CN111422682A - Electric power construction project management device - Google Patents

Electric power construction project management device Download PDF

Info

Publication number
CN111422682A
CN111422682A CN202010288430.3A CN202010288430A CN111422682A CN 111422682 A CN111422682 A CN 111422682A CN 202010288430 A CN202010288430 A CN 202010288430A CN 111422682 A CN111422682 A CN 111422682A
Authority
CN
China
Prior art keywords
fixing
plate
electric power
motor
management device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010288430.3A
Other languages
Chinese (zh)
Inventor
韩维娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoyang University
Original Assignee
Shaoyang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoyang University filed Critical Shaoyang University
Priority to CN202010288430.3A priority Critical patent/CN111422682A/en
Publication of CN111422682A publication Critical patent/CN111422682A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H49/00Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
    • B65H49/18Methods or apparatus in which packages rotate
    • B65H49/20Package-supporting devices
    • B65H49/30Swifts or skein holders
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B1/00Cleaning by methods involving the use of tools
    • B08B1/20Cleaning of moving articles, e.g. of moving webs or of objects on a conveyor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H49/00Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
    • B65H49/18Methods or apparatus in which packages rotate
    • B65H49/34Arrangements for effecting positive rotation of packages
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/005Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for cutting cables or wires, or splicing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/34Handled filamentary material electric cords or electric power cables

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses an electric power construction engineering project management device which comprises a bottom plate, a cable frame and a limiting cylinder, wherein a first fixing plate is arranged on the left side of the upper end of the bottom plate, a fixing rod is arranged at the upper end of the first fixing plate, the cable frame is arranged on the outer side of the middle part of the fixing rod, a first belt wheel is arranged at the left end of the fixing rod, a first motor is arranged on the side surface of the bottom end of the first fixing plate, a second belt wheel is arranged at the front end of a rotating shaft of the first motor, and a belt is arranged between; the second fixed plate is installed on bottom plate upper end right side, and hydraulic motor is installed to second fixed plate upper end inboard, and the connecting block is installed to the hydraulic motor front end, and fixed frame is installed to the connecting block bottom, and the second motor is installed to fixed frame inboard, and the cutting piece is installed to second motor shaft front end, and the cutting piece below is equipped with the fixed slot. The cable pay-off device is reasonable in structure and simple in operation, can conveniently pay off cables, avoids manual operation, conveniently fixes and cuts the cables, and avoids safety accidents caused by manual cutting.

Description

Electric power construction project management device
Technical Field
The invention relates to the technical field of electric power construction engineering, in particular to an electric power construction engineering project management device.
Background
The electric power construction has obvious pulling effect on social economy, Chinese economy develops rapidly, the power supply is relatively tense, in order to meet the needs of national economy and social development, the country needs to accelerate the power construction strength, the national industry added value has a positive correlation with the electric power construction all the time, along with the increase of the power construction, especially the increase of industrial power, the industry added value also increases, at this moment, equipment capable of carrying out automatic paying-off and cutting on cables is needed, the project of the power construction can be processed more systematically and efficiently, and positive influence is brought to the subsequent production; the existing electric power construction project management device needs manual operation when paying off a cable, consumes a large amount of manpower and material resources, and secondly, needs manual cutting when carrying out cable cutting, uses very danger, and the use process of giving people has brought certain influence.
Disclosure of Invention
The present invention is directed to a power construction project management apparatus to solve the problems of the background art.
In order to achieve the purpose, the invention provides the following technical scheme:
the utility model provides an electric power construction engineering project management device, includes bottom plate, cable frame and a spacing section of thick bamboo, the fixing base is installed to the bottom plate bottom, and the pulley is installed to the fixing base bottom, and first fixed plate is installed in bottom plate upper end left side, and first fixed plate is equipped with antifriction bearing, and the dead lever is installed to the antifriction bearing inboard, and the cable frame is installed in the dead lever middle part outside, and first band pulley is installed to the dead lever left end, and first fixed plate bottom side-mounting has first motor, and the second band pulley is installed to first motor shaft front end, installs the belt between first band pulley and.
The middle of the upper end of the bottom plate is provided with a fixed cylinder, the inner side of the fixed cylinder is provided with a support column, the bottom end of the support column is provided with a fixed hole, the outer side of the fixed cylinder is provided with a screw, the side surface of the upper end of the support column is provided with a limiting cylinder, and the inner side of the limiting cylinder is provided with a brush; the second fixed plate is installed on bottom plate upper end right side, and hydraulic motor is installed to second fixed plate upper end inboard, and the connecting block is installed to the hydraulic motor front end, and fixed frame is installed to the connecting block bottom, and the second motor is installed to fixed frame inboard, and the cutting piece is installed to second motor shaft front end, and the cutting piece below is equipped with the fixed slot.
As a further scheme of the invention: first fixed plate and antifriction bearing all are equipped with two, install in the bottom plate upper end, and the dead lever passes two antifriction bearing, and the cable frame is installed between two first fixed plates.
As a further scheme of the invention: the first belt wheel, the belt, the second belt wheel and the first motor are all installed on one side of the first fixing plate, and the first belt wheel and the second belt wheel are on the same plane.
As a further scheme of the invention: the inner side of the fixed cylinder is in concave-convex connection with the support, the fixed holes are uniformly distributed at the bottom end of the support, and the diameter of each fixed hole is the same as that of each screw.
As a further scheme of the invention: the shape of second fixed plate is the shape of falling the U-shaped, and hydraulic motor installs on the inboard top of second fixed plate, installs the connecting block between hydraulic motor front end and the fixed frame, and the shape of connecting block is cylindric.
As a further scheme of the invention: the inboard recess that is equipped with of second fixed plate, the recess length is the same with the length of fixed frame, recess and fixed frame unsmooth connection.
As a further scheme of the invention: the section shape and the front shape of the fixing groove are both U-shaped, the fixing groove is fixedly installed at the upper end of the bottom plate, and the middle part of the upper end of the fixing groove is aligned with the cutting blade.
Compared with the prior art, the invention has the beneficial effects that:
a fixed seat and a pulley are installed at the bottom end of a bottom plate in an electric power construction project management device, a toilet stool is moved, a first fixed plate is installed at the upper end of the bottom plate, a fixed rod and a rolling bearing are arranged on the first fixed plate to support a cable frame, a first motor drives the cable frame to rotate through a belt wheel and a belt, and the cable is conveniently paid off; the middle part of the upper end of the bottom plate is provided with a fixed cylinder and a support column, the height of the support column can be adjusted through a fixed hole and a screw, the inner side of a limiting cylinder at the upper end of the support column is provided with a brush, and the outer side of a cable can be cleaned in the cable paying-off process; the second motor and the cutting piece cut the cable through hydraulic motor, and the fixed frame in the second motor outside and the inboard unsmooth connection of second fixed plate restrict the displacement direction of second motor, improve cutting efficiency. The cable pay-off device is reasonable in structure and simple in operation, can conveniently pay off cables, avoids manual operation, conveniently fixes and cuts the cables, and avoids safety accidents caused by manual cutting.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic structural view of the cable pay-off device of the present invention.
Fig. 3 is a schematic structural view of a fixed cylinder and a pillar in the present invention.
Fig. 4 is a schematic structural view of a second fixing plate and a fixing frame according to the present invention.
FIG. 5 is a schematic structural diagram of example 2 of the present invention.
In the figure: 1-bottom plate, 2-fixing seat, 3-pulley, 4-first fixing plate, 5-first pulley, 6-belt, 7-second pulley, 8-first motor, 9-rolling bearing, 10-fixing rod, 11-cable frame, 12-fixing cylinder, 13-pillar, 14-fixing hole, 15-screw, 16-second fixing plate, 17-hydraulic motor, 18-connecting block, 19-fixing frame, 20-second motor, 21-cutting piece, 22-fixing groove, 23-limiting cylinder, 24-brush, 25-slotted hole and 26-nut.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1
Referring to fig. 1 to 4, in an embodiment of the present invention, an electric power construction project management apparatus includes a bottom plate 1, a cable frame 11 and a limiting cylinder 23, fixing base 2 is installed to 1 bottom of bottom plate, pulley 3 is installed to 2 bottoms of fixing base, first fixed plate 4 is installed in 1 upper end left side of bottom plate, first fixed plate 4 is equipped with antifriction bearing 9, dead lever 10 is installed to antifriction bearing 9 inboard, cable frame 11 is installed in the dead lever 10 middle part outside, first band pulley 5 is installed to dead lever 10 left end, 4 bottom side-mounting of first fixed plate have first motor 8, second band pulley 7 is installed to 8 pivot front ends of first motor, install belt 6 between first band pulley 5 and the second band pulley 7, first fixed plate 4 and antifriction bearing 9 all are equipped with two, install in 1 upper end of bottom plate, dead lever 10 passes two antifriction bearing 9, cable frame 11 is installed between two first fixed plates 4.
A fixed cylinder 12 is arranged in the middle of the upper end of the bottom plate 1, a support column 13 is arranged on the inner side of the fixed cylinder 12, a fixing hole 14 is formed in the bottom end of the support column 13, a screw 15 is arranged on the outer side of the fixed cylinder 12, a limiting cylinder 23 is arranged on the side face of the upper end of the support column 13, and a brush 24 is arranged on the inner side of the limiting cylinder 23; second fixed plate 16 is installed on 1 upper end right side of bottom plate, hydraulic motor 17 is installed to 16 upper end inboards of second fixed plate, connecting block 18 is installed to hydraulic motor 17 front end, fixed frame 19 is installed to 18 bottom of connecting block, second motor 20 is installed to fixed frame 19 inboard, cutting piece 21 is installed to 20 pivot front ends of second motor, cutting piece 21 below is equipped with fixed slot 22, the section shape and the front shape of fixed slot 22 are the U-shaped, fixed slot 22 fixed mounting is in 1 upper end of bottom plate, fixed slot 22 upper end middle part and cutting piece 21 align.
Example 2
Referring to fig. 5, in an embodiment of the present invention, an electric power construction project management device includes a bottom plate 1, a cable frame 11 and two limiting cylinders 23, a fixing seat 2 is installed at a bottom end of the bottom plate 1, a pulley 3 is installed at a bottom end of the fixing seat 2, a pillar 13 is installed in a middle portion of an upper end of the bottom plate 1, a slot 25 is installed in a middle portion of the pillar 13, two pillars 13 are provided, the limiting cylinders 23 are installed in a middle portion of the two pillars 13, threaded columns are installed on two sides of each limiting cylinder 23, nuts 26 are installed on outer sides of the threaded columns, the nuts 26 are installed on outer sides of the pillars 13, and a length of the slot 25 is the same as a length. The other structure in this embodiment is the same as that in embodiment 1.
The working principle of the invention is as follows:
a fixed seat 2 and a pulley 3 are installed at the bottom end of a bottom plate 1 in an electric power construction project management device, the bottom plate is convenient to move, a first fixed plate 4 is installed at the upper end of the bottom plate 1, a fixed rod 10 and a rolling bearing 9 are arranged on the first fixed plate 4 to support a cable frame 11, a first motor 8 drives the cable frame 11 to rotate through a belt wheel and a belt 6, and the cable is convenient to pay off; a fixed cylinder 12 and a support column 13 are arranged in the middle of the upper end of the bottom plate 1, the height of the support column 13 can be adjusted through a fixed hole 14 and a screw 15, a brush 24 is arranged on the inner side of a limiting cylinder 23 at the upper end of the support column 13, and the outer side of a cable can be cleaned in the cable paying-off process; the second motor 20 and the cutting blade 21 cut the cable through the hydraulic motor 17, and the fixing frame 19 on the outer side of the second motor 20 is in concave-convex connection with the inner side of the second fixing plate 16, so that the displacement direction of the second motor 20 is limited, and the cutting efficiency is improved. The cable pay-off device is reasonable in structure and simple in operation, can conveniently pay off cables, avoids manual operation, conveniently fixes and cuts the cables, and avoids safety accidents caused by manual cutting.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (9)

1. The utility model provides an electric power construction engineering project management device, includes bottom plate (1), cable frame (11) and spacing section of thick bamboo (23), and bottom plate (1) upper end is equipped with cable frame (11), and cable frame (11) side is equipped with spacing section of thick bamboo (23), its characterized in that, first fixed plate (4) are installed in bottom plate (1) upper end left side, and first fixed plate (4) are equipped with antifriction bearing (9), and dead lever (10) are installed to antifriction bearing (9) inboard, and cable frame (11) are installed in dead lever (10) middle part outside, and first band pulley (5) are installed to dead lever (10) left end, and first motor (8) are installed to first fixed plate (4) bottom side, and second band pulley (7) are installed to first motor (8) pivot front end, install belt (6) between first band pulley (5) and second band pulley (7.
2. The electric power construction engineering project management device according to claim 1, wherein the bottom end of the bottom plate (1) is provided with a fixed seat (2), the bottom end of the fixed seat (2) is provided with a pulley (3), the middle part of the upper end of the bottom plate (1) is provided with a fixed cylinder (12), the inner side of the fixed cylinder (12) is provided with a strut (13), the bottom end of the strut (13) is provided with a fixed hole (14), the outer side of the fixed cylinder (12) is provided with a screw (15), the side surface of the upper end of the strut (13) is provided with a limiting cylinder (23), and the inner side of the limiting.
3. The electric power construction engineering project management device according to claim 2, wherein a second fixing plate (16) is installed on the right side of the upper end of the bottom plate (1), a hydraulic motor (17) is installed on the inner side of the upper end of the second fixing plate (16), a connecting block (18) is installed at the front end of the hydraulic motor (17), a fixing frame (19) is installed at the bottom end of the connecting block (18), a second motor (20) is installed on the inner side of the fixing frame (19), a cutting blade (21) is installed at the front end of a rotating shaft of the second motor (20), and a fixing groove (22) is formed below the cutting blade.
4. The electric power construction project management device according to claim 1, wherein two first fixing plates (4) and two rolling bearings (9) are arranged and mounted at the upper end of the bottom plate (1), the fixing rod (10) penetrates through the two rolling bearings (9), and the cable frame (11) is mounted between the two first fixing plates (4).
5. The electric power construction project management device according to claim 4, wherein the first belt wheel (5), the belt (6), the second belt wheel (7) and the first motor (8) are all installed on one side of the first fixing plate (4), and the first belt wheel (5) and the second belt wheel (6) are on the same plane.
6. The electric power construction project management device according to claim 2, wherein the inner side of the fixing cylinder (12) is connected with the support column (13) in a concave-convex manner, the fixing holes (14) are uniformly distributed at the bottom end of the support column (13), and the diameter of the fixing hole (14) is the same as that of the screw (15).
7. The electric power construction project management device according to claim 3, wherein the second fixing plate (16) is in an inverted U shape, the hydraulic motor (17) is mounted on the top end of the inner side of the second fixing plate (16), a connecting block (18) is mounted between the front end of the hydraulic motor (17) and the fixing frame (19), and the connecting block (18) is in a cylindrical shape.
8. The electric power construction project management device according to claim 7, wherein a groove is formed inside the second fixing plate (16), the length of the groove is the same as that of the fixing frame (19), and the groove is connected with the fixing frame (19) in a concave-convex manner.
9. The electric power construction project management device according to claim 8, wherein the sectional shape and the frontal shape of the fixing groove (22) are both U-shaped, the fixing groove (22) is fixedly installed at the upper end of the base plate (1), and the middle part of the upper end of the fixing groove (22) is aligned with the cutting blade (21).
CN202010288430.3A 2020-04-14 2020-04-14 Electric power construction project management device Pending CN111422682A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010288430.3A CN111422682A (en) 2020-04-14 2020-04-14 Electric power construction project management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010288430.3A CN111422682A (en) 2020-04-14 2020-04-14 Electric power construction project management device

Publications (1)

Publication Number Publication Date
CN111422682A true CN111422682A (en) 2020-07-17

Family

ID=71556291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010288430.3A Pending CN111422682A (en) 2020-04-14 2020-04-14 Electric power construction project management device

Country Status (1)

Country Link
CN (1) CN111422682A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117262871A (en) * 2023-10-23 2023-12-22 国网山东省电力公司莱州市供电公司 Twisting mill for laying power engineering cable

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06165336A (en) * 1992-11-19 1994-06-10 Kiso Seisakusho:Kk End-periphery grinder of high-voltage cable
CN205407100U (en) * 2016-02-26 2016-07-27 国网山东省电力公司蓬莱市供电公司 Electrical control electric power cleaning device
CN205740181U (en) * 2016-07-06 2016-11-30 胡广 A kind of electrical network cleaning servicing machine
CN206117015U (en) * 2016-11-04 2017-04-19 国家电网公司 Electric power is power communication cable processing apparatus for infrastructure project
CN108173162A (en) * 2018-01-31 2018-06-15 成都梵辰科技有限公司 Cable cleaner based on wireless communication
CN207765899U (en) * 2018-01-31 2018-08-24 怀化恒光电力勘测设计有限公司 A kind of cable processing cutting integrated device
CN208157985U (en) * 2018-06-06 2018-11-27 滁州继保电气科技有限公司 A kind of cable cutting device
CN208516629U (en) * 2018-04-19 2019-02-19 北京中电紫荆电力工程有限公司 A kind of wire rod being easily installed
CN210084604U (en) * 2019-06-15 2020-02-18 吴海涛 Electric power construction project management device
CN210103160U (en) * 2019-05-23 2020-02-21 张家港市亨昌焊材有限公司 A novel welding wire layer is around machine for welding wire production

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06165336A (en) * 1992-11-19 1994-06-10 Kiso Seisakusho:Kk End-periphery grinder of high-voltage cable
CN205407100U (en) * 2016-02-26 2016-07-27 国网山东省电力公司蓬莱市供电公司 Electrical control electric power cleaning device
CN205740181U (en) * 2016-07-06 2016-11-30 胡广 A kind of electrical network cleaning servicing machine
CN206117015U (en) * 2016-11-04 2017-04-19 国家电网公司 Electric power is power communication cable processing apparatus for infrastructure project
CN108173162A (en) * 2018-01-31 2018-06-15 成都梵辰科技有限公司 Cable cleaner based on wireless communication
CN207765899U (en) * 2018-01-31 2018-08-24 怀化恒光电力勘测设计有限公司 A kind of cable processing cutting integrated device
CN208516629U (en) * 2018-04-19 2019-02-19 北京中电紫荆电力工程有限公司 A kind of wire rod being easily installed
CN208157985U (en) * 2018-06-06 2018-11-27 滁州继保电气科技有限公司 A kind of cable cutting device
CN210103160U (en) * 2019-05-23 2020-02-21 张家港市亨昌焊材有限公司 A novel welding wire layer is around machine for welding wire production
CN210084604U (en) * 2019-06-15 2020-02-18 吴海涛 Electric power construction project management device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117262871A (en) * 2023-10-23 2023-12-22 国网山东省电力公司莱州市供电公司 Twisting mill for laying power engineering cable

Similar Documents

Publication Publication Date Title
CN204643605U (en) A kind of adjustable for height mobile gantry frame
CN111422682A (en) Electric power construction project management device
CN208787988U (en) A kind of fixed length infeed set-up for composite metal plate processing
CN111922736B (en) Honeycomb core bonding, stretching and cutting continuous production device
CN213256525U (en) Automatic cutting device is used in processing of light baffle wall girder steel
CN210997260U (en) Clamping equipment for machining steel structure
CN210849433U (en) Aluminum alloy section bar cutting device
CN211135028U (en) Self-adaptive deformation-preventing straightening mechanism for large H-shaped steel
CN220598164U (en) Beam penetrating machine for pre-stranded wires of bridge
CN219836995U (en) Automobile hub shaping machine
CN220144637U (en) Wire and cable cutting structure
CN214321984U (en) Plate shearing machine structure
CN218771859U (en) Light photovoltaic support
CN213916828U (en) Clamp suitable for frame of overhead working truck
CN220825381U (en) Bending knife assembly of side shaping die
CN217859998U (en) Cutting positioning device for aluminum alloy door and window production
CN214733277U (en) Collecting device is cut to cylinder body paper
CN216613447U (en) Carbon ribbon roller installation mechanism of carbon ribbon cutting machine
CN220324227U (en) Bus processing auxiliary device for power transformation engineering
CN217942528U (en) Cold shearing device
CN215101503U (en) Steering support of lifting beam
CN217051474U (en) Height-adjustable's material hoist for building engineering
CN215391672U (en) Welding seam leveling equipment for flattening welding seams of stainless steel pipes with adjustable size
CN209918993U (en) Adjustable guide cylinder for scrap shears
CN212170956U (en) Labor-saving device of open mill

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200717

RJ01 Rejection of invention patent application after publication