CN111456407A - Method and device for constructing decoration and maintenance process of wall bodies at two ends below beam track by using travelling crane beam - Google Patents

Method and device for constructing decoration and maintenance process of wall bodies at two ends below beam track by using travelling crane beam Download PDF

Info

Publication number
CN111456407A
CN111456407A CN202010292548.3A CN202010292548A CN111456407A CN 111456407 A CN111456407 A CN 111456407A CN 202010292548 A CN202010292548 A CN 202010292548A CN 111456407 A CN111456407 A CN 111456407A
Authority
CN
China
Prior art keywords
connecting part
length
wall body
travelling crane
target wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010292548.3A
Other languages
Chinese (zh)
Inventor
赵晓磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Chemical Engineering Third Construction Co Ltd
Original Assignee
China National Chemical Engineering Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Chemical Engineering Third Construction Co Ltd filed Critical China National Chemical Engineering Third Construction Co Ltd
Priority to CN202010292548.3A priority Critical patent/CN111456407A/en
Publication of CN111456407A publication Critical patent/CN111456407A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • E04G3/325Safety devices for stabilising the mobile platform, e.g. to avoid it swinging in the wind

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)

Abstract

A method for utilizing a traveling crane beam to construct the decoration and maintenance process of walls at two ends below a beam traveling rail comprises the following steps: the upper part of the hanging basket is connected with the travelling crane and moves to a target wall with the travelling crane, the hanging basket is provided with a first connecting part and a second connecting part, the upper end of the first connecting part is used for being connected with the travelling crane, the second connecting part is connected with the first connecting part, and the second connecting part is used for being in contact with the target wall; and the working personnel stand at the second connecting part of the travelling crane to be close to the target wall body and are used for constructing the target wall body. When the hanging basket is used, a worker can maintain and decorate the wall body on the second connecting part, and the second connecting part has a certain length, so that the worker can be positioned between the end part of the crane and the wall body when standing on the second connecting part, and further the worker can maintain and decorate the target wall body on the second connecting part.

Description

Method and device for constructing decoration and maintenance process of wall bodies at two ends below beam track by using travelling crane beam
Technical Field
The invention relates to a decoration and maintenance method, in particular to a method and a device for utilizing a crane beam to construct the decoration and maintenance process of walls at two ends below a beam track.
Background
At present, chemical fiber projects, biomass power generation projects, household garbage incineration projects and the like all need to use plants. The plants of these projects are all light steel roofs, and the walls are frame infilled wall structures. In the construction process, as the inner frame and the outer frame can not be removed synchronously, a scaffold hole is usually reserved on the wall body, the scaffold is removed when the wall body decoration is not completed in the civil engineering cross construction process, and a plurality of construction tail items and decoration projects are usually reserved when the wall bodies at two ends of the travelling crane beam travelling rail are constructed along with the propulsion of the installation progress, the entering of a steam engine, the construction of a steel roof, the grouting and tail sweeping after the installation is completed in a matched mode and the like. The distance between the movable trolley lifting hook on the travelling beam and the wall body at the end part of the travelling beam track is generally about 2-4 m, so that the side operation cannot be carried out by using the traditional hanging basket.
At present, in the construction tail item and decoration project, the scaffold is generally erected for final completion, however, the scaffold erection operation cannot be influenced due to the existence of equipment foundations on floors, and therefore the method for erecting the scaffold is huge in cost.
Disclosure of Invention
The invention aims to overcome the technical problem of huge cost of erecting a scaffold in the prior art, and provides a cost-saving method and a cost-saving device for the decoration and maintenance process of two end walls below a beam track of a crane beam construction beam.
In order to achieve the technical purpose and achieve the technical effect, the invention is realized by the following technical scheme:
the first aspect provides a method for constructing decoration and maintenance processes of walls at two ends below a beam travelling rail by using a travelling beam, which comprises the following steps:
the upper part of the hanging basket is connected with the travelling crane and moves to a target wall with the travelling crane, the hanging basket is provided with a first connecting part and a second connecting part, the upper end of the first connecting part is used for being connected with the travelling crane, the second connecting part is connected with the first connecting part, and the second connecting part is used for being in contact with the target wall;
and the working personnel stand at the second connecting part of the travelling crane to be close to the target wall body and are used for constructing the target wall body.
The invention relates to a method for utilizing a traveling crane beam to construct the decoration and maintenance process of walls at two ends below a beam traveling rail, wherein,
the length of the second connecting part is larger than the distance between the end part of the travelling crane track and the target wall body.
The method for utilizing the travelling crane beam to construct the decoration and maintenance process of the wall bodies at the two ends below the beam travelling rail comprises the following steps of constructing the wall bodies at the two ends below the beam travelling rail, wherein the length of the first connecting part is greater than that of the second connecting part.
The method for utilizing the travelling crane beam to construct the decoration and maintenance process of the wall bodies at the two ends below the beam travelling rail comprises the following steps that the length of the first connecting part is 2.5-3.5m, and the length of the second connecting part is 1.5-2.5 m.
A second aspect provides a gondola comprising:
the upper end of the first connecting part is used for being connected with a target travelling crane;
and the second connecting part is connected with the first connecting part and is used for contacting with a target wall body.
The hanging basket is characterized in that the length of the second connecting part is greater than the distance between the end part of the travelling crane track and a target wall.
The hanging basket of the invention is characterized in that the length of the first connecting part is greater than that of the second connecting part.
The hanging basket provided by the invention is characterized in that the length of the first connecting part is 2.5-3.5m, and the length of the second connecting part is 1.5-2.5 m.
Compared with the prior art, the invention has the beneficial effects that:
when the hanging basket is implemented, the hanging basket is provided with the first connecting part and the second connecting part, the upper end of the first connecting part is connected with the travelling crane, the travelling crane drives the hanging basket to move, when the hanging basket moves to the end part of the travelling crane, due to the existence of the second connecting part, a worker can maintain and decorate the wall body on the second connecting part, due to the fact that the second connecting part has a certain length, the worker can be located between the end part of the travelling crane and the wall body when standing on the second connecting part, and further the worker can maintain and decorate the target wall body on the second connecting part.
Drawings
FIG. 1 is a diagram of one embodiment of a method provided by the present invention;
FIG. 2 is a view of an embodiment of a hanging basket provided by the invention;
FIG. 3 is a view showing an embodiment of a hanging basket according to the present invention;
FIG. 4 is a left side view of an embodiment of a hanging basket provided by the invention;
Detailed Description
Referring to fig. 1-4, it should be understood by those skilled in the art that the terms "upper", "lower", "one end", "the other end", etc., in the present disclosure, are used in an orientation or positional relationship shown in the drawings, which is only for convenience of description and simplicity of description, but do not indicate or imply that the referenced device or component must have a particular orientation, be constructed in a particular orientation, and be operated, and therefore the above terms should not be construed as limiting the present invention.
It should be noted that, in the current chemical fiber project, biomass power generation project, household garbage incineration project and the like, a factory building is required. The plants of these projects are all light steel roofs, and the walls are frame infilled wall structures. In the construction process, as the inner frame and the outer frame can not be removed synchronously, a scaffold hole is usually reserved on the wall body, the scaffold is removed when the wall body decoration is not completed in the civil engineering cross construction process, and a plurality of construction tail items and decoration projects are usually reserved when the wall bodies at two ends of the travelling crane beam travelling rail are constructed along with the propulsion of the installation progress, the entering of a steam engine, the construction of a steel roof, the grouting and tail sweeping after the installation is completed in a matched mode and the like. The distance between the movable trolley lifting hook on the travelling beam and the wall body at the end part of the travelling beam track is generally about 2-4 m, so that the side operation cannot be carried out by using the traditional hanging basket.
At present, in the construction tail item and decoration project, the scaffold is generally erected for final completion, however, the scaffold erection operation cannot be influenced due to the existence of equipment foundations on floors, and therefore the method for erecting the scaffold is huge in cost.
Based on the method, the invention provides a method for constructing the decoration and maintenance process of the wall bodies at the two ends below the beam travelling rail by using the travelling beam, which comprises the following steps:
s101, the upper portion of a hanging basket is connected with a traveling crane and moves to a target wall with the traveling crane, the hanging basket is provided with a first connecting portion and a second connecting portion, the upper end of the first connecting portion is used for being connected with the traveling crane, the second connecting portion is connected with the first connecting portion, and the second connecting portion is used for being in contact with the target wall;
s102, a worker stands at the second connecting part of the travelling crane to be close to the target wall and is used for constructing the target wall.
When the method is implemented, the hanging basket is provided with the first connecting portion and the second connecting portion, the upper end of the first connecting portion is connected with the traveling crane, the traveling crane drives the hanging basket to move, when the hanging basket moves to the end portion of the traveling crane, due to the existence of the second connecting portion, a worker can maintain and decorate the wall body on the second connecting portion, due to the fact that the second connecting portion is of a certain length, the worker can be located between the end portion of the traveling crane and the wall body when standing on the second connecting portion, the worker can further maintain and decorate the target wall body on the second connecting portion, compared with the method of erecting a scaffold, the method can achieve maintenance and decoration on the target wall body only by using the hanging basket, and cost is saved.
It should be noted that the target wall is a wall that needs to be repaired and decorated.
In some embodiments, the second connection length is greater than a distance of the end of the running rail from a target wall.
The length of the second connecting portion is larger than the distance between the end portion of the travelling crane track and the target wall body, when the travelling crane runs to the end portion, the second connecting portion is in contact with the target wall body, and a worker moves on the second connecting portion to maintain and decorate the target wall body at a proper distance from the end portion of the travelling crane track to the wall body.
In some embodiments, the second connection portion length is greater than the first connection portion length.
First connecting portion length is greater than second connecting portion length, and when first connecting portion were connected with the driving, because first connecting portion length is greater than second connecting portion length, the staff is at the during operation on the second connecting portion, because the existence of first connecting portion makes the focus of hanging flower basket be located first connecting portion department, and then makes the hanging flower basket steady, does not overturn.
In some embodiments, the first connector length is 2.5-3.5m and the second connector length is 1.5-2.5 m.
In the practical use process, the length of the first connecting part is 2.5-3.5m, the length of the second connecting part is 1.5-2.5m, and the hanging basket can be better used.
The present invention provides another embodiment, as shown in fig. 2-4, a basket, comprising:
the upper end of the first connecting part 100 is used for being connected with a target travelling crane;
a second connection part 200, the second connection part 200 being connected to the first connection part 100, and the second connection part 200 being for contacting a target wall.
As shown in fig. 3, when the traveling crane moves to the end of the traveling crane beam, the second connecting portion 200 contacts the target wall, and the worker at the second connecting portion can repair and decorate the wall.
It should be noted that the first connecting portion 100 and the second connecting portion 200 are basket-shaped as shown in fig. 2-4, so that the worker can move and work in the basket conveniently.
In some embodiments, the second connection 200 has a length greater than the distance of the end of the running rail from the target wall.
The length of the second connecting portion is larger than the distance between the end portion of the travelling crane track and the target wall body, when the travelling crane runs to the end portion, the second connecting portion is in contact with the target wall body, and a worker moves on the second connecting portion to maintain and decorate the target wall body at a proper distance from the end portion of the travelling crane track to the wall body.
In some embodiments, the first connection 100 is longer than the second connection 200.
First connecting portion length is greater than second connecting portion length, and when first connecting portion were connected with the driving, because first connecting portion length is greater than second connecting portion length, the staff is at the during operation on the second connecting portion, because the existence of first connecting portion makes the focus of hanging flower basket be located first connecting portion department, and then makes the hanging flower basket steady, does not overturn.
In some embodiments, the first connector 100 has a length of 2.5-3.5m and the second connector 200 has a length of 1.5-2.5 m.
In the practical use process, the length of the first connecting part 100 is 2.5-3.5m, and the length of the second connecting part 200 is 1.5-2.5m, so that the hanging basket can be better used.
The above-described embodiments are merely illustrative of the preferred embodiments of the present invention, and do not limit the scope of the present invention, and various modifications and improvements of the technical solution of the present invention may be made by those skilled in the art without departing from the spirit of the present invention, which is defined by the claims.

Claims (8)

1. A method for utilizing a traveling crane beam to construct the decoration and maintenance process of walls at two ends below a beam traveling rail is characterized by comprising the following steps:
the upper part of the hanging basket is connected with the travelling crane and moves to a target wall with the travelling crane, the hanging basket is provided with a first connecting part and a second connecting part, the upper end of the first connecting part is used for being connected with the travelling crane, the second connecting part is connected with the first connecting part, and the second connecting part is used for being in contact with the target wall;
and the working personnel stand at the second connecting part of the travelling crane to be close to the target wall body and are used for constructing the target wall body.
2. The method for the process of finishing and repairing a wall body at both ends below a running rail using a girder for a traveling crane according to claim 1,
the length of the second connecting part is larger than the distance between the end part of the travelling crane track and the target wall body.
3. The method of claim 2, wherein the first connecting portion length is greater than the second connecting portion length.
4. The method for the process of finishing and repairing a wall body at both ends below a construction beam and a travel rail using a traveling beam as set forth in claim 3, wherein the first connecting portion has a length of 2.5 to 3.5m and the second connecting portion has a length of 1.5 to 2.5 m.
5. A gondola, characterized in that it comprises:
the upper end of the first connecting part is used for being connected with a target travelling crane;
and the second connecting part is connected with the first connecting part and is used for contacting with a target wall body.
6. A gondola as claimed in claim 5, characterized in that the second connection length is greater than the distance of the running rail end from the target wall.
7. The basket according to claim 6, wherein the first connection length is greater than the second connection length.
8. A basket according to claim 7, characterized in that the first connection portion has a length of 2.5-3.5m and the second connection portion has a length of 1.5-2.5 m.
CN202010292548.3A 2020-04-15 2020-04-15 Method and device for constructing decoration and maintenance process of wall bodies at two ends below beam track by using travelling crane beam Pending CN111456407A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010292548.3A CN111456407A (en) 2020-04-15 2020-04-15 Method and device for constructing decoration and maintenance process of wall bodies at two ends below beam track by using travelling crane beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010292548.3A CN111456407A (en) 2020-04-15 2020-04-15 Method and device for constructing decoration and maintenance process of wall bodies at two ends below beam track by using travelling crane beam

Publications (1)

Publication Number Publication Date
CN111456407A true CN111456407A (en) 2020-07-28

Family

ID=71685338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010292548.3A Pending CN111456407A (en) 2020-04-15 2020-04-15 Method and device for constructing decoration and maintenance process of wall bodies at two ends below beam track by using travelling crane beam

Country Status (1)

Country Link
CN (1) CN111456407A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102004009865B4 (en) * 2004-02-25 2009-07-30 Klaus Sonnen Device for bridge remediation works
CN104631810A (en) * 2015-01-15 2015-05-20 中誉远发国际建设集团有限公司 High-altitude movable hanging basket system and construction method thereof
CN206144126U (en) * 2016-06-20 2017-05-03 张松涛 Construction safety protects hanging flower basket
CN206487129U (en) * 2017-02-27 2017-09-12 青岛东捷建设工程有限公司 Safety hanging cradle for industrial premises Construction of Steel Structure
CN107165401A (en) * 2017-05-31 2017-09-15 中国冶集团有限公司 Cantilever Beams bottom wall construction method
CN207739611U (en) * 2018-01-18 2018-08-17 朱林可 A kind of promotion hanging basket in high-altitude for building
CN109403612A (en) * 2018-09-13 2019-03-01 中国铁建重工集团有限公司 A kind of extension type hanging basket and the construction equipment comprising it
CN209066296U (en) * 2018-10-26 2019-07-05 四川志德公路工程有限责任公司 One kind facing side job platform
CN209210319U (en) * 2018-12-26 2019-08-06 安徽古井贡酒股份有限公司 It drives a vehicle dedicated maintenance hanging basket
CN210239096U (en) * 2019-06-10 2020-04-03 唐山港集团股份有限公司 Platform for overhauling bridge crane support steel structure connecting bolt

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102004009865B4 (en) * 2004-02-25 2009-07-30 Klaus Sonnen Device for bridge remediation works
CN104631810A (en) * 2015-01-15 2015-05-20 中誉远发国际建设集团有限公司 High-altitude movable hanging basket system and construction method thereof
CN206144126U (en) * 2016-06-20 2017-05-03 张松涛 Construction safety protects hanging flower basket
CN206487129U (en) * 2017-02-27 2017-09-12 青岛东捷建设工程有限公司 Safety hanging cradle for industrial premises Construction of Steel Structure
CN107165401A (en) * 2017-05-31 2017-09-15 中国冶集团有限公司 Cantilever Beams bottom wall construction method
CN207739611U (en) * 2018-01-18 2018-08-17 朱林可 A kind of promotion hanging basket in high-altitude for building
CN109403612A (en) * 2018-09-13 2019-03-01 中国铁建重工集团有限公司 A kind of extension type hanging basket and the construction equipment comprising it
CN209066296U (en) * 2018-10-26 2019-07-05 四川志德公路工程有限责任公司 One kind facing side job platform
CN209210319U (en) * 2018-12-26 2019-08-06 安徽古井贡酒股份有限公司 It drives a vehicle dedicated maintenance hanging basket
CN210239096U (en) * 2019-06-10 2020-04-03 唐山港集团股份有限公司 Platform for overhauling bridge crane support steel structure connecting bolt

Similar Documents

Publication Publication Date Title
CN203383148U (en) Span internal lifting device for small prefabricated box girders
CN207774633U (en) Prefabricated piping lane fast hoisting construction system
CN105298099A (en) Modular suspension type steel tube fastener scaffold operating platform and erecting method thereof
CN110397289B (en) All-dimensional beam erecting equipment standing on top of house column and having automatic walking function
CN212251443U (en) Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device
CN105484502A (en) Combination installation method for steel structure roofing purlins and support bars of industrial factory building
CN110172922B (en) Construction method of environment-friendly downlink self-propelled steel trestle structure
CN105088970A (en) Construction method of corrugated steel web PC box girder cable-stayed bridge
CN208932821U (en) A kind of erecting beam construction height leg gantry crane
CN102261043A (en) Assembled steel pipe upright post system
CN107720542B (en) Hoisting track composite beam
CN111456407A (en) Method and device for constructing decoration and maintenance process of wall bodies at two ends below beam track by using travelling crane beam
CN206769347U (en) Special movable operating platform for pedestrian street
CN108675170A (en) Roofing monorail crane and its construction method
CN209338005U (en) A kind of mobile height leg gantry crane of erecting beam construction
CN211007590U (en) Construction platform for overhanging steel structure
CN214456325U (en) Gantry crane beam lifting machine with high legs and low legs
CN212076208U (en) Assembled building component lifting device
CN110172923B (en) Environment-friendly type descending self-propelled steel trestle structure
CN113802858A (en) Reverse hanging construction method for steel structure roof tile
CN207194414U (en) A kind of foundation-free steel platform for temporary support
CN107867300B (en) A kind of rail flat car for transporting beam on steel truss girder main framing
CN112377672A (en) Old factory dust removal pipeline reconstruction and installation method and special pipeline moving and hoisting device thereof
CN112065023A (en) Hanging basket traveling crane for nuclear reactor-based high-altitude outer wall operation
CN220056126U (en) Curtain wall hoisting and installing system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200728