CN111664760B CN202010590045.4A CN202010590045A CN111664760B CN 111664760 B CN111664760 B CN 111664760B CN 202010590045 A CN202010590045 A CN 202010590045A CN 111664760 B CN111664760 B CN 111664760B
Authority
CN
China
Prior art keywords
data
blast hole
construction
data points
blasting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010590045.4A
Other languages
Chinese (zh)
Other versions
CN111664760A (en
Inventor
高军
林晓
岳勇
谭发刚
杨立云
贾超
罗华明
吴德兴
项小珍
李行利
张旭东
蔡荣喜
王东旭
熊晓晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010590045.4A priority Critical patent/CN111664760B/en
Publication of CN111664760A publication Critical patent/CN111664760A/en
Application granted granted Critical
Publication of CN111664760B publication Critical patent/CN111664760B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Earth Drilling (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The invention discloses a micro-step full-section construction accurate blasting method, which comprises the steps of firstly utilizing an underground imager and an ultrasonic detector to detect a soil layer distribution structure of a blasting construction section, and transmits the data information to the computer host, the computer host generates a soil layer structure distribution diagram by comparison and analysis, the computer host compares and analyzes the soil layer structure distribution diagram, the method can vividly and specifically plan the specific size and position of the blast hole, fully utilize the explosion effect of the detonator explosive, plan out the optimal blast hole arrangement scheme, improve the blasting quality and effect during construction, establish a mathematical model by a computer host by utilizing data such as quantitative theory, construction parameters, blasting scale, detonation mode and the like, realize the fine control of blasting by utilizing the comprehensive calculation and analysis of the mathematical model, through numerical analysis simulation, the judgment result is accurately given, and the effective control on the blasting excavation effect and the harmful effect generated by blasting can be realized.

Description

Precise blasting method for micro-step full-section construction
Technical Field
The invention relates to the technical field of blasting construction, in particular to a precise blasting method for micro-step full-section construction.
Background
The tunnel is the key and key project for the construction of roads, railways and the like. With the development of railway construction and the improvement of science and technology, the tunnel excavation method is developed rapidly. The more common excavation methods include a drilling and blasting method, a shield method and a digging machine method. The drilling and blasting method is still the tunnel excavation method commonly used at home and abroad at present because the drilling and blasting method has strong adaptability to geological conditions and low excavation cost, and is particularly suitable for the construction of hard rock tunnels, broken rock tunnels and a large number of short tunnels.
However, the blasting precision of the existing blasting method is not high enough, so that the blasting quality of the tunnel rock wall is influenced, the construction difficulty is increased, the installation of equipment such as a drilling machine is greatly influenced, the use of the equipment is inconvenient, and the construction efficiency of the project is seriously slowed down.
Therefore, an accurate blasting method for micro-step full-section construction is provided.
Disclosure of Invention
The invention aims to provide an accurate blasting method for micro-step full-section construction, which comprises the steps of firstly detecting a soil layer distribution structure of a blasting construction section by using an underground imager and an ultrasonic detector, transmitting data information of the soil layer distribution structure to a computer host, generating a soil layer structure distribution diagram by the computer host through comparison and analysis, figuratively and specifically planning the specific size and the position of a blast hole by using the soil layer structure distribution diagram, establishing a mathematical model by using data such as a quantitative theory, construction parameters, a blasting scale and a blasting mode through the computer host, and realizing the fine control of blasting by using the comprehensive calculation and analysis of the mathematical model, thereby solving the problems provided by the background.
In order to achieve the purpose, the invention provides the following technical scheme: a micro-step full-section construction accurate blasting method adopts a computing device and comprises the following steps:
s1: surveying the geology of the construction operation land by using exploration equipment, and drawing a construction section soil layer structure distribution map;
s2: planning, arranging and blasting according to the construction section soil layer structure distribution diagram drawn in the S1, performing construction measurement punching on the upper step and the lower step of the construction section, and planning the difference of the detonation section;
s3: after the blast hole is drilled, a field technician checks the drilling condition of the blast hole and carries out technical confirmation on the blast hole, so as to ensure that the drilling error of the blast hole is kept within the range of 0.1-0.5 mm;
s4: after the blast hole is detected to be normal, detonator explosive is quantitatively filled into the blast hole;
s5: after the detonator explosive is filled, a technical worker is responsible for detonating after all workers enter an absolute safe area, and the site is cleaned after the explosion is finished;
s6: leveling out an operation field of a drilling machine in a construction section;
s7: transporting excavating equipment and conveying equipment to the field, and erecting an excavating frame on a flat operation field;
s8: synchronously excavating the rock walls of the construction section after the upper and lower steps are blasted by an excavator, and conveying the excavated slag out of the tunnel construction section by utilizing a loader in combination with a self-dumping car;
s9: uniformly spraying concrete on the excavated tunnel rock wall, and forming a layer of fixed lining plate on the surface layer of the rock wall to prevent the soil layer at the top of the tunnel from falling or collapsing;
s10: and after the construction of the blasting planning section is finished, repeating the steps S1-S9 again, and entering the next cycle of construction until the tunnel construction is completely finished.
Further, the step S1 further includes the following steps:
s101: checking the integrity of the host computer and the display equipment, starting up for commissioning, displaying a system for debugging the host computer after the system is normal, and setting system parameters of the host computer;
s102: checking the use condition of each peripheral interface arranged on the outer wall of the host computer shell, and eliminating the problems of poor contact and damage of the peripheral interfaces;
s103: installing an underground imager and setting and adjusting a system of the underground imager, connecting a host computer and the underground imager by utilizing an external interface and matching a data connecting line, wherein the host computer receives construction section soil layer structure data detected by the underground imager;
s104: installing an ultrasonic detector and setting and adjusting a system of the ultrasonic detector, connecting a host computer and the ultrasonic detector by utilizing a peripheral interface matched with a data connecting line, and receiving construction section soil layer structure data detected by the ultrasonic detector by the host computer;
s105: and the host computer performs calculation and analysis on the data detected by the underground imager and the ultrasonic detector to generate a construction section soil layer structure distribution diagram.
Further, before the step S105, a data cleaning stage is further included, and the specific steps are as follows:
step A1, acquiring data detected by the underground imager (4) and the ultrasonic detector (5) according to the following formula, graying the data, and judging interference data points in the data:
Figure DEST_PATH_IMAGE002
Figure DEST_PATH_IMAGE004
wherein,
Figure DEST_PATH_IMAGE006
representing the point of the annotation data,
Figure DEST_PATH_IMAGE008
which represents the value of the difference in the data,
Figure DEST_PATH_IMAGE010
representing data points to be judged after graying
Figure DEST_PATH_IMAGE012
The data value of each of the plurality of bits,
Figure DEST_PATH_IMAGE014
representative need to judgeIs the probability of an interfering data point,
Figure DEST_PATH_IMAGE016
representing data points to be judged after graying
Figure DEST_PATH_IMAGE018
The data value of each of the plurality of bits,
Figure DEST_PATH_IMAGE020
if, if
Figure DEST_PATH_IMAGE022
Representing an interference data point and labeling the data point;
step A2, dynamically sensing interference data points, and after the initial interference data points are identified, firstly acquiring dynamic standard data points and dynamic data difference values during real-time sensing according to the interference data points during the real-time acquisition during the dynamic sensing;
Figure DEST_PATH_IMAGE024
Figure DEST_PATH_IMAGE026
wherein,
Figure DEST_PATH_IMAGE028
representing the initial dynamic standard data point of the data point to be judged in dynamic sensing,
Figure DEST_PATH_IMAGE030
data points representing the data points to be judged are in
Figure DEST_PATH_IMAGE032
The dynamic standard data points at the time of the sub-dynamic sensing,
Figure DEST_PATH_IMAGE034
is represented as
Figure DEST_PATH_IMAGE036
The data value of the data point to be judged after the acquired data is grayed,
Figure DEST_PATH_IMAGE038
data points representing the data points to be judged are in
Figure DEST_PATH_IMAGE036A
The dynamic standard data points at the time of the sub-dynamic sensing,
Figure 100002_DEST_PATH_IMAGE040
represents a predetermined time coefficient of
Figure 100002_DEST_PATH_IMAGE042
The stronger the value in between, the time information,
Figure 100002_DEST_PATH_IMAGE040A
the larger the preset value is,
Figure 100002_DEST_PATH_IMAGE044
representing the initial dynamic data difference value of the data point to be judged during dynamic monitoring,
Figure DEST_PATH_IMAGE046
data points representing the data points to be judged are in
Figure DEST_PATH_IMAGE032A
The dynamic data difference value in the secondary dynamic sensing,
Figure DEST_PATH_IMAGE048
represents the first
Figure DEST_PATH_IMAGE036AA
The dynamic data difference value in the secondary dynamic sensing,
Figure 100002_DEST_PATH_IMAGE050
represents the first
Figure DEST_PATH_IMAGE032AA
The data value of the data point which needs to be judged after the obtained data is grayed;
step a3, determining whether the data point is an interference data point according to the following formula:
Figure 100002_DEST_PATH_IMAGE052
wherein,
Figure DEST_PATH_IMAGE054
representing a preset judgment coefficient, wherein the preset value is any value between 3 and 4, and if the data point needing to be judged is in the first place
Figure DEST_PATH_IMAGE036AAA
The data point which is required to be judged is in the first place when the secondary dynamic induction meets the formula
Figure DEST_PATH_IMAGE036AAAA
Marking interference data points during secondary dynamic induction;
and A4, judging whether all data points of the acquired data are interference data points or not by utilizing the step A3, labeling all the interference data points, modifying the interference data points into the average value of the data points around the neighborhood of the interference data points, and finishing the removal of the interference data points to obtain the data after data cleaning.
Further, the step S2 further includes the following steps:
s201: respectively calculating the depths of each blast hole, the peripheral holes and the auxiliary holes according to actual data;
s202: forming a cut hole in an inclined-hole wedge-shaped cut mode;
s203: and arranging holes, namely arranging blast holes, peripheral holes and auxiliary holes in an accurate positioning manner according to the blasting plan.
Further, the depth of the blasthole can be determined by utilizing the utilization rate of the blasthole and the planned cycle footage, the determined depth should be matched with the adaptive slag tapping capacity, each work class finishes integer cycle, and the depth of the blasthole is calculated according to the formula: l = L/n
In the formula: l is the depth of the blast hole; l is the planned footage for each tunnelling cycle; and n is the utilization rate of the blast hole, and the value is more than 0.85. Peripheral eye and auxiliary eye depth: the V-level surrounding rock is 0.8-1.0m, and the cutting holes and the bottom plate holes are deepened by 20-30 cm.
Furthermore, the detonation sequence of the blast hole is a cut hole, an auxiliary hole, a peripheral hole and a bottom plate hole, and the explosive loading amount can be increased when the bottom plate hole is charged.
Further, the step S4 further includes the following steps:
s401: calculating the explosive loading of the detonator in each blast hole;
s402: cleaning each arranged blast hole to prevent rock slag from falling into the blast hole along with the charge;
s403: quantitatively filling detonator explosives into each blast hole;
s404: directly filling detonator explosive into the blast hole when the inside of the blast hole is dry and anhydrous;
s405: when the inside of the blast hole is wet with water, the water in the blast hole is discharged and then the detonator explosive is wrapped by the oilcloth for filling;
s406: after detonator explosive is quantitatively filled in each blast hole, the upper end of the detonator explosive is plugged by using stemming, wherein the stemming is a mixture of clay and fine sand, and the ratio of the clay to the fine sand is 2: 1, the length of the shallow hole plug is 20 cm.
Compared with the prior art, the invention has the following beneficial effects:
1. the invention provides an accurate blasting method for micro-step full-section construction, which is characterized in that an underground imager and an ultrasonic detector are firstly utilized to detect a soil layer distribution structure of a blasting construction section, data information of the soil layer distribution structure is transmitted to a computer host, the computer host generates a soil layer structure distribution diagram through comparison and analysis, and the structure composition of a soil layer of the blasting section can be clearly known through the soil layer structure distribution diagram, so that a shallow underground river and a soft foundation soil layer section are avoided during blasting, the accident risk and unnecessary trouble during blasting construction are avoided, and the method is convenient and practical.
2. According to the micro-step full-section construction accurate blasting method provided by the invention, the computer host contrasts and analyzes the soil layer structure distribution diagram, so that the specific size and position of the blast hole can be vividly and specifically planned, the blasting effect of the detonator explosive is fully utilized, the optimal blast hole arrangement scheme is planned, and the blasting quality and effect during construction are improved.
3. According to the micro-step full-section construction accurate blasting method provided by the invention, a computer establishes a mathematical model by using data such as a quantitative theory, construction parameters, a blasting scale and a blasting mode, the mathematical model is used for realizing fine control of blasting by comprehensive calculation and analysis, a judgment result is accurately given through numerical analysis simulation, and effective control on the blasting excavation effect and the harmful effect generated by blasting can be realized.
Drawings
FIG. 1 is an overall flow chart of the micro-step full-section construction precision blasting method of the invention;
FIG. 2 is a block diagram of soil texture survey of the micro-step full-section construction precision blasting method of the invention;
FIG. 3 is a schematic diagram of an implementation method of step S2 of the method for precise blasting of micro-step full-section construction according to the present invention;
FIG. 4 is a schematic diagram of an implementation method of step S4 of the micro-step full-section construction precision blasting method of the invention;
fig. 5 is a table diagram illustrating the charging coefficient alpha value of the micro-step full-section construction precision blasting method of the invention.
In the figure: 1. a host computer; 2. a display device; 3. a peripheral interface; 4. an underground imager; 5. an ultrasonic detector.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example one
Referring to fig. 1, a method for precise blasting of micro-step full-section construction, which uses a computing device, includes the following steps:
s1: and surveying the geology of the construction operation land by using the exploration equipment, and drawing a construction section soil layer structure distribution diagram.
S2: and planning, arranging and blasting according to the construction section soil layer structure distribution diagram drawn in the S1, performing construction measurement punching on the upper and lower steps of the construction section, and planning the difference of the detonation section.
S3: after the blast hole is drilled, a field technician checks the drilling condition of the blast hole and carries out technical confirmation on the blast hole, so that the drilling error of the blast hole is kept within the range of 0.1-0.5 mm.
S4: and after the blast hole is detected to be normal, the detonator explosive is quantitatively filled into the blast hole.
S5: after the detonator explosive is filled, a technical worker is responsible for detonating after all workers enter an absolute safe area, and the site is cleaned after the explosion is finished.
S6: and leveling out an operation site of the drilling machine in the construction section.
S7: and transporting the excavating equipment and the conveying equipment to the field, and erecting an excavating frame on the flat operation field.
S8: and synchronously excavating the rock walls of the upper and lower steps of the construction section after blasting by using an excavator, and conveying the excavated slag out of the tunnel construction section by using a loader in combination with a self-dumping car.
S9: concrete is uniformly sprayed on the excavated tunnel rock wall, and a layer of fixed lining plate is formed on the surface layer of the rock wall, so that the soil layer on the top of the tunnel is prevented from falling or collapsing.
S10: and after the construction of the blasting planning section is finished, repeating the steps S1-S9 again, and entering the next cycle of construction until the tunnel construction is completely finished.
Example two
Referring to fig. 2, a method for precise blasting of micro-step full-section construction, step S1, further includes the following steps:
s101: checking the health condition of the host computer 1 and the display equipment 2, starting up for commissioning, displaying the system for debugging the host computer 1 after normal operation, and setting the system parameters of the host computer 1.
S102: the use condition of each peripheral interface 3 arranged on the outer wall of the shell of the host computer 1 is checked, and the problems of poor contact and damage of the peripheral interfaces 3 are solved.
S103: the underground imager 4 is installed and the system is set and adjusted, the peripheral interface 3 is matched with the data connecting line to be connected with the host computer 1 and the underground imager 4, and the host computer 1 receives the soil layer structure data of the construction section detected by the underground imager 4.
S104: the ultrasonic detector 5 is installed and the system is set and adjusted, the peripheral interface 3 is matched with a data connecting line to be connected with the host computer 1 and the ultrasonic detector 5, and the host computer 1 receives the soil structure data of the construction section detected by the ultrasonic detector 5.
S105: host computer 1 carries out computational analysis to the data that underground imaging appearance 4 and ultrasonic detector 5 detected, generate construction section soil structure distribution diagram, the structure of understanding blasting section soil layer that can be clear through soil structure distribution diagram constitutes, so as to avoid shallower underground river and soft basic soil layer section during the blasting, thereby accident risk and unnecessary when avoiding blasting construction are troublesome, convenient and practical, computer 1 contrasts analysis soil structure distribution diagram, concrete size and position of specific planning porthole that can be vivid, make full use of detonator explosive's explosion effect, plan out the optimal porthole and arrange the scheme, blasting quality and effect when improving the construction.
Before step S105, a data cleaning stage is further included, and the specific steps are as follows:
step A1, acquiring data detected by the underground imager (4) and the ultrasonic detector (5) according to the following formula, graying the data, and judging interference data points in the data:
Figure 100002_DEST_PATH_IMAGE002A
Figure 100002_DEST_PATH_IMAGE004A
wherein,
Figure 100002_DEST_PATH_IMAGE006A
representing the point of the annotation data,
Figure 100002_DEST_PATH_IMAGE008A
which represents the value of the difference in the data,
Figure 100002_DEST_PATH_IMAGE010A
representing data points to be judged after graying
Figure 100002_DEST_PATH_IMAGE012A
The data value of the one or more of the plurality of the data elements,
Figure 100002_DEST_PATH_IMAGE014A
representing the probability that the data point to be judged is an interfering data point,
Figure 100002_DEST_PATH_IMAGE016A
representing data points to be judged after graying
Figure 100002_DEST_PATH_IMAGE018A
The data value of each of the plurality of bits,
Figure 100002_DEST_PATH_IMAGE020A
if, if
Figure 100002_DEST_PATH_IMAGE022A
Representing an interference data point and labeling the data point;
step A2, dynamically sensing interference data points, and after the initial interference data points are identified, firstly acquiring dynamic standard data points and dynamic data difference values during real-time sensing according to the interference data points during the real-time acquisition during the dynamic sensing;
Figure 100002_DEST_PATH_IMAGE024A
Figure 100002_DEST_PATH_IMAGE026A
wherein,
Figure 100002_DEST_PATH_IMAGE028A
representing the initial dynamic standard data point of the data point to be judged in dynamic sensing,
Figure 100002_DEST_PATH_IMAGE030A
data points representing the data points to be judged are in
Figure 100002_DEST_PATH_IMAGE032AAA
The dynamic standard data points at the time of the sub-dynamic sensing,
Figure 100002_DEST_PATH_IMAGE034A
is represented as
Figure 100002_DEST_PATH_IMAGE036_5A
The data value of the data point to be judged after the acquired data is grayed,
Figure 100002_DEST_PATH_IMAGE038A
data points representing the data points to be judged are in
Figure 100002_DEST_PATH_IMAGE036_6A
The dynamic standard data points at the time of the sub-dynamic sensing,
Figure DEST_PATH_IMAGE040AA
represents a predetermined time coefficient of
Figure DEST_PATH_IMAGE042A
The stronger the value in between, the time information,
Figure DEST_PATH_IMAGE040AAA
the larger the preset value is,
Figure DEST_PATH_IMAGE044A
representing the initial dynamic data difference value of the data point to be judged during dynamic monitoring,
Figure 100002_DEST_PATH_IMAGE046A
data points representing the data points to be judged are in
Figure DEST_PATH_IMAGE032AAAA
The dynamic data difference value in the secondary dynamic sensing,
Figure 100002_DEST_PATH_IMAGE048A
represents the first
Figure 100002_DEST_PATH_IMAGE036_7A
The dynamic data difference value in the secondary dynamic sensing,
Figure DEST_PATH_IMAGE050A
represents the first
Figure DEST_PATH_IMAGE032_5A
The data value of the data point which needs to be judged after the obtained data is grayed;
step a3, determining whether the data point is an interference data point according to the following formula:
Figure DEST_PATH_IMAGE052A
wherein,
Figure 100002_DEST_PATH_IMAGE054A
representing a preset judgment coefficient, wherein the preset value is any value between 3 and 4, and if the data point needing to be judged is in the first place
Figure DEST_PATH_IMAGE036_8A
The data point which is required to be judged is in the first place when the secondary dynamic induction meets the formula
Figure DEST_PATH_IMAGE036_9A
Marking interference data points during secondary dynamic induction;
and step A4, judging whether all data points of the acquired data are interference data points or not by using the step A3, labeling all the interference data points, modifying the interference data points into the average value of the data points around the neighborhood of the interference data points, and removing the interference data points to obtain the data after data cleaning.
Has the advantages that: by the aid of the technology, interference factors in data detected by the underground imager and the ultrasonic detector can be identified and labeled, so that the data can be subjected to a data cleaning stage to remove interference data points, later-stage calculation and analysis caused by the interference data points are avoided, the structural distribution diagram of the soil layer at the construction section is generated inaccurately, the interference data points are replaced by the mean value of the neighborhood of the interference data points, cleaned data are obtained, and later-stage calculation and analysis capacity is improved.
EXAMPLE III
Referring to fig. 3, a method for precise blasting of micro-step full-section construction, step S2 further includes the following steps:
s201: and respectively calculating the depths of each blasthole, the peripheral holes and the auxiliary holes according to the actual data.
S202: the cutting holes are formed in an inclined-hole wedge-shaped cutting mode.
S203: and arranging holes, namely arranging blast holes, peripheral holes and auxiliary holes in an accurate positioning manner according to the blasting plan.
The depth of the blast hole can be determined by utilizing the utilization rate of the blast hole and the planned circulating footage, the determined depth should be matched with the adaptive slag tapping capability, so that each work class finishes integer circulation, and the depth of the blast hole is calculated according to the formula: l = L/n
In the formula: l is the depth of the blast hole; l is the planned footage for each tunnelling cycle; and n is the utilization rate of the blast hole, and the value is more than 0.85. Peripheral eye and auxiliary eye depth: the V-level surrounding rock is 0.8-1.0m, and the cutting holes and the bottom plate holes are deepened by 20-30 cm.
The detonating sequence of the blast hole is a cut hole, an auxiliary hole, a peripheral hole and a bottom plate hole, and the charge amount can be increased when the charge work of the bottom plate hole is carried out.
Example four
Referring to fig. 4-5, a method for precise blasting of micro-step full-section construction, step S4, further includes the following steps:
s401: and calculating the explosive loading of the detonator in each blast hole.
S402: and cleaning each arranged blast hole to prevent rock slag from falling into the blast hole along with the charge.
S403: and (4) quantitatively filling detonator explosives into each blast hole.
S404: when the inside of the blast hole is dry and anhydrous, detonator explosive is directly filled into the blast hole.
S405: when water is wet inside the blasthole, the water inside the blasthole is discharged and then the detonator explosive is wrapped by the oilcloth for filling.
S406: after detonator explosive is quantitatively filled in each blast hole, the upper end of the detonator explosive is plugged by using stemming, wherein the stemming is a mixture of clay and fine sand, and the ratio of the clay to the fine sand is 2: 1, the length of the shallow hole plug is 20 cm.
In summary, the following steps: the invention provides an accurate blasting method for micro-step full-section construction, which comprises the steps of firstly utilizing an underground imager 4 and an ultrasonic detector 5 to detect a soil layer distribution structure of a blasting construction section, transmitting data information of the soil layer distribution structure to a computer host 1, generating a soil layer structure distribution diagram through the comparison and analysis of the computer host 1, and clearly knowing the structure composition of a soil layer of the blasting section through the soil layer structure distribution diagram so as to avoid a shallow underground river and a soft foundation soil layer section during blasting, thereby avoiding accident risk and unnecessary trouble during blasting construction, and being convenient and practical; the computer host 1 contrasts and analyzes the soil layer structure distribution diagram, can vividly and specifically plan the specific size and position of the blast hole, make full use of the explosive effect of the detonator, plan out the optimal blast hole arrangement scheme, improve blasting quality and effect while constructing; the computer host 1 establishes a mathematical model by using data such as a quantitative theory, construction parameters, blasting scale, a blasting mode and the like, realizes fine control of blasting by using comprehensive calculation analysis of the mathematical model, gives a judgment result accurately by numerical analysis simulation, and can realize effective control of blasting excavation effect and harmful effect generated by blasting.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. A micro-step full-section construction accurate blasting method adopts a computing device and comprises the following steps:
s1: surveying the geology of the construction operation land by using exploration equipment, and drawing a construction section soil layer structure distribution map;
s2: planning, arranging and blasting according to the construction section soil layer structure distribution diagram drawn in the S1, performing construction measurement punching on the upper step and the lower step of the construction section, and planning the difference of the detonation section;
s3: after the blast hole is drilled, a field technician checks the drilling condition of the blast hole and carries out technical confirmation on the blast hole, so as to ensure that the drilling error of the blast hole is kept within the range of 0.1-0.5 mm;
s4: after the blast hole is detected to be normal, detonator explosive is quantitatively filled into the blast hole;
s5: after the detonator explosive is filled, a technical worker is responsible for detonating after all workers enter an absolute safe area, and the site is cleaned after the explosion is finished;
s6: leveling out an operation field of a drilling machine in a construction section;
s7: transporting excavating equipment and conveying equipment to the field, and erecting an excavating frame on a flat operation field;
s8: synchronously excavating the rock walls of the construction section after the upper and lower steps are blasted by an excavator, and conveying the excavated slag out of the tunnel construction section by utilizing a loader in combination with a self-dumping car;
s9: uniformly spraying concrete on the excavated tunnel rock wall, and forming a layer of fixed lining plate on the surface layer of the rock wall to prevent the soil layer at the top of the tunnel from falling or collapsing;
s10: after the construction of the blasting planning section is finished, repeating the steps S1-S9 again, and entering the next cycle of construction until the tunnel construction is completely finished;
the step S1 further includes the steps of:
s101: checking the integrity of the host computer (1) and the display equipment (2), starting up for commissioning, displaying a system for debugging the host computer (1) after normal operation, and setting system parameters of the host computer (1);
s102: checking the use condition of each peripheral interface (3) arranged on the outer wall of the shell of the host computer (1) and eliminating the problems of poor contact and damage of the peripheral interfaces (3);
s103: installing an underground imager (4) and setting and adjusting a system of the underground imager, connecting a host computer (1) and the underground imager (4) by using a peripheral interface (3) and a data connecting line, wherein the host computer (1) receives construction section soil layer structure data detected by the underground imager (4);
s104: installing an ultrasonic detector (5) and setting and adjusting a system of the ultrasonic detector, connecting a host computer (1) and the ultrasonic detector (5) by utilizing a peripheral interface (3) and matching a data connecting line, wherein the host computer (1) receives construction section soil layer structure data detected by the ultrasonic detector (5);
s105: the host computer (1) carries out calculation and analysis on data detected by the underground imager (4) and the ultrasonic detector (5) to generate a construction section soil structure distribution map;
before step S105, a data cleaning stage is further included, and the specific steps are as follows:
step A1, acquiring data detected by the underground imager (4) and the ultrasonic detector (5) according to the following formula, graying the data, and judging interference data points in the data:
Figure DEST_PATH_IMAGE002A
Figure DEST_PATH_IMAGE004A
wherein,
Figure DEST_PATH_IMAGE006A
representing the point of the annotation data,
Figure DEST_PATH_IMAGE008A
which represents the value of the difference in the data,
Figure DEST_PATH_IMAGE010A
representing data points to be judged after graying
Figure DEST_PATH_IMAGE012A
The data value of each of the plurality of bits,
Figure DEST_PATH_IMAGE014A
representing the probability that the data point to be judged is an interfering data point,
Figure DEST_PATH_IMAGE016A
representing data points to be judged after graying
Figure DEST_PATH_IMAGE018A
The data value of each of the plurality of bits,
Figure DEST_PATH_IMAGE020A
if, if
Figure DEST_PATH_IMAGE022A
Then representing the data point needing to be judged as an interference data point, and labeling the data point;
step A2, dynamically sensing interference data points, and after the initial interference data points are identified, firstly acquiring dynamic standard data points and dynamic data difference values during real-time sensing according to the interference data points during the real-time acquisition during the dynamic sensing;
Figure DEST_PATH_IMAGE024A
Figure DEST_PATH_IMAGE026A
wherein,
Figure DEST_PATH_IMAGE028A
representing the initial dynamic standard data point of the data point to be judged in dynamic sensing,
Figure DEST_PATH_IMAGE030A
data points representing the data points to be judged are in
Figure DEST_PATH_IMAGE032AAA
The dynamic standard data points at the time of the sub-dynamic sensing,
Figure DEST_PATH_IMAGE034A
is represented as
Figure DEST_PATH_IMAGE036_5A
The data value of the data point to be judged after the acquired data is grayed,
Figure DEST_PATH_IMAGE038A
data points representing the data points to be judged are in
Figure DEST_PATH_IMAGE036_6A
The dynamic standard data points at the time of the sub-dynamic sensing,
Figure DEST_PATH_IMAGE040
represents a predetermined time coefficient of
Figure DEST_PATH_IMAGE042
The stronger the value in between, the time information,
Figure DEST_PATH_IMAGE040A
the larger the preset value is,
Figure DEST_PATH_IMAGE044
representing the initial dynamic data difference value of the data point to be judged during dynamic monitoring,
Figure DEST_PATH_IMAGE046A
data points representing the data points to be judged are in
Figure DEST_PATH_IMAGE048A
The dynamic data difference value in the secondary dynamic sensing,
Figure DEST_PATH_IMAGE050
represents the first
Figure DEST_PATH_IMAGE036_7A
The dynamic data difference value in the secondary dynamic sensing,
Figure DEST_PATH_IMAGE052
represents the first
Figure DEST_PATH_IMAGE054A
The data value of the data point which needs to be judged after the obtained data is grayed;
step a3, determining whether the data point is an interference data point according to the following formula:
Figure DEST_PATH_IMAGE056
wherein,
Figure DEST_PATH_IMAGE058
representing a preset judgment coefficient, wherein the preset value is any value between 3 and 4, and if the data point needing to be judged is in the first place
Figure DEST_PATH_IMAGE060
The data point which is required to be judged is in the first place when the secondary dynamic induction meets the formula
Figure DEST_PATH_IMAGE060A
Marking interference data points during secondary dynamic induction;
and A4, judging whether all data points of the acquired data are interference data points or not by utilizing the step A3, labeling all the interference data points, modifying the interference data points into the average value of the data points around the neighborhood of the interference data points, and finishing the removal of the interference data points to obtain the data after data cleaning.
2. The micro-step full-section construction accurate blasting method according to claim 1, characterized in that: the step S2 further includes the steps of:
s201: respectively calculating the depths of each blast hole, the peripheral holes and the auxiliary holes according to actual data;
s202: forming a cut hole in an inclined-hole wedge-shaped cut mode;
s203: and arranging holes, namely arranging blast holes, peripheral holes and auxiliary holes in an accurate positioning manner according to the blasting plan.
3. The micro-step full-section construction accurate blasting method according to claim 2, characterized in that: the depth of the blast hole can be determined by utilizing the utilization rate of the blast hole and the planned cycle footage, the determined depth is matched with the adaptive slag discharge capacity, each work class finishes integer cycle, and the depth of the blast hole is calculated according to the formula that L = L/n
In the formula: l is the depth of the blast hole; l is the planned footage for each tunnelling cycle; n is the utilization rate of the blast hole, and the value is more than 0.85; peripheral eye and auxiliary eye depth: the V-level surrounding rock is 0.8-1.0m, and the cutting holes and the bottom plate holes are deepened by 20-30 cm.
4. The micro-step full-section construction accurate blasting method according to claim 2, characterized in that: the detonating sequence of the blast hole is a cut hole, an auxiliary hole, a peripheral hole and a bottom plate hole, and the explosive loading amount can be increased when the explosive loading work of the bottom plate hole is carried out.
5. The micro-step full-section construction accurate blasting method according to claim 1, characterized in that: the step S4 further includes the steps of:
s401: calculating the explosive loading of the detonator in each blast hole;
s402: cleaning each arranged blast hole to prevent rock slag from falling into the blast hole along with the charge;
s403: quantitatively filling detonator explosives into each blast hole;
s404: directly filling detonator explosive into the blast hole when the inside of the blast hole is dry and anhydrous;
s405: when the inside of the blast hole is wet with water, the water in the blast hole is discharged and then the detonator explosive is wrapped by the oilcloth for filling;
s406: after detonator explosive is quantitatively filled in each blast hole, the upper end of the detonator explosive is plugged by using stemming, wherein the stemming is a mixture of clay and fine sand, and the ratio of the clay to the fine sand is 2: 1, the length of the shallow hole plug is 20 cm.
CN202010590045.4A 2020-06-24 2020-06-24 Precise blasting method for micro-step full-section construction Active CN111664760B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010590045.4A CN111664760B (en) 2020-06-24 2020-06-24 Precise blasting method for micro-step full-section construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010590045.4A CN111664760B (en) 2020-06-24 2020-06-24 Precise blasting method for micro-step full-section construction

Publications (2)

Publication Number Publication Date
CN111664760A CN111664760A (en) 2020-09-15
CN111664760B true CN111664760B (en) 2022-05-20

Family

ID=72389689

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010590045.4A Active CN111664760B (en) 2020-06-24 2020-06-24 Precise blasting method for micro-step full-section construction

Country Status (1)

Country Link
CN (1) CN111664760B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112324424B (en) * 2020-10-21 2023-07-18 高军 Detection method and device for detecting karst geological virtual instrument by Rayleigh waves
CN117993053B (en) * 2023-12-28 2024-07-12 中交第二航务工程局有限公司 Cable-stayed bridge main tower section lofting system and lofting method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110097133A (en) * 2019-05-09 2019-08-06 中铁工程服务有限公司 A kind of preprocess method for shield machine big data
CN110930008A (en) * 2019-11-15 2020-03-27 中国矿业大学 Mine disaster event detection method based on convolutional neural network

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105571415B (en) * 2015-12-29 2017-03-22 重庆大学 Precise control method for smooth surface blasting of fractured rock mass of highway tunnel
CN107589471B (en) * 2017-07-13 2019-05-07 高军 A kind of Railway Tunnel Synthetic Geological Prediction Ahead of Construction method
JP6810665B2 (en) * 2017-07-21 2021-01-06 鹿島建設株式会社 Blasting method and construction management system
CN110487138B (en) * 2019-09-16 2022-04-15 中国十九冶集团有限公司 Full-section smooth blasting construction method for high-altitude small-section long steep slope tunnel
CN111259095A (en) * 2020-01-08 2020-06-09 京工博创(北京)科技有限公司 Method, device and equipment for calculating boundary of ore rock

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110097133A (en) * 2019-05-09 2019-08-06 中铁工程服务有限公司 A kind of preprocess method for shield machine big data
CN110930008A (en) * 2019-11-15 2020-03-27 中国矿业大学 Mine disaster event detection method based on convolutional neural network

Also Published As

Publication number Publication date
CN111664760A (en) 2020-09-15

Similar Documents

Publication Publication Date Title
CN106524844B (en) Boulder reconnoitres the construction method with explosion treatment along a kind of shield tunnel
CN111750822B (en) Coal mining induced overlying strata and surface subsidence collaborative dynamic prediction method
CN111664760B (en) Precise blasting method for micro-step full-section construction
CN108930539A (en) A method of it is controlled based on BIM Tunnel Overbreak & Underbreak
CN104390537A (en) Method for controlling damage of slope pre-splitting blasting digging based on blast vibration test
CN104089551B (en) Old lock directional inclination collapses demolition blasting construction method
CN102071940A (en) Construction method for mine shaft through multilayer goaf
CN104748632A (en) Underwater rock plug blasting construction method
CN110006300B (en) Blasting excavation method for soft rock and large-inclination-angle tunnel anchor digital detonator
CN109252868A (en) Hard-soft heterogeneous ground shield-tunneling construction boulder and basement rock protrusion processing method
CN108489601A (en) Blasting vibration monitoring and control method for tunnel passing through underground pipeline in short distance
CN106288987A (en) A kind of small interval top-bottom cross constructing tunnel engineering method
CN108757043A (en) One kind is for the anti-method of harnessing the river of getting working face
CN116289969A (en) Deep foundation pit support structure secant pile anti-seepage construction method based on sonar detection technology
CN113846618A (en) Dynamic compaction replacement reinforcing method for foundation treatment
CN117556687A (en) Tunnel blasting parameter determination method, system, electronic equipment and medium
CN112432566A (en) Full-section rapid excavation method for large-section tunnel
CN110295848B (en) Blast hole bottom leveling drilling method
CN110553557A (en) Rocky cutting blasting construction method
CN110952988A (en) Method for treating boulder outside reinforced area
CN102071925B (en) Method for tracking, positioning, quantifying and rectifying coordinate of reversed pendulum hole
Li et al. Study on influence of key blasthole parameters on tunnel overbreak
CN204571844U (en) A kind of air drill reaming bit being applicable to underwater rock plug burst construction
CN111692932A (en) Rotary excavating drilling internal auxiliary blasting construction technology for rock-socketed pile foundation
CN104747084A (en) Pneumatic drill reamer bit suitable for underwater rock plug blasting construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant