CN110866690A - Application of BIM model data in intelligent construction site - Google Patents
Application of BIM model data in intelligent construction site Download PDFInfo
- Publication number
- CN110866690A CN110866690A CN201911107057.0A CN201911107057A CN110866690A CN 110866690 A CN110866690 A CN 110866690A CN 201911107057 A CN201911107057 A CN 201911107057A CN 110866690 A CN110866690 A CN 110866690A
- Authority
- CN
- China
- Prior art keywords
- bim model
- construction
- construction site
- data
- application
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 47
- 238000012800 visualization Methods 0.000 claims abstract description 8
- 238000004458 analytical method Methods 0.000 claims abstract description 4
- 239000000463 material Substances 0.000 claims description 12
- 238000013480 data collection Methods 0.000 claims 2
- 238000000034 method Methods 0.000 abstract description 6
- 230000007547 defect Effects 0.000 abstract description 2
- 238000009435 building construction Methods 0.000 description 3
- 238000000605 extraction Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000009430 construction management Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Primary Health Care (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention overcomes the defects in the prior art, provides the application of the BIM model data in the intelligent construction site, optimizes the construction process, saves the construction cost and improves the construction efficiency; in order to solve the technical problems, the invention adopts the technical scheme that: the application of the BIM model data in the intelligent construction site obtains construction plan progress and construction site data acquisition by carrying out lightweight analysis on the BIM model, then constructs a BIM4D model according to the construction plan progress, and constructs BIM model visualization according to the construction site data acquisition.
Description
Technical Field
The invention discloses application of BIM model data in an intelligent construction site, relates to building construction management, and particularly relates to informatization application of BIM technology in project construction.
Background
In the information management system for the construction of the building construction project, most of information is manually filled, the accuracy and timeliness of the information are determined by human factors, and the information has no reference value for managing all aspects of the project in the actual application process.
Disclosure of Invention
The invention overcomes the defects in the prior art, provides the application of the BIM model data in the intelligent construction site, optimizes the construction process, saves the construction cost and improves the construction efficiency.
In order to solve the technical problems, the invention adopts the technical scheme that: the application of the BIM model data in the intelligent construction site obtains construction plan progress and construction site data acquisition by carrying out lightweight analysis on the BIM model, then constructs a BIM4D model according to the construction plan progress, and constructs BIM model visualization according to the construction site data acquisition.
The BIM4D model includes construction plan work volume, construction plan material volume, and construction plan labor.
The BIM model visualization comprises video BIM model positioning display, personnel information BIM model positioning display and equipment information BIM model positioning display.
Compared with the prior art, the invention has the beneficial effects that: the invention can flexibly extract the engineering quantity, reduce the frequency of manually extracting the engineering quantity repeatedly, extract the engineering quantity and the material quantity of any section in any time period at any time, provide basic data for extracting a material plan, reduce repeated purchase and multiple extraction of the material, reduce the capital occupation, reduce the occupied area of the material and improve the working efficiency.
Drawings
The invention is further described below with reference to the accompanying drawings.
FIG. 1 is a block diagram schematically illustrating the structure of the present invention.
Detailed Description
As shown in FIG. 1, the application of the BIM model data in the intelligent construction site obtains construction plan progress and construction site data acquisition by lightweight analysis of the BIM model, then builds a BIM4D model according to the construction plan progress, and builds BIM model visualization according to the construction site data acquisition.
The BIM4D model includes construction plan work volume, construction plan material volume, and construction plan labor.
The BIM model visualization comprises video BIM model positioning display, personnel information BIM model positioning display and equipment information BIM model positioning display.
According to the invention, the geometric data in the model is extracted through the light BIM model, the data is associated with the construction plan in the intelligent construction site, the 4D model is realized, the engineering basic data in the construction process is accurately and quickly analyzed into the engineering quantity, timely and accurate data support is provided for the formulation of a material purchasing plan and a labor force plan at any time, an accurate data basis is provided for zero inventory and zero labor force, and a data basis is provided for the judgment of the field management condition. And in combination with data collected by the intelligent worksite site using sensors, provide on-site real-time status data in BIM visualization.
The invention can flexibly extract the engineering quantity, reduce the frequency of manually extracting the engineering quantity repeatedly, extract the engineering quantity and the material quantity of any section in any time period at any time, provide basic data for extracting a material plan, reduce repeated purchase and multiple extraction of the material, reduce the capital occupation, reduce the occupied area of the material and improve the working efficiency.
The BIM related to the invention is a perfect information model, can connect data, processes and resources of different stages of the life cycle of a construction project, is a complete description of the project, provides real-time engineering data which can be combined and split randomly, can be generally used by all participants of the construction project, but is difficult to be really combined with construction management in practical application.
The invention is formed by further optimizing on the basis of a database system for BIM platform calculation of a building construction enterprise, and the modeling process of the invention refers to the files.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge of those skilled in the art without departing from the gist of the present invention.
Claims (3)
1. The application of the BIM model data in the intelligent construction site is characterized in that a construction plan progress and construction site data collection are obtained through lightweight analysis of the BIM model, then the BIM4D model is built according to the construction plan progress, and BIM model visualization is built according to the construction site data collection.
2. The use of BIM model data in an intelligent worksite according to claim 1, wherein the BIM4D model includes construction planning work volume, construction planning material volume, and construction planning labor.
3. The use of the BIM model data in the intelligent worksite according to claim 1, wherein the BIM model visualization comprises a video BIM model positioning display, a personnel information BIM model positioning display and an equipment information BIM model positioning display.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911107057.0A CN110866690A (en) | 2019-11-13 | 2019-11-13 | Application of BIM model data in intelligent construction site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911107057.0A CN110866690A (en) | 2019-11-13 | 2019-11-13 | Application of BIM model data in intelligent construction site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110866690A true CN110866690A (en) | 2020-03-06 |
Family
ID=69654209
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911107057.0A Pending CN110866690A (en) | 2019-11-13 | 2019-11-13 | Application of BIM model data in intelligent construction site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110866690A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111709106A (en) * | 2020-06-08 | 2020-09-25 | 山西省工业设备安装集团有限公司 | Construction process of multi-professional complex underground pipe network of DCPS (DCPS) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103440600A (en) * | 2013-09-13 | 2013-12-11 | 成都中铁隆工程集团有限公司 | BIM (Building Information Modeling) risk monitoring system and method of multilayer 4D (4-Dimensional) model |
CN108596423A (en) * | 2018-03-02 | 2018-09-28 | 重庆机电装备技术研究院有限公司 | A kind of trackways engineering construction progress msg management method based on BIM |
CN110008648A (en) * | 2019-05-15 | 2019-07-12 | 平煤神马建工集团有限公司 | A kind of wisdom building site Integration Data Model method based on BIM model |
-
2019
- 2019-11-13 CN CN201911107057.0A patent/CN110866690A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103440600A (en) * | 2013-09-13 | 2013-12-11 | 成都中铁隆工程集团有限公司 | BIM (Building Information Modeling) risk monitoring system and method of multilayer 4D (4-Dimensional) model |
CN108596423A (en) * | 2018-03-02 | 2018-09-28 | 重庆机电装备技术研究院有限公司 | A kind of trackways engineering construction progress msg management method based on BIM |
CN110008648A (en) * | 2019-05-15 | 2019-07-12 | 平煤神马建工集团有限公司 | A kind of wisdom building site Integration Data Model method based on BIM model |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111709106A (en) * | 2020-06-08 | 2020-09-25 | 山西省工业设备安装集团有限公司 | Construction process of multi-professional complex underground pipe network of DCPS (DCPS) |
CN111709106B (en) * | 2020-06-08 | 2023-06-13 | 山西省安装集团股份有限公司 | Construction method of DCPS multi-specialty complex underground pipe network |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106988221B (en) | Unit construction bridge beam construction method based on BIM | |
CN110490415B (en) | Building progress assessment method for visual coordination of multiple unmanned aerial vehicles | |
CN109559069B (en) | Production management method and device based on assembly type building platform and terminal equipment | |
CN111369158A (en) | BIM-based informatization quality management method and system | |
CN109544675B (en) | Three-dimensional model state visualization method based on holographic data processing transformation equipment | |
US20130335413A1 (en) | System and method for estimating construction duration | |
CN111143915A (en) | Steel structure modular installation method based on Tekla software platform | |
Boon et al. | Evolution of quantity surveying practice in the use of BIM–the New Zealand experience | |
CN104680320A (en) | BIM-based project management system and method | |
CN106997511A (en) | Railway beam yard management system and railway beam yard management method based on BIM technology | |
CN106910009A (en) | Construction manpower management system based on BIM technology and its method for manpower management of constructing | |
CN109583852B (en) | Material and progress informatization management system for bridge cantilever pouring construction | |
CN105069542A (en) | Responsibility cost budgeting method and system | |
CN113269527A (en) | Method for accurately processing steel bar based on BIM steel bar shape and parameters | |
CN116562802A (en) | Intelligent construction application platform of track traffic based on BIM | |
Rui et al. | Construction project management based on building information modeling (Bim) | |
CN110866690A (en) | Application of BIM model data in intelligent construction site | |
CN116167582A (en) | Intelligent construction progress monitoring system based on BIM technology | |
CN110689263A (en) | River channel quality management and control system based on BIM technology | |
Xiaosheng et al. | Precast concrete building construction process comparison | |
Patil et al. | Labour productivity improvement by work-study tools of fiber composite company | |
CN103295085A (en) | Highway engineering three-dimensional office system building method based on Google earth | |
CN112396296A (en) | Resource scheduling system based on BIM | |
TWI567687B (en) | Asset management system and asset management method | |
CN111047290A (en) | Historical data-based inspection task execution and route optimization method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200306 |