CN110532663A - A kind of collaborative modeling woprk standardization process based on BIM - Google Patents

A kind of collaborative modeling woprk standardization process based on BIM Download PDF

Info

Publication number
CN110532663A
CN110532663A CN201910786520.2A CN201910786520A CN110532663A CN 110532663 A CN110532663 A CN 110532663A CN 201910786520 A CN201910786520 A CN 201910786520A CN 110532663 A CN110532663 A CN 110532663A
Authority
CN
China
Prior art keywords
model
construction
bim
component
modeling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910786520.2A
Other languages
Chinese (zh)
Inventor
张宇
张鸿杰
高太平
闫建龙
李刚
凌萌茁
郑秋爽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Third Construction Co Ltd of CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Third Construction Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group, Third Construction Co Ltd of CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201910786520.2A priority Critical patent/CN110532663A/en
Publication of CN110532663A publication Critical patent/CN110532663A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of, and the standardization flow and method of model is established in the collaboration based on BIM, includes the following steps: that project basic point 1) is arranged, to determine the relativeness between the position of building and other buildings in place;2) Level System is set, and the model Level System of each work point is ± the 0 of local height system, and is subject to design drawing and topographic map, is all made of absolute altitude;3) rendering model: according to the practical rendering model figure of construction drawing depth and scene, and unify the material in each stage;4) typing additional information;5) deepen model: in the construction stage, deepening by temporary structure model of the construction feature to the permanent structure model of construction documents design phase and itself creation;6) inspection model;7) it clears up model: removing external linkage file and extra internal component.The present invention ensure that the accuracy of model molding, avoid the generation of molding mistake, improve molding efficiency by establishing the standardization process of collaborative modeling.

Description

A kind of collaborative modeling woprk standardization process based on BIM
Technical field
The invention belongs to technical field of buildings, in particular to a kind of collaborative modeling woprk standardization process based on BIM.
Background technique
BIM (Building Information Modeling) technology is a kind of applied to engineering design, construction, management Digitization tool, integrated by digitization to building, informationization model, in the full life of project planning, operation and maintenance It is shared and is transmitted in periodic process, engineers and technicians is made to make correct understanding and efficiently reply to various architecture informations, The basis of collaborative work is provided for design team and each side's construction bodies including building, unit of operation, is given birth to improving It produces efficiency, save the cost and shortens the construction period aspect and play a significant role.
In BIM project at this stage, the more tired the model of the big scale of construction the more, multi-person synergy modeling be now model it is basic Form.And in more people modeling, since the modeling gimmick of modeling personnel individual is different, modeling procedure difference is obvious, causes There are a large amount of mistakes when molding to the model that everyone establishes, for accurate, the modeling of standardization of assurance model molding Process is particularly important.
Summary of the invention
For the technical problems in the prior art, the present invention provides a kind of collaborative modeling working stamndard based on BIM Change process.
In order to solve the above technical problems, the technical solution adopted by the present invention is that:
A kind of collaborative modeling woprk standardization process based on BIM, includes the following steps:
1) project basic point is set, to determine the relativeness between the position of building and other buildings in place;
2) Level System is set, the model Level System of each work point is ± the 0 of local height system, and with design drawing and Subject to topographic map, it is all made of absolute altitude;
3) rendering model: according to the practical rendering model figure of construction drawing depth and scene, and unify the material in each stage;
4) typing additional information;
5) deepen model: in the construction stage, by construction feature to the permanent structure model of construction documents design phase and The temporary structure model of itself creation is deepened, and can satisfy the construction mould that construction speed shows requirement to finally obtain one Type;
6) inspection model;
7) it clears up model: removing external linkage file and extra internal component.
Preferably, splitting model component in the step 5) when deepening permanent structure model and adding as requested Relevant information obtains the BIM model for meeting implementation management needs.
Preferably, in the step 5) when deepening temporary structure model, need to split component by what process was shown, and The independent component for drawing construction by stages.
Preferably, the content that the step 6) includes is as follows:
(1) architectural discipline model staircase, escalator, pipe well, stair, Air Conditioning Facilities, pump house, piping lane ruler is accurately positioned Very little, heights of ceilings;
(2) guarantee that beam, plate, the sectional dimension of column are consistent with location dimension and drawing, bottom elevation is wanted with design in piping lane Ask consistent;
(3) when component overlapping checks modeling, similar component overlapping cases are avoided to occur, and from generating by BIM model collision Then audit report carries out model modification according to audit report.
(4) linear structure closure inspection draws logical drafting linear structure pel, to guarantee the accuracy of cost calculation amount;
(5) coordinate system inspection.
Compared with prior art, the present invention has the beneficial effects that the present invention is by establishing the standard of collaborative modeling Change process, ensure that the accuracy of model molding, avoids the generation of molding mistake, improve molding efficiency.
Detailed description of the invention
Fig. 1 is a kind of block diagram of the collaborative modeling woprk standardization process based on BIM in the present invention.
Specific embodiment
Technical solution in order to enable those skilled in the art to better understand the present invention, below with reference to specific drawings and examples It elaborates to the present invention.
The standardization process side of the collaboration based on BIM establishes as shown in Figure 1, embodiment of the invention discloses a kind of model Method includes the following steps:
1) project basic point is set
The setting of model reference depends on the setting of project datum mark parameter in Revit.Sheet of the project basic point for definition The absolute coordinate of project local coordinate system origin (0,0,0), for being determined in place between the position of building and other buildings Relativeness.It is limited by Revit software, when inputting its absolute coordinate in the property box in project basic point, numerical value cannot be big In 10km, otherwise cannot succeed assignment;When coordinate value is greater than 10km, the coordinate of project basic point should be carried out directly in operation interface Coordinate assignment.
Setting principle:
1) when project does not need to split, project basic point is assisted by participating in each professional of this purpose according to design drawing It adjusts and determines.
2) when project needs to split, different subregions is individually completed by different team, and the setting of project basic point can root It is separately provided according to different subregions, coordination is carried out according to design drawing by each professional in the inside of relevant teams and is determined (referring to planning and designing total figure).The setting of datum mark should select specific crossing point of axes, and just be arranged before project starts It is good, it is recorded, is not answered careless location revision in Project Process, guarantee that the collaborative work between each profession is effectively performed.
3) project basic point coordinate is obtained from planning and designing total figure.
4) all professions are used uniformly same axis online article part, guarantee to be aligned, when model integration to just.Axis net is set Afterwards, axis net is locked, in case modeling process axis net shifts.
2) Level System is set
Elevation is all made of absolute altitude in the Level System of each work point BIM model, is subject to design drawing and topographic map;Respectively ± 0 in work point Revit model Level System is identical, is ± the 0 of local height system.The relative elevation marked in design drawing It embodies in the name of absolute altitude, is identified convenient for designer.The setting method of Level System.
3) rendering model
(1) it during project BIM model buildings, to be carried out in strict accordance with construction drawing depth and on-site actual situations, respectively Phase material should be unified.It is updated in time more with project progress and live architectural drawing (making a joint checkup summary comprising change, negotiation, drawing) New model (includes the information such as wall positioning, wall thickness, door opening size and positioning, wall telephone electricity box out size and positioning).
(2) it when establishing the rule component such as column, wall, beam, plate, stair, should independently be drawn with corresponding race's component, it is not handy " interior established model " carries out integrally stretching;When needing to create a kind of material in " project material ", it is necessary to be adjusted again from Materials Library Materials matter is simultaneously named, and name should be convenient for identification;It must not directly replicate and have material in " project material ".
4) typing additional information
Relevant information is added on place, building, structural model, such as " subway civil engineering structure _ permanent structure _ station hall layer ", " surrounding enviroment _ municipal pipeline _ electric power _ superfine ", additional information input, model component attribute in " annotation " of the attribute of component In " annotation " be all element types public attribute.
5) deepen model
In the construction stage, unit in charge of construction should establish subway temporary structure model, and set by construction feature to construction drawing The permanent structure model in meter stage and the temporary structure model of itself creation are deepened, and finally obtaining one can satisfy construction The construction model that progress display requires.
(1) permanent structure model (in-depth) deepens construction drawing stage BIM model (permanent structure) according to construction feature, It splits model component and adds relevant information as requested, obtain the BIM model for meeting implementation management needs,
(2) temporary structure model (newly-built) establishes the temporary structure of construction stage according to construction drawing and construction feature Model, and relevant information is added as requested, obtain the BIM model for meeting implementation management needs.The fractionation of component should meet work The needs that sequence is shown, the component of construction by stages should independently be drawn.
6) inspection model
(1) architectural discipline model staircase, escalator, pipe well, stair, Air Conditioning Facilities, pump house, tube lane dimension, ceiling The positioning such as height must be accurate, and model component should be split by layer, and the component across deformation joint must be disconnected according to drawing home position, It can identify and be split by drawing if any post-cast strip.
(2) structure discipline require beam, plate, column sectional dimension must be consistent with drawing with location dimension;Beam bottom mark in piping lane Height needs consistent with design requirement.
(3) when component overlapping checks modeling, similar component overlapping cases is avoided to occur.It is generated and is examined by BIM model collision Report is looked into, and carries out model modification according to audit report.
(4) linear structure closure inspection, linear structure pel (linear structures such as wall, beam, base, foundation beam) Ying Latong It draws, to guarantee the accuracy of cost calculation amount.
(5) coordinate system inspection
It must look at model coordinate (at least selection two o'clock) and compared with design total figure, guarantee the letter of coordinate contained by model The correctness of breath.The coordinate of certain point in model can be obtained by the tool " putting upper specified coordinate " of " management " module.
7) model is cleared up
(1) external linkage file is removed, by deleting extra external linkage model in " management links " under management-plane And referenced drawing.
(2) remove extra internal component, cleared up by " removing unused entry " under management-plane extra race's component, Model group and pattern.
(3) extra view template is removed.
Above embodiments are only exemplary embodiment of the present invention, are not used in the limitation present invention, protection scope of the present invention It is defined by the claims.Those skilled in the art can within the spirit and scope of the present invention make respectively the present invention Kind modification or equivalent replacement, this modification or equivalent replacement also should be regarded as being within the scope of the present invention.

Claims (4)

1. a kind of collaborative modeling woprk standardization process based on BIM, which comprises the steps of:
1) project basic point is set, to determine the relativeness between the position of building and other buildings in place;
2) Level System is set, and the model Level System of each work point is ± the 0 of local height system, and with design drawing and landform Subject to figure, it is all made of absolute altitude;
3) rendering model: according to the practical rendering model figure of construction drawing depth and scene, and unify the material in each stage;
4) typing additional information;
5) deepen model: in the construction stage, by construction feature to the permanent structure model of construction documents design phase and itself The temporary structure model of creation is deepened, and can satisfy the construction model that construction speed shows requirement to finally obtain one;
6) inspection model;
7) it clears up model: removing external linkage file and extra internal component.
2. a kind of collaborative modeling woprk standardization process based on BIM according to claim 1, which is characterized in that described It in step 5) when deepening permanent structure model, splits model component and adds relevant information as requested, obtain meeting construction Manage the BIM model needed.
3. a kind of collaborative modeling woprk standardization process based on BIM according to claim 2, which is characterized in that described In step 5) when deepening temporary structure model, need to split component by what process was shown, and independently draw construction by stages Component.
4. a kind of collaborative modeling woprk standardization process based on BIM according to claim 1, which is characterized in that described The content that step 6) includes is as follows:
(1) architectural discipline model staircase, escalator, pipe well, stair, Air Conditioning Facilities, pump house, tube lane dimension, day is accurately positioned Card height;
(2) guarantee that beam, plate, the sectional dimension of column are consistent with location dimension and drawing, bottom elevation and design requirement one in piping lane It causes;
(3) when component overlapping checks modeling, similar component overlapping cases is avoided to occur, and is generated and is checked by BIM model collision Then report carries out model modification according to audit report;
(4) linear structure closure inspection draws logical drafting linear structure pel, to guarantee the accuracy of cost calculation amount;
(5) coordinate system inspection.
CN201910786520.2A 2019-08-24 2019-08-24 A kind of collaborative modeling woprk standardization process based on BIM Pending CN110532663A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910786520.2A CN110532663A (en) 2019-08-24 2019-08-24 A kind of collaborative modeling woprk standardization process based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910786520.2A CN110532663A (en) 2019-08-24 2019-08-24 A kind of collaborative modeling woprk standardization process based on BIM

Publications (1)

Publication Number Publication Date
CN110532663A true CN110532663A (en) 2019-12-03

Family

ID=68662770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910786520.2A Pending CN110532663A (en) 2019-08-24 2019-08-24 A kind of collaborative modeling woprk standardization process based on BIM

Country Status (1)

Country Link
CN (1) CN110532663A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395524A (en) * 2020-03-27 2020-07-10 毅德建筑咨询(上海)有限公司 Cold-formed thin-wall light steel structure modularized building design method
CN111428295A (en) * 2020-03-17 2020-07-17 中色科技股份有限公司 Heating and plotting method for large workshop for BIM forward design
CN112395677A (en) * 2020-11-19 2021-02-23 温岭市第一建筑工程有限公司 Construction method of civil engineering BIM (building information modeling) engineering quantity model
CN113139227A (en) * 2021-04-23 2021-07-20 中南建筑设计院股份有限公司 BIM component construction code creation method based on Revit
CN117371114A (en) * 2023-12-07 2024-01-09 广东省建筑设计研究院有限公司 Working model intelligent creation method and system based on BIM design platform

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0871112A1 (en) * 1997-03-10 1998-10-14 Ncr International Inc. Information technology architecture
CN105335559A (en) * 2015-10-28 2016-02-17 上海同筑信息科技有限公司 Engineering standardized construction process control method and system on basis of BIM (building information modeling)
CN108776875A (en) * 2018-06-22 2018-11-09 中船第九设计研究院工程有限公司 A kind of cooperative operation system based on design, construction and O&M set
CN110046364A (en) * 2018-01-16 2019-07-23 中国建筑第八工程局有限公司 A kind of method for computing work amount based on BIM technology

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0871112A1 (en) * 1997-03-10 1998-10-14 Ncr International Inc. Information technology architecture
CN105335559A (en) * 2015-10-28 2016-02-17 上海同筑信息科技有限公司 Engineering standardized construction process control method and system on basis of BIM (building information modeling)
CN110046364A (en) * 2018-01-16 2019-07-23 中国建筑第八工程局有限公司 A kind of method for computing work amount based on BIM technology
CN108776875A (en) * 2018-06-22 2018-11-09 中船第九设计研究院工程有限公司 A kind of cooperative operation system based on design, construction and O&M set

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
广东省建设执业资格注册中心: "《二级建造师继续教育必修课教材之三》", 31 March 2016, 中国环境出版社 *
申琳,王雪妮,贾青: "《建筑构造与识图》", 31 January 2016, 西南交通大学出版社 *
邓兴龙: "《BIM技术Revit建筑设计应用基础》", 31 January 2017, 华南理工大学出版社 *
高银鹰,等: "城市轨道交通BIM-GIS融合技术研究与实现", 《市政技术》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111428295A (en) * 2020-03-17 2020-07-17 中色科技股份有限公司 Heating and plotting method for large workshop for BIM forward design
CN111428295B (en) * 2020-03-17 2023-02-28 中色科技股份有限公司 Heating map making method for large workshop for BIM forward design
CN111395524A (en) * 2020-03-27 2020-07-10 毅德建筑咨询(上海)有限公司 Cold-formed thin-wall light steel structure modularized building design method
CN112395677A (en) * 2020-11-19 2021-02-23 温岭市第一建筑工程有限公司 Construction method of civil engineering BIM (building information modeling) engineering quantity model
CN113139227A (en) * 2021-04-23 2021-07-20 中南建筑设计院股份有限公司 BIM component construction code creation method based on Revit
CN113139227B (en) * 2021-04-23 2022-07-19 中南建筑设计院股份有限公司 BIM component construction code creation method based on Revit
CN117371114A (en) * 2023-12-07 2024-01-09 广东省建筑设计研究院有限公司 Working model intelligent creation method and system based on BIM design platform
CN117371114B (en) * 2023-12-07 2024-04-26 广东省建筑设计研究院有限公司 Working model intelligent creation method and system based on BIM design platform

Similar Documents

Publication Publication Date Title
CN110532663A (en) A kind of collaborative modeling woprk standardization process based on BIM
CN106988221B (en) Unit construction bridge beam construction method based on BIM
CN109766581A (en) A method of bridge BIM model is established using Dynamo software
CN110992490B (en) Method for automatically extracting indoor map based on CAD building plan
CN103150751B (en) The three-dimensional modeling method of building inside and outside integrity is realized in numerical map
CN106709660A (en) BIM-based architectural design method
CN107045526A (en) A kind of pattern recognition method of electronics architectural working drawing
CN106202723A (en) A kind of BIM subway work method
CN109933900A (en) A kind of construction three dimensional field cloth modeling method based on BIM technology
Liu et al. IFC-based integration tool for supporting information exchange from architectural model to structural model
Brumana et al. HBIM for documentation, dissemination and management of built heritage. The case study of St. Maria in Scaria d'Intelvi
CN107992643A (en) It is a kind of to be produced and installation accuracy control technique with the construction industry structure component calculated based on 3-D scanning cloud data and artificial intelligence identification
CN113779663B (en) BIM-based subway station enclosure structure three-dimensional modeling method, system and medium
CN112270033A (en) CAD platform based construction engineering collaborative design drawing method
Beltramo et al. Evaluation of an integrative approach between HBIM and architecture history
CN108984876A (en) A kind of service sleeve automation modeling method and system based on BIM
Baik From point cloud to existing bim for modelling and simulation purposes
Naik et al. GIS based 4D model development for planning and scheduling of a construction project
CN109002584A (en) A kind of rail traffic escalator overall process aided design system
Naik et al. Integrated 4D model development for planning and scheduling of a construction project using geographical information system
Lee et al. The development of automatic module for formwork layout using the BIM
Tejaswini et al. A Comparative Study on Various Stages of Level of Details in Advanced 3D Building Construction Using BIM Tools
CN112487534A (en) BIM technology-based method for analyzing net height of building
Montaldo BIM for project management in federated models: The Trompone case study
Zhao et al. Application Strategy of BIM Technology in Virtual Construction of Prefabricated Buildings

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191203