CN111622571B - Construction method for pouring reserved plate joint bars on cyclone well pool wall and cantilever plate in stages - Google Patents

Construction method for pouring reserved plate joint bars on cyclone well pool wall and cantilever plate in stages Download PDF

Info

Publication number
CN111622571B
CN111622571B CN202010318342.3A CN202010318342A CN111622571B CN 111622571 B CN111622571 B CN 111622571B CN 202010318342 A CN202010318342 A CN 202010318342A CN 111622571 B CN111622571 B CN 111622571B
Authority
CN
China
Prior art keywords
plate
bars
wall
pool wall
steel bars
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010318342.3A
Other languages
Chinese (zh)
Other versions
CN111622571A (en
Inventor
王丽文
韩亿宏
乔林春
陈永强
李斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd, Shanghai Ershiye Construction Co Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN202010318342.3A priority Critical patent/CN111622571B/en
Publication of CN111622571A publication Critical patent/CN111622571A/en
Application granted granted Critical
Publication of CN111622571B publication Critical patent/CN111622571B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/02Containers for fluids or gases; Supports therefor
    • E04H7/18Containers for fluids or gases; Supports therefor mainly of concrete, e.g. reinforced concrete, or other stone-like material
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention provides a construction method for pouring reserved plate joint bars by stages for a whirlwind well open caisson pool wall and a cantilever plate. Compared with the traditional method, the invention shortens the mounting and dismounting period of the template worker, ensures the construction quality of the reserved plate dowel, improves the labor productivity, reduces the engineering cost and improves the engineering quality.

Description

Construction method for pouring reserved plate joint bars on cyclone well pool wall and cantilever plate in stages
Technical Field
The invention belongs to the field of construction of a cyclone well open caisson, and particularly relates to a construction method for pouring reserved plate joint bars by stages on a cyclone well pool wall and a cantilever plate.
Background
In the existing traditional construction technology, the construction method for reserving the dowel bars by the platform plate of the pool wall overhanging structure in the construction of the sunk well of the cyclone well is as follows: and reserving the joint bars according to the corresponding holes in the joint bar position template when the template is installed after the installation of the joint bars and the reserved joint bars of the pool wall steel bars and the cantilever beam plate is completed, reserving the joint bars, and planting the joint bars on the steel bars of the pool wall pouring completed back plate. The traditional construction method has the disadvantages that the formwork is provided with holes during the manufacturing of the formwork of the pool wall, the workload of woodworkers is increased, the joint bars reserved in the installation of the formwork correspond to the positions of the holes of the formwork, and the installation and removal operation time of the woodworkers is increased due to the dense space between the joint bars of the formwork; secondly, the plate bar is embedded with bars after the pouring of the pool wall is finished, and the quality factors of the embedded bars are influenced more (construction quality of bar embedding personnel, hole cleaning quality, bar embedding glue quality and the like). Therefore, a construction method for pouring the reserved plate dowel bars by stages on the wall of the whirlwind well pool and the cantilever plate is needed, which can reduce the working time of installing and dismantling the templates, improve the labor productivity and ensure the construction quality of the reserved dowel bars.
Disclosure of Invention
The invention aims to solve the technical problem of providing a construction method for pouring the dowel bars of the reserved plates by stages on the wall of the whirlwind well pool and the cantilever plates, which can reduce the working time of installing and dismantling templates, improve the labor productivity and ensure the construction quality of the dowel bars.
The technical scheme adopted by the invention for solving the technical problem is as follows: a construction method for pouring reserved plate joint bars on the wall of a cyclone well and a cantilever plate in stages comprises the following steps:
step 1, after the tank wall inner steel bars and the tank wall outer steel bars of the open caisson of the cyclone well are positioned and installed, the plate joint bars are bent in the same direction, the positions of the cantilever plate and the plate joint bars are positioned according to a design drawing, a plurality of plate joint bars are arranged along the inner wall of the tank wall in a staggered mode from one end of the position of the cantilever plate, the bent parts of the two ends of the plate joint bars are respectively arranged at the positions of the tank wall inner steel bars and the tank wall outer steel bars, the plate joint bars are located within the thickness range of the cantilever plate, and the bent parts of the plate joint bars at the positions of the tank wall inner steel bars and the tank wall outer steel bars are bound into a whole and are bound and fixed with the main steel bars of the tank wall inner steel bars and the tank wall outer steel bars;
step 2, installing the formwork after the installation of the steel bars on the inner side of the pool wall, the steel bars on the outer side of the pool wall and the plate inserting bars is finished, and pouring concrete on the pool wall after the installation of the formwork is finished;
and 3, removing the side die of the pool wall after the strength of the concrete of the pool wall reaches 30%, chiseling according to the position of the inserted steel bars of the positioning plate and the thickness range of the cantilever plate according to design drawings, chiseling the inserted steel bars of the plate in the chiseling process, correcting the inserted steel bars of the plate and welding or binding and connecting the inserted steel bars of the plate and the cantilever plate steel bars during construction of the cantilever plate.
Further, in the step 3, the chiseling thickness of the chiseling is the thickness of the pool wall steel bar protection layer.
Further, in the step 1, the bending length of the plate joint bar on the reinforcing steel bar at the inner side of the pool wall is greater than that of the reinforcing steel bar at the outer side of the pool wall.
Further, in step 1, the distance between the two bends of the plate joint bar is equal to the thickness of the pool wall.
Further, in the step 2, the steel bars on the inner side of the pool wall, the steel bars on the outer side of the pool wall and the plate inserting bars are installed and accepted, then the templates are installed, and the concrete pouring of the pool wall is performed after the templates are installed and accepted.
Further, in the step 1, the length and the anchoring form of the plate joint bar are set according to drawings and specifications.
According to the construction method, the construction process that the position of the construction joint needs to be roughened when the open caisson pool wall and the inner cantilever plate of the cyclone well are poured in stages and the pool wall is built after the plate inserted ribs are installed and bent in a space with thicker protective layer of the pool wall, and the method that the plate inserted ribs are chiseled out and corrected when the construction joint is chiseled out is utilized, the installation and dismantling period of a template worker is shortened, the construction quality of reserved plate inserted ribs is guaranteed, the labor productivity is improved, the engineering cost is reduced, and the engineering quality is improved.
Drawings
FIG. 1 is a schematic cross-sectional view of a cell wall according to the present invention;
FIG. 2 is a schematic plan view of the plate grid of the present invention;
fig. 3 is a schematic view of the bent plate bar according to the present invention.
1. Cantilever plate, 2, plate dowel bar, 3, pool wall reinforcing steel bar protective layer, 4, pool wall inner side reinforcing steel bar, 5, pool wall outer side reinforcing steel bar.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1 to 3, the present embodiment includes a construction method for pouring the dowel bars of the reserved plates in stages on the wall of the cyclone well and the cantilever plate, and includes the following steps:
step 1, after the tank wall inner side steel bars 4 and the tank wall outer side steel bars 5 of the sunk well of the cyclone well are positioned and installed, the plate inserting bars 2 are installed and bent in the same direction, one bending is long, and the distance between the two bends is equal to the thickness of the tank wall. Positioning the positions of an overhanging plate 1 and plate joint bars 2 according to a design drawing, and arranging a plurality of plate joint bars 2 along the inner wall of the pool wall in a staggered manner from one end of the position of the overhanging plate 1, wherein the longer bent end of each plate joint bar 2 is arranged at a steel bar 4 at the inner side of the pool wall, the shorter bent end is arranged at a steel bar 5 at the outer side of the pool wall, the plate joint bars 2 are all positioned in the thickness range of the overhanging plate 1, and the bent parts of the plate joint bars 2 at the steel bars at the inner side and the outer side of the pool wall are bound into a whole and are bound and fixed with the main bars of the steel bars 4 at the inner side of the pool wall and the steel bars 5 at the outer side of the pool wall; the length and the anchoring form of the plate joint bar 2 are set according to drawings and specifications;
step 2, after the installation of the steel bars 4 on the inner side of the pool wall, the steel bars 5 on the outer side of the pool wall and the plate joint bars 2 is finished, the installation of the templates is carried out after the acceptance is qualified, and the concreting of the pool wall is carried out after the installation of the templates is finished and the acceptance is qualified;
and 3, removing the side die of the pool wall after the strength of the concrete of the pool wall reaches 30%, chiseling according to the position of the inserted steel bar 2 of the positioning plate and the thickness range of the cantilever plate 1 according to design drawings, chiseling the inserted steel bar according to the thickness of a steel bar protective layer 3 of the pool wall, chiseling the inserted steel bar 2 in the chiseling process, correcting the inserted steel bar 2 of the cantilever plate 1 during construction of the cantilever plate 1, and welding or binding and connecting the inserted steel bar 2 with the inserted steel bar of the cantilever plate 1.

Claims (6)

1. A construction method for pouring reserved plate joint bars on the wall of a cyclone well and a cantilever plate in stages is characterized by comprising the following steps:
step 1, after the tank wall inner side steel bars (4) and the tank wall outer side steel bars (5) of the open caisson of the cyclone well are positioned and installed, the positions of an overhanging plate (1) and plate inserting bars (2) are positioned according to a design drawing, a plurality of plate inserting bars (2) are arranged along the tank wall inner wall in a staggered mode, the bent parts of the two ends of the plate inserting bars (2) are respectively arranged at the tank wall inner side steel bars (4) and the tank wall outer side steel bars (5) and fixed, the plate inserting bars (2) are located within the thickness range of the overhanging plate (1), the bent parts of the plate inserting bars (2) in the tank wall and at the outer side steel bars are bound into a whole and are bound and fixed with the main bars of the tank wall inner side steel bars (4) and the tank wall outer side steel bars (5);
step 2, installing a template after the installation of the steel bars (4) on the inner side of the pool wall, the steel bars (5) on the outer side of the pool wall and the plate inserting bars (2), and pouring concrete on the pool wall after the installation of the template is finished;
and 3, removing the side die of the pool wall after the concrete strength of the pool wall reaches 30%, positioning the positions of the plate insertion ribs (2) and the thickness range of the cantilever plate (1) according to design drawings, chiseling according to the requirements of construction joints, chiseling the plate insertion ribs (2) out in the chiseling process, correcting the plate insertion ribs (2) during construction of the cantilever plate (1), and welding or binding and connecting the plate insertion ribs (2) with the plate ribs of the cantilever plate (1).
2. The construction method for pouring the dowel of the reserved plate by stages for the cyclone well pool wall and the cantilever plate according to claim 1, wherein in the step 3, the chiseling thickness is the thickness of the steel bar protective layer (3) on the pool wall.
3. The construction method for pouring the reserved plate dowel bars between the cyclone well tank wall and the cantilever plate in stages according to claim 1, wherein in the step 1, the bending length of the plate dowel bars (2) arranged on the inner side steel bars (4) of the tank wall is greater than that of the outer side steel bars (5) of the tank wall.
4. The construction method for pouring the reserved plate dowel bars between the wall of the cyclone well and the cantilever plate in stages as claimed in claim 1, wherein in the step 1, the distance between two bends of the plate dowel bars (2) is equal to the thickness of the wall of the cyclone well.
5. The construction method for pouring the reserved plate dowel bars between the cyclone well pool wall and the cantilever plate in stages according to claim 1, wherein in the step 2, the inner side steel bars (4) of the pool wall, the outer side steel bars (5) of the pool wall and the plate dowel bars (2) are installed and accepted, then formwork installation is carried out, and the pool wall concrete pouring is carried out after the formwork installation and acceptance are qualified.
6. The construction method for pouring the reserved plate dowel bars between the wall of the cyclone well and the cantilever plate in stages as claimed in claim 1, wherein in the step 1, the length and the anchoring form of the plate dowel bars (2) are set according to drawings and specifications.
CN202010318342.3A 2020-04-21 2020-04-21 Construction method for pouring reserved plate joint bars on cyclone well pool wall and cantilever plate in stages Active CN111622571B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010318342.3A CN111622571B (en) 2020-04-21 2020-04-21 Construction method for pouring reserved plate joint bars on cyclone well pool wall and cantilever plate in stages

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010318342.3A CN111622571B (en) 2020-04-21 2020-04-21 Construction method for pouring reserved plate joint bars on cyclone well pool wall and cantilever plate in stages

Publications (2)

Publication Number Publication Date
CN111622571A CN111622571A (en) 2020-09-04
CN111622571B true CN111622571B (en) 2021-11-16

Family

ID=72268912

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010318342.3A Active CN111622571B (en) 2020-04-21 2020-04-21 Construction method for pouring reserved plate joint bars on cyclone well pool wall and cantilever plate in stages

Country Status (1)

Country Link
CN (1) CN111622571B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08120972A (en) * 1994-10-25 1996-05-14 Ishikawajima Constr Materials Co Ltd Segment for underground tank
CN101372872A (en) * 2008-10-20 2009-02-25 中冶实久建设有限公司 Method for implementing hot rolling swirl pool constructional engineering by top-down method
CN201351279Y (en) * 2009-01-07 2009-11-25 中冶天工建设有限公司 Circular deep foundation pit support
CN109113068A (en) * 2018-10-16 2019-01-01 中冶南方工程技术有限公司 A kind of inverse construction joint structure for building construction of deep basal pit
CN109403632A (en) * 2018-12-08 2019-03-01 上海宝冶集团有限公司 A kind of ground-connecting-wall crown beam and superstructure connection construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08120972A (en) * 1994-10-25 1996-05-14 Ishikawajima Constr Materials Co Ltd Segment for underground tank
CN101372872A (en) * 2008-10-20 2009-02-25 中冶实久建设有限公司 Method for implementing hot rolling swirl pool constructional engineering by top-down method
CN201351279Y (en) * 2009-01-07 2009-11-25 中冶天工建设有限公司 Circular deep foundation pit support
CN109113068A (en) * 2018-10-16 2019-01-01 中冶南方工程技术有限公司 A kind of inverse construction joint structure for building construction of deep basal pit
CN109403632A (en) * 2018-12-08 2019-03-01 上海宝冶集团有限公司 A kind of ground-connecting-wall crown beam and superstructure connection construction method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《冶金大型旋流池内衬结构逆作法施工技术》;张凤勇,王龙;《施工技术》;20130131;第42卷(第1期);全文 *
《旋流井施工方案》;百度文库;《https://wenku.***.com/view/643b33065527a5e9856a561252d380eb629423e1.html?fr=search-1-income6-psrec1&fixfr=3NDrjqwCLk%2B%2F74Es%2F0FfrA%3D%3D#》;20200405;全文 *
《钢筋剥肋滚轧直螺纹套筒连接技术在马钢新区热轧旋流池逆作施工中的应用》;袁恺枫;《安徽冶金科技职业学院学报》;20071031;第17卷(第4期);全文 *

Also Published As

Publication number Publication date
CN111622571A (en) 2020-09-04

Similar Documents

Publication Publication Date Title
CN110509396B (en) Laminated slab, laminated slab production equipment and laminated slab production method
CN110792164B (en) Transverse assembling device and method for assembled shear wall
CN111733873A (en) Construction method of assembled subway station
CN111622571B (en) Construction method for pouring reserved plate joint bars on cyclone well pool wall and cantilever plate in stages
CN105862912A (en) Construction method of protective walls of concrete antiskid piles
CN103321153A (en) Construction method for medium and small span trough girder bridge
CN209907737U (en) Reserved joint connecting steel bar connecting mechanism for staged construction of concrete structure
CN111456105B (en) Construction method of post-pouring belt of underground garage bottom plate
CN205915488U (en) Reserve door and window pouring mold
CN211200645U (en) Easy-to-detach template for cast-in-place reinforced concrete gutter inlet
CN214739890U (en) Steel form for concrete constructional column construction
KR200357642Y1 (en) Reinforcement structure of inconner panel
CN210459229U (en) Support assembled in deep basal pit and trade and prop construction frock
CN210459631U (en) Simple interface of prefabricated concrete structure wall
CN210421625U (en) Cast-in-place combination beam structure of assembled
CN115012423B (en) Waist beam pouring construction method and waist beam structure for foundation pit support
CN213859863U (en) Prefabricated coincide bottom plate side forms that can cyclic utilization
CN212836076U (en) Two-sided coincide wall windowsill
CN210798297U (en) Floor board connection structure is worn to crane span structure
CN210798045U (en) Prefabricated external wall panel of assembly type structure
CN210002879U (en) kinds of steel mould for water-stop tongue-and-groove of upstream face external wall
CN219158447U (en) Assembled wall body conversion layer dowel bar positioning steel plate
CN219794382U (en) Windowsill coping prefabricated building block
CN114934733B (en) Prefabricated windowsill construction structure and construction method thereof
CN219732277U (en) Shelve formula prefabrication owner, secondary beam construction connection structure

Legal Events

Date Code Title Description