CN110685424A - 楼地面找平防裂施工方法及楼地面找平防裂结构 - Google Patents
楼地面找平防裂施工方法及楼地面找平防裂结构 Download PDFInfo
- Publication number
- CN110685424A CN110685424A CN201910838295.2A CN201910838295A CN110685424A CN 110685424 A CN110685424 A CN 110685424A CN 201910838295 A CN201910838295 A CN 201910838295A CN 110685424 A CN110685424 A CN 110685424A
- Authority
- CN
- China
- Prior art keywords
- concrete
- cement mortar
- cracking
- plastic strip
- plastic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/12—Flooring or floor layers made of masses in situ, e.g. seamless magnesite floors, terrazzo gypsum floors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/12—Flooring or floor layers made of masses in situ, e.g. seamless magnesite floors, terrazzo gypsum floors
- E04F15/14—Construction of joints, e.g. dividing strips
- E04F15/142—Dividing strips or boundary strips
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Repair (AREA)
Abstract
本发明提供了楼地面找平防裂施工方法,包括如下步骤:(1)将基层表面的浮土或砂浆铲除清理干净;(2)根据水平标准线和设计厚度,在四周墙、柱上画出高度控制线;(3)将需要施工的区域安装塑料长条,进行分格,每格的宽度和长度都不超过2m,塑料长条厚度为5‑15mm,塑料长条的顶部与高度控制线平齐;(4)将基底湿润,并在基底上刷一道素水泥浆或界面结合剂,将搅拌均匀的水泥砂浆或混凝土铺设在分格内,水泥砂浆或混凝土的量;(5)用振捣器振捣,确保每格内的水泥砂浆或混凝土密实,且水泥砂浆或混凝土不遮盖塑料长条;(6)用木尺在塑料长条上压实刮平水泥砂浆或混凝土。该方法在楼地面形成伸缩缝,防止地面龟裂,保证地面平整。
Description
技术领域
本发明涉及建筑施工技术领域,具体地,涉及一种楼地面找平防裂施工方法。
背景技术
自住宅商品化以来,为了满足装修个性化的要求。开发商基本上按粗装修的标准交房。按照这一标准,楼地面大多采用水泥砂浆或细石混凝土找平,然而,这样处理的楼地面经常出现裂缝等质量问题,且长期得不到很好地解决,占住宅工程质量投诉量不可忽视的一部分,成为住宅工程质量通病的顽疾。
发明内容
为了克服现有技术的不足,本发明提供了一种楼地面找平防裂施工方法,通过在楼地面设置伸缩缝,防止地面龟裂,保证地面平整,解决了现有技术存在的技术问题。
本发明的技术方案如下:一种楼地面找平防裂施工方法,包括如下步骤:
(1)基层处理:将基层表面的浮土或砂浆铲除清理干净;
(2)找标高:根据水平标准线和设计厚度,在四周墙、柱上画出高度控制线;
(3)铺设塑料长条:将需要施工的区域安装塑料长条,相邻塑料长条间距不超过2m,塑料长条厚度为5-15mm,塑料长条的顶部与高度控制线平齐;
(4)铺设水泥浆:将基底湿润,并在基底上刷一道素水泥浆或界面结合剂,将搅拌均匀的水泥砂浆或混凝土铺设在相邻塑料长条间;
(5)振捣:用振捣器振捣,确保每格内的水泥砂浆或混凝土密实,且水泥砂浆或混凝土不遮盖塑料长条;
(6)找平:用木尺在塑料长条上压实刮平水泥砂浆或混凝土。
较佳地,所述楼地面找平防裂施工方法,还包括以下步骤:
(7)洒水养护:夏季地面浇筑24h后,及时洒水养护,每天洒水3-4次,保持地面潮湿状态,养护5-7天;冬季应保温养护,关闭门窗,地面覆盖养护,根据气温情况可适当的洒水。
较佳地,所述楼地面找平防裂施工方法,步骤(3)中,使用激光尺控制塑料长条的顶部与高度控制线平齐。
较佳地,所述所述楼地面找平防裂施工方法,步骤(6)中,用木尺压实刮平水泥砂浆或混凝土时,还压入抗裂网格布。所述抗裂网格布可以进一步防止楼地面产生裂缝。
较佳地,所述所述楼地面找平防裂施工方法,还包括以下步骤:
(8)在水泥砂浆或混凝土表面打磨,固化,抛光,涂刷混凝土密封固化剂等步骤。
所述塑料长条纵横交错形成网格,每个网格的宽度和长度都不超过2m。
较佳地,所述塑料长条具有弹性,其材质为PVC,TPU,PP,PE,PVA等等。
一种楼地面找平防裂结构,包括基底层,该基底层上设有塑胶长条,相邻塑料长条的间距不超过2m,相邻塑料长条间填充有水泥砂浆或混凝土;水泥砂浆或混凝土与塑胶长条贴合的侧面形成有伸缩缝。
较佳地,水泥砂浆或混凝土的顶面与塑胶长条的顶面平齐。
较佳地,塑胶长条具有弹性。
较佳地,塑料长条纵横交错形成网格,每个网格的宽度和长度都不超过2m。
较佳地,塑料长条厚度为5-15mm。
本发明的有益效果为:本发明所述的楼地面找平防裂施工方法,在铺设水泥砂浆或混凝土之前,先用塑料长条将待施工区域进行分区,相邻塑料长条的间距不超过2m。水泥砂浆或混凝土凝固后收缩,与塑料长条之间形成收缩缝。当温度变化或发送振动时,收缩缝为凝固的水泥砂浆或混凝土提供了膨胀空间或微动空间,从而避免楼地面出现裂缝等质量问题。
另外,本发明所述的楼地面找平防裂施工方法,将塑料长条顶端与高度控制线平齐,从而在找平时,能够控制找平精度,误差不超过1mm。
塑料长条对木尺有支撑和定位作用,找平过程中,木尺从在塑料长条顶部刮过,找平施工方便。
附图说明
图1为本发明所述的楼地面找平防裂结构的结构示意图。
具体实施方式
为了使本发明的发明目的,技术方案及技术效果更加清楚明白,下面结合具体实施方式对本发明做进一步的说明。应理解,此处所描述的具体实施例及相关附图,仅用于解释本发明,并不用于限定本发明。
实施例1一种楼地面找平防裂施工方法,包括如下步骤:
(1)基层处理:将基层表面的浮土和砂浆铲除清理干净;
(2)找标高:根据水平标准线和设计厚度,在四周墙、柱上画出高度控制线,高度控制线距离基层5cm;
(3)铺设塑料长条:将需要施工的区域安装塑料长条,相邻塑料长条间距为1m,塑料长条厚度为10mm,塑料长条的顶部与高度控制线平齐;
(4)铺设水泥浆:将基底湿润,并在基底上刷一道素水泥浆,将搅拌均匀的水泥砂浆铺设在相邻塑料长条之间内,水泥砂浆的量以略高于塑料长条顶部为宜;
(5)振捣:用振捣器振捣,确保每格内的水泥砂浆或混凝土密实,且水泥砂浆或混凝土不遮盖塑料长条;
(6)找平:用木尺在塑料长条上压实刮平水泥砂浆或混凝土。
实施例2一种楼地面找平防裂施工方法,包括如下步骤:
(1)基层处理:将基层表面的浮土或砂浆铲除清理干净;
(2)找标高:根据水平标准线和设计厚度,在四周墙、柱上画出高度控制线,高度控制线距离基层4cm;
(3)铺设塑料长条:将需要施工的区域安装塑料长条,相邻塑料长条间距为1.5m,塑料长条厚度为15mm,塑料长条的顶部与高度控制线平齐;
(4)铺设水泥浆:将基底湿润,并在基底上刷一道素水泥浆,将搅拌均匀的水泥砂浆铺设在相邻塑料长条之间内,水泥砂浆的量以略高于塑料长条顶部为宜;
(5)振捣:用振捣器振捣,确保网格内的混凝土密实,且水泥砂浆或混凝土不遮盖塑料长条;
(6)找平:用木尺在塑料长条上压实刮平水泥砂浆或混凝土。
(7)洒水养护:夏季地面浇筑24h后,及时洒水养护,每天洒水3-4次,保持地面潮湿状态,养护5-7天。
(8)在水泥砂浆或混凝土表面打磨,固化,抛光,涂刷混凝土密封固化剂等步骤。
所述塑料长条具有弹性,其材质为PVC。
实施例3一种楼地面找平防裂施工方法,包括如下步骤:
(1)基层处理:将基层表面的浮土或砂浆铲除清理干净;
(2)找标高:根据水平标准线和设计厚度,在四周墙、柱上画出高度控制线,高度控制线距离基层4cm;
(3)铺设塑料长条:将需要施工的区域安装塑料长条,相邻塑料长条间距为2m,塑料长条厚度为15mm,使用激光尺侧梁塑料长条的顶部与高度控制线,使二者平齐;
(4)铺设水泥浆:将基底湿润,并在基底上刷一道素水泥浆,将搅拌均匀的水泥砂浆铺设在相邻塑料长条之间内,水泥砂浆的量以略高于塑料长条顶部为宜;
(5)振捣:用振捣器振捣,确保网格内的混凝土密实,且水泥砂浆或混凝土不遮盖塑料长条;
(6)找平:用木尺在塑料长条上压实刮平水泥砂浆或混凝土,并压入抗裂网格布。
(7)洒水养护:冬季应保温养护,关闭门窗,地面覆盖养护,根据气温情况可适当的洒水;
(8)在水泥砂浆或混凝土表面打磨,固化,抛光,涂刷混凝土密封固化剂等步骤。
所述塑料长条具有弹性,其材质为TPU。
参照图1,用上述楼地面找平防裂施工方法施工得到的楼地面找平防裂结构,包括基底层1,该基底层1上铺设有塑胶长条2,相邻塑料长条的间距不超过2m。相邻塑料长条之间填充有水泥砂浆或混凝土3;水泥砂浆或混凝土3与所述塑胶长条贴合的侧面形成有伸缩缝。当温度变化,凝固的水泥砂浆或混凝土会发生热胀冷缩,伸缩缝为水泥砂浆或混凝土膨胀提供了空间,从而避免楼地面出现裂缝等质量问题。当楼地面发生振动时,伸缩缝也为水泥砂浆或混凝土3提供了微动空间,防止楼地面出现裂缝。
所述水泥砂浆或所述混凝土的顶面与所述塑胶长条的顶面平齐。
在本发明的一些实施例中,所述塑料长条2具有弹性,其材质为PVC,TPU,PP,PE,PVA等等。弹性的塑料长条2为水泥砂浆或混凝土提供了缓冲,进一步防止其在热胀冷缩或振动时产生裂缝。
在本发明的一些实施例中,塑料长条纵横交错形成网格,每个网格的宽度和长度都不超过2m。
在本发明的一些实施例中,塑料长条厚度为5-15mm。
以上内容是结合具体的优选实施方式对本发明所作的进一步详细说明,不能认定本发明的具体实施只局限于这些说明。对于本发明所属技术领域的普通技术人员来说,在不脱离本发明构思的前提下,其架构形式能够灵活多变,可以派生系列产品。只是做出若干简单推演或替换,都应当视为属于本发明由所提交的权利要求书确定的专利保护范围。
Claims (10)
1.一种楼地面找平防裂施工方法,其特征在于,包括如下步骤:
(1)基层处理:将基层表面的浮土或砂浆铲除清理干净;
(2)找标高:根据水平标准线和设计厚度,在四周墙、柱上画出高度控制线;
(3)铺设塑料长条:将需要施工的区域安装塑料长条,相邻塑料长条间距不超过2m,塑料长条厚度为5-15mm,塑料长条的顶部与高度控制线平齐;
(4)铺设水泥浆:将基底湿润,并在基底上刷一道素水泥浆或界面结合剂,将搅拌均匀的水泥砂浆或混凝土铺设在相邻塑料长条间;
(5)振捣:用振捣器振捣,确保每格内的水泥砂浆或混凝土密实,且水泥砂浆或混凝土不遮盖塑料长条;
(6)找平:用木尺在塑料长条上压实刮平水泥砂浆或混凝土。
2.根据权利要求1所述的楼地面找平防裂施工方法,其特征在于,还包括以下步骤:
(7)洒水养护:夏季地面浇筑24h后,及时洒水养护,每天洒水3-4次,保持地面潮湿状态,养护5-7天;冬季应保温养护,关闭门窗,地面覆盖养护,根据气温情况可适当的洒水。
3.根据权利要求1所述的楼地面找平防裂施工方法,其特征在于,步骤(3)中,使用激光尺控制塑料长条的顶部与高度控制线平齐。
4.根据权利要求1所述的楼地面找平防裂施工方法,其特征在于,步骤(6)中,用木尺压实刮平水泥砂浆或混凝土时,还压入抗裂网格布。
5.根据权利要求1所述的楼地面找平防裂施工方法,其特征在于,所述塑料长条具有弹性。
6.一种楼地面找平防裂结构,其特征在于,包括基底层,该基底层上设有塑胶长条,相邻塑料长条的间距不超过2m,相邻塑料长条间填充有水泥砂浆或混凝土;水泥砂浆或混凝土与塑胶长条贴合的侧面形成有伸缩缝。
7.根据权利要求6所述的楼地面找平防裂结构,其特征在于,水泥砂浆或混凝土的顶面与塑胶长条的顶面平齐。
8.根据权利要求6所述的楼地面找平防裂结构,其特征在于,塑胶长条具有弹性。
9.根据权利要求6所述的楼地面找平防裂结构,其特征在于,塑料长条纵横交错形成网格,每个网格的宽度和长度都不超过2m。
10.根据权利要求6所述的楼地面找平防裂结构,其特征在于,塑料长条厚度为5-15mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910838295.2A CN110685424A (zh) | 2019-09-05 | 2019-09-05 | 楼地面找平防裂施工方法及楼地面找平防裂结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910838295.2A CN110685424A (zh) | 2019-09-05 | 2019-09-05 | 楼地面找平防裂施工方法及楼地面找平防裂结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110685424A true CN110685424A (zh) | 2020-01-14 |
Family
ID=69108813
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910838295.2A Pending CN110685424A (zh) | 2019-09-05 | 2019-09-05 | 楼地面找平防裂施工方法及楼地面找平防裂结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110685424A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111550001A (zh) * | 2020-04-25 | 2020-08-18 | 武汉理工大学 | 一种轻质石膏基自流平楼地面保温隔音结构及其施工方法 |
CN114370164A (zh) * | 2022-02-15 | 2022-04-19 | 中国十七冶集团有限公司 | 一种楼地面平整度控制方法 |
Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100521754B1 (ko) * | 2003-05-26 | 2005-10-17 | 이창남 | 스플리티 가위 보 |
CN102155086A (zh) * | 2011-04-25 | 2011-08-17 | 巨石集团有限公司 | 一种房屋地坪浇注方法 |
CN102425307A (zh) * | 2011-10-19 | 2012-04-25 | 江苏瑞峰建设集团有限公司 | 一种避免大体积混凝土裂缝形成的浇筑方法 |
CN103114728A (zh) * | 2013-03-04 | 2013-05-22 | 温州建设集团有限公司 | 大面积水泥耐磨地面的分格施工方法 |
CN203174992U (zh) * | 2013-04-11 | 2013-09-04 | 中建城市建设发展有限公司 | 一种整体地面伸缩缝结构 |
CN103470044A (zh) * | 2013-07-03 | 2013-12-25 | 天津二十冶建设有限公司 | 一种控制混凝土地坪裂缝的施工方法 |
CN104314289A (zh) * | 2014-11-07 | 2015-01-28 | 广西壮族自治区冶金建设公司 | 一种耐磨混凝土地坪整体成型的施工方法 |
CN104847114A (zh) * | 2015-05-14 | 2015-08-19 | 广西梧州运龙港船机械制造有限公司 | 预防混凝土裂缝的施工方法 |
KR101636615B1 (ko) * | 2014-09-05 | 2016-07-05 | 오세열 | 건축물용 바닥 시스템 및 이의 시공 방법 |
CN106088530A (zh) * | 2016-06-29 | 2016-11-09 | 中冶建工集团有限公司 | 大面积地坪施工方法 |
CN206408897U (zh) * | 2016-12-12 | 2017-08-15 | 南京利国建筑装饰工程有限公司 | 防开裂地坪 |
AT518961A2 (de) * | 2016-07-26 | 2018-02-15 | Rivaplan Ag | Gebäudebereich mit Dehnungsfuge und Schnittschutz sowie Baugruppe oder Montagesatz zur Montage räumseitig in einer Dehnungsfuge eines Gebäudes |
CN207079865U (zh) * | 2017-08-10 | 2018-03-09 | 中冶建工集团有限公司 | 一种地坪分仓缝结构 |
CN207974233U (zh) * | 2018-03-15 | 2018-10-16 | 北京城建集团有限责任公司 | 基于多级网格式后浇带的超大平面混凝土结构 |
CN108842994A (zh) * | 2018-06-15 | 2018-11-20 | 五冶集团上海有限公司 | 一种混凝土楼地面面层分隔缝的施工方法 |
CN108868065A (zh) * | 2018-06-20 | 2018-11-23 | 中国建筑第七工程局有限公司 | 一种混凝土地坪伸缩缝施工留设方法 |
CN108868063A (zh) * | 2018-06-07 | 2018-11-23 | 上海宝冶集团有限公司 | 一种地坪施工方法 |
CN110029798A (zh) * | 2019-03-06 | 2019-07-19 | 中国五冶集团有限公司 | 一种减少耐磨地坪开裂的施工方法 |
-
2019
- 2019-09-05 CN CN201910838295.2A patent/CN110685424A/zh active Pending
Patent Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100521754B1 (ko) * | 2003-05-26 | 2005-10-17 | 이창남 | 스플리티 가위 보 |
CN102155086A (zh) * | 2011-04-25 | 2011-08-17 | 巨石集团有限公司 | 一种房屋地坪浇注方法 |
CN102425307A (zh) * | 2011-10-19 | 2012-04-25 | 江苏瑞峰建设集团有限公司 | 一种避免大体积混凝土裂缝形成的浇筑方法 |
CN103114728A (zh) * | 2013-03-04 | 2013-05-22 | 温州建设集团有限公司 | 大面积水泥耐磨地面的分格施工方法 |
CN203174992U (zh) * | 2013-04-11 | 2013-09-04 | 中建城市建设发展有限公司 | 一种整体地面伸缩缝结构 |
CN103470044A (zh) * | 2013-07-03 | 2013-12-25 | 天津二十冶建设有限公司 | 一种控制混凝土地坪裂缝的施工方法 |
KR101636615B1 (ko) * | 2014-09-05 | 2016-07-05 | 오세열 | 건축물용 바닥 시스템 및 이의 시공 방법 |
CN104314289A (zh) * | 2014-11-07 | 2015-01-28 | 广西壮族自治区冶金建设公司 | 一种耐磨混凝土地坪整体成型的施工方法 |
CN104847114A (zh) * | 2015-05-14 | 2015-08-19 | 广西梧州运龙港船机械制造有限公司 | 预防混凝土裂缝的施工方法 |
CN106088530A (zh) * | 2016-06-29 | 2016-11-09 | 中冶建工集团有限公司 | 大面积地坪施工方法 |
AT518961A2 (de) * | 2016-07-26 | 2018-02-15 | Rivaplan Ag | Gebäudebereich mit Dehnungsfuge und Schnittschutz sowie Baugruppe oder Montagesatz zur Montage räumseitig in einer Dehnungsfuge eines Gebäudes |
CN206408897U (zh) * | 2016-12-12 | 2017-08-15 | 南京利国建筑装饰工程有限公司 | 防开裂地坪 |
CN207079865U (zh) * | 2017-08-10 | 2018-03-09 | 中冶建工集团有限公司 | 一种地坪分仓缝结构 |
CN207974233U (zh) * | 2018-03-15 | 2018-10-16 | 北京城建集团有限责任公司 | 基于多级网格式后浇带的超大平面混凝土结构 |
CN108868063A (zh) * | 2018-06-07 | 2018-11-23 | 上海宝冶集团有限公司 | 一种地坪施工方法 |
CN108842994A (zh) * | 2018-06-15 | 2018-11-20 | 五冶集团上海有限公司 | 一种混凝土楼地面面层分隔缝的施工方法 |
CN108868065A (zh) * | 2018-06-20 | 2018-11-23 | 中国建筑第七工程局有限公司 | 一种混凝土地坪伸缩缝施工留设方法 |
CN110029798A (zh) * | 2019-03-06 | 2019-07-19 | 中国五冶集团有限公司 | 一种减少耐磨地坪开裂的施工方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111550001A (zh) * | 2020-04-25 | 2020-08-18 | 武汉理工大学 | 一种轻质石膏基自流平楼地面保温隔音结构及其施工方法 |
CN114370164A (zh) * | 2022-02-15 | 2022-04-19 | 中国十七冶集团有限公司 | 一种楼地面平整度控制方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106381980B (zh) | 一种地砖铺设工艺 | |
CN106284425A (zh) | 高层建筑地下室顶板变形缝防水构造施工方法 | |
CN108797903B (zh) | 屋面防水结构及其施工工艺 | |
CN110685424A (zh) | 楼地面找平防裂施工方法及楼地面找平防裂结构 | |
CN108396607A (zh) | 施工方便的严寒地区大面积翼形广场石材铺装裂缝防治法 | |
CN203716410U (zh) | 一种新型屋面分格缝 | |
CN110821181A (zh) | 一种地面找平方法 | |
CN111074852B (zh) | 渠道衬砌混凝土现浇方法及非直线型渠道衬砌施工方法 | |
CN110735493B (zh) | 一种平屋面防渗漏的复合防水方法 | |
CN112049365B (zh) | 室内地坪施工方法及应用于其的室内地坪结构 | |
CN110952752A (zh) | 一种铺盖防裂抗起砂耐磨地面的方法 | |
CN110439016A (zh) | 一种桩基基础防水施工方法 | |
CN110029798A (zh) | 一种减少耐磨地坪开裂的施工方法 | |
CN114876075A (zh) | 一种车库顶板防渗水施工方法 | |
CN110130643B (zh) | 一种塑胶、亚麻地面施工工艺 | |
CN112343094A (zh) | 一种防水卷材预铺反粘施的施工方法 | |
KR100542380B1 (ko) | 콘크리트 슬래브용 신축줄눈 구조 및 그 시공 방법 | |
CN220167371U (zh) | 一种地面结构 | |
CN106868960B (zh) | 高铁无砟轨道路基防排水维修方法 | |
CN111962808A (zh) | 基于轻钢龙骨冲筋铺贴大规格陶瓷薄板地面及其施工工艺 | |
CN111074851A (zh) | 渠道底部混凝土衬砌施工方法 | |
CN220620858U (zh) | 一种可防止地面块料起拱破坏的结构 | |
CN210195142U (zh) | 一种地面找平防开裂结构 | |
CN103821159A (zh) | 地下室建筑夹层塑料成型板防排水构造 | |
US11162229B1 (en) | Paver system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200114 |