CN111960304A - Anti-collision method for building construction tower crane - Google Patents

Anti-collision method for building construction tower crane Download PDF

Info

Publication number
CN111960304A
CN111960304A CN202010656265.2A CN202010656265A CN111960304A CN 111960304 A CN111960304 A CN 111960304A CN 202010656265 A CN202010656265 A CN 202010656265A CN 111960304 A CN111960304 A CN 111960304A
Authority
CN
China
Prior art keywords
crane
control room
distance sensor
camera
cross arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010656265.2A
Other languages
Chinese (zh)
Inventor
赵炬
张永祥
高亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linyi Lantai Environmental Protection Technology Co ltd
Original Assignee
Linyi Lantai Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Linyi Lantai Environmental Protection Technology Co ltd filed Critical Linyi Lantai Environmental Protection Technology Co ltd
Priority to CN202010656265.2A priority Critical patent/CN111960304A/en
Publication of CN111960304A publication Critical patent/CN111960304A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/88Safety gear
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/16Applications of indicating, registering, or weighing devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

The invention discloses a collision prevention method for a crane of a building construction tower, which comprises the steps of installing a first distance sensor at a crane hook, installing a second distance sensor at one end of a crane cross arm, sending detected distance signals to a control room processor through a signal wire by the first distance sensor and the second distance sensor, controlling the opening and closing of a control room alarm through a switch by the control room processor, and installing a first camera at the bottom of one end of the crane cross arm. When the crane is used, the first distance sensor and the second distance sensor are used for respectively monitoring the distance between the crane hook and one end of the crane cross arm and the barrier in real time, so that the early warning effect is achieved, meanwhile, the first camera and the second camera are used for shooting the air conditions at the top and the bottom of one end of the crane cross arm in real time, the judgment and adjustment of workers are facilitated, effective collision avoidance is achieved, and the use is safer.

Description

Anti-collision method for building construction tower crane
Technical Field
The invention relates to the technical field of collision prevention early warning of building construction tower cranes, in particular to a collision prevention method of a building construction tower crane.
Background
Two or more tower cranes are crossed and overlapped during the hoisting operation of the tower crane group in building construction, and the existing method for commanding the hoisting operation of the tower crane group is realized by adopting a combination mode of an operator and a hoister. The method has strict requirements on comprehensive quality of people, can complete hoisting operation only by establishing a unified relationship and close cooperation between an operator and a hoist, has complex operation and control flow, low intelligence degree and is uneconomical; in addition, safety accidents such as collision between tower cranes or collision between a tower crane and a surrounding building are easily caused by human operation or command errors. In order to avoid collision accidents in the hoisting operation of the tower crane group in the cross overlapping area, a building construction tower crane collision prevention early warning system which can monitor the hoisting operation of the tower crane in real time and can send out early warning signals is urgently needed.
Through retrieval, a Chinese patent with publication number CN109231016B discloses a collision avoidance method for a building construction tower crane, which comprises a first cross arm height determination step of determining the cross arm height H1 of the first building construction tower crane; a second cross arm height determination step of determining a cross arm height H2 of the second building construction tower crane; and a cross arm height comparison step, namely comparing H1 with H2, and determining the construction tower crane with the lower cross arm height as a low-height tower crane. The collision prevention method of the building construction tower crane in the patent has the following defects: the distance between the position of a lifting hook of the crane and one end of a cross arm of the crane and a barrier and aerial condition videos of the top and the bottom of one end of the cross arm of the crane cannot be obtained in real time by workers, and the workers cannot conveniently carry out effective and safe operation.
Disclosure of Invention
The invention aims to solve the defects in the prior art and provides a collision prevention method for a construction tower crane.
In order to achieve the purpose, the invention adopts the following technical scheme:
a collision prevention method for a building construction tower crane comprises the following steps:
step 1: installing a first distance sensor at a crane hook;
step 2: a second distance sensor is arranged at one end of a cross arm of the crane;
and step 3: the first distance sensor and the second distance sensor send detected distance signals to the control room processor through signal lines, and the control room processor controls the control room alarm to be opened and closed through the switch;
and 4, step 4: a first camera is arranged at the bottom of one end of a cross arm of the crane;
and 5: the first camera sends the shot video information to the control room processor, and the control room processor displays the video information on the control room display screen.
As a still further scheme of the invention: the method comprises the following steps:
step 1: installing a first distance sensor at a crane hook;
step 2: a second distance sensor is arranged at one end of a cross arm of the crane;
and step 3: the first distance sensor and the second distance sensor send detected distance signals to the control room processor through signal lines, and the control room processor controls the control room alarm to be opened and closed through the switch;
and 4, step 4: a first camera is arranged at the bottom of one end of a cross arm of the crane;
and 5: a second camera is arranged at the top of one end of the crane cross arm;
step 6: the first camera and the second camera send shot video information to the control room processor, and the control room processor displays the video information on the control room display screen.
The invention has the beneficial effects that:
through setting up first distance sensor, the second distance sensor, first camera and second camera, when the loop wheel machine used, through first distance sensor and second distance sensor respectively real-time supervision loop wheel machine lifting hook department and the distance between loop wheel machine xarm one end and the barrier, play the effect of early warning in advance, the aerial situation of loop wheel machine xarm one end top and bottom is shot in real time to first camera and second camera simultaneously, make things convenient for the staff to judge the adjustment, convenient operation realizes effectively avoiding bumping, it is safer to use.
Drawings
Fig. 1 is a schematic flow chart of a collision prevention method of a construction tower crane according to embodiment 1;
fig. 2 is a schematic view illustrating installation of a crane, a first distance sensor, a second distance sensor, and a first camera according to the method for preventing collision of a crane of a building construction tower proposed in embodiment 1;
fig. 3 is a schematic flow chart of a collision prevention method of the construction tower crane according to embodiment 2;
fig. 4 is an installation schematic diagram of the crane, the first distance sensor, the second distance sensor, the first camera and the second camera in the method for preventing the crane from colliding in the building construction tower proposed in embodiment 2.
In the figure: the system comprises a crane 1, a first distance sensor 2, a first camera 3, a second distance sensor 4 and a second camera 5.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
Reference will now be made in detail to embodiments of the present patent, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present patent and are not to be construed as limiting the present patent.
In the description of this patent, it is to be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientations and positional relationships indicated in the drawings for the convenience of describing the patent and for the simplicity of description, and are not intended to indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are not to be considered limiting of the patent.
In the description of this patent, it is noted that unless otherwise specifically stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can include, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by those of ordinary skill in the art as appropriate.
Example 1
Referring to fig. 1-2, a method for preventing collision of a construction tower crane includes the following steps:
step 1: a first distance sensor 2 is arranged at the position of a lifting hook of a crane 1;
step 2: a second distance sensor 4 is arranged at one end of a cross arm of the crane 1;
and step 3: the first distance sensor 2 and the second distance sensor 4 send detected distance signals to the control room processor through signal lines, and the control room processor controls the control room alarm to be opened and closed through a switch;
and 4, step 4: a first camera 3 is arranged at the bottom of one end of a cross arm of the crane 1;
and 5: the first camera 3 sends the shot video information to the control room processor, and the control room processor displays the video information on the control room display screen.
Example 2
Referring to fig. 3 to 4, a method for preventing collision of a construction tower crane according to the present embodiment, compared to embodiment 1, includes the following steps:
step 1: a first distance sensor 2 is arranged at the position of a lifting hook of a crane 1;
step 2: a second distance sensor 4 is arranged at one end of a cross arm of the crane 1;
and step 3: the first distance sensor 2 and the second distance sensor 4 send detected distance signals to the control room processor through signal lines, and the control room processor controls the control room alarm to be opened and closed through a switch;
and 4, step 4: a first camera 3 is arranged at the bottom of one end of a cross arm of the crane 1;
and 5: a second camera 5 is arranged at the top of one end of a cross arm of the crane 1;
step 6: the first camera 3 and the second camera 5 send the shot video information to the control room processor, and the control room processor displays the video information on the control room display screen.
The working principle is as follows: the method comprises the steps that a first distance sensor 2 is installed at a lifting hook of a crane 1, a second distance sensor 4 is installed at one end of a cross arm of the crane 1, detected distance signals are sent to a control room processor through signal lines by the first distance sensor 2 and the second distance sensor 4, the control room processor controls opening and closing of a control room alarm through a switch, a first camera 3 is installed at the bottom of one end of the cross arm of the crane 1, a second camera 5 is installed at the top of one end of the cross arm of the crane 1, the first camera 3 and the second camera 5 send shot video information to the control room processor, and the control room processor displays the video information on a display screen of a control room.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (2)

1. A collision prevention method for a building construction tower crane comprises the following steps:
step 1: a first distance sensor (2) is arranged at the position of a lifting hook of the crane (1);
step 2: a second distance sensor (4) is arranged at one end of a cross arm of the crane (1);
and step 3: the first distance sensor (2) and the second distance sensor (4) send detected distance signals to the control room processor through signal lines, and the control room processor controls the control room alarm to be opened and closed through a switch;
and 4, step 4: a first camera (3) is arranged at the bottom of one end of a cross arm of the crane (1);
and 5: the first camera (3) sends the shot video information to the control room processor, and the control room processor displays the video information on the control room display screen.
2. The collision avoidance method of the construction tower crane according to claim 1, characterized by comprising the steps of:
step 1: a first distance sensor (2) is arranged at the position of a lifting hook of the crane (1);
step 2: a second distance sensor (4) is arranged at one end of a cross arm of the crane (1);
and step 3: the first distance sensor (2) and the second distance sensor (4) send detected distance signals to the control room processor through signal lines, and the control room processor controls the control room alarm to be opened and closed through a switch;
and 4, step 4: a first camera (3) is arranged at the bottom of one end of a cross arm of the crane (1);
and 5: a second camera (5) is arranged at the top of one end of a cross arm of the crane (1);
step 6: the first camera (3) and the second camera (5) send shot video information to the control room processor, and the control room processor displays the video information on the control room display screen.
CN202010656265.2A 2020-07-09 2020-07-09 Anti-collision method for building construction tower crane Pending CN111960304A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010656265.2A CN111960304A (en) 2020-07-09 2020-07-09 Anti-collision method for building construction tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010656265.2A CN111960304A (en) 2020-07-09 2020-07-09 Anti-collision method for building construction tower crane

Publications (1)

Publication Number Publication Date
CN111960304A true CN111960304A (en) 2020-11-20

Family

ID=73361212

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010656265.2A Pending CN111960304A (en) 2020-07-09 2020-07-09 Anti-collision method for building construction tower crane

Country Status (1)

Country Link
CN (1) CN111960304A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117361167A (en) * 2023-11-06 2024-01-09 秦皇岛燕大滨沅科技发展有限公司 Bucket type lifting ship loader with high safety

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100757596B1 (en) * 2006-05-18 2007-09-10 현대자동차주식회사 Device and method for sensing object of front and side using camera
JP2008144378A (en) * 2006-12-06 2008-06-26 Shin Caterpillar Mitsubishi Ltd Controller for remote controlled working machine
CN205045718U (en) * 2015-09-25 2016-02-24 符强 Remote control formula tower crane
CN205087823U (en) * 2015-11-16 2016-03-16 周宏� Supplementary operating means is tracked to tower crane lifting hook video
CN206940264U (en) * 2017-07-19 2018-01-30 上海宝冶集团有限公司 A kind of camera and the new tower crane of radar monitoring
CN107814317A (en) * 2017-11-21 2018-03-20 中国计量大学 A kind of new tower crane of remote operation and its application method
CN109231016A (en) * 2017-08-11 2019-01-18 北京建筑大学 A kind of construction crane machine collision prevention method
CN110342402A (en) * 2019-07-15 2019-10-18 李勤 A kind of construction tower crane group of planes lifting operation anticollision prior-warning device
CN110790141A (en) * 2019-10-29 2020-02-14 铜陵市清华宝能源设备有限责任公司 Tower crane based on three-dimensional coordinate projection and remote control method thereof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100757596B1 (en) * 2006-05-18 2007-09-10 현대자동차주식회사 Device and method for sensing object of front and side using camera
JP2008144378A (en) * 2006-12-06 2008-06-26 Shin Caterpillar Mitsubishi Ltd Controller for remote controlled working machine
CN205045718U (en) * 2015-09-25 2016-02-24 符强 Remote control formula tower crane
CN205087823U (en) * 2015-11-16 2016-03-16 周宏� Supplementary operating means is tracked to tower crane lifting hook video
CN206940264U (en) * 2017-07-19 2018-01-30 上海宝冶集团有限公司 A kind of camera and the new tower crane of radar monitoring
CN109231016A (en) * 2017-08-11 2019-01-18 北京建筑大学 A kind of construction crane machine collision prevention method
CN107814317A (en) * 2017-11-21 2018-03-20 中国计量大学 A kind of new tower crane of remote operation and its application method
CN110342402A (en) * 2019-07-15 2019-10-18 李勤 A kind of construction tower crane group of planes lifting operation anticollision prior-warning device
CN110790141A (en) * 2019-10-29 2020-02-14 铜陵市清华宝能源设备有限责任公司 Tower crane based on three-dimensional coordinate projection and remote control method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117361167A (en) * 2023-11-06 2024-01-09 秦皇岛燕大滨沅科技发展有限公司 Bucket type lifting ship loader with high safety

Similar Documents

Publication Publication Date Title
CN112794208B (en) Hoisting method, hoisting control system and engineering machinery
CN112479038A (en) Tower crane operation visual monitoring system
CN113682960B (en) Visual tower crane control system and control method
KR20100037257A (en) Monitoring Method of Work Condition of Tower Crane Using Intelligent Imaging System
CN114084798A (en) Integrated video safety monitoring system for tower crane and tower crane
CN110092311A (en) A kind of application method of the visual based remote controller of tower crane radar anticollision
CN111960304A (en) Anti-collision method for building construction tower crane
CN206720590U (en) Safety-type grab bucket with real-time imaging monitoring
WO2018211489A1 (en) A crane ground control operating system
CN209872162U (en) Tower crane radar anticollision visual remote controller
CN218446466U (en) Chimney attached type climbing frame safety lifting construction monitoring mechanism
CN205087823U (en) Supplementary operating means is tracked to tower crane lifting hook video
CN215828192U (en) Gantry crane remote control system
CN114229724A (en) Remote control system and method for tower crane
CN108975165A (en) Tower crane monitoring system and method and tower crane
CN215558497U (en) Gantry crane with remote control function
CN210558949U (en) Lifting hook visualization system based on wireless digital transmission
CN211056546U (en) Tower crane control system and tower crane
CN211338571U (en) Black box
CN114655897A (en) High-altitude operation faces electric anti-collision system based on digit twin
CN207877124U (en) Self-unloading arm assembly
CN212953963U (en) Crane lifting alarm device
CN216105726U (en) Tower crane running state monitoring system with face recognition function
CN110040641A (en) A kind of tower crane black box anticollision monitoring system
CN216785512U (en) Tower crane safety monitoring system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination