CN110991814A - Coal mine safety dual-prevention mechanism management system - Google Patents

Coal mine safety dual-prevention mechanism management system Download PDF

Info

Publication number
CN110991814A
CN110991814A CN201911099686.3A CN201911099686A CN110991814A CN 110991814 A CN110991814 A CN 110991814A CN 201911099686 A CN201911099686 A CN 201911099686A CN 110991814 A CN110991814 A CN 110991814A
Authority
CN
China
Prior art keywords
risk
module
management
coal mine
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911099686.3A
Other languages
Chinese (zh)
Inventor
章惟康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Zhenxun Software Co ltd
Original Assignee
Hefei Zhenxun Software Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Zhenxun Software Co ltd filed Critical Hefei Zhenxun Software Co ltd
Priority to CN201911099686.3A priority Critical patent/CN110991814A/en
Publication of CN110991814A publication Critical patent/CN110991814A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Forestry; Mining

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Primary Health Care (AREA)
  • Animal Husbandry (AREA)
  • General Health & Medical Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Agronomy & Crop Science (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses a coal mine safety double prevention mechanism management system, which belongs to the technical field of coal mine safety and comprises a prevention management system, wherein the prevention management system comprises a user management module, a risk management and control module, a statistical module and a background management module; the system comprises a user management module, a risk management and control module, a statistic module and a background management module, wherein the user management module is used for managing users logging in the system, the risk management and control module is used for managing hidden risks in the safety production of the coal mine, the statistic module is used for counting coal mine risk data, and the background management module is used for managing the normal use of the system; the functions of the risk management and control module comprise risk identification, risk list and risk patrol, wherein the risk identification is used for distinguishing whether the equipment has risks and risk types. The risk management and control module manages and controls the risk of the equipment, the risk management and control comprises risk identification, inventory and patrol, the risk which possibly exists is identified and listed, the hidden risk is avoided, and the running safety of the equipment is improved.

Description

Coal mine safety dual-prevention mechanism management system
Technical Field
The invention relates to the technical field of coal mine safety, in particular to a coal mine safety dual-prevention mechanism management system.
Background
95% of coal mines in China are underground operation, coal bed occurrence conditions are complex and changeable, and gas coal dust explosion, coal and gas outburst, rock burst and roof disaster accidents frequently occur. Particularly, in more than ten years, the mining conditions are more complex due to the increase of the mining depth and strength, the major dynamic disasters are increasingly aggravated, the coal mine safety management is the necessary way for the management and the reform of the current coal mine enterprises, the safety management is enhanced, the safety production management level of the coal mine enterprises can be effectively improved, and the effects of high yield, high quality and safety are achieved.
The coal mine safety condition in China is poor, and besides the factors of complex geological conditions, serious natural disasters, poor equipment, low technology level and the like of the coal mine in China, the coal mine safety management method mainly has the following reasons: coal mine equipment lacks the control of risks when working.
The traditional coal mine safety management generally adopts a monitoring system to monitor each device, and timely alarms when the device is in an abnormal state, but the parameter data of the device counted in such a way cannot be unified and can only be notified to maintenance personnel when the device is in a problem, so that the aspect of controlling the risk is single, the risk estimation capability is poor, the risk cannot be estimated, and the specific inquiry of the risk information of the device is not convenient.
Disclosure of Invention
The invention aims to provide a coal mine safety dual prevention mechanism management system for solving the problems that the traditional coal mine safety management system cannot estimate the equipment risk and is not convenient to inquire the risk information in real time, and the coal mine safety dual prevention mechanism management system has the advantages that the risk equipment can be intuitively inquired, and even if the risk is restrained, the coal mine safety dual prevention mechanism management system has the function of estimating the risk.
The coal mine safety dual prevention mechanism management system comprises a prevention management system, wherein the prevention management system comprises a user management module, a risk management and control module, a statistical module and a background management module;
the system comprises a user management module, a risk management and control module, a statistic module and a background management module, wherein the user management module is used for managing users logging in the system, the risk management and control module is used for managing hidden risks in the safety production of the coal mine, the statistic module is used for counting coal mine risk data, and the background management module is used for managing the normal use of the system;
the functions of the risk management and control module comprise risk identification, a risk list and risk patrol, wherein the risk identification is used for distinguishing whether the equipment has risks and risk types, and the risk list is used for listing risk levels and risk solving means.
Preferably, the risk management and control includes a main control unit, a sensor group, a device state monitoring unit and a server cluster, and the sensor group and the device state monitoring unit perform data interaction through a wireless gateway.
Preferably, the equipment state monitoring adopts a camera to acquire a working picture of the equipment.
Preferably, the server cluster comprises a GIS server, a database server and a comparison server, the comparison server is used for comparing the collected state data with the safety data and alarming when the data is abnormal, and an alarm and a short message alarm module are installed at the alarm output end.
Preferably, the GIS server is combined with a GPS positioning module in the coal mine equipment to display the position of each equipment on a map.
Preferably, the user management module includes user login and user registration.
Preferably, the statistic module comprises a maintenance statistic module, a risk statistic module and a report generation module.
Preferably, the background management module includes role assignment, authority management and system configuration.
Compared with the prior art, the invention has the beneficial effects that:
1. the risk management and control module manages and controls the risk of equipment existence, the risk management and control includes risk identification, inventory and inspection, identify and enumerate the risk that probably exists, avoid hiding the existence of risk, improve the security of equipment operation, and the risk identification includes annual identification and special item identification, can be according to annual time, all risks that accord with the condition of present year are inquired in a flexible way to each risk point or risk type or risk level condition, also can inquire the risk that accords with the condition according to the risk type, make things convenient for managers to inquire the risk and can in time prevent the risk.
2. Through at management and control module internally mounted server cluster, data that the control of sensor group and equipment state was gathered are saved and are compared with normal state data, can discover whether every equipment goes wrong, if discover the risk then carry out the risk alarm through siren and SMS alarm module, can inform near fortune dimension personnel or long-range fortune dimension personnel to maintain, the inside alarm function of risk management and control module uses with the cooperation of inquiry risk function can dual protection equipment, and still include in the entire system that the statistics module is used for statistics maintenance data, risk data and generate the report form, help the direct-viewing inquiry risk data of managers.
Drawings
Fig. 1 is a schematic structural diagram of internal functional modules of the preventive management system according to the present invention.
Fig. 2 is a schematic diagram illustrating connection of internal modules of the risk management module according to the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-2, the coal mine safety dual prevention mechanism management system includes a prevention management system, where the prevention management system includes a user management module, a risk management and control module, a statistics module, and a background management module; the system comprises a user management module, a risk management and control module, a statistic module and a background management module, wherein the user management module is used for managing users logging in the system, the risk management and control module is used for managing hidden risks in the safety production of the coal mine, the statistic module is used for counting coal mine risk data, and the background management module is used for managing the normal use of the system; the functions of the risk management and control module comprise risk identification, a risk list and risk patrol, wherein the risk identification is used for identifying whether the equipment has risks and risk types, the risk list is used for listing risk levels and risk solving means, and annual risks are various risk points, risk types and risk levels displayed in a form. By presenting the query. All risks meeting the conditions in the current year can be flexibly inquired according to the annual time, each risk point or risk type or risk level condition, and the special risks are special risk identification aiming at a special working face, such as: the risk is always, major risk, the number index of general risk, risk list can see a certain time point in detail, the risk description that the risk point takes place, and the risk type, main management and control means measure, and the risk level of this risk, and implement to manage and control person responsible, can be very clear to the risk handle accuse, and the theory of responsible person, can be according to inquiring time, or risk level, remove the state to inquire about the inquiry risk, convenient succinct, easy operation.
The risk control system comprises a master control unit, a sensor group, an equipment state monitoring and server cluster, wherein the sensor group and the equipment state monitoring are in data interaction through a wireless gateway, the equipment state monitoring adopts a camera to acquire a working picture of the equipment, the server cluster comprises a GIS server, a database server and a comparison server, the comparison server is used for comparing acquired state data with safety data and alarming when the data is abnormal, an alarm and a short message alarm module are installed at an alarm output end, the GIS server is combined with a GPS positioning module in the coal mine equipment to display the position of each equipment on a map, the sensor group is used for acquiring the working parameter of each coal mine equipment or the environmental parameter of a specific area, the equipment state monitoring acquires an equipment running picture or an environmental picture through the camera to provide data support for risk prediction, the data that sensor group and equipment state control gathered all send for the main control unit through wireless gateway, and the main control unit shifts the packing with data and gives the server cluster, and GIS server among the service cluster provides the map function, cooperatees with the GPS orientation module of data acquisition equipment, can confirm the equipment position rapidly, and the data base server storage data of gathering, contrast the server and compare the data of gathering with normal data to confirm whether reach risk value, can effectually report to the police.
The user management module comprises user login and user registration, a user name and a password are input, and if the user name is input wrongly, a prompt pops up: the user does not exist! (ii) a If the password is wrong, prompting that: incorrect password! After the user name and the password are correctly input, the user logs in by clicking, namely, the user enters a main page of a system, the login operation is completed, the statistical module comprises a maintenance statistics module, a risk statistics module and a report generation module, the record of each maintenance of coal mine equipment is maintained by the maintenance statistics module, the equipment omission is prevented, the risk is supposed to be sent, the risk statistics module is used for counting the risk data of each stage or each type, data support is provided for risk identification, the report generation module is used for carrying out statistical analysis on a visual data chart, each risk index and percentage are clearly displayed, each type of risk is newly added every day, and the removal of each type of risk is as: the risk of gas, conflagration, explosion etc. is relieved, can the audio-visual prevention risk of accomplishing, control risk, statistics risk, analysis risk, backstage management module includes role distribution, authority management and system configuration.
According to the risk management and control system, risks existing in equipment are managed and controlled through a risk management and control module, the risk management and control module comprises risk identification, inventory and patrol, the possible risks are identified and listed, hidden risks are avoided, the running safety of the equipment is improved, the risk identification comprises annual identification and special item identification, all risks meeting conditions in the current year can be flexibly inquired according to annual time, various risk points, risk types or risk level conditions, the risks meeting the conditions can also be inquired according to the risk types, and managers can conveniently inquire the risks and timely prevent the risks; through at management and control module internally mounted server cluster, data that the control of sensor group and equipment state was gathered are saved and are compared with normal state data, can discover whether every equipment goes wrong, if discover the risk then carry out the risk alarm through siren and SMS alarm module, can inform near fortune dimension personnel or long-range fortune dimension personnel to maintain, the inside alarm function of risk management and control module uses with the cooperation of inquiry risk function can dual protection equipment, and still include in the entire system that the statistics module is used for statistics maintenance data, risk data and generate the report form, help the direct-viewing inquiry risk data of managers.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (8)

1. Coal mine safety dual prevention mechanism management system, its characterized in that: the system comprises a prevention management system, wherein the prevention management system comprises a user management module, a risk management and control module, a statistical module and a background management module;
the system comprises a user management module, a risk management and control module, a statistic module and a background management module, wherein the user management module is used for managing users logging in the system, the risk management and control module is used for managing hidden risks in the safety production of the coal mine, the statistic module is used for counting coal mine risk data, and the background management module is used for managing the normal use of the system;
the functions of the risk management and control module comprise risk identification, a risk list and risk patrol, wherein the risk identification is used for distinguishing whether the equipment has risks and risk types, and the risk list is used for listing risk levels and risk solving means.
2. The coal mine safety double prevention mechanism management system according to claim 1, characterized in that: the risk management and control system comprises a main control unit, a sensor group, equipment state monitoring and a server cluster, wherein the sensor group and the equipment state monitoring are conducted data interaction through a wireless gateway.
3. The coal mine safety double prevention mechanism management system according to claim 2, characterized in that: the equipment state monitoring adopts a camera to acquire a working picture of the equipment.
4. The coal mine safety double prevention mechanism management system according to claim 2, characterized in that: the server cluster comprises a GIS server, a database server and a comparison server, wherein the comparison server is used for comparing the collected state data with the safety data and giving an alarm when the data are abnormal, and an alarm and a short message alarm module are installed at the alarm output end.
5. The coal mine safety double prevention mechanism management system according to claim 4, characterized in that: and the GIS server is combined with a GPS positioning module in the coal mine equipment to realize the display of the position of each equipment on a map.
6. The coal mine safety double prevention mechanism management system according to claim 1, characterized in that: the user management module comprises user login and user registration.
7. The coal mine safety double prevention mechanism management system according to claim 1, characterized in that: the statistic module comprises a maintenance statistic module, a risk statistic module and a report generation module.
8. The coal mine safety double prevention mechanism management system according to claim 1, characterized in that: the background management module comprises role distribution, authority management and system configuration.
CN201911099686.3A 2019-11-12 2019-11-12 Coal mine safety dual-prevention mechanism management system Pending CN110991814A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911099686.3A CN110991814A (en) 2019-11-12 2019-11-12 Coal mine safety dual-prevention mechanism management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911099686.3A CN110991814A (en) 2019-11-12 2019-11-12 Coal mine safety dual-prevention mechanism management system

Publications (1)

Publication Number Publication Date
CN110991814A true CN110991814A (en) 2020-04-10

Family

ID=70083958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911099686.3A Pending CN110991814A (en) 2019-11-12 2019-11-12 Coal mine safety dual-prevention mechanism management system

Country Status (1)

Country Link
CN (1) CN110991814A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112101894A (en) * 2020-08-21 2020-12-18 南京业恒达智能***股份有限公司 Coal dressing intelligent system
CN113486080A (en) * 2021-06-16 2021-10-08 中国安全生产科学研究院 Data processing method and device, electronic equipment and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107939447A (en) * 2017-12-07 2018-04-20 重庆天府矿业有限责任公司 A kind of safety of coal mines risk stratification early warning management-control method and system
CN109707447A (en) * 2019-01-07 2019-05-03 张效春 Improvement system is analyzed in a kind of coal mine safety management Internet-based and hidden troubles removing
CN110147948A (en) * 2019-05-06 2019-08-20 河南能源化工集团有限公司 A kind of coal mining enterprise's Risk Identification control platform and its implementation
CN110428112A (en) * 2019-08-09 2019-11-08 烟台东方纵横科技股份有限公司 A kind of dual prevention mechanism management system of enterprise based under internet+mode

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107939447A (en) * 2017-12-07 2018-04-20 重庆天府矿业有限责任公司 A kind of safety of coal mines risk stratification early warning management-control method and system
CN109707447A (en) * 2019-01-07 2019-05-03 张效春 Improvement system is analyzed in a kind of coal mine safety management Internet-based and hidden troubles removing
CN110147948A (en) * 2019-05-06 2019-08-20 河南能源化工集团有限公司 A kind of coal mining enterprise's Risk Identification control platform and its implementation
CN110428112A (en) * 2019-08-09 2019-11-08 烟台东方纵横科技股份有限公司 A kind of dual prevention mechanism management system of enterprise based under internet+mode

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112101894A (en) * 2020-08-21 2020-12-18 南京业恒达智能***股份有限公司 Coal dressing intelligent system
CN113486080A (en) * 2021-06-16 2021-10-08 中国安全生产科学研究院 Data processing method and device, electronic equipment and storage medium

Similar Documents

Publication Publication Date Title
CN102367742B (en) Monitoring system
CN103775129B (en) The method of a kind of colliery dangerous matter sources early warning
CN112769908B (en) Cooperative control method and device and electronic equipment
CN101575984A (en) Coal mine underground monitoring and staff locating system
CN102999813A (en) Social unit fire-fighting comprehensive information management platform and implementation method thereof
CN110991814A (en) Coal mine safety dual-prevention mechanism management system
CN204941604U (en) Mine safety monitoring total management system
CN207472722U (en) Constructing metro tunnel security information comprehensive management system
CN113613171B (en) Method and system for accurately managing ground wire operation based on UWB indoor positioning technology
CN112598368A (en) Sewage treatment online supervision platform
CN205105252U (en) Fire control thing networking transmission equipment
CN111569346A (en) Intelligent fire extinguisher remote monitoring and management system
CN114023031A (en) Intelligent fire-fighting management system and method for small and micro-place based on 5G technology
CN103593883A (en) On-line GPS (Global Positioning System) night-patrol positioning system
CN113763676A (en) Intelligent dangerous chemical online monitoring and early warning system based on Internet of things technology
CN114925980A (en) Production safety management system
CN113487840A (en) Gas management and monitoring early warning system
CN109057865A (en) A kind of coal mine downhole safety monitoring system
CN111708765A (en) Internet of things cloud platform management system and method based on big data micro-service
CN113592210A (en) Internet of things integrated management platform for water supply non-negative-pressure secondary water supply facility
CN204215535U (en) A kind of fire-fighting with security protection in conjunction with warning system
CN110545331A (en) liquid hazardous waste recycling, storing and transferring system and working method thereof
CN104243917A (en) Video monitoring device alarm protecting and monitoring system and control method thereof
CN112465090A (en) Gas cylinder intelligent management information detection system
CN105317462A (en) Coal mine safety monitoring system having write protection function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200410