CN111130144B - Small hydropower station quick grid connection method considering deviation and trend change - Google Patents

Small hydropower station quick grid connection method considering deviation and trend change Download PDF

Info

Publication number
CN111130144B
CN111130144B CN201911285017.5A CN201911285017A CN111130144B CN 111130144 B CN111130144 B CN 111130144B CN 201911285017 A CN201911285017 A CN 201911285017A CN 111130144 B CN111130144 B CN 111130144B
Authority
CN
China
Prior art keywords
voltage
small hydropower
distribution network
hydropower station
control system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201911285017.5A
Other languages
Chinese (zh)
Other versions
CN111130144A (en
Inventor
李嘉琪
林颖
郑少铧
陈辉
王智东
张紫凡
王玕
陈志峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou College of South China University of Technology
Original Assignee
Guangzhou College of South China University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou College of South China University of Technology filed Critical Guangzhou College of South China University of Technology
Priority to CN201911285017.5A priority Critical patent/CN111130144B/en
Publication of CN111130144A publication Critical patent/CN111130144A/en
Priority to PCT/CN2020/116365 priority patent/WO2021114804A1/en
Application granted granted Critical
Publication of CN111130144B publication Critical patent/CN111130144B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/40Synchronising a generator for connection to a network or to another generator

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention provides a small hydropower station rapid water supply considering deviation and trend changeThe grid connection method is characterized in that the small hydropower station comprises a voltage transformer and a control system, and the voltage of the small hydropower station side is acquiredy a And distribution network voltagey b Is conveyed to a control system which applies small hydropower side voltagey a And distribution network voltagey b Comparing, and controlling the reclosing of the small hydropower station to be started by the control system according to a comparison result; the acquisition points are randomly selected, so that the reliability of the method is improved; by a relatively small hydroelectric side voltagey a And distribution network voltagey b The difference between them, and then performing an operation whenY≤0.05*(|y a1|+…+|y an I) is established, and the voltage of the small hydropower side isy a Trend of change and distribution network voltagey b The variation trends of the grid-connected; at the same time by judgmenty=|y b y a |>0.05*y a Whether it is true or not, so that the voltage on the small hydropower side can be avoidedy a And distribution network voltagey b The voltage sampling value of (2) is polluted by data; and meanwhile, the step of comparing the whole trend is set, so that the reliability of the method can be improved.

Description

Small hydropower station quick grid connection method considering deviation and trend change
Technical Field
The invention relates to the field of small hydropower station grid connection, in particular to a small hydropower station quick grid connection method considering deviation and trend change.
Background
The existing closing schemes all need long waiting time, and at the cost of disconnecting all small power supplies in the area, reclosing needs to be carried out on the small hydropower stations again after the small hydropower stations are disconnected, at the moment, for the distributed small hydropower stations, more time is consumed for re-operating grid connection, the operation is also complex, the recovery of a normal power grid operation mode needs a long time, short-time power failure of a line cannot be avoided, and the requirement of a client on power supply reliability cannot be met.
The existing implementation scheme adopts the existing small hydropower grid-connected intelligent electronic equipment and a multi-purpose full-wave Fourier algorithm, at least one cycle data window (20 ms) is needed, the calculation process is complex, firstly, the full-wave Fourier calculation needs to be carried out on the collected voltages of the small hydropower side and the power distribution network side, then, three quantities of voltage amplitude, phase and frequency of the small hydropower side and the power distribution network side need to be calculated and extracted, and finally, the extracted three quantities of voltage amplitude, phase and frequency need to be compared one by one to judge whether the grid-connected requirement is met.
The method has longer fault detection time, leads to longer power restoration time, and thus leads to lower power supply reliability. Meanwhile, when a fault occurs, the power distribution network adjusts the voltage parameters by cutting off the power supply end or the load end, so that the closing time can be greatly prolonged.
Disclosure of Invention
In order to solve the problems in the prior art, the invention provides the small hydropower station quick grid-connection method which is quick in grid connection and high in data accuracy and considers deviation and trend change.
In order to achieve the purpose, the technical scheme of the invention is as follows: a method for quickly connecting small hydropower station to a grid in consideration of deviation and trend change comprises the steps that the small hydropower station comprises a voltage transformer and a control system, and the voltage transformer collects the voltage of the small hydropower station sidey a And distribution network voltagey b Is conveyed to a control system which applies small hydropower side voltagey a And distribution network voltagey b Comparing, and controlling the reclosing of the small hydropower station to be started by the control system according to a comparison result;
when the small hydropower station is quickly connected to the grid, the method comprises the following steps:
a) whether the small hydropower station detects tripping; if yes, performing step b);
b) starting a control system, and randomly setting acquisition points and the number n of the acquisition points; then step c) is carried out;
c) small hydropower station side voltage with n values collected by voltage transformery a And distribution network voltagey b (ii) a And transmitting the collected data to a control system, and then performing step d);
d) the control system calculates the voltage at the small hydropower side of one of the collection pointsy a And distribution network voltagey b The difference between them, and then step e) is carried out;
e) determining noty b -y a |>0.05*y a If yes, performing step f), and if not, performing step j);
f) proceed withY=|y b1-y a1|+…+|y bn -y an|Operation, when Y finishes the small hydropower side voltage of n acquisition pointsy a And distribution network voltagey b The difference between the two is the sum, then step g) is carried out; when Y does not finish the small hydropower side voltage of n acquisition pointsy a And distribution network voltagey b If the difference between the two points is equal to the sum, returning to the step d) to calculate another acquisition point;
g) judgment ofY≤0.05*(|y a1|+…+|y an I) whether the result is true, if true, performing step h); if the grid connection is not established, the grid connection cannot be carried out;
h) relatively small side voltage of water and electricityy a Trend of change and distribution network voltagey b The graphs are similar to the graph in step i);
i) starting a reclosing switch;
j) discarding the collection point, and randomly collecting by the voltage transformer to remove the step c)A new collection point is arranged outside, and the control system compares the voltage of the small hydropower side of the collection pointy a And distribution network voltagey b The difference between them, and then step e) is carried out;
in the method, the acquisition points are randomly selected, so that the reliability of the method is improved; by a relatively small hydroelectric side voltagey a And distribution network voltagey bIf the difference is larger than 0.05 times of the voltage value of the small hydropower side, the difference is accumulated, otherwise the collection point is abandoned and is replenished with a collection point, and then the operation is carried out, when the difference is larger than the voltage value of the small hydropower sideY≤0.05*(|y a1|+…+|y an I) is established, and the voltage of the small hydropower side isy a Trend of change and distribution network voltagey b The variation trends of the grid-connected voltage values are similar, so that grid-connected conditions are met, the grid-connected method is simple, only comparison and judgment are carried out on the voltage values, and the time required by grid connection is short; at the same time by judgmenty=|y b -y a |>0.05*y a Whether it is true or not, so that the voltage on the small hydropower side can be avoidedy a And distribution network voltagey bThe voltage sampling value of (2) is polluted by data; and meanwhile, the step of comparing the whole trend is set, so that the reliability of the method can be improved.
Further, small hydropower side voltagey a And distribution network voltagey b The same collection quantity, the voltage mutual inductor collects the voltage of the small hydropower station side at the same pointy a And distribution network voltagey b And (5) synchronous acquisition.
Thus ensuring the voltage of the small hydropower sidey a And distribution network voltagey b The synchronism of (2).
Further, n has a value of 5.
Therefore, the condition that grid connection is sporadic due to too little data acquisition is avoided; meanwhile, the phenomenon that the grid connection time is increased due to excessive data acquisition is avoided.
Further, randomly setting the collection points is realized by randomly setting the collection time.
This improves the reliability of the method.
Drawings
FIG. 1 is a flow chart of the present invention
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
As shown in figure 1, the small hydropower station rapid grid-connected method considering deviation and trend change comprises a voltage transformer and a control system, wherein the voltage transformer collects voltage on the side of the small hydropower stationy a And distribution network voltage ybIs conveyed to a control system which applies small hydropower side voltagey a And distribution network voltagey b Comparing, and controlling the reclosing of the small hydropower station to be started by the control system according to a comparison result;
when the small hydropower station is quickly connected to the grid, the method comprises the following steps:
a) whether the small hydropower station detects tripping; if yes, performing step b);
b) starting a control system, and randomly setting acquisition points and the number n of the acquisition points; then step c) is carried out;
c) small hydropower station side voltage with n values collected by voltage transformery a And distribution network voltagey b (ii) a And transmitting the collected data to a control system, and then performing step d);
d) the control system calculates the voltage at the small hydropower side of one of the collection pointsy a And distribution network voltagey b The difference between them, and then step e) is carried out;
e) determining noty b -y a |>0.05*y a If yes, performing step f), and if not, performing step j);
f) proceed withY=|y b1-y a1|+…+|y bn -y an I calculation, namely when Y finishes the voltage of the small hydropower side of n acquisition pointsy a And distribution network voltagey b The difference between the two is the sum, then step g) is carried out; when Y does not finish the small hydropower side voltage of n acquisition pointsy a And distribution network voltagey b If the difference between the two points is equal to the sum, returning to the step d) to calculate another acquisition point;
g) judgment ofY≤0.05*(|y a1|+…+|y an I) whether the result is true, if true, performing step h); if the grid connection is not established, the grid connection cannot be carried out;
h) relatively small side voltage of water and electricityy a Trend of change and distribution network voltagey b The graphs are similar to the graph in step i);
i) starting a reclosing switch;
j) discarding the collection point, randomly collecting a new collection point except the step c) by a voltage transformer, and comparing the small hydropower side voltage of the collection point by a control systemy a And distribution network voltagey b The difference between the voltage values is then carried out in the step e), in the invention, the acquisition points are randomly selected, and n is the voltage of the small hydropower sidey a And distribution network voltagey b The number of acquisition points; small hydropower side voltage with same acquisition quantity and acquisition points of voltage transformersy a And distribution network voltagey b Thus ensuring the voltage of the small hydropower sidey a And distribution network voltagey b The synchronism of (2). The control system compares the voltages of the same small hydropower stations at the acquisition pointsy a And distribution network voltagey b The difference between them, which is comparable.
In this embodiment, n has a value of 5; small hydropower side voltagey a And distribution network voltagey b Five are provided. The condition that grid connection is sporadic due to too little data acquisition is avoided; meanwhile, the phenomenon that the grid connection time is increased due to excessive data acquisition is avoided. Acquisition points include time point T1, time point T2, time point T3, time point T4, and time point T5; small hydropower side voltagey a IncludedVoltage ofy a1Voltage ofy a2Voltage ofy a3Voltage ofy a4And voltagey a5(ii) a Distribution network voltagey b Including a voltagey b1Voltage ofy b2Voltage ofy b3Voltage ofy b4And voltagey b5
Voltage ofy a1Voltage ofy a2Voltage ofy a3Voltage ofy a4And voltagey a5Respectively small hydroelectric side voltagey a Real-time voltages at time point T1, time point T2, time point T3, time point T4, and time point T5.
Voltage ofy b1Voltage ofy b2Voltage ofy b3Voltage ofy b4And voltagey b5Respectively the voltage of the distribution networky b Real-time voltages at time point T1, time point T2, time point T3, time point T4, and time point T5.
At time point T1, the voltage transformer couples the voltagesy a1And voltagey b1Collecting; at time point T2, the voltage transformer couples the voltagesy a2And voltagey b2Collecting; voltage transformer pair voltage at time point T3y a3And voltagey b3Collecting; at time point T4, the voltage transformer couples the voltagesy a4And voltagey b4Collecting voltage of a voltage transformer at a time point T5y a5And voltagey b5And (5) collecting.
Control system passes formulay=|y b -y a |>0.05*y a Calculating the voltagey a1And voltagey b1Difference between themy 1When is coming into contact withy 1>0.05* y a1If true; namely, the difference between the two voltage values is larger than half of the sampling value, and then the differences of the five acquisition points are added; calculating a difference value and Y;
y is the sum of the difference values of the n acquisition points; when Y finishes the small hydropower side voltage of n acquisition pointsy a And distribution network voltagey b Comparing the variation trend if the difference between the two is the sum; when Y finishes the small hydropower side voltage of n collection points in the futurey a And distribution network voltagey b If the difference between the two points is equal to the sum, returning to the step d) to calculate another acquisition point; for example, in this embodiment, it is assumed that the current acquisition point is time point T2, and acquisition at time point T3 is completed, since 3 time points in n acquisition points are used for operation, Y only has the accumulated sum of the difference values of T2 and T3, and the accumulated sum of 5 acquisition points is not completed, the process returns to step d) to perform difference comparison of another acquisition point except T2 and T3, and the process proceeds to the next round of operation according to the judgment of the difference values.
When true; then will compare the voltage at the relatively small hydropower sidey a Trend and distribution network voltagey b The trend of change of (c); specifically, curves are generated by corresponding a plurality of small hydropower side voltage values with time points, whether the two curves are similar or not is determined according to a curve similarity calculation algorithm such as a cosine similarity algorithm, and when the change trends of the two curves are similar, a reclosing switch is started to carry out grid connection.
When in usey 1>0.05*y a1If not, the time point T1 is discarded; the abandoned time points are not put into the difference value and Y formula for calculation; the voltage transformer collects a new collecting point which is a time point T6, and the calculated voltage collected at the time point T6 is calculatedy a6And voltagey b6Difference between themy 6And make a judgment ony 6>0.05*y a6Whether the result is true or not; if true, willy 6Added to the difference and Y equations, the number of n is unchanged. The difference sum Y at this time is:
if it isy 6>0.05*y a6If the time point T6 is not the same, the time point T6 is abandoned, the voltage transformer acquires a new acquisition point, and the new acquisition point is the time point T7 and is calculated.
In the method, the acquisition points are randomly selected, so that the reliability of the method is improved; by a relatively small hydroelectric side voltagey a And distribution network voltagey b The difference between them, and then performing an operation whenY≤0.05*(|y a1|+…+|y an I) is established, and the small hydropower side voltage y a Trend of change and distribution network voltagey b The variation trends of the grid-connected; at the same time by judgmenty=|y b -y a |>0.05*y a Whether it is true or not, so that the voltage on the small hydropower side can be avoidedy a And distribution network voltagey b The voltage sampling value of (2) is polluted by data; and meanwhile, the step of comparing the whole trend is set, so that the reliability of the method can be improved.

Claims (3)

1. A small hydropower station quick grid-connection method considering deviation and trend change is characterized in that: the small hydropower station comprises a voltage transformer and a control system, wherein the voltage transformer collects the voltage of the small hydropower station sidey a And distribution network voltage ybIs conveyed to a control system which applies small hydropower side voltagey a And distribution network voltagey b Comparing, and controlling the reclosing of the small hydropower station to be started by the control system according to a comparison result;
when the small hydropower station is quickly connected to the grid, the method comprises the following steps:
a) whether the small hydropower station detects tripping; if yes, performing step b);
b) starting a control system, and randomly setting acquisition points and the number n of the acquisition points; then step c) is carried out; the acquisition point is a sampling time point;
c) voltage to voltage converterSmall hydropower station side voltage with n numerical values acquired by sensory a And distribution network voltagey b (ii) a And transmitting the collected data to a control system, and then performing step d); small hydropower side voltagey a And distribution network voltagey bThe same collection quantity, the voltage mutual inductor collects the voltage of the small hydropower station side at the same pointy a And distribution network voltagey bSynchronously collecting;
d) the control system calculates the voltage at the small hydropower side of one of the collection pointsy a And distribution network voltagey b The difference between them, and then step e) is carried out;
e) determining noty b -y a |>0.05*y a If yes, performing step f); if not, step j);
f) proceed withY=|y b1-y a1|+…+|y nb-y an I calculation, namely when Y finishes the voltage of the small hydropower side of n acquisition pointsy a And distribution network voltagey b The difference between the two is the sum, then step g) is carried out; when Y does not finish the small hydropower side voltage of n acquisition pointsy a And distribution network voltagey b If the difference between the two points is equal to the sum, returning to the step d) to calculate another acquisition point;
g) judgment ofY≤0.05*(|y a1|+…+|y an I) whether the result is true, if true, performing step h); if the grid connection is not established, the grid connection cannot be carried out;
h) relatively small side voltage y of water and electricity a Trend of change and distribution network voltagey bThe graphs are similar to the graph in step i); if not, go to step j);
i) starting a reclosing switch;
j) discarding the collection point, randomly collecting a new collection point except the step c) by a voltage transformer, and comparing the small hydropower side voltage of the collection point by a control systemy a And distribution networkVoltage ofy b The difference between them, and then step e) is performed.
2. The small hydropower station rapid grid connection method considering deviation and trend change as claimed in claim 1, is characterized in that: n has a value of 5.
3. The small hydropower station rapid grid connection method considering deviation and trend change as claimed in claim 1, is characterized in that: the random setting of the acquisition points is realized by randomly setting the acquisition time.
CN201911285017.5A 2019-12-13 2019-12-13 Small hydropower station quick grid connection method considering deviation and trend change Active CN111130144B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201911285017.5A CN111130144B (en) 2019-12-13 2019-12-13 Small hydropower station quick grid connection method considering deviation and trend change
PCT/CN2020/116365 WO2021114804A1 (en) 2019-12-13 2020-09-21 Small hydropower station rapid grid connection method considering deviation and trend changes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911285017.5A CN111130144B (en) 2019-12-13 2019-12-13 Small hydropower station quick grid connection method considering deviation and trend change

Publications (2)

Publication Number Publication Date
CN111130144A CN111130144A (en) 2020-05-08
CN111130144B true CN111130144B (en) 2021-11-19

Family

ID=70498792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911285017.5A Active CN111130144B (en) 2019-12-13 2019-12-13 Small hydropower station quick grid connection method considering deviation and trend change

Country Status (2)

Country Link
CN (1) CN111130144B (en)
WO (1) WO2021114804A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111130144B (en) * 2019-12-13 2021-11-19 华南理工大学广州学院 Small hydropower station quick grid connection method considering deviation and trend change

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101719679A (en) * 2009-12-21 2010-06-02 中国电力科学研究院 Method for synchronizing distributed power supply and power grid
CN101876690A (en) * 2010-05-28 2010-11-03 长沙威克电力技术科技有限公司 Generator contemporary process monitoring and analyzing system
CN102075001A (en) * 2010-06-25 2011-05-25 广东省电力调度中心 Intelligent incoming line backup power automatic switching method and device suitable for areas with abundant small hydroelectric stations
CN103560535A (en) * 2013-11-20 2014-02-05 北京四方继保自动化股份有限公司 Micro-grid operation mode seamless switching method based on energy storage current transformer
CN109217266A (en) * 2018-09-06 2019-01-15 南京国电南自电网自动化有限公司 Small power station's adaptive direction current protection definite value switching method, device and equipment
CN110429660A (en) * 2019-07-19 2019-11-08 国家电网有限公司 A kind of generator connecting in parallel with system asynchronous switch-on pulse issues the determination method of time

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101752875A (en) * 2008-12-09 2010-06-23 王永强 Interconnecting meter
CN205429687U (en) * 2015-10-19 2016-08-03 广东电网有限责任公司茂名供电局 Heavy switching -on device of distribution lines of small power station
US10103544B2 (en) * 2016-02-05 2018-10-16 Sungrow Power Supply Co., Ltd. Medium and high voltage grid-connected power generation system, medium and high voltage grid-connected system and control unit thereof
JP7012513B2 (en) * 2017-11-13 2022-01-28 株式会社日立製作所 Hydropower system
CN109599902B (en) * 2018-12-24 2024-02-20 北京天诚同创电气有限公司 Synchronous presynchronization and synchronous closing detection control method and device for micro-grid
CN111130144B (en) * 2019-12-13 2021-11-19 华南理工大学广州学院 Small hydropower station quick grid connection method considering deviation and trend change

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101719679A (en) * 2009-12-21 2010-06-02 中国电力科学研究院 Method for synchronizing distributed power supply and power grid
CN101876690A (en) * 2010-05-28 2010-11-03 长沙威克电力技术科技有限公司 Generator contemporary process monitoring and analyzing system
CN102075001A (en) * 2010-06-25 2011-05-25 广东省电力调度中心 Intelligent incoming line backup power automatic switching method and device suitable for areas with abundant small hydroelectric stations
CN103560535A (en) * 2013-11-20 2014-02-05 北京四方继保自动化股份有限公司 Micro-grid operation mode seamless switching method based on energy storage current transformer
CN109217266A (en) * 2018-09-06 2019-01-15 南京国电南自电网自动化有限公司 Small power station's adaptive direction current protection definite value switching method, device and equipment
CN110429660A (en) * 2019-07-19 2019-11-08 国家电网有限公司 A kind of generator connecting in parallel with system asynchronous switch-on pulse issues the determination method of time

Also Published As

Publication number Publication date
CN111130144A (en) 2020-05-08
WO2021114804A1 (en) 2021-06-17

Similar Documents

Publication Publication Date Title
CN110707686B (en) Transformer area identification method and transformer area line topology construction method
CN109416379B (en) Method for determining mutual inductance voltage sensitivity coefficient among multiple measurement nodes of power network
CN107238779B (en) A kind of fault distance-finding method of active power distribution network
Mugnier et al. Model-less/measurement-based computation of voltage sensitivities in unbalanced electrical distribution networks
WO2011035461A1 (en) State-matrix-independent dynamic process estimation method in real-time for weakly observable measurement nodes without pmu
CN107093895B (en) online transient state safety and stability assessment method based on automatic screening of expected fault set
CN109586301B (en) Intelligent distribution network local voltage control method based on synchronous phasor measurement equivalence
CN106872855A (en) One-phase earthing failure in electric distribution network adaptive failure segmentation method based on transient signal
CN111130144B (en) Small hydropower station quick grid connection method considering deviation and trend change
CN102230948A (en) Active high voltage direct current switch oscillation loop parameter on-line measuring system and method thereof
CN107785920A (en) Control method and device for converting ground return wire into metal return wire and power transmission system
CN104410165A (en) Micro-network interconnection method and system
Duong et al. Online voltage stability monitoring based on PMU measurements and system topology
CN109858061A (en) Distribution network equivalence and simplifying method towards voltage power sensitivity estimation
CN109633506A (en) Data acquisition check method and monitor control system in DC transmission system
Zhang et al. Motor driver-based topology of integrated on-board charging system and data-driven inductance identification method
CN112731014A (en) Island detection method and device for direct-current interconnected power distribution system
CN109901003A (en) A kind of inverter power fault detection method and system
CN112557813B (en) Method for judging voltage stability of power grid under simultaneous fault of multiple loops of direct current
CN103944158B (en) A kind of online Poewr control method based on small interference stability risk supervision and system
CN109460896A (en) A kind of power grid 110kV route N-1 risk automatically scanning analysis method
CN116316642A (en) Electric device is rocked in defending with independently match mode
CN113138326B (en) Insulation detection system, insulation detection method and photovoltaic system
CN111130143B (en) Small hydropower station rapid synchronization method for directly comparing voltage sampling values
CN103779875A (en) Method for obtaining equivalent impedance ratio of grid connection transmission line in distributed system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant