CN111738626A - Starting method and system of radial flow type hydropower station - Google Patents

Starting method and system of radial flow type hydropower station Download PDF

Info

Publication number
CN111738626A
CN111738626A CN202010711172.5A CN202010711172A CN111738626A CN 111738626 A CN111738626 A CN 111738626A CN 202010711172 A CN202010711172 A CN 202010711172A CN 111738626 A CN111738626 A CN 111738626A
Authority
CN
China
Prior art keywords
unit
flow
output value
starting
incoming flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010711172.5A
Other languages
Chinese (zh)
Other versions
CN111738626B (en
Inventor
马跃先
邓旭
王朋
郭峰
郭洋洋
刘纪轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Datang International Lixian River Basin Hydropower Development Co ltd
Original Assignee
Henan Zhengda Water Conservancy Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Zhengda Water Conservancy Technology Co ltd filed Critical Henan Zhengda Water Conservancy Technology Co ltd
Priority to CN202010711172.5A priority Critical patent/CN111738626B/en
Publication of CN111738626A publication Critical patent/CN111738626A/en
Application granted granted Critical
Publication of CN111738626B publication Critical patent/CN111738626B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Control Of Water Turbines (AREA)

Abstract

The invention provides a starting method and a starting system of a radial-flow type hydropower station, which can realize the matching of a unit and flow, improve the integral utilization efficiency of the unit and improve the power generation benefit under the working condition of limited incoming flow by estimating and judging the incoming flow, combining the operation efficiency of the unit of the power station, carrying out optimization selection and selecting a reasonable starting scheme.

Description

Starting method and system of radial flow type hydropower station
Technical Field
The invention relates to water conservancy projects, in particular to a starting method and a starting system of a radial flow type hydropower station.
Background
The radial-flow hydropower station cannot effectively regulate incoming flow, so that the starting combination of the radial-flow hydropower station needs to be matched with the incoming flow, and on the basis, the forebay needs to be stabilized at a high water level as much as possible so as to improve the generating head of the radial-flow hydropower station. For the radial flow type hydropower station, because the machine set installation size, the machine set model, the machine set arrangement and other forms are different, the utilization efficiency of different water amounts is different, and in order to improve the utilization efficiency of hydroenergy, the reasonable determination of the startup mode needs to be carried out by combining the arrangement form, the installation model and the efficiency of the machine set.
At present, the radial flow type hydropower station is started by manpower, the starting mode is started by experience, the starting mode is started in a full load or equal division mode, the starting mode has blind randomness, and the utilization efficiency of a unit is low. The operating efficiency curve of the unit is an important reference for the operating state of the unit, and the operating efficiency of the unit is not considered in the starting operation of the conventional radial flow type hydropower station, so that scientific and reasonable guidance is lacked.
Disclosure of Invention
Based on the above, the invention provides a starting method of a radial flow type hydropower station, wherein the radial flow type hydropower station comprises a front pool, 2 hydropower station installation units are provided, and the starting method comprises the following steps:
s1: obtaining the incoming flow of the power station: determining the inflow of the power station diversion canal according to the inflow information of the diversion canal or an upstream power station or a diversion canal water intake;
s2: acquiring unit operation characteristic curves of water turbines of each unit;
s3: when the incoming flow is smaller than the maximum value of the rated flows of the two units, assuming that the front pool water level is a normal high water level, respectively distributing the incoming flow to the first unit or the second unit, according to the distribution mode of the incoming flow, calculating the head loss and the tail water level of the first unit or the second unit according to the arrangement mode of the water diversion system and the arrangement mode of the tail water, then obtaining the generating head of the first unit or the second unit, respectively according to the generating heads of the first unit and the second unit and the distributed flow, searching the operation characteristic curve of the units, searching the corresponding efficiency, respectively calculating the output values of the corresponding first unit and the corresponding second unit, and finding out the unit with the maximum value and the output value thereof as a starting unit and a starting output;
s4: when the incoming flow is greater than the maximum value of the rated flows of the two units, the incoming flow is divided equally firstly, the two units select half of the incoming flow, the front pool water level is assumed to be a normal high water level, the flows are distributed to the first unit and the second unit respectively, according to the distribution mode of the incoming flow, the head loss and the tail water level of the first unit and the second unit are obtained through calculation according to the arrangement mode of the water diversion system and the arrangement mode of the tail water, then the power generation heads of the first unit and the second unit are obtained, the operation characteristic curves of the units are searched according to the power generation heads of the first unit and the second unit and the distributed flows of the first unit and the second unit, the corresponding efficiencies of the units are searched, the corresponding output values of the first unit and the second unit are calculated respectively, the total output value is obtained through addition, and then the following steps are carried out:
increasing a certain flow rate for the first unit, reducing a certain flow rate for the second unit, then calculating to obtain a first unit output force value and a second unit output force value corresponding to the working condition according to the step in the step S4, and calculating a total output force value of the units; and the following judgment is made:
s41: if the total output value of the units is increased, the first unit continues to increase a certain flow, the second unit continues to decrease a certain flow, the step in the step S4 is continuously executed, the corresponding first unit output value and the second unit output value are obtained through calculation, the total output value of the units is calculated, the relation between the total output value and the last calculated total output value is judged, if the total output value is increased, the adjustment is continuously executed until the total output value is reduced, the first reduction step or the average value of the two flows of the first reduction step and the last step is selected as the starting flow of each unit, and the unit output corresponding to the flow is the starting output;
s42: if the total output value of the units is not changed, starting each unit according to the output value corresponding to half of the incoming flow;
s43: if the total output value of the units is decreased, the first unit decreases a certain flow on the basis of half of the incoming flow, the second unit increases a certain flow on the basis of half of the incoming flow, corresponding first unit output value and second unit output value are obtained through calculation according to the steps in the step S4, the total output value of the units is calculated, the relation between the total output value and the last calculated total output value is judged, if the total output value is increased, the adjustment is continuously executed until the total output value is decreased, the average value of the two flows of the first decreasing step or the first decreasing step and the last step is selected as the starting flow of each unit, and the unit output corresponding to the flow is the starting output.
Preferably, the inflow rate is obtained by installing a water level gauge or a current measuring device on the water diversion channel; when the water level meter is installed, the inflow rate needs to be converted according to the combination of the water level meter and the arrangement of the water diversion channel.
Preferably, when the unit output is calculated according to the flow, if the unit output is greater than the unit limit output, the unit output is taken as the unit limit output.
Preferably, the unit limit output is a rated installation.
Preferably, the unit limit output is a number which is obtained by multiplying a rated installation machine by an over-expansion coefficient, wherein the over-expansion coefficient is greater than 1.
A system applying the starting-up method is characterized in that: the system comprises an incoming flow determining module and a starting determining module, wherein the incoming flow determining module is used for determining the incoming flow of the power station, and the starting determining module is used for selecting corresponding starting according to the incoming flow and the unit characteristics.
The principle of the invention is as follows:
the method comprises the steps of acquiring the inflow flow of an approach channel of a power station by using a corresponding measuring device of the power station, judging the inflow flow on the basis, starting the unit by using the flow, specifically, leading the operating efficiency of the unit, and taking the height of the operating efficiency and the total output of the unit as the judgment basis of the starting flow.
The invention has the advantages that:
the invention provides a starting method and a starting system of a radial-flow type hydropower station, which can realize the matching of a unit and flow, improve the integral utilization efficiency of the unit and improve the power generation benefit under the working condition of limited incoming flow by estimating and judging the incoming flow, combining the operation efficiency of the unit of the power station, carrying out optimization selection and selecting a reasonable starting scheme.
The specific implementation mode is as follows: the structure defined in the present invention will be explained in detail with reference to the embodiments.
The invention provides a starting method of a radial flow type hydropower station, wherein the radial flow type hydropower station comprises a front pool, 2 hydropower station installation units are provided, and the starting method comprises the following steps:
s1: obtaining the incoming flow of the power station: determining the inflow of the power station diversion canal according to the inflow information of the diversion canal or an upstream power station or a diversion canal water intake;
s2: acquiring unit operation characteristic curves of water turbines of each unit;
s3: when the incoming flow is smaller than the maximum value of the rated flows of the two units, assuming that the front pool water level is a normal high water level, respectively distributing the incoming flow to the first unit or the second unit, according to the distribution mode of the incoming flow, calculating the head loss and the tail water level of the first unit or the second unit according to the arrangement mode of the water diversion system and the arrangement mode of the tail water, then obtaining the generating head of the first unit or the second unit, respectively according to the generating heads of the first unit and the second unit and the distributed flow, searching the operation characteristic curve of the units, searching the corresponding efficiency, respectively calculating the output values of the corresponding first unit and the corresponding second unit, and finding out the unit with the maximum value and the output value thereof as a starting unit and a starting output;
s4: when the incoming flow is greater than the maximum value of the rated flows of the two units, the incoming flow is divided equally firstly, the two units select half of the incoming flow, the front pool water level is assumed to be a normal high water level, the flows are distributed to the first unit and the second unit respectively, according to the distribution mode of the incoming flow, the head loss and the tail water level of the first unit and the second unit are obtained through calculation according to the arrangement mode of the water diversion system and the arrangement mode of the tail water, then the power generation heads of the first unit and the second unit are obtained, the operation characteristic curves of the units are searched according to the power generation heads of the first unit and the second unit and the distributed flows of the first unit and the second unit, the corresponding efficiencies of the units are searched, the corresponding output values of the first unit and the second unit are calculated respectively, the total output value is obtained through addition, and then the following steps are carried out:
increasing a certain flow rate for the first unit, reducing a certain flow rate for the second unit, then calculating to obtain a first unit output force value and a second unit output force value corresponding to the working condition according to the step in the step S4, and calculating a total output force value of the units; and the following judgment is made:
s41: if the total output value of the units is increased, the first unit continues to increase a certain flow, the second unit continues to decrease a certain flow, the step in the step S4 is continuously executed, the corresponding first unit output value and the second unit output value are obtained through calculation, the total output value of the units is calculated, the relation between the total output value and the last calculated total output value is judged, if the total output value is increased, the adjustment is continuously executed until the total output value is reduced, the first reduction step or the average value of the two flows of the first reduction step and the last step is selected as the starting flow of each unit, and the unit output corresponding to the flow is the starting output;
s42: if the total output value of the units is not changed, starting each unit according to the output value corresponding to half of the incoming flow;
s43: if the total output value of the units is decreased, the first unit decreases a certain flow on the basis of half of the incoming flow, the second unit increases a certain flow on the basis of half of the incoming flow, corresponding first unit output value and second unit output value are obtained through calculation according to the steps in the step S4, the total output value of the units is calculated, the relation between the total output value and the last calculated total output value is judged, if the total output value is increased, the adjustment is continuously executed until the total output value is decreased, the average value of the two flows of the first decreasing step or the first decreasing step and the last step is selected as the starting flow of each unit, and the unit output corresponding to the flow is the starting output.
Preferably, the inflow rate is obtained by installing a water level gauge or a current measuring device on the water diversion channel; when the water level meter is installed, the inflow rate needs to be converted according to the combination of the water level meter and the arrangement of the water diversion channel.
Preferably, when the unit output is calculated according to the flow, if the unit output is greater than the unit limit output, the unit output is taken as the unit limit output.
Preferably, the unit limit output is a rated installation.
Preferably, the unit limit output is a number which is obtained by multiplying a rated installation machine by an over-expansion coefficient, wherein the over-expansion coefficient is greater than 1.
A system applying the starting-up method is characterized in that: the system comprises an incoming flow determining module and a starting determining module, wherein the incoming flow determining module is used for determining the incoming flow of the power station, and the starting determining module is used for selecting corresponding starting according to the incoming flow and the unit characteristics.
When the method or the system is used, the corresponding output values under different flow distribution can be calculated according to the incoming flow information and by combining different arrangement of the units, so that the maximum total output value of the units under the flow is determined, and the utilization efficiency of the units is highest at the moment. The optimization method can better solve the problem of the starting strategy of the hydropower station and can provide scientific guidance for the operation of the hydropower station.
The above-described embodiments are only preferred embodiments of the present invention, and the scope of the present invention should not be construed as being limited to the specific forms set forth in the examples, but also includes equivalent technical means which can be conceived by those skilled in the art from the present inventive concept.

Claims (6)

1. A starting method of a radial flow type hydropower station comprises a front pool, 2 hydropower station installation units are provided, and the starting method comprises the following steps:
s1: obtaining the incoming flow of the power station: determining the inflow of the power station diversion canal according to the inflow information of the diversion canal or an upstream power station or a diversion canal water intake;
s2: acquiring unit operation characteristic curves of water turbines of each unit;
s3: when the incoming flow is smaller than the maximum value of the rated flows of the two units, assuming that the front pool water level is a normal high water level, respectively distributing the incoming flow to the first unit or the second unit, according to the distribution mode of the incoming flow, calculating the head loss and the tail water level of the first unit or the second unit according to the arrangement mode of the water diversion system and the arrangement mode of the tail water, then obtaining the generating head of the first unit or the second unit, respectively according to the generating heads of the first unit and the second unit and the distributed flow, searching the operation characteristic curve of the units, searching the corresponding efficiency, respectively calculating the output values of the corresponding first unit and the corresponding second unit, and finding out the unit with the maximum value and the output value thereof as a starting unit and a starting output;
s4: when the incoming flow is greater than the maximum value of the rated flows of the two units, the incoming flow is divided equally firstly, the two units select half of the incoming flow, the front pool water level is assumed to be a normal high water level, the flows are distributed to the first unit and the second unit respectively, according to the distribution mode of the incoming flow, the head loss and the tail water level of the first unit and the second unit are obtained through calculation according to the arrangement mode of the water diversion system and the arrangement mode of the tail water, then the power generation heads of the first unit and the second unit are obtained, the operation characteristic curves of the units are searched according to the power generation heads of the first unit and the second unit and the distributed flows of the first unit and the second unit, the corresponding efficiencies of the units are searched, the corresponding output values of the first unit and the second unit are calculated respectively, the total output value is obtained through addition, and then the following steps are carried out:
increasing a certain flow rate for the first unit, reducing a certain flow rate for the second unit, then calculating to obtain a first unit output force value and a second unit output force value corresponding to the working condition according to the step in the step S4, and calculating a total output force value of the units; and the following judgment is made:
s41: if the total output value of the units is increased, the first unit continues to increase a certain flow, the second unit continues to decrease a certain flow, the step in the step S4 is continuously executed, the corresponding first unit output value and the second unit output value are obtained through calculation, the total output value of the units is calculated, the relation between the total output value and the last calculated total output value is judged, if the total output value is increased, the adjustment is continuously executed until the total output value is reduced, the first reduction step or the average value of the two flows of the first reduction step and the last step is selected as the starting flow of each unit, and the unit output corresponding to the flow is the starting output;
s42: if the total output value of the units is not changed, starting each unit according to the output value corresponding to half of the incoming flow;
s43: if the total output value of the units is decreased, the first unit decreases a certain flow on the basis of half of the incoming flow, the second unit increases a certain flow on the basis of half of the incoming flow, corresponding first unit output value and second unit output value are obtained through calculation according to the steps in the step S4, the total output value of the units is calculated, the relation between the total output value and the last calculated total output value is judged, if the total output value is increased, the adjustment is continuously executed until the total output value is decreased, the average value of the two flows of the first decreasing step or the first decreasing step and the last step is selected as the starting flow of each unit, and the unit output corresponding to the flow is the starting output.
2. The method for determining the start-up of a radial flow hydropower station according to the incoming flow as claimed in claim 1, characterized in that: the inflow rate is obtained by installing a water level gauge or a current measuring device on the water diversion channel; when the water level meter is installed, the inflow rate needs to be converted according to the combination of the water level meter and the arrangement of the water diversion channel.
3. The method for determining the start-up of a radial flow hydropower station according to the incoming flow as claimed in claim 1, characterized in that: and when the output of the set is calculated according to the flow, if the output of the set is greater than the limited output of the set, taking the output of the set as the limited output of the set.
4. A method of determining the start-up of a radial flow hydroelectric power station according to the incoming flow rate, as claimed in claim 3, wherein: the unit limit output may be a rated installation.
5. A method of determining the start-up of a radial flow hydroelectric power station according to the incoming flow rate, as claimed in claim 3, wherein: the unit limit output is the number which is obtained by multiplying the rated installation by the over-expansion coefficient, and the over-expansion coefficient is more than 1.
6. A system using the booting method according to any one of claims 1 to 5, characterized in that: the system comprises an incoming flow determining module and a starting determining module, wherein the incoming flow determining module is used for determining the incoming flow of the power station, and the starting determining module is used for selecting corresponding starting according to the incoming flow and the unit characteristics.
CN202010711172.5A 2020-07-22 2020-07-22 Starting method and system for radial hydropower station Active CN111738626B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010711172.5A CN111738626B (en) 2020-07-22 2020-07-22 Starting method and system for radial hydropower station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010711172.5A CN111738626B (en) 2020-07-22 2020-07-22 Starting method and system for radial hydropower station

Publications (2)

Publication Number Publication Date
CN111738626A true CN111738626A (en) 2020-10-02
CN111738626B CN111738626B (en) 2023-07-14

Family

ID=72657247

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010711172.5A Active CN111738626B (en) 2020-07-22 2020-07-22 Starting method and system for radial hydropower station

Country Status (1)

Country Link
CN (1) CN111738626B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104216383A (en) * 2014-09-22 2014-12-17 国家电网公司 Operating efficiency optimizing method of small hydropower station unit
CN108193653A (en) * 2018-01-16 2018-06-22 河南创辉水利水电工程有限公司 A kind of plant without storage's Automatic Optimal system
CN108223258A (en) * 2018-01-16 2018-06-29 河南创辉水利水电工程有限公司 A kind of plant without storage's automatic optimization method
CN108252276A (en) * 2018-02-09 2018-07-06 河南创辉水利水电工程有限公司 A kind of plant without storage's automatic optimization method based on adjusting of contributing
CN108335045A (en) * 2018-02-09 2018-07-27 河南创辉水利水电工程有限公司 A kind of plant without storage's automatic optimization method based on aperture regulation
CN109764586A (en) * 2018-12-04 2019-05-17 珠海格力电器股份有限公司 A kind of unit start-up control method and device adapting to variable-flow
CN110009036A (en) * 2019-04-03 2019-07-12 中国水利水电科学研究院 A method of improving power station comprehensive benefit
WO2019174039A1 (en) * 2018-03-16 2019-09-19 大连理工大学 Short-term practical scheduling method for super-large-scale hydroelectric station group
CN111102212A (en) * 2019-12-31 2020-05-05 武汉睿山智水科技发展有限公司 Method and device for scheduling cascade pump station and electronic equipment
CN111321713A (en) * 2019-06-19 2020-06-23 河南郑大水利科技有限公司 Hydropower station unit operation method based on ecological flow

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104216383A (en) * 2014-09-22 2014-12-17 国家电网公司 Operating efficiency optimizing method of small hydropower station unit
CN108193653A (en) * 2018-01-16 2018-06-22 河南创辉水利水电工程有限公司 A kind of plant without storage's Automatic Optimal system
CN108223258A (en) * 2018-01-16 2018-06-29 河南创辉水利水电工程有限公司 A kind of plant without storage's automatic optimization method
CN108252276A (en) * 2018-02-09 2018-07-06 河南创辉水利水电工程有限公司 A kind of plant without storage's automatic optimization method based on adjusting of contributing
CN108335045A (en) * 2018-02-09 2018-07-27 河南创辉水利水电工程有限公司 A kind of plant without storage's automatic optimization method based on aperture regulation
WO2019174039A1 (en) * 2018-03-16 2019-09-19 大连理工大学 Short-term practical scheduling method for super-large-scale hydroelectric station group
CN109764586A (en) * 2018-12-04 2019-05-17 珠海格力电器股份有限公司 A kind of unit start-up control method and device adapting to variable-flow
CN110009036A (en) * 2019-04-03 2019-07-12 中国水利水电科学研究院 A method of improving power station comprehensive benefit
CN111321713A (en) * 2019-06-19 2020-06-23 河南郑大水利科技有限公司 Hydropower station unit operation method based on ecological flow
CN111102212A (en) * 2019-12-31 2020-05-05 武汉睿山智水科技发展有限公司 Method and device for scheduling cascade pump station and electronic equipment

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
CHEN TIAN-QIONG ET AL.: "A short-term joint optimal dispatching method of wind farms, photovoltaic generations, hydropower stations and gas power plants", 《2014 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY》 *
唐凡等: "长引水隧洞巨型水电站机组开机方式探讨", 《水电与新能源》 *
李朝晖等: "长距离引水径流式水电站装机容量及水轮机额定水头的确定", 《东北水利水电》 *
林显: "溪洛渡-向家坝梯级水电站机组运行组合方式分析", 《水电与新能源》 *
王朋: "梯级小水电优化运行技术研究", 《中国优秀硕士学位论文全文数据库 》 *

Also Published As

Publication number Publication date
CN111738626B (en) 2023-07-14

Similar Documents

Publication Publication Date Title
CN108223258B (en) Automatic optimization method for radial flow hydropower station
CN108193653B (en) Automatic optimizing system of radial-flow hydropower station
CN109063890B (en) Thermal load distribution method based on thermal power plant whole-plant peak shaving capacity maximization
CN107276122B (en) Peak-shaving resource calling decision method suitable for large-scale renewable energy grid connection
CN110705784B (en) Optimized operation evaluation method for radial flow type hydropower station
JP2001037085A (en) Method and apparatus for frequency controlling power system including secondary cell
CN110212554B (en) Wind power frequency modulation control method for improving peak shaving characteristic of power grid
CN105656064A (en) Method for enabling thermoelectric unit to participate in system peak-load regulation scheduling by using heat supply time lag
CN114492085B (en) Regional power and electric quantity balancing method related to load and power supply joint probability distribution
CN114447379A (en) Fuel cell cooling liquid temperature control method, system and controller thereof
CN111799772A (en) Electric heating system optimal scheduling method considering unit deep peak shaving
CN113659620A (en) Water-wind complementary power generation system day-ahead scheduling method based on dynamic frequency constraint
CN114024339B (en) Method for expanding full-power variable-speed pumped storage unit by using step hydropower
CN111859823A (en) Method and system for determining starting of radial flow type hydropower station according to incoming flow
CN111738626A (en) Starting method and system of radial flow type hydropower station
CN112564088A (en) Renewable energy consumption capacity improving method considering thermal power flexibility modification cost
CN108053083A (en) A kind of hydro plant with reservoir non-flood period combined optimization power generation dispatching method
CN105976046B (en) Low-carbon power grid planning method considering demand side management
CN113919719A (en) Method and system for calculating power generation flow of radial flow type hydropower station and method for adjusting output
CN111810345A (en) Method and system for leveling front pool water level of radial flow type hydropower station
CN105634023B (en) A kind of power system production run method
CN113300414A (en) Method and system for optimizing operation of step hydropower station under constant load
CN113904346A (en) Wind turbine generator rotating speed recovery method considering hydroelectric frequency modulation resources
CN114035432A (en) Pump station control method considering startup and shutdown loss based on linear integer-dynamic programming combination algorithm
CN116822838A (en) Runoff type hydropower station optimizing system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20230620

Address after: 665000 No.1, floor 1-4, unit 1, building 19, urban quality community, No.2 Shilong Road, Simao District, Pu'er City, Yunnan Province

Applicant after: YUNNAN DATANG INTERNATIONAL LIXIAN RIVER BASIN HYDROPOWER DEVELOPMENT Co.,Ltd.

Address before: Room 219, building 1, Zhengda science and Technology Park, 100 Cuizhu street, high tech Zone, Zhengzhou City, Henan Province, 450001

Applicant before: Henan Zhengda Water Conservancy Technology Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant