CN111335460A - Bolt type prefabricated concrete connection point structure - Google Patents

Bolt type prefabricated concrete connection point structure Download PDF

Info

Publication number
CN111335460A
CN111335460A CN202010238438.9A CN202010238438A CN111335460A CN 111335460 A CN111335460 A CN 111335460A CN 202010238438 A CN202010238438 A CN 202010238438A CN 111335460 A CN111335460 A CN 111335460A
Authority
CN
China
Prior art keywords
flange
bolt
connecting rod
joint structure
concrete joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010238438.9A
Other languages
Chinese (zh)
Inventor
姚俊威
史科
薛茹
王剑利
吴娇龙
吴迪
刘昱芊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadian Zhengzhou Machinery Design and Research Institute Co Ltd
Original Assignee
Huadian Zhengzhou Machinery Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huadian Zhengzhou Machinery Design and Research Institute Co Ltd filed Critical Huadian Zhengzhou Machinery Design and Research Institute Co Ltd
Priority to CN202010238438.9A priority Critical patent/CN111335460A/en
Publication of CN111335460A publication Critical patent/CN111335460A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • E04B1/215Connections specially adapted therefor comprising metallic plates or parts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention provides a bolt type prefabricated concrete connection point structure which comprises an upright post and cross beams arranged on two sides of the upright post, wherein a first flange and a second flange are arranged between the upright post and the cross beams, the first flange is fixedly connected with the upper side and the lower side of the upright post, the second flange is fixedly connected with the upper side and the lower side of the cross beams, connecting through holes matched with each other are formed in the first flange and the second flange, the first flange is inserted into the second flange, and the first flange and the second flange are connected through a connecting piece.

Description

Bolt type prefabricated concrete connection point structure
Technical Field
The invention relates to the technical field of concrete connection nodes, in particular to a bolt type prefabricated concrete connection point structure.
Background
In recent years, China actively promotes building industrialization all the time, relevant policies are given for many times, the development of the building industry of China comprehensively carries out structural adjustment and transformation upgrading, the development starts to be towards the directions of green, industrialization, informatization and the like, and the development of novel building industrialization with assembly type buildings as the key point is emphasized.
The prefabricated assembly type concrete connection node has the advantages of being high in production efficiency, short in construction period, good in product quality, small in environmental influence, capable of being continuously developed, low in labor consumption and the like, but the problems that cast-in-place type concrete connection is low in production efficiency, long in construction period, high in labor consumption and the like are solved.
Disclosure of Invention
In order to solve the problems, the invention provides a bolt type prefabricated concrete connection point structure.
The object of the invention is achieved in the following way:
the utility model provides a prefabricated assembled concrete tie point structure of bolt formula, includes stand and the crossbeam of setting in the stand both sides, be equipped with first flange and second flange between stand and the crossbeam, the upper and lower both sides of first flange fixed connection stand, the upper and lower both sides of second flange fixed connection crossbeam, be equipped with the connect the via hole that the cooperation was used on first flange and the second flange, first flange is pegged graft in the second flange, and first flange and second flange pass through the connecting piece and connect.
The connecting piece comprises a bolt, a connecting sleeve and a connecting rod with threads at two ends, the bolt is inserted in the connecting through hole, the connecting sleeve is in threaded connection with the tail end of the bolt, and the other end of the connecting sleeve is in threaded connection with the connecting rod.
The bolts are arranged on two sides of the second flange, and the connecting rod is connected with two inner sides of the first flange and the second flange through connecting sleeves.
The front side and the rear side of the upright post are provided with cover plates, and the cover plates are provided with a plurality of reinforcing steel bar through holes which are uniformly distributed.
One end of the connecting rod is a positive wire, and the other end of the connecting rod is a negative wire.
The first flange is arranged inside the second flange.
Compared with the prior art, the first flange and the second flange can be connected together through the connecting piece, the construction is simple and convenient, the time is saved, the efficiency is improved, the reinforcing steel bar through hole is formed in the cover plate, the penetration and the positioning of the reinforcing steel bar are facilitated, and the strength and the stability of the structure are enhanced.
Drawings
Fig. 1 is a schematic structural view of the present invention.
Fig. 2 is a side view of fig. 1.
Fig. 3 is a front view of the post.
Fig. 4 is a side view of the post.
Fig. 5 is a schematic structural view of the cover plate.
Fig. 6 is a front view of the cross member.
Fig. 7 is a side view of the cross member.
Fig. 8 is a schematic view of the structure of the connecting rod.
The steel bar connecting structure comprises a beam 1, a second flange 2, a first flange 3, a bolt 4, a connecting sleeve 5, a connecting rod 6, a stand column 7, a cover plate 8 and a steel bar perforation 9.
Detailed Description
As shown in a concave 8 of an attached figure 1, the bolt 4 type prefabricated concrete connection point structure comprises an upright post 7 and cross beams arranged on two sides of the upright post 7, wherein a first flange 3 and a second flange 2 are arranged between the upright post 7 and the cross beams, the first flange 3 is fixedly connected with the upper side and the lower side of the upright post 7, the second flange 2 is fixedly connected with the upper side and the lower side of the cross beams, connecting through holes matched with each other are formed in the first flange 3 and the second flange 2, the first flange 3 is inserted into the second flange 2, and the first flange 3 is connected with the second flange 2 through a connecting piece.
The connecting piece includes bolt 4, adapter sleeve 5 and both ends threaded connecting rod 6, bolt 4 alternates in connect the through hole, adapter sleeve 5 and bolt 4's terminal threaded connection, the other end threaded connection connecting rod 6 of adapter sleeve 5.
The bolts 4 are arranged on two sides of the second flange 2, and the connecting rod 6 is connected with two inner sides of the first flange 3 and the second flange 2 through a connecting sleeve 5.
The front side and the rear side of the upright post 7 are provided with cover plates 8, and the cover plates 8 are provided with a plurality of reinforcing steel bar through holes 9 which are uniformly distributed.
One end of the connecting rod 6 is a positive wire, and the other end of the connecting rod 6 is a negative wire.
The first flange 3 is arranged inside the second flange 2.
The working process of the invention is as follows: with the butt joint of the first flange 3 of stand 7 and the second flange 2 of crossbeam, penetrate bolt 4 in the good connect the through hole of butt joint, 4 other end erection joint covers 5 of bolt, then connect the adapter sleeve 5 of both sides through connecting rod 6, and then with stand 7 and crossbeam fixed connection, apron 8 is fixed in stand 7 both sides, the reinforcing bar passes the reinforcing bar perforation 9 of apron 8, accomplish the installation and the location to the reinforcing bar, the construction is simple and convenient, the time is saved, the efficiency is improved, be equipped with reinforcing bar perforation 9 on the apron 8, be convenient for alternate and the location of reinforcing bar, the intensity and the stability of structure have been strengthened.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, various changes and modifications can be made without departing from the overall concept of the present invention, and these should also be considered as the protection scope of the present invention.

Claims (6)

1. The utility model provides a prefabricated assembled concrete tie point structure of bolt formula, includes stand and the crossbeam of setting in the stand both sides, its characterized in that: the connecting device is characterized in that a first flange and a second flange are arranged between the upright column and the cross beam, the first flange is fixedly connected with the upper side and the lower side of the upright column, the second flange is fixedly connected with the upper side and the lower side of the cross beam, connecting through holes matched with each other are arranged on the first flange and the second flange, the first flange is inserted into the second flange, and the first flange is connected with the second flange through a connecting piece.
2. The bolted precast fabricated concrete joint structure of claim 1, wherein: the connecting piece comprises a bolt, a connecting sleeve and a connecting rod with threads at two ends, the bolt is inserted in the connecting through hole, the connecting sleeve is in threaded connection with the tail end of the bolt, and the other end of the connecting sleeve is in threaded connection with the connecting rod.
3. The bolted precast fabricated concrete joint structure of claim 2, wherein: the bolts are arranged on two sides of the second flange, and the connecting rod is connected with two inner sides of the first flange and the second flange through connecting sleeves.
4. The bolted precast fabricated concrete joint structure of claim 1, wherein: the front side and the rear side of the upright post are provided with cover plates, and the cover plates are provided with a plurality of reinforcing steel bar through holes which are uniformly distributed.
5. The bolted precast fabricated concrete joint structure of claim 1, wherein: one end of the connecting rod is a positive wire, and the other end of the connecting rod is a negative wire.
6. The bolted precast fabricated concrete joint structure of claim 1, wherein: the first flange is arranged inside the second flange.
CN202010238438.9A 2020-03-30 2020-03-30 Bolt type prefabricated concrete connection point structure Pending CN111335460A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010238438.9A CN111335460A (en) 2020-03-30 2020-03-30 Bolt type prefabricated concrete connection point structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010238438.9A CN111335460A (en) 2020-03-30 2020-03-30 Bolt type prefabricated concrete connection point structure

Publications (1)

Publication Number Publication Date
CN111335460A true CN111335460A (en) 2020-06-26

Family

ID=71180437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010238438.9A Pending CN111335460A (en) 2020-03-30 2020-03-30 Bolt type prefabricated concrete connection point structure

Country Status (1)

Country Link
CN (1) CN111335460A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113882509A (en) * 2021-09-29 2022-01-04 深圳市市政工程总公司 Prefabricated post and prefabricated beam clamping and splicing type rigid connection structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113882509A (en) * 2021-09-29 2022-01-04 深圳市市政工程总公司 Prefabricated post and prefabricated beam clamping and splicing type rigid connection structure

Similar Documents

Publication Publication Date Title
CN201546435U (en) Bolted stayed cantilever scaffold
CN104372967B (en) A kind of cooling stack inclined strut structure and construction method thereof
CN210887559U (en) Low multi-storey steel structure residential system
CN110748063B (en) Assembled steel bar truss floor support plate with support
CN111335460A (en) Bolt type prefabricated concrete connection point structure
CN208023713U (en) A kind of prefabrication and assembly construction steel reinforced concrete beam column connection structure
CN112922237A (en) Take telescopic assembled reinforced concrete post and girder steel connected node
CN212613012U (en) Bolt type prefabricated concrete connection point structure
CN207377233U (en) A kind of triple Aseismic Structure Systems of preprocessing
CN212376021U (en) Steel corbel and support-free installation connecting node comprising same
CN212053252U (en) Square steel pipe column-H-shaped steel beam connecting node for connecting outer sleeve with double channel steel
CN208815934U (en) A kind of layer reinforced structure of steel building
CN215802266U (en) Direct-insertion type bolt-free connecting joint of closed cavity column and steel beam
CN207484676U (en) A kind of buckling restrained brace reinforced concrete frame dry type flexible beam-column connection
CN215926273U (en) Prefabricated frame concrete structure connected node
CN214658653U (en) A overhanging type scaffold strutting arrangement for building engineering
CN202152442U (en) Assembling type steel tube-vertical post system
CN210396103U (en) Connecting piece for shear wall template system, external wall panel and shear wall template system
CN213062632U (en) Assembled steel truss structure
CN113944309A (en) Cold-formed steel support beam framework and construction method thereof
CN212104522U (en) Prefabricated assembled concrete connection structure
CN111335461A (en) Prefabricated assembled concrete connection structure
CN220978747U (en) High-altitude cantilever structure formwork construction platform easy to assemble and disassemble and capable of being turned
CN215168094U (en) Connecting structure of T beam formwork
CN219059780U (en) Support for large-span cast-in-situ bridge construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination