CN111401765A - Engineering progress supervisory systems based on big data - Google Patents
Engineering progress supervisory systems based on big data Download PDFInfo
- Publication number
- CN111401765A CN111401765A CN202010213028.9A CN202010213028A CN111401765A CN 111401765 A CN111401765 A CN 111401765A CN 202010213028 A CN202010213028 A CN 202010213028A CN 111401765 A CN111401765 A CN 111401765A
- Authority
- CN
- China
- Prior art keywords
- progress
- project
- management system
- real
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000007726 management method Methods 0.000 claims abstract description 70
- 238000012544 monitoring process Methods 0.000 claims abstract description 65
- 238000010276 construction Methods 0.000 claims abstract description 38
- 238000000034 method Methods 0.000 claims abstract description 28
- 239000004035 construction material Substances 0.000 claims abstract description 8
- 238000004458 analytical method Methods 0.000 claims abstract description 4
- 230000000007 visual effect Effects 0.000 claims description 18
- 239000000463 material Substances 0.000 claims description 17
- 238000005070 sampling Methods 0.000 claims description 15
- 238000004891 communication Methods 0.000 claims description 12
- 238000005516 engineering process Methods 0.000 claims description 6
- 238000004519 manufacturing process Methods 0.000 claims description 6
- 238000012545 processing Methods 0.000 claims description 5
- 230000005540 biological transmission Effects 0.000 claims description 3
- 238000004364 calculation method Methods 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims description 3
- 238000003860 storage Methods 0.000 claims description 3
- 238000012800 visualization Methods 0.000 claims description 3
- 230000007812 deficiency Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- -1 manpower Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063116—Schedule adjustment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Educational Administration (AREA)
- Life Sciences & Earth Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a project progress supervision system based on big data, which comprises a project management system, a basic information management system, a real-time monitoring system, a progress management system and a cloud server, wherein the project management system comprises a project management system, a basic information management system, a real-time monitoring system and a cloud server; the project management system is used for collecting, recording and managing and planning the project information of the name, type, drawing, construction process and construction material type of the project; the basic information management system is used for managing and summarizing related constructors, construction equipment and construction materials; the real-time monitoring system is used for collecting data information in real time in the construction process, and the data information comprises video image information, text information and data information; the progress management system is used for comparing the data information acquired by the real-time monitoring system with progress planning performed by the project management system, judging the progress condition of the current period, and performing dynamic progress prediction and progress analysis according to the actual progress. The invention has the advantages of accurate supervision and dynamic adjustment.
Description
Technical Field
The invention relates to the field related to engineering supervision, in particular to an engineering progress supervision system based on big data.
Background
The infrastructure is always an important strength in China, rapid development of urban construction in China is guaranteed, the infrastructure is also output outwards as national strength, and in project engineering of the infrastructure, a condition which generally receives attention except quality is a construction period.
In the construction process of project engineering, the investment is huge, the expenses of raw materials, manpower, material resources and equipment occupy a large proportion, on the premise of ensuring the quality, the construction progress of construction teams or construction workers can be consistent with expectation, and supervision personnel are required to be configured on site.
Disclosure of Invention
To the deficiency of the prior art, the technical problem to be solved by the present patent application is: how to provide a project progress supervision system based on big data with accurate supervision and dynamic adjustment.
In order to achieve the purpose, the invention adopts the following technical scheme:
a project progress supervision system based on big data comprises a project management system, a basic information management system, a real-time monitoring system, a progress management system and a cloud server;
the project management system is used for collecting, recording and managing and planning the project information of the name, type, drawing, construction process and construction material type of the project;
the basic information management system is used for managing and summarizing constructors, construction equipment and construction materials related in project engineering;
the real-time monitoring system is used for collecting data information in real time in the construction process, and the data information comprises video image information, text information and data information;
the progress management system is used for comparing data information acquired by the real-time monitoring system with progress planning performed by the project management system, judging the progress condition of the current period, and performing dynamic progress prediction and progress analysis according to the actual progress;
the cloud server provides communication, storage and management services for all parts in the system.
Optimally, the project management system comprises a first input unit, a model management unit and a production management unit; the first input unit converts project data and information into electronic data, and can input data acquired by the real-time monitoring system in real time, so that progress comparison is facilitated; the model management unit forms a visual model from the building drawing based on a BIM technology, wherein the visual model has specific knot and size data, and a sampling point is established in the visual model to serve as a sampling basis for the operation of a real-time monitoring system and a progress management system; the production management unit is used for recording the types of the process, the equipment and the materials required in the project construction process.
Preferably, the basic information management system comprises a second entry unit, and the second entry unit is used for entering specific situations of personnel situations, equipment states, material usage and construction periods designed in the actual building process and forming electronic data.
Optimized, real-time monitoring system includes fixed monitoring unit and handheld monitoring unit, fixed monitoring unit and handheld monitoring unit all regard as video image data acquisition end, fixed monitoring unit fixed mounting is in the periphery of engineering scene, is located simultaneously in visual model's sampling point scope, handheld monitoring unit carries on the mobile monitoring camera equipment the sampling point within range of visual model carries out the sample monitoring to the concrete internal conditions of project engineering.
Preferably, the fixed monitoring unit is in communication connection with a cloud server, the cloud server is provided with an authority management unit, and the handheld monitoring unit is provided with a positioning module, an identity authentication module, an image acquisition module and a communication module.
Optimally, the progress management system comprises a real-time progress comparison subsystem and a dynamic progress adjustment subsystem; the real-time progress comparison subsystem is provided with an image processing module; and the dynamic progress adjusting submodule is used for combining the comparison result of the progress comparison subsystem with the change of the material personnel related to the project management system and the basic information management system to form dynamic construction period adjustment.
And optimally, the dynamic progress adjustment subsystem carries out keyword retrieval on the process and the material adopted in the keyword construction based on a network big database, and carries out time measurement and calculation of the next construction period by taking time as a unit and combining the field material allowance and the equipment state acquired by the basic information management system.
Preferably, the fixed monitoring unit and the handheld monitoring unit are provided with high-definition cameras.
And the system is optimized and further comprises a display device, wherein the display device is used for displaying the visual model and the video image acquired by the real-time monitoring system.
Preferably, the communication mode of the cloud server comprises a network cable, mobile data flow or wireless transmission.
Has the advantages that:
the invention adopts BIM technology to carry out drawing visualization operation on the engineering project, carries out construction period segmentation on the engineering project, sets progress tracking points in each construction period or on nodes, realizes comparison of four-dimensional angles by realizing real-time data acquisition and drawing comparison and introducing time as a reference dimension, and has the following advantages:
(1): aspects related to the project progress, including personnel, processes, materials and the like, can be considered in an all-round manner, and the one-sidedness generated in the process of project progress planning, real-time monitoring and subsequent adjustment is avoided;
(2): the method has the advantages that the fixed monitoring and the handheld monitoring are adopted for collection, the fixed monitoring can realize real-time all-weather uninterrupted sampling, the problem tracing can be guaranteed, the handheld monitoring can meet the requirement of details, the on-line size identification is convenient, and the construction period formulation and the refinement of comparison are facilitated;
(3): by adopting a big data technology, accurate dynamic adjustment is realized by inquiring authoritative information in the same industry and comparing the performance of the current period of constructors;
(4): the whole process relates to identity recognition, the sampling device has the functions of positioning and time, the situations of counterfeiting and false reporting inside engineering personnel are placed, and the effects of checking, accuracy, precision and remote control of progress situations are guaranteed.
Description of the drawings:
FIG. 1 is a structural framework diagram of a big data-based project progress supervision system disclosed by the invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1, a big data-based project progress supervision system includes a project management system, a basic information management system, a real-time monitoring system, a progress management system and a cloud server;
the project management system is used for collecting, recording and managing and planning the project information of the name, type, drawing, construction process and construction material type of the project;
the basic information management system is used for managing and summarizing constructors, construction equipment and construction materials related in project engineering;
the real-time monitoring system is used for collecting data information in real time in the construction process, and the data information comprises video image information, text information and data information;
the progress management system is used for comparing data information acquired by the real-time monitoring system with progress planning performed by the project management system, judging the progress condition of the current period, and performing dynamic progress prediction and progress analysis according to the actual progress;
the cloud server provides communication, storage and management services for all parts in the system.
Further, the project management system comprises a first entry unit, a model management unit and a production management unit; the first input unit converts project data and information into electronic data, and can input data acquired by the real-time monitoring system in real time, so that progress comparison is facilitated; the model management unit forms a visual model from the building drawing based on a BIM technology, wherein the visual model has specific knot and size data, and a sampling point is established in the visual model to serve as a sampling basis for the operation of a real-time monitoring system and a progress management system; the production management unit is used for recording the types of the process, the equipment and the materials required in the project construction process.
Further, the basic information management system includes a second entry unit for entering specific cases of personnel conditions, equipment states, material usage, and construction periods designed in an actual building process, and forming electronic data.
Furthermore, the real-time monitoring system comprises a fixed monitoring unit and a handheld monitoring unit, wherein the fixed monitoring unit and the handheld monitoring unit are both used as video image data acquisition ends, the fixed monitoring unit is fixedly installed on the periphery of an engineering site and is located in the sampling point range of the visual model, the handheld monitoring unit is carried on a mobile monitoring camera device, and the specific internal conditions of the project engineering are sampled and monitored in the sampling point range of the visual model.
Furthermore, the fixed monitoring unit is in communication connection with a cloud server, the cloud server is provided with an authority management unit, and the handheld monitoring unit is provided with a positioning module, an identity authentication module, an image acquisition module and a communication module.
Specifically, the positioning module is a GPS positioning module or a Beidou positioning module;
specifically, the identity authentication mode of the identity authentication module comprises one or more modes of identity card identification, card identification and face identification;
further, the progress management system comprises a real-time progress comparison subsystem and a dynamic progress adjustment subsystem; the real-time progress comparison subsystem is provided with an image processing module; and the dynamic progress adjusting submodule is used for combining the comparison result of the progress comparison subsystem with the change of the material personnel related to the project management system and the basic information management system to form dynamic construction period adjustment.
Specifically, the image processing module performs centralized processing on the visual model and the video image acquired by the real-time monitoring system, performs distance and size measurement and calculation on the video image at corresponding sampling points, compares the video image with the visual model, and judges by adding time as a construction period reference
Further, the dynamic progress adjustment subsystem searches the keywords for the process and materials adopted in the keyword construction based on the network big database, and measures and calculates the time of the next construction period by taking the time as a unit and combining the field material allowance and the equipment state acquired by the basic information management system.
Specifically, the large database is a professional authoritative website formed based on the internet, and comprises a thesis website, an information website, a technical service website and the like of all related building industries, and the time range required by the similar process for the size-changing engineering construction is matched through keyword identification.
Specifically, when keyword matching is performed, a web crawler technology is adopted, and a relatively comprehensive reference is obtained.
Specifically, during the time limit prediction, the time corresponding to the same process is subjected to multi-party comparison, the use time of the finished time limit and the process is referred to, and the final prediction is obtained by means of weight distribution, wherein when the weight is distributed, the weight ratio of the keyword matching to the actual use time of the past time limit is 6: 4.
further, the fixed monitoring unit and the handheld monitoring unit are provided with high-definition cameras.
And further, the system also comprises a display device which is used for displaying the visualization model and the video image acquired by the real-time monitoring system.
Further, the communication mode of the cloud server includes a network cable, mobile data traffic or wireless transmission.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.
Claims (10)
1. A project progress supervision system based on big data is characterized by comprising a project management system, a basic information management system, a real-time monitoring system, a progress management system and a cloud server;
the project management system is used for collecting, recording and managing and planning the project information of the name, type, drawing, construction process and construction material type of the project;
the basic information management system is used for managing and summarizing constructors, construction equipment and construction materials related in project engineering;
the real-time monitoring system is used for collecting data information in real time in the construction process, and the data information comprises video image information, text information and data information;
the progress management system is used for comparing data information acquired by the real-time monitoring system with progress planning performed by the project management system, judging the progress condition of the current period, and performing dynamic progress prediction and progress analysis according to the actual progress;
the cloud server provides communication, storage and management services for all parts in the system.
2. The big data based project progress supervision system according to claim 1, wherein the project management system comprises a first entry unit, a model management unit and a production management unit; the first input unit converts project data and information into electronic data, and can input data acquired by the real-time monitoring system in real time, so that progress comparison is facilitated; the model management unit forms a visual model from the building drawing based on a BIM technology, wherein the visual model has specific knot and size data, and a sampling point is established in the visual model to serve as a sampling basis for the operation of a real-time monitoring system and a progress management system; the production management unit is used for recording the types of the process, the equipment and the materials required in the project construction process.
3. The project progress supervision system based on big data according to claim 2, characterized in that the basic information management system comprises a second entry unit, which is used to enter the specific situations of personnel situation, equipment status, material usage, construction period designed in the actual building process and form electronic data.
4. The project progress supervision system based on big data according to claim 3, characterized in that, the real-time monitoring system includes a fixed monitoring unit and a handheld monitoring unit, the fixed monitoring unit and the handheld monitoring unit are both used as video image data acquisition ends, the fixed monitoring unit is fixedly installed on the periphery of the project site and is located in the sampling point range of the visual model, the handheld monitoring unit is carried on a mobile monitoring camera device, and the specific internal conditions of the project are sampled and monitored in the sampling point range of the visual model.
5. The project progress supervision system based on big data according to claim 4, characterized in that the fixed monitoring unit is in communication connection with a cloud server, the cloud server has a right management unit, and the handheld monitoring unit has a positioning module, an identity authentication module, an image acquisition module and a communication module.
6. The big data based project progress supervision system according to claim 5, characterized in that the progress management system comprises a real-time progress comparison subsystem and a dynamic progress adjustment subsystem; the real-time progress comparison subsystem is provided with an image processing module; and the dynamic progress adjusting submodule is used for combining the comparison result of the progress comparison subsystem with the change of the material personnel related to the project management system and the basic information management system to form dynamic construction period adjustment.
7. The project progress supervision system based on big data as claimed in claim 6, characterized in that the dynamic progress adjustment subsystem performs keyword retrieval on the processes and materials adopted in keyword construction based on the network big database, and performs time measurement and calculation of the next construction period by taking time as unit and combining with the field material surplus and equipment status collected by the basic information management system.
8. The big data based project progress supervision system according to claim 7, characterized in that the fixed monitoring unit and the hand-held monitoring unit each have a high definition camera.
9. The big data based project progress supervision system according to claim 8, characterized by further comprising a display device for displaying the visualization model and video images collected by a real-time monitoring system.
10. The big data based project progress supervision system according to claim 9, wherein the communication mode of the cloud server comprises network cable, mobile data traffic or wireless transmission.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010213028.9A CN111401765B (en) | 2020-03-24 | 2020-03-24 | Engineering progress supervision system based on big data |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010213028.9A CN111401765B (en) | 2020-03-24 | 2020-03-24 | Engineering progress supervision system based on big data |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111401765A true CN111401765A (en) | 2020-07-10 |
CN111401765B CN111401765B (en) | 2024-01-16 |
Family
ID=71436595
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010213028.9A Active CN111401765B (en) | 2020-03-24 | 2020-03-24 | Engineering progress supervision system based on big data |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111401765B (en) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112288225A (en) * | 2020-09-24 | 2021-01-29 | 上海荷福人工智能科技(集团)有限公司 | Engineering construction management system and method based on AI algorithm and super calculation |
CN112508340A (en) * | 2020-11-10 | 2021-03-16 | 浙江鑫润工程管理有限公司 | Project supervision project progress supervision method, system, device and storage medium |
CN112580939A (en) * | 2020-12-03 | 2021-03-30 | 中国十九冶集团有限公司 | BIM + GIS technology-based process management system for highway construction |
CN112950175A (en) * | 2021-04-16 | 2021-06-11 | 重庆中楷工程技术服务有限公司 | Whole-process project management system |
CN113343342A (en) * | 2021-07-07 | 2021-09-03 | 贵州百胜工程建设咨询有限公司 | BIM technology-based construction engineering quantity analysis management method and system and computer storage medium |
CN113362029A (en) * | 2021-06-05 | 2021-09-07 | 浙江宏诚工程咨询管理有限公司 | Unmanned aerial vehicle-based project progress supervision method and device and electronic equipment |
CN113393342A (en) * | 2021-03-30 | 2021-09-14 | 浙江绿城房屋服务***有限公司 | Building decoration project overall process management method and system |
CN113408034A (en) * | 2021-07-12 | 2021-09-17 | 贵州百胜工程建设咨询有限公司 | Engineering construction intelligent cloud management platform based on BIM building three-dimensional model technology |
CN113435864A (en) * | 2021-07-23 | 2021-09-24 | 中信国安建工集团有限公司 | Information management service system for super high-rise building engineering project |
CN113971781A (en) * | 2021-12-03 | 2022-01-25 | 上海建工四建集团有限公司 | Building structure construction progress identification method and device, client and storage medium |
CN114527705A (en) * | 2022-02-17 | 2022-05-24 | 河南省奥瑞环保科技股份有限公司 | Energy-saving control management system for instruments and meters |
CN116452152A (en) * | 2023-05-15 | 2023-07-18 | 哈尔滨商业大学 | Engineering management system based on Internet of things |
CN116934274A (en) * | 2023-09-14 | 2023-10-24 | 济南科金信息技术有限公司 | Engineering progress management system based on artificial intelligence |
CN117114592A (en) * | 2023-06-13 | 2023-11-24 | 华腾建信科技有限公司 | Engineering progress control method and device |
CN117408643A (en) * | 2023-12-12 | 2024-01-16 | 长春建业集团股份有限公司 | Progress monitoring management method and system applied to engineering number intelligent management platform |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1746910A (en) * | 2004-09-11 | 2006-03-15 | 鸿富锦精密工业(深圳)有限公司 | Mould Machining production deploying management system and method |
US20090119268A1 (en) * | 2007-11-05 | 2009-05-07 | Nagaraju Bandaru | Method and system for crawling, mapping and extracting information associated with a business using heuristic and semantic analysis |
CN102609512A (en) * | 2012-02-07 | 2012-07-25 | 北京中机科海科技发展有限公司 | System and method for heterogeneous information mining and visual analysis |
CN104376406A (en) * | 2014-11-05 | 2015-02-25 | 上海计算机软件技术开发中心 | Enterprise innovation resource management and analysis system and method based on big data |
CN104866952A (en) * | 2015-04-28 | 2015-08-26 | 国家电网公司 | Three-dimensional digital management implementation method for hydropower station engineering project |
CN106408254A (en) * | 2016-09-06 | 2017-02-15 | 江苏智通交通科技有限公司 | Highway engineering project supervision system |
CN109447479A (en) * | 2018-10-31 | 2019-03-08 | 广西路桥工程集团有限公司 | One kind being based on three-dimensional visualization project management system |
CN110008588A (en) * | 2019-04-04 | 2019-07-12 | 南京林业大学 | Multidimensional integrated highway engineering construction progress msg management system and method |
CN110084526A (en) * | 2019-05-05 | 2019-08-02 | 广西路桥工程集团有限公司 | A kind of visualization project management monitoring system based on BIM+WBS |
CN110598346A (en) * | 2019-09-20 | 2019-12-20 | 国网江苏省电力工程咨询有限公司 | Interaction method of construction management system and GIM (graphic information management) model |
CN110727774A (en) * | 2019-10-11 | 2020-01-24 | 北京中鹏诚工程造价咨询有限公司 | Engineering cost consultation management system |
-
2020
- 2020-03-24 CN CN202010213028.9A patent/CN111401765B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1746910A (en) * | 2004-09-11 | 2006-03-15 | 鸿富锦精密工业(深圳)有限公司 | Mould Machining production deploying management system and method |
US20090119268A1 (en) * | 2007-11-05 | 2009-05-07 | Nagaraju Bandaru | Method and system for crawling, mapping and extracting information associated with a business using heuristic and semantic analysis |
CN102609512A (en) * | 2012-02-07 | 2012-07-25 | 北京中机科海科技发展有限公司 | System and method for heterogeneous information mining and visual analysis |
CN104376406A (en) * | 2014-11-05 | 2015-02-25 | 上海计算机软件技术开发中心 | Enterprise innovation resource management and analysis system and method based on big data |
CN104866952A (en) * | 2015-04-28 | 2015-08-26 | 国家电网公司 | Three-dimensional digital management implementation method for hydropower station engineering project |
CN106408254A (en) * | 2016-09-06 | 2017-02-15 | 江苏智通交通科技有限公司 | Highway engineering project supervision system |
CN109447479A (en) * | 2018-10-31 | 2019-03-08 | 广西路桥工程集团有限公司 | One kind being based on three-dimensional visualization project management system |
CN110008588A (en) * | 2019-04-04 | 2019-07-12 | 南京林业大学 | Multidimensional integrated highway engineering construction progress msg management system and method |
CN110084526A (en) * | 2019-05-05 | 2019-08-02 | 广西路桥工程集团有限公司 | A kind of visualization project management monitoring system based on BIM+WBS |
CN110598346A (en) * | 2019-09-20 | 2019-12-20 | 国网江苏省电力工程咨询有限公司 | Interaction method of construction management system and GIM (graphic information management) model |
CN110727774A (en) * | 2019-10-11 | 2020-01-24 | 北京中鹏诚工程造价咨询有限公司 | Engineering cost consultation management system |
Non-Patent Citations (1)
Title |
---|
索玉萍等: "《建筑工程管理与造价审计》", 吉林科学技术出版社, pages: 102 - 108 * |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112288225A (en) * | 2020-09-24 | 2021-01-29 | 上海荷福人工智能科技(集团)有限公司 | Engineering construction management system and method based on AI algorithm and super calculation |
CN112508340A (en) * | 2020-11-10 | 2021-03-16 | 浙江鑫润工程管理有限公司 | Project supervision project progress supervision method, system, device and storage medium |
CN112580939A (en) * | 2020-12-03 | 2021-03-30 | 中国十九冶集团有限公司 | BIM + GIS technology-based process management system for highway construction |
CN113393342A (en) * | 2021-03-30 | 2021-09-14 | 浙江绿城房屋服务***有限公司 | Building decoration project overall process management method and system |
CN112950175A (en) * | 2021-04-16 | 2021-06-11 | 重庆中楷工程技术服务有限公司 | Whole-process project management system |
CN113362029A (en) * | 2021-06-05 | 2021-09-07 | 浙江宏诚工程咨询管理有限公司 | Unmanned aerial vehicle-based project progress supervision method and device and electronic equipment |
CN113343342B (en) * | 2021-07-07 | 2022-02-15 | 贵州百胜数源工程技术管理有限公司 | BIM technology-based construction engineering quantity analysis management method and system and computer storage medium |
CN113343342A (en) * | 2021-07-07 | 2021-09-03 | 贵州百胜工程建设咨询有限公司 | BIM technology-based construction engineering quantity analysis management method and system and computer storage medium |
CN113408034A (en) * | 2021-07-12 | 2021-09-17 | 贵州百胜工程建设咨询有限公司 | Engineering construction intelligent cloud management platform based on BIM building three-dimensional model technology |
CN113408034B (en) * | 2021-07-12 | 2022-02-18 | 贵州百胜数源工程技术管理有限公司 | Engineering construction intelligent cloud management platform based on BIM building three-dimensional model technology |
CN113435864A (en) * | 2021-07-23 | 2021-09-24 | 中信国安建工集团有限公司 | Information management service system for super high-rise building engineering project |
CN113971781A (en) * | 2021-12-03 | 2022-01-25 | 上海建工四建集团有限公司 | Building structure construction progress identification method and device, client and storage medium |
CN114527705A (en) * | 2022-02-17 | 2022-05-24 | 河南省奥瑞环保科技股份有限公司 | Energy-saving control management system for instruments and meters |
CN116452152A (en) * | 2023-05-15 | 2023-07-18 | 哈尔滨商业大学 | Engineering management system based on Internet of things |
CN117114592A (en) * | 2023-06-13 | 2023-11-24 | 华腾建信科技有限公司 | Engineering progress control method and device |
CN117114592B (en) * | 2023-06-13 | 2024-03-19 | 华腾建信科技有限公司 | Engineering progress control method and device |
CN116934274A (en) * | 2023-09-14 | 2023-10-24 | 济南科金信息技术有限公司 | Engineering progress management system based on artificial intelligence |
CN117408643A (en) * | 2023-12-12 | 2024-01-16 | 长春建业集团股份有限公司 | Progress monitoring management method and system applied to engineering number intelligent management platform |
CN117408643B (en) * | 2023-12-12 | 2024-03-22 | 长春建业集团股份有限公司 | Progress monitoring management method and system applied to engineering number intelligent management platform |
Also Published As
Publication number | Publication date |
---|---|
CN111401765B (en) | 2024-01-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111401765A (en) | Engineering progress supervisory systems based on big data | |
CN106600501B (en) | Geological disaster group testing and group prevention method and platform for realizing same | |
CN100583168C (en) | Channel patrol checking management system | |
CN211180869U (en) | Intelligent system for construction safety management | |
CN114676984A (en) | System for construction is built to wisdom | |
CN102088365B (en) | Energy consumption collecting and energy-saving metering system of communication room | |
CN110648422A (en) | Standardized inspection method, system and platform | |
CN202134048U (en) | Scenic area visitor distribution statistical system | |
CN113408034B (en) | Engineering construction intelligent cloud management platform based on BIM building three-dimensional model technology | |
CN115019008B (en) | Intelligent 3D model design analysis service management platform | |
CN115238430A (en) | Infrastructure construction on-site monitoring system based on Internet of things | |
CN112988510A (en) | BIM-based road compaction synchronous monitoring and feedback control system | |
CN115705699A (en) | Intelligent highway inspection method and device based on digital twinning technology | |
CN115049306A (en) | Overall process engineering consultation management system | |
CN116579607A (en) | Multi-source data collaborative regional tailing pond risk monitoring method | |
CN109102583A (en) | Ammeter patrolling and checking management system and method | |
CN207690160U (en) | Based on electric line mapping system | |
CN209640902U (en) | A kind of experimental data collection monitoring system of combination two dimensional code and video monitoring | |
CN114091944A (en) | Cloud-end-coordinated distribution network engineering field operation analysis decision system | |
CN115442739B (en) | Temporary communication processing method and device for subway construction, electronic equipment and medium | |
CN115187086A (en) | Intelligent management and control system for emergency management | |
CN114860816A (en) | Water pollution intelligent early warning system integration method, device and related equipment | |
CN113593069A (en) | Intelligent inspection system for mathematics twin | |
CN112102549A (en) | Wisdom building site management system based on cloud platform | |
CN110955168A (en) | Intelligent inspection management method based on power transmission and transformation equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |