CN111724070B - Information repeating method of power dispatching instruction - Google Patents

Information repeating method of power dispatching instruction Download PDF

Info

Publication number
CN111724070B
CN111724070B CN202010574706.4A CN202010574706A CN111724070B CN 111724070 B CN111724070 B CN 111724070B CN 202010574706 A CN202010574706 A CN 202010574706A CN 111724070 B CN111724070 B CN 111724070B
Authority
CN
China
Prior art keywords
dispatching
repeating
instruction
scheduling
station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010574706.4A
Other languages
Chinese (zh)
Other versions
CN111724070A (en
Inventor
王纪旋
王文林
张炜
刘路登
凌永标
贾伟
徐自力
王磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Anhui Electric Power Co Ltd
Huanshang Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Anhui Electric Power Co Ltd
Huanshang Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Anhui Electric Power Co Ltd, Huanshang Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN202010574706.4A priority Critical patent/CN111724070B/en
Publication of CN111724070A publication Critical patent/CN111724070A/en
Application granted granted Critical
Publication of CN111724070B publication Critical patent/CN111724070B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G10MUSICAL INSTRUMENTS; ACOUSTICS
    • G10LSPEECH ANALYSIS TECHNIQUES OR SPEECH SYNTHESIS; SPEECH RECOGNITION; SPEECH OR VOICE PROCESSING TECHNIQUES; SPEECH OR AUDIO CODING OR DECODING
    • G10L15/00Speech recognition
    • G10L15/26Speech to text systems
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/08Network architectures or network communication protocols for network security for authentication of entities
    • H04L63/0876Network architectures or network communication protocols for network security for authentication of entities based on the identity of the terminal or configuration, e.g. MAC address, hardware or software configuration or device fingerprint
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/12Applying verification of the received information
    • H04L63/123Applying verification of the received information received data contents, e.g. message integrity
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/40Display of information, e.g. of data or controls
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Computer Security & Cryptography (AREA)
  • Physics & Mathematics (AREA)
  • Power Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Strategic Management (AREA)
  • General Engineering & Computer Science (AREA)
  • Human Computer Interaction (AREA)
  • Signal Processing (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Computing Systems (AREA)
  • Computer Hardware Design (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Quality & Reliability (AREA)
  • General Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Educational Administration (AREA)
  • Public Health (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Primary Health Care (AREA)
  • Computational Linguistics (AREA)
  • Audiology, Speech & Language Pathology (AREA)
  • Acoustics & Sound (AREA)
  • Multimedia (AREA)
  • Mobile Radio Communication Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an information repeating method of a power dispatching instruction, which comprises the following steps: scheduling pre-downlink: the dispatching end pre-sends a complete dispatching instruction to the station end, wherein the complete dispatching instruction comprises a dispatching number, preset operation time and operation content; the method comprises the steps of factory station pre-order signing, dispatching formal issuing, factory station repeating, dispatching confirmation, factory station returning, dispatching receipt and factory station confirmation. The information repeating method of the power dispatching instruction disclosed by the invention is more reliable and precise, and can effectively ensure that the dispatching instruction is correctly conveyed and completed.

Description

Information repeating method of power dispatching instruction
Technical Field
The invention relates to an information repeating method of a power dispatching instruction.
Background
The dispatching network command is to realize the electronic issuing and replying of dispatching command via network to replace traditional telephone command mode. The mode of dispatching the network command makes full use of the advantages of rapidness and convenience of the network, standardizes the dispatching workflow, realizes the functions of starting and finishing normal dispatching business and applying corresponding dispatching commands in advance and dispatching and recovering, and replaces the traditional telephone command dispatching mode to realize the network circulation of dispatching commands. The dispatching network command not only greatly improves the work efficiency of a dispatcher, but also enables a dispatching object to clearly grasp the operation content, and eliminates the defects of traditional telephone command modes such as harmonic sound error interference, environmental interference, stride operation and the like, thereby enhancing the monitoring function and greatly enhancing the safety of the dispatching operation of the power grid.
Disclosure of Invention
The invention aims to provide a new and reliable information repeating method of power dispatching instructions, which is more reliable and more precise in repeating and can effectively ensure that the dispatching instructions are correctly transmitted and completed.
The technical scheme adopted for solving the technical problems is as follows: an information repeating method of a power dispatching instruction comprises the following steps: scheduling pre-downlink: the dispatching end pre-sends a complete dispatching instruction to the station end, wherein the complete dispatching instruction comprises a dispatching number, preset operation time and operation content;
station pre-order signing: the factory station receives the complete scheduling instruction sent by the scheduling end in advance and then performs the pre-instruction signing; when the pre-order sign is signed, firstly, the identity of an operator needs to be identified, and when the identification is passed, the pre-order sign can be signed; in the process of pre-order signing, complete information repeating is needed for the scheduling instruction, and the repeating content comprises a calling number repeating, a preset operation time repeating and an operation content repeating; the reciting of the pre-order signing process is completed in two steps, the first step is used for dispatching the serial number reciting and the preset operation time reciting, the second step is used for operating the content reciting, the second step can be entered after the first step is completed correctly, and the signing is completed and the dispatching end is fed back after the second step is completed correctly; the signing can be carried out only once, and repeated signing can not be carried out;
scheduling formally issuing: the scheduling end performs scheduling formality order according to the fed-back signing information;
repeating the factory station: the factory station receives the complete dispatching instruction sent by the dispatching end in advance, and then recites the complete dispatching instruction, and feeds back the complete dispatching instruction to the dispatching end;
scheduling confirmation: after receiving the factory station recitation, the dispatching end completes dispatching confirmation work;
and (3) station return instruction: after the dispatching confirmation, the factory station end can perform field operation according to the contents in the dispatching formal descending order, and after the completion, report the repeating work, repeat the contents in the dispatching formal descending order, and add an 'execution finishing' word at the end part to complete factory station return order;
scheduling and receiving: after receiving the station return instruction, the dispatching end sends dispatching and receiving information to the station end through the simultaneous operation change of the switching state and the switching current in the SCADA system, if the operation change is satisfied, the dispatching end indicates that the work is completed, issues the next dispatching instruction; if the operation is not satisfied at the same time, the operation is not completed, the information is transmitted to the station end for corresponding inspection, the next dispatching instruction is not issued, after the station is inspected and the operation is completed correctly, the switching state and the switching current in the SCADA system are simultaneously changed in operation, the dispatching and receiving information is issued to the station end, and the next dispatching instruction is issued;
and (5) station confirmation: and after receiving the scheduling receiving information, the station end confirms and feeds back to the scheduling end.
In order to facilitate archiving management, the method further comprises archiving operation tickets after the confirmation of the factory stations, and the operation ticket information can be screened and consulted according to the ticket simulating time, the operation tasks and the operation ticket numbers after the archiving of the operation tickets.
Furthermore, the repeating mode can adopt one of a filling repeating mode and a splicing repeating mode.
In order to ensure the correct transmission of the scheduling instruction, the repeating mode adopts a filling repeating mode and a splicing repeating mode to be used simultaneously; it needs to be repeated correctly to complete the repeated.
Further, the repeated errors can be provided with color marks and sound reminding.
Furthermore, the operation ticket can be consulted, exported and printed in the factory station pre-order signing and factory station repeating.
In order to improve the accuracy of the transmission of the scheduling instruction, in a filling and repeating mode, keywords in the scheduling instruction are set as items needing to be filled, and when repeating, the missing keywords need to be in blank positions according to the scheduling instruction so as to complete repeating; in the splicing and repeating mode, the instructions are disturbed and broken, when the instructions are repeated, the disturbed and broken instructions are rearranged to form correct instructions, and the rearrangement mode can adopt a dragging mode and a sequential clicking mode.
In order to improve convenience and ensure correct transmission of instructions, the method also comprises voice repeating, wherein the voice repeating adopts a mode of converting voice input into characters, and only verifies whether keywords are consistent with scheduling instructions; and simultaneously, when one of the repeating mode and the splicing repeating mode and the voice repeating mode are correct, the repeating of the scheduling instruction is calculated.
The invention has the beneficial effects that: firstly, the identification of the spirit can be signed and received, so that only direct personnel who are instructed can operate, and the dispatch instruction is guaranteed to be ready to be transmitted to a target; the pre-order signature is repeated in two steps, so that the accuracy of the transmission of the scheduling instruction is improved, the operation time and the operation content are separated, and the repeated person can memorize the scheduling instruction and the scheduling instruction in a deepened mode. In the dispatching and receiving process, the switching state and the switching current amount of the SCADA system are combined for checking, so that whether a dispatching instruction is correctly completed or not is facilitated, and the accuracy of the method is improved. The information repeating method of the power dispatching instruction is more reliable and precise, and can effectively ensure that the dispatching instruction is correctly transmitted and completed.
The present invention will be described in more detail with reference to examples.
Detailed Description
An embodiment, an information repeating method of a power dispatching instruction includes the following steps:
scheduling pre-downlink: the dispatching end pre-sends a complete dispatching instruction to the station end, wherein the complete dispatching instruction comprises a dispatching number, preset operation time and operation content;
station pre-order signing: the factory station receives the complete scheduling instruction sent by the scheduling end in advance and then performs the pre-instruction signing; when the pre-order sign is signed, firstly, the identity of an operator needs to be identified, and when the identification is passed, the pre-order sign can be signed; in the process of pre-order signing, complete information repeating is needed for the scheduling instruction, and the repeating content comprises a calling number repeating, a preset operation time repeating and an operation content repeating; the reciting of the pre-order signing process is completed in two steps, the first step is used for dispatching the serial number reciting and the preset operation time reciting, the second step is used for operating the content reciting, the second step can be entered after the first step is completed correctly, and the signing is completed and the dispatching end is fed back after the second step is completed correctly; the signing can be carried out only once, and repeated signing can not be carried out;
scheduling formally issuing: the scheduling end performs scheduling formality order according to the fed-back signing information;
repeating the factory station: the factory station receives the complete dispatching instruction sent by the dispatching end in advance, and then recites the complete dispatching instruction, and feeds back the complete dispatching instruction to the dispatching end;
scheduling confirmation: after receiving the factory station recitation, the dispatching end completes dispatching confirmation work;
and (3) station return instruction: after the dispatching confirmation, the factory station end can perform field operation according to the contents in the dispatching formal descending order, and after the completion, report the repeating work, repeat the contents in the dispatching formal descending order, and add an 'execution finishing' word at the end part to complete factory station return order;
scheduling and receiving: after receiving the station return instruction, the dispatching end sends dispatching and receiving information to the station end through the simultaneous operation change of the switching state and the switching current in the SCADA system, if the operation change is satisfied, the dispatching end indicates that the work is completed, issues the next dispatching instruction; if the operation is not satisfied at the same time, the operation is not completed, the information is transmitted to the station end for corresponding inspection, the next dispatching instruction is not issued, after the station is inspected and the operation is completed correctly, the switching state and the switching current in the SCADA system are simultaneously changed in operation, the dispatching and receiving information is issued to the station end, and the next dispatching instruction is issued;
and (5) station confirmation: and after receiving the scheduling receiving information, the station end confirms and feeds back to the scheduling end.
And after the factory station is confirmed, the operation ticket archiving is further included, and the operation ticket information can be screened and consulted according to the ticket simulating time, the operation task and the operation ticket number after the operation ticket archiving.
The repeating mode can adopt one of a filling repeating mode and a splicing repeating mode. The repeating mode can be combined with the filling repeating mode and the splicing repeating mode simultaneously, and when the repeating mode and the splicing repeating mode are used simultaneously, the repeating mode and the splicing repeating mode can be completed only by correctly repeating the filling mode and the splicing repeating mode.
The related scheduling instruction is repeated, and when the repeated instruction is wrong, color identification and sound reminding can be realized. Of course, the reminding mode is not limited to the above design mode, and other modes which are easy to think in the field should be included in the protection scope of the present invention.
The factory station pre-order signing and repeating can be used for consulting, exporting and printing operation tickets. The operation ticket can be consulted, exported and printed, and rights can be selectively opened in different links according to the requirements.
In the method of filling in the repeating, the keywords in the scheduling instruction are set as the items to be filled, and when repeating, the missing keywords need to be in blank positions according to the scheduling instruction to complete repeating; in the splicing and repeating mode, the instructions are disturbed and broken, when the instructions are repeated, the disturbed and broken instructions are rearranged to form correct instructions, and the rearrangement mode can adopt a dragging mode and a sequential clicking mode. The key may be some key quantity of device name, location, time, duration, device model, etc. When the instruction is broken and disturbed, the key words are required to be broken independently, so that the memory of a reciter is deepened when the key words are spliced.
The repeating mode also comprises a voice repeating mode, wherein the voice repeating mode adopts a mode of converting voice input into characters, and only verifies whether keywords are consistent with scheduling instructions; and simultaneously, when one of the repeating mode and the splicing repeating mode and the voice repeating mode are correct, the repeating of the scheduling instruction is calculated.
The method comprises the steps of scheduling pre-order, station pre-order signing, scheduling formal order, station repeating, scheduling confirmation, station return order, scheduling order receiving and station confirmation, wherein the identity of an operator is identified in each step, and related operation can be performed after the identification is passed.
The invention has been described above by way of example. It will be clear that the invention is not limited to the embodiments described above. As long as various insubstantial improvements are made using the inventive method concepts and technical solutions; or the invention is not improved, and the conception and the technical scheme are directly applied to other occasions and are all within the protection scope of the invention.

Claims (4)

1. An information repeating method of a power dispatching instruction is characterized in that: the method comprises the following steps:
scheduling pre-downlink: the dispatching end pre-sends a complete dispatching instruction to the station end, wherein the complete dispatching instruction comprises a dispatching number, preset operation time and operation content;
station pre-order signing: the factory station receives the complete scheduling instruction sent by the scheduling end in advance and then performs the pre-instruction signing; when the pre-order sign is signed, firstly, the identity of an operator needs to be identified, and when the identification is passed, the pre-order sign can be signed; in the process of pre-order signing, complete information repeating is needed for the scheduling instruction, and the repeating content comprises a calling number repeating, a preset operation time repeating and an operation content repeating; the reciting of the pre-order signing process is completed in two steps, the first step is used for dispatching the serial number reciting and the preset operation time reciting, the second step is used for operating the content reciting, the second step can be entered after the first step is completed correctly, and the signing is completed and the dispatching end is fed back after the second step is completed correctly; the signing can be carried out only once, and repeated signing can not be carried out;
scheduling formally issuing: the scheduling end performs scheduling formality order according to the fed-back signing information;
repeating the factory station: the factory station receives the complete dispatching instruction sent by the dispatching end in advance, and then recites the complete dispatching instruction, and feeds back the complete dispatching instruction to the dispatching end;
scheduling confirmation: after receiving the factory station recitation, the dispatching end completes dispatching confirmation work;
and (3) station return instruction: after the dispatching confirmation, the factory station end can perform field operation according to the contents in the dispatching formal descending order, and after the completion, report the repeating work, repeat the contents in the dispatching formal descending order, and add an 'execution finishing' word at the end part to complete factory station return order;
scheduling and receiving: after receiving the station return instruction, the dispatching end sends dispatching and receiving information to the station end through the simultaneous operation change of the switching state and the switching current in the SCADA system, if the operation change is satisfied, the dispatching end indicates that the work is completed, issues the next dispatching instruction; if the operation is not satisfied at the same time, the operation is not completed, the information is transmitted to the station end for corresponding inspection, the next dispatching instruction is not issued, after the station is inspected and the operation is completed correctly, the switching state and the switching current in the SCADA system are simultaneously changed in operation, the dispatching and receiving information is issued to the station end, and the next dispatching instruction is issued;
and (5) station confirmation: after receiving the dispatching receiving information, the station end confirms and feeds back to the dispatching end;
after the factory station is confirmed, the method further comprises the step of archiving the operation ticket, and after the operation ticket is archived, the operation ticket information can be screened and consulted according to the ticket simulating time, the operation task and the operation ticket number;
the repeating mode can adopt one of filling repeating mode and splicing repeating mode; the repeating mode can also be used in a filling repeating mode and a splicing repeating mode, and at the moment, the repeating mode and the splicing repeating mode can be completed only by the fact that the repeating mode and the splicing repeating mode are correct;
in the method of filling in the repeating, the keywords in the scheduling instruction are set as the items to be filled, and when repeating, the missing keywords need to be in blank positions according to the scheduling instruction to complete repeating; in the splicing and repeating mode, the instructions are disturbed and broken, when the instructions are repeated, the disturbed and broken instructions are rearranged to form correct instructions, and the rearrangement mode can adopt a dragging mode and a sequential clicking mode.
2. The method for information replication of power scheduling instructions of claim 1, wherein: the repeating error has color identification and sound reminding.
3. The method for information replication of power scheduling instructions of claim 2, wherein: the factory station pre-order signing and the factory station repeating can be used for consulting, exporting and printing operation tickets.
4. The method for information replication of power scheduling instructions of claim 3, wherein: the method also comprises the step of speech repeating, wherein the speech repeating adopts a mode of speech input to text, and only the keyword is verified to be consistent with the scheduling instruction; and simultaneously, when one of the repeating mode and the splicing repeating mode and the voice repeating mode are correct, the repeating of the scheduling instruction is calculated.
CN202010574706.4A 2020-06-22 2020-06-22 Information repeating method of power dispatching instruction Active CN111724070B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010574706.4A CN111724070B (en) 2020-06-22 2020-06-22 Information repeating method of power dispatching instruction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010574706.4A CN111724070B (en) 2020-06-22 2020-06-22 Information repeating method of power dispatching instruction

Publications (2)

Publication Number Publication Date
CN111724070A CN111724070A (en) 2020-09-29
CN111724070B true CN111724070B (en) 2023-12-19

Family

ID=72569885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010574706.4A Active CN111724070B (en) 2020-06-22 2020-06-22 Information repeating method of power dispatching instruction

Country Status (1)

Country Link
CN (1) CN111724070B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112990793B (en) * 2021-05-11 2021-07-23 国网浙江省电力有限公司金华供电公司 Scheduling instruction identification and repeating method
CN114091694A (en) * 2021-11-09 2022-02-25 深圳供电局有限公司 Intelligent dispatching management system and method for distribution network live working

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104376440A (en) * 2014-12-12 2015-02-25 广西电网有限责任公司 Automatic power grid dispatching electronic token confirming method based on network token issuing
WO2015136705A1 (en) * 2014-03-14 2015-09-17 株式会社日立システムズ System and method for verifying and registering work check sheets, voice recognition control system, and voice recognition control method
CN110956357A (en) * 2019-10-10 2020-04-03 国网浙江省电力有限公司宁波供电公司 Intelligent regulation and control networked interaction system applied to power company

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015136705A1 (en) * 2014-03-14 2015-09-17 株式会社日立システムズ System and method for verifying and registering work check sheets, voice recognition control system, and voice recognition control method
CN104376440A (en) * 2014-12-12 2015-02-25 广西电网有限责任公司 Automatic power grid dispatching electronic token confirming method based on network token issuing
CN110956357A (en) * 2019-10-10 2020-04-03 国网浙江省电力有限公司宁波供电公司 Intelligent regulation and control networked interaction system applied to power company

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
基于自动化安全区隔离交互的电网调令防误控制方法及应用;张中超等;《机电信息》;20191215(第35期);全文 *
惠州调度操作防误网络***在电力调度中的应用;李鸿文;《中国电力教育》;20120720(第21期);全文 *

Also Published As

Publication number Publication date
CN111724070A (en) 2020-09-29

Similar Documents

Publication Publication Date Title
CN111724070B (en) Information repeating method of power dispatching instruction
CN106815681B (en) Transformer substation secondary equipment closed-loop management platform based on two-dimensional code and management system thereof
CN109191082A (en) A kind of method for programming of dispatching platform, system and computer readable storage medium
CN103065215B (en) Power grid dispatching method
CN107591892B (en) Intelligent substation operation and maintenance method and system
CN101719690B (en) Dispatching method of electric network
CN113258669B (en) Networked intelligent scheduling method and terminal based on distribution network maintenance
CN108233536A (en) A kind of intelligent program remote handling system
CN102591223B (en) Intelligentized diagnostic system of substation-operation operation tickets
CN102117444A (en) System for comprehensive arrangement and execution management of production equipment maintenance plan
CN104133443A (en) Method for automatically generating power grid dispatching operation order through power grid overhaul application forms
CN110112831A (en) A kind of supervisory control of substation information automation checks and accepts device and its acceptance method
CN109782724B (en) Control method for preventing misoperation-locking and terminal equipment
CN110768247B (en) Main and distribution network model splicing method based on distribution automation main station
CN102111508A (en) Fault processing method and system as well as fault scheduling equipment
CN106647648A (en) Method for checking power plant and transformer substation operation order execution conditions in scheduling automation system
CN116308139A (en) Intelligent misoperation prevention and networked command issuing platform for regulation and control
CN109840675B (en) Intelligent power transfer application system and method in power distribution network fault state
CN105279588A (en) Power grid dispatching operation associated monitoring system
CN111524031B (en) Implementation method and system for intelligently generating operation steps based on analysis operation task
CN106312507B (en) The control method of polytypic engine cylinder cover cylinder body assembly line
CN201974848U (en) Management system for comprehensively arranging and executing maintenance plan of production equipment
CN113673903B (en) Task management system for off-site nuclear emergency and control method thereof
CN113504774B (en) Train control interlocking integration and dispatching centralized system interface data checking method and device
CN202854510U (en) Intelligentized diagnostic system of substation-operation operation tickets

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant