CN111558493A CN202010435456.6A CN202010435456A CN111558493A CN 111558493 A CN111558493 A CN 111558493A CN 202010435456 A CN202010435456 A CN 202010435456A CN 111558493 A CN111558493 A CN 111558493A
Authority
CN
China
Prior art keywords
workpiece
fixedly connected
paint spraying
chain
conveyor belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010435456.6A
Other languages
Chinese (zh)
Other versions
CN111558493B (en
Inventor
李峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Jingfeng Construction Standardization Engineering Co ltd
Original Assignee
Hunan Jingfeng Construction Standardization Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Jingfeng Construction Standardization Engineering Co ltd filed Critical Hunan Jingfeng Construction Standardization Engineering Co ltd
Priority to CN202010435456.6A priority Critical patent/CN111558493B/en
Publication of CN111558493A publication Critical patent/CN111558493A/en
Application granted granted Critical
Publication of CN111558493B publication Critical patent/CN111558493B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/80Movable spray booths
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/0221Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work characterised by the means for moving or conveying the objects or other work, e.g. conveyor belts
    • B05B13/0264Overhead conveying means, i.e. the object or other work being suspended from the conveying means; Details thereof, e.g. hanging hooks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B16/00Spray booths
    • B05B16/90Spray booths comprising conveying means for moving objects or other work to be sprayed in and out of the booth, e.g. through the booth

Landscapes

  • Spray Control Apparatus (AREA)

Abstract

The invention relates to a temporary protective guard workpiece paint spraying line which comprises a support ring and a paint spraying chamber, wherein the support ring penetrates through the paint spraying chamber, a chain is connected to the support ring in a sliding manner, the chain is arranged along the circumferential direction of the support ring, a driving assembly for driving the chain to slide is arranged on the support ring, a plurality of hooks which are arranged at equal intervals are fixedly connected to the chain, each hook comprises a cross rod and a vertical rod, one end of each vertical rod is fixedly connected to the chain, the other end of each vertical rod is vertically and movably sleeved with the cross rod, the cross rod is used for penetrating through a through hole in a workpiece, one end of the cross rod penetrates through the vertical rod and is fixedly connected with an anti-falling block, one end, close; the utility model provides a interim rail guard work piece paint spraying line still includes the support, fixedly connected with cylinder on the support, and cylinder piston rod fixedly connected with is used for the fixed block of butt anticreep piece to remove with restriction anticreep piece. The invention has the effect of reducing the labor intensity of operators to a certain extent.

Description

Interim rail guard work piece line of spraying paint
Technical Field
The invention relates to the technical field of paint spraying, in particular to a temporary protective guard workpiece paint spraying line.
Background
Currently, in the production process of the temporary protective guard, workpieces of the temporary protective guard are generally required to be painted out and then assembled so as to prevent the temporary protective guard from rusting.
As shown in fig. 1, when manufacturing a guard rail, the guard rail has a large amount of workpieces 43, a fixing plate 44 is vertically and fixedly connected to a side wall of one end of each workpiece 43, and a through hole 45 is formed in each fixing plate 44; referring to fig. 2, in a painting process of a conventional protective guard workpiece 43, a circle of support ring 1 is generally installed on the ground, the support ring 1 is controlled to pass through a painting chamber 2, then a chain 6 is installed on the support ring 1, then a driving wheel 8 is installed on the support ring 1, the driving wheel 8 is engaged with the chain 6 through the driving wheel 8, then the driving wheel 8 is driven to rotate through a motor 9, so as to drive the chain 6 to rotate, meanwhile, a hook 11 is installed on the chain 6, and then the workpiece 43 is hung on the hook 11.
The above prior art solutions have the following drawbacks: after the workpiece is painted, the workpiece is generally required to be manually taken down from the hook, the hook has a certain height, a worker generally needs to lift the hand to operate, and the workpiece is easy to fatigue when working for a long time.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide a temporary protective guard workpiece paint spraying line which has the advantage of reducing the labor intensity of operators to a certain extent.
The above object of the present invention is achieved by the following technical solutions:
a temporary protective guard workpiece paint spraying line comprises a support ring and a paint spraying chamber, wherein the support ring penetrates through the paint spraying chamber, the supporting ring is connected with a chain in a sliding way, the chain is arranged along the circumferential direction of the supporting ring, the supporting ring is provided with a driving component for driving the chain to slide, a plurality of hooks which are equidistantly arranged are fixedly connected on the chain and comprise cross rods and vertical rods, one end of the vertical rod is fixedly connected to the chain, the other end of the vertical rod is vertically and movably sleeved with the cross rod, the cross bar is used for penetrating through a through hole on a workpiece, one end of the cross bar penetrates through the vertical bar and is fixedly connected with an anti-falling block, one end, close to the anti-falling block, of the cross rod is sleeved and fixedly connected with a first spring, one end, far away from the cross rod, of the first spring is fixedly connected to the vertical rod, and when the first spring is not deformed, the cross rod penetrates through the vertical rod and can be hung by a workpiece; the temporary protective guard workpiece paint spraying line further comprises a support, a cylinder is fixedly connected to the support, and a cylinder piston rod is fixedly connected with the fixed block used for abutting against the anti-falling block to limit the anti-falling block to move.
By adopting the technical scheme, after the workpiece is painted, when blanking is needed, the air cylinder is started to drive the fixing block to move until the fixing block abuts against the anti-falling block to limit the anti-falling block to move, at the moment, the vertical rod still moves due to the movement of the chain, the anti-falling block cannot move due to the limitation of the fixing block, and at the moment, the spring deforms, so that the vertical rod moves to push the workpiece out of the cross rod, the workpiece is separated from the cross rod, workers do not need to lift hands to take down the workpiece, and the labor intensity of operators is reduced to a certain extent; after the work piece breaks away from the horizontal pole, the horizontal pole also part is located the montant this moment, and the horizontal pole can not break away from the montant, closes the cylinder immediately this moment, and the fixed block breaks away from the anticreep piece, and the spring loses and stops, resumes deformation, releases the horizontal pole to take off next work piece.
The present invention in a preferred example may be further configured to: the temporary protective guard workpiece paint spraying line further comprises a first conveyor belt arranged below the support ring, and the first conveyor belt is used for receiving workpieces.
Through adopting above-mentioned technical scheme, the work piece that drops from the couple drops on conveyer belt one to collect the work piece.
The present invention in a preferred example may be further configured to: the two sides of one end, close to the support ring, of the first conveying belt are connected with push plates in a sliding mode along the width direction of the first conveying belt, and driving pieces used for driving the two push plates to be close to or far away from each other are arranged on the first conveying belt.
Through adopting above-mentioned technical scheme, the work piece drops on conveyer belt one, is close to each other through two push pedals of driving piece drive, and two push pedals of control are close to the work piece, and the focus is unstable and empty when preventing the work piece whereabouts to can avoid just having spouted the paint on the work piece of paint to a certain extent and drop.
The present invention in a preferred example may be further configured to: the driving piece is a bidirectional screw rod, the bidirectional screw rod is arranged along the sliding direction of the push plate, the bidirectional screw rod is rotatably connected to the first conveying belt, the two push plates are respectively in threaded connection to two sections of reverse thread lines of the bidirectional screw rod, the fixing block is provided with a transmission piece for driving the bidirectional screw rod to rotate, and the fixing block moves to drive the bidirectional screw rod to rotate.
Through adopting above-mentioned technical scheme, during the unloading, open the cylinder drive fixed block and remove, the fixed block removes and drives two-way lead screw through the driving medium and rotates, and two push pedal difference threaded connection are on two sections reverse thread lines of two-way lead screw to two-way lead screw rotates and can drive two push pedal mutual displacement, thereby realize through opening the cylinder that the work piece breaks away from can control two push pedals and be close to the work piece when the horizontal pole, thereby need not to set up solitary driving piece in addition, and guaranteed the continuity of step.
The present invention in a preferred example may be further configured to: the transmission part is a rack, the rack is fixedly connected to the fixing block along the moving direction of the fixing block, a gear is coaxially and fixedly connected to the bidirectional screw rod, and the rack is meshed with the gear.
By adopting the technical scheme, the fixed block drives the rack to move when moving, and the rack is meshed with the gear, so that the rack moves to drive the gear to rotate, and the bidirectional screw rod can be driven to rotate; the transmission part has good transmission effect and stable transmission.
The present invention in a preferred example may be further configured to: and a receiving hopper is arranged beside the discharge end of the first conveying belt.
Through adopting above-mentioned technical scheme, conveniently collect the work piece.
The present invention in a preferred example may be further configured to: and a guide plate is fixedly connected with the discharge end of one conveyor belt, and one end of the guide plate, which is far away from the first conveyor belt, extends into the receiving hopper.
Through adopting above-mentioned technical scheme, the work piece passes through conveyer belt one and removes to deflector position department, then drops in collecting the fill through the deflector to can guarantee the continuity of work piece transportation to a certain extent.
The present invention in a preferred example may be further configured to: the conveying belt II is fixedly connected with a plurality of positioning boxes along the length direction of the conveying belt II, and the positioning boxes are arranged at equal intervals along the length direction of the conveying belt II and are used for allowing workpieces to be vertically inserted; an opening for a workpiece to pass through is formed in one surface, far away from the support ring, of the positioning box, a cover plate used for covering the opening is connected to the bottom surface of the positioning box in a sliding mode along the length direction of the second conveyor belt, a second spring is fixedly connected to the positioning box, when the workpiece is placed in the positioning box, the second spring is located below the workpiece, the second spring is arranged along the sliding direction of the cover plate, two ends of the second spring are fixedly connected with the cover plate and the positioning box respectively, and when the second spring is not deformed, the cover plate completely covers the opening; the fixing block is fixedly connected with a clamping sleeve used for clamping a workpiece, the clamping sleeve moves to clamp the workpiece and drives the workpiece to be separated from the positioning box so that the cross rod can be horizontally inserted into a through hole of the workpiece.
By adopting the technical scheme, when the clamping device works, a workpiece is inserted into the positioning box, when the positioning box moves to the position of the support ring, the air cylinder is started to drive the fixing block to move so as to drive the clamping sleeve to move until the clamping sleeve clamps the workpiece, meanwhile, the positioning box on the second conveyor belt and the clamping sleeve move in opposite directions so as to separate the workpiece from the positioning box, in the process that the workpiece is separated from the positioning box, the cover plate slides, the opening is opened until the workpiece is separated from the positioning box, meanwhile, the second spring deforms, then the second spring drives the chain to slide through the driving assembly so as to drive the hook to slide, in the process that the hook slides, the cross rod on the hook is inserted into the through hole on the workpiece, then the air cylinder is closed, the clamping sleeve is separated from the workpiece, the cross rod has a certain length and plays a buffering role when the clamping sleeve is completely separated, thereby the work piece is hung on the couple, and follows the couple and remove and spray paint in the paint spray booth, then operating personnel only need insert the work piece in the location box, need not to raise one's hand and hang the couple in the perforation of work piece to workman's intensity of labour has been reduced to a certain extent.
In summary, the invention includes at least one of the following beneficial technical effects:
1. the labor intensity of operators is reduced to a certain extent.
Drawings
Fig. 1 is a schematic view of the overall structure of the background art of the present invention.
FIG. 2 is a schematic view of the structure of a workpiece according to the present invention.
Fig. 3 is a first overall structural diagram of the embodiment of the invention.
Fig. 4 is an enlarged schematic view of the region a in fig. 3.
Fig. 5 is a partial structural schematic diagram of an embodiment of the present invention.
Fig. 6 is a schematic view of the overall structure of the embodiment of the present invention (wherein a cover plate on a positioning box is not shown).
Fig. 7 is an enlarged schematic view of region B in fig. 6.
Fig. 8 is an enlarged schematic view of region C in fig. 3.
In the figure, 1, a support ring; 2. a paint spray booth; 3. a support leg; 4. straight path; 5. an arc-shaped path; 6. a chain; 7. a drive assembly; 8. a driving wheel; 9. a motor; 10. a driven wheel; 11. hooking; 12. a cross bar; 13. a vertical rod; 14. an anti-drop block; 15. a first spring; 16. a support; 17. a cylinder; 18. a connecting rod; 19. fixing the rod; 20. a fixed block; 21. a notch; 22. a first conveyor belt; 23. a first frame body; 24. a first belt; 25. a material receiving hopper; 26. a guide plate; 27. pushing the plate; 28. a support frame; 29. a bidirectional screw rod; 30. a rack; 31. a gear; 32. a second conveyor belt; 33. a second frame body; 34. a second belt; 35. a positioning box; 36. an opening; 37. a support plate; 38. a guide bar; 39. a cover plate; 40. a second spring; 41. a push rod; 42. a jacket; 43. a workpiece; 44. a fixing plate; 45. and (6) perforating.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 3, the temporary protective guard workpiece paint spraying line disclosed by the invention comprises a support ring 1 and a paint spraying chamber 2 for the support ring 1 to pass through, wherein a plurality of support legs 3 are vertically and fixedly connected to the support ring 1, the support legs 3 are used for supporting the support ring 1, the cross section of the support ring 1 is in a straight notch 21 shape, namely, the support ring 1 comprises two straight ways 4 which are oppositely arranged and two arc ways 5 which are oppositely arranged, the straight ways 4 and the arc ways 5 are connected end to end, a chain 6 is connected to the support ring 1 in a sliding manner, and the chain 6 is arranged along the circumferential direction of the support ring 1.
Be equipped with on the lock ring 1 and be used for the gliding drive assembly 7 of drive chain 6, drive assembly 7 includes action wheel 8 and motor 9, and action wheel 8 and the meshing of chain 6 are connected, and the coaxial fixed connection motor 9 output shaft of action wheel 8 still is equipped with three from driving wheel 10 on the lock ring 1, and three are all connected with the meshing of chain 6 from driving wheel 10, and action wheel 8 and three are set up the four corners position at lock ring 1 respectively from driving wheel 10.
Referring to fig. 3 and 4, a plurality of couples 11 that are the equidistance setting of fixedly connected with on the chain 6, couple 11 includes horizontal pole 12 and montant 13, montant 13 is vertical setting, montant 13 one end fixed connection is on chain 6, montant 13 other end vertical movement cup joints horizontal pole 12, horizontal pole 12 sets up along 4 length direction on the straight track, the one end of horizontal pole 12 is used for passing perforation 45 on the work piece 43, the other end fixedly connected with anticreep piece 14 of horizontal pole 12, horizontal pole 12 is close to the pot head of anticreep piece 14 and establishes and fixedly connected with spring 15, the one end fixed connection that horizontal pole 12 was kept away from to spring 15 is on montant 13, when spring 15 is undeformed, horizontal pole 12 passes and penetrates montant 13 and can supply work.
Referring to fig. 4 and 5, a temporary protective guard work piece paint spraying line still includes support 16, fixedly connected with cylinder 17 on the support 16, cylinder 17 is the level and sets up along 4 length direction of perpendicular to straight way, cylinder 17 piston rod fixedly connected with connecting rod 18, connecting rod 18 sets up along 4 length direction of straight way, connecting rod 18 is close to one end fixedly connected with dead lever 19 of cylinder 17, dead lever 19 keeps away from one of connecting rod 18 and serves fixedly connected with fixed block 20, notch 21 has been seted up to fixed block 20, notch 21 is used for supplying horizontal pole 12 to pass through, notch 21 height is less than anticreep piece 14 height, cylinder 17 drive fixed block 20 removes the one side that is close to montant 13 with butt anticreep piece 14, thereby restriction anticreep piece 14 removes.
Referring to fig. 3 and 5, the workpiece painting line for the temporary protective fence further comprises a first conveyor belt 22, the first conveyor belt 22 comprises a first frame body 23 and a first belt 24, the first conveyor belt 22 is arranged below the support ring 1 and is arranged along a direction perpendicular to the length direction of the straight channel 4, and the first conveyor belt 22 is used for receiving a workpiece 43.
Receiving hopper 25 has been placed to the one end side that the support ring 1 was kept away from to conveyer belt 22, and support body 23 keeps away from the one end fixedly connected with deflector 26 of support ring 1, and deflector 26 is the slope setting, and the one end that deflector 26 is close to support body 23 is higher than the one end that deflector 26 kept away from support body 23, and the one end that deflector 26 kept away from support body 23 extends to receiving hopper 25 inboard upper end.
One end both sides that conveyer belt 22 is close to retainer 1 all have a push pedal 27 along conveyer belt 22 width direction sliding connection, push pedal 27 is transversal to personally submit squarely, push pedal 27 bottom surface butt is on belt 24 upper surface, support frame 28 has been placed to support body 23 side, be equipped with the driving piece that is used for driving two push pedals 27 and is close to each other or keep away from on the support frame 28, the driving piece is two-way lead screw 29, two-way lead screw 29 sets up along push pedal 27 slip direction, two-way lead screw 29 rotates and connects on support frame 28, two push pedal 27 difference threaded connection are on two sections reverse thread line of two-way lead.
A transmission part for driving the bidirectional screw 29 to rotate is arranged on the connecting rod 18, the transmission part is a rack 30, the rack 30 is fixedly connected to one end, close to the air cylinder 17, of the connecting rod 18 along the moving direction of the fixing block 20, a gear 31 is coaxially and fixedly connected to the middle position of the bidirectional screw 29, and the rack 30 is meshed with the gear 31; when the distance between the two push plates 27 is equal to the width of the workpiece 43, the workpiece 43 falls onto the first conveyor belt 22, and at this time, the cylinder 17 is continuously opened to drive the rack 30 to move, so that the two push plates 27 are driven to approach each other until the two push plates 27 abut against the side walls of the workpiece 43.
Referring to fig. 6 and 7, the temporary protective guard workpiece paint spraying line further comprises a second conveyor belt 32, the second conveyor belt 32 is placed beside the first conveyor belt 22, the second conveyor belt 32 is parallel to the first conveyor belt 22 and has the same height as the first conveyor belt 22, the second conveyor belt 32 comprises a second frame body 33 and a second belt 34, a plurality of positioning boxes 35 are fixedly connected to the second belt 34 along the length direction of the second belt, the positioning boxes 35 are arranged at equal intervals, and the positioning boxes 35 are used for allowing workpieces 43 to be vertically inserted.
The opening 36 for the workpiece 43 to pass through is formed in one surface, away from the support ring 1, of the positioning box 35, the support plate 37 for supporting the workpiece 43 is fixedly connected to the inner wall of the positioning box 35, and the height of the support plate 37 is higher than or equal to that of the push plate 27, so that the workpiece 43 cannot be blocked by the push plate 27 in the moving process of the workpiece 43.
Two guide rods 38 extending out of the positioning box 35 are fixedly connected to the side wall, away from the opening 36, of the positioning box 35, the guide rods 38 are located below the supporting plate 37, the guide rods 38 are arranged along the length direction of the second conveyor belt 32, a cover plate 39 used for covering the opening 36 is arranged on the positioning box 35, and one ends, extending out of the positioning box 35, of the two guide rods 38 penetrate through the cover plate 39.
The second spring 40 is sleeved on the guide rod 38, the second spring 40 is arranged along the sliding direction of the cover plate 39, two ends of the second spring 40 are fixedly connected with one surface, close to the positioning box 35, of the cover plate 39 and the guide rod 38 respectively, and when the second spring 40 is not deformed, the cover plate 39 completely covers the opening 36.
Referring to fig. 3 and 8, a push rod 41 is fixedly connected to one end of the connecting rod 18 away from the cylinder 17, a collet 42 for clamping a workpiece 43 is fixedly connected to one end of the push rod 41 away from the connecting rod 18, and the collet 42 moves to clamp the workpiece 43 and push the workpiece 43 out of the positioning box 35 so that the cross bar 12 can be horizontally inserted into a through hole 45 of the workpiece 43.
The implementation principle of the embodiment is as follows: during operation, a workpiece 43 is inserted into the positioning box 35, when the positioning box 35 moves to the position of the support ring 1, the air cylinder 17 is started to drive the fixing block 20 to move, so that the clamping sleeve 42 is driven to move until the workpiece 43 is clamped by the clamping sleeve 42, meanwhile, the positioning box 35 and the clamping sleeve 42 on the second conveyor belt 32 move in the opposite direction, so that the workpiece 43 can be separated from the positioning box 35, in the process that the workpiece 43 is separated from the positioning box 35, the cover plate 39 slides, the opening 36 is opened until the workpiece 43 is separated from the positioning box 35, meanwhile, the second spring 40 deforms, then the motor 9 is started to drive the chain 6 to slide, so that the hook 11 is driven to slide, in the sliding process of the hook 11, the cross rod 12 on the hook 11 is inserted into the through hole 45 on the workpiece 43, then the air cylinder 17 is closed, the clamping sleeve 42 is separated from the workpiece 43, so that the workpiece, after painting, the workpiece 43 moves to the first conveyor belt 22, the cylinder 17 is started to drive the fixed block 20 to move until the fixed block 20 abuts against the anti-falling block 14 to limit the anti-falling block 14 to move, at the moment, the chain 6 moves, the vertical rod 13 still moves, the anti-falling block 14 is limited by the fixed block 20 and cannot move, at the moment, the first spring 15 deforms, so that the vertical rod 13 moves to push the workpiece 43 out of the cross rod 12, the workpiece 43 is separated from the cross rod 12 and falls onto the first conveyor belt 22, meanwhile, the fixed block 20 moves to drive the rack 30 to move, so as to drive the gear 31 to rotate, the gear 31 rotates to drive the bidirectional screw 29 to rotate, so as to control the two push plates 27 to approach each other, when the distance between the two push plates 27 is equal to the width of the workpiece 43, the workpiece 43 falls onto the first conveyor belt 22, at the moment, the cylinder 17 is continuously, until the two push plates 27 abut against the side walls of the workpiece 43, the workpiece 43 is conveyed into the receiving hopper 25 by the first conveyor belt 22.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (8)

1. The utility model provides a interim rail guard work piece paint spraying line, includes lock ring (1) and paint spray booth (2), lock ring (1) is passed paint spray booth (2), sliding connection has chain (6) on lock ring (1), chain (6) are followed lock ring (1) circumference sets up, be equipped with on lock ring (1) and be used for driving gliding drive assembly (7) of chain (6), its characterized in that: a plurality of hooks (11) which are arranged at equal intervals are fixedly connected on the chain (6), the hook (11) comprises a cross rod (12) and a vertical rod (13), one end of the vertical rod (13) is fixedly connected to the chain (6), the other end of the vertical rod (13) is vertically and movably sleeved with the cross rod (12), the cross rod (12) is used for penetrating through a through hole (45) on a workpiece (43), one end of the cross bar (12) penetrates through the vertical bar (13) and is fixedly connected with an anti-drop block (14), one end of the cross bar (12) close to the anti-falling block (14) is sleeved and fixedly connected with a first spring (15), one end of the first spring (15) far away from the cross rod (12) is fixedly connected to the vertical rod (13), when the first spring (15) is not deformed, the cross rod (12) penetrates through the vertical rod (13) and can be used for hanging a workpiece (43); the utility model provides a temporary protective guard work piece (43) line of spraying paint still includes support (16), fixedly connected with cylinder (17) on support (16), cylinder (17) piston rod fixedly connected with be used for the butt fixed block (20) of anticreep piece (14) are in order to restrict anticreep piece (14) remove.
2. A temporary guard rail workpiece paint spraying line as claimed in claim 1, wherein: a temporary protective guard workpiece (43) paint spraying line further comprises a first conveyor belt (22) arranged below the support ring (1), and the first conveyor belt (22) is used for receiving the workpiece (43).
3. A temporary guard rail workpiece paint spraying line as claimed in claim 2, wherein: both sides of one end, close to the support ring (1), of the first conveyor belt (22) are connected with push plates (27) in a sliding mode along the width direction of the first conveyor belt (22), and driving pieces used for driving the two push plates (27) to be close to or far away from each other are arranged on the first conveyor belt (22).
4. A temporary guard rail workpiece paint spraying line as claimed in claim 3, wherein: the driving piece is two-way lead screw (29), two-way lead screw (29) are followed push pedal (27) slip direction sets up, two-way lead screw (29) rotate to be connected on conveyer belt (22), two push pedal (27) threaded connection respectively are in on two sections reverse thread lines of two-way lead screw (29), be equipped with on fixed block (20) and be used for driving two-way lead screw (29) pivoted driving medium, fixed block (20) remove in order to drive two-way lead screw (29) rotate.
5. A temporary protective guard workpiece paint spraying line as claimed in claim 4, wherein: the transmission piece is a rack (30), the rack (30) is fixedly connected to the fixed block (20) along the moving direction of the fixed block (20), a gear (31) is coaxially and fixedly connected to the bidirectional screw rod (29), and the rack (30) is meshed with the gear (31).
6. A temporary guard rail workpiece paint spraying line as claimed in claim 2, wherein: a material receiving hopper (25) is arranged beside the discharge end of the first conveyor belt (22).
7. A temporary guard rail workpiece paint spraying line as claimed in claim 6, wherein: the discharge end of the first conveyor belt (22) is fixedly connected with a guide plate (26), and one end, far away from the first conveyor belt (22), of the guide plate (26) extends into the receiving hopper (25).
8. The temporary guard rail workpiece paint spraying line as claimed in claim 7, wherein: the conveying belt (32) is fixedly connected with a plurality of positioning boxes (35) along the length direction of the conveying belt (32), the positioning boxes (35) are arranged at equal intervals along the length direction of the conveying belt (32), and the positioning boxes (35) are used for allowing workpieces (43) to be vertically inserted;
an opening (36) for a workpiece (43) to pass through is formed in one surface, far away from the support ring (1), of the positioning box (35), a cover plate (39) used for covering the opening (36) is connected to the bottom surface of the positioning box (35) in a sliding mode along the length direction of a second conveyor belt (32), a second spring (40) is fixedly connected to the positioning box (35), when the workpiece (43) is placed in the positioning box (35), the second spring (40) is located below the workpiece (43), the second spring (40) is arranged in the sliding direction of the cover plate (39), two ends of the second spring (40) are fixedly connected to the cover plate (39) and the positioning box (35) respectively, and when the second spring (40) is not deformed, the cover plate (39) completely covers the opening (36);
the fixing block (20) is fixedly connected with a clamping sleeve (42) used for clamping a workpiece (43), the clamping sleeve (42) moves to clamp the workpiece (43), and the workpiece (43) is driven to be separated from the positioning box (35) so that the cross rod (12) can be horizontally inserted into a through hole (45) of the workpiece (43).
CN202010435456.6A 2020-05-21 2020-05-21 Interim rail guard work piece line of spraying paint Expired - Fee Related CN111558493B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010435456.6A CN111558493B (en) 2020-05-21 2020-05-21 Interim rail guard work piece line of spraying paint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010435456.6A CN111558493B (en) 2020-05-21 2020-05-21 Interim rail guard work piece line of spraying paint

Publications (2)

Publication Number Publication Date
CN111558493A true CN111558493A (en) 2020-08-21
CN111558493B CN111558493B (en) 2021-04-23

Family

ID=72068225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010435456.6A Expired - Fee Related CN111558493B (en) 2020-05-21 2020-05-21 Interim rail guard work piece line of spraying paint

Country Status (1)

Country Link
CN (1) CN111558493B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113058800A (en) * 2021-04-14 2021-07-02 长沙祥泰机械科技有限公司 Guitar box equipment
CN113083631A (en) * 2021-04-14 2021-07-09 长沙祥泰机械科技有限公司 Guitar box curb plate installation device
CN113171917A (en) * 2021-04-09 2021-07-27 泉州芸台科技有限公司 Automatic spray painting production line with movable treatment chamber
CN113769953A (en) * 2021-08-30 2021-12-10 上海金笔达标识标牌工程有限公司 Metal section production process
CN114345583A (en) * 2021-12-30 2022-04-15 上海尧冠实业有限公司 Automatic spraying device for hub of automobile production line
CN114849956A (en) * 2022-05-23 2022-08-05 赣州嘉蓓乐实业发展有限公司 Hardware surface treatment device
CN114950788A (en) * 2022-06-16 2022-08-30 山东开泰抛丸机械股份有限公司 Shot-blasting machine blade production coating device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3642147A (en) * 1969-05-19 1972-02-15 Gerald H Voorhies Hanger device
US4129217A (en) * 1977-10-17 1978-12-12 Campbell Talmage D Portable spray painting station
DE3401014A1 (en) * 1984-01-13 1985-07-25 Hermann 7320 Göppingen Steiner Driveless bogie truck
CN105964448A (en) * 2016-07-19 2016-09-28 浙江捷洋科技有限公司 Automatic paint spraying device
CN108654880A (en) * 2018-06-05 2018-10-16 苏州帝航防护设施有限公司 Fence upright or the full-automatic loading and unloading equipment integrating of cross bar
CN109731724A (en) * 2019-03-04 2019-05-10 青岛欧轩机械有限公司 A kind of work piece hoisting spray-painting production line
CN111036473A (en) * 2020-01-17 2020-04-21 上海惠元机械制造有限公司 Spray paint circulation line

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3642147A (en) * 1969-05-19 1972-02-15 Gerald H Voorhies Hanger device
US4129217A (en) * 1977-10-17 1978-12-12 Campbell Talmage D Portable spray painting station
DE3401014A1 (en) * 1984-01-13 1985-07-25 Hermann 7320 Göppingen Steiner Driveless bogie truck
CN105964448A (en) * 2016-07-19 2016-09-28 浙江捷洋科技有限公司 Automatic paint spraying device
CN108654880A (en) * 2018-06-05 2018-10-16 苏州帝航防护设施有限公司 Fence upright or the full-automatic loading and unloading equipment integrating of cross bar
CN109731724A (en) * 2019-03-04 2019-05-10 青岛欧轩机械有限公司 A kind of work piece hoisting spray-painting production line
CN111036473A (en) * 2020-01-17 2020-04-21 上海惠元机械制造有限公司 Spray paint circulation line

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113171917A (en) * 2021-04-09 2021-07-27 泉州芸台科技有限公司 Automatic spray painting production line with movable treatment chamber
CN113058800A (en) * 2021-04-14 2021-07-02 长沙祥泰机械科技有限公司 Guitar box equipment
CN113083631A (en) * 2021-04-14 2021-07-09 长沙祥泰机械科技有限公司 Guitar box curb plate installation device
CN113769953A (en) * 2021-08-30 2021-12-10 上海金笔达标识标牌工程有限公司 Metal section production process
CN114345583A (en) * 2021-12-30 2022-04-15 上海尧冠实业有限公司 Automatic spraying device for hub of automobile production line
CN114849956A (en) * 2022-05-23 2022-08-05 赣州嘉蓓乐实业发展有限公司 Hardware surface treatment device
CN114849956B (en) * 2022-05-23 2023-02-28 赣州嘉蓓乐实业发展有限公司 Hardware surface treatment device
CN114950788A (en) * 2022-06-16 2022-08-30 山东开泰抛丸机械股份有限公司 Shot-blasting machine blade production coating device

Also Published As

Publication number Publication date
CN111558493B (en) 2021-04-23

Similar Documents

Publication Publication Date Title
CN111558493B (en) Interim rail guard work piece line of spraying paint
CN110560296B (en) Powder spraying process and powder spraying equipment thereof
DE102007040465B3 (en) Device for supplying laundry items into laundry treatment device, particularly mangle, has supply promoter and spreading unit with two displaceable spreading clips arranged straight across before supply promoter
EP3486589B1 (en) Crates drying and/or cleaning device
CN108328276A (en) A kind of blanking component of sheet metal acid dip pickle
WO2020001707A1 (en) Conveying system, treatment system, and conveying method
CN110253447B (en) Shot blasting equipment for rotating shot blasting treatment vehicle parts
CH656151A5 (en) ANODE ROD CLEANING MACHINE.
CN113442038B (en) Steel structure rust removal device and rust removal process
CN208278899U (en) A kind of blanking component of sheet metal acid dip pickle
DE4101402A1 (en) DEVICE AND METHOD FOR THE PRODUCTION OF UPRIGHT WALL PANELS FROM WALL STONES
CN212945537U (en) Aluminium alloy powder coating is with assisting utensil
CN210875918U (en) Automatic motor decorative shell paint spraying machine
CN109604836B (en) Automatic cutting device for plates
DE2645232A1 (en) Vertical buffer frame linked to horizontal plate conveyor - is controlled by two pairs of plate sensors which overlap conveyor belts
CN208810365U (en) A kind of auto spray painting device
CN110271729A (en) A kind of full-automatic trademark plastering machine
CN210046158U (en) Laser welding machine
CN110813613B (en) Spraying processing method of fireproof paint for wooden door
CN212665253U (en) Automatic straight seam welding device
CN207223361U (en) A kind of oil cylinder piston bar portion fills area's Automated assembly device
US3426563A (en) Peening apparatus
DE3604706C2 (en)
CN221157214U (en) Electrostatic powder spraying device for strip-shaped section bar
CN2088921U (en) Shot-blast cleaning device for steel pipe inwall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210423

CF01 Termination of patent right due to non-payment of annual fee