on testboard
CN215184591U (en) Exchange device for private network interconnection through virtual tunnel
CN215262845U (en) Electrical mica tape tensile strength tester
CN220874556U (en) Test fixture of communication equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant