CN110512849A - A kind of scaffold being easily installed scaffold board and setting method - Google Patents
A kind of scaffold being easily installed scaffold board and setting method Download PDFInfo
- Publication number
- CN110512849A CN110512849A CN201910688129.9A CN201910688129A CN110512849A CN 110512849 A CN110512849 A CN 110512849A CN 201910688129 A CN201910688129 A CN 201910688129A CN 110512849 A CN110512849 A CN 110512849A
- Authority
- CN
- China
- Prior art keywords
- scaffold
- vertical bar
- scaffold board
- inserted block
- limit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/02—Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means
- E04G1/04—Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means the members being exclusively poles, rods, beams, or other members of similar form and simple cross-section
- E04G1/06—Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means the members being exclusively poles, rods, beams, or other members of similar form and simple cross-section comprising members with rod-like or tubular portions fitting together end to end, with or without separate connecting pieces
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/08—Scaffold boards or planks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/02—Connections between parts of the scaffold with separate coupling elements
- E04G7/28—Clips or connections for securing boards
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Movable Scaffolding (AREA)
Abstract
The present invention relates to Construction Formwork & Scaffold Technology fields, more specifically to a kind of scaffold for being easily installed scaffold board and setting method, including vertical bar, the top side of the vertical bar is fixedly connected with cross bar, there are two the quantity settings of the cross bar, and the peripheral side outer wall of two cross bars is arranged with scaffold board, and the both ends of the surface axial section shape of the scaffold board is disposed as arc, the inside of the scaffold board, which is run through, offers location hole, and the top end surface of scaffold board is provided with gasket close to the top of location hole.The present invention passes through the first limit of setting inserted block, the second limit inserted block and expansible plug, by two end caps of scaffold board cross bar peripheral side outer wall, and the first limit inserted block and the second limit inserted block are inserted into the inside of location hole and scaffold board, expansible plug is rotated, the fixed installation of scaffold board is realized;By the first supporting mechanism of setting and the second supporting mechanism, the phenomenon that scaffold shakes is avoided.
Description
Technical field
The present invention relates to Construction Formwork & Scaffold Technology fields, it is more particularly related to a kind of foot for being easily installed scaffold board
Hand cradle and setting method.
Background technique
Scaffold is divided by the position set up outer to guarantee each work progress is gone on smoothly and is set up workbench
Scaffold, internal scaffolding;Timber scaffolding, bamboo scaffolding, steel pipe scaffold can be divided by material difference;It is divided by structural form vertical
Rod-type scaffold, door-type scaffold, swinging scaffold, suspended scaffold, chooses formula scaffold, climbs formula foot hand bridge scaffold
Frame.
The patent of 205742939 U of patent application publication CN discloses a kind of Anti-inclining scaffold, which includes foot
Hand cradle cross bar, scaffold vertical bar, adjustment hole, fixing piece, snap close piece, support base and anti-dumping inclined support bar.A kind of anti-dumping
The characteristics of tiltedly scaffold has height-adjustable, can prevent scaffold inclination safety coefficient height simultaneously, and the service life is longer.
But it is in actual use, still there is more disadvantage, is such as not easy to carry out Fast Installation to scaffold board.
Summary of the invention
In order to overcome the drawbacks described above of the prior art, the embodiment of the present invention provides a kind of foot hand for being easily installed scaffold board
Frame and setting method are existed two end caps of scaffold board by being provided with the first limit inserted block, the second limit inserted block and expansible plug
The peripheral side outer wall of cross bar, and the first limit inserted block and the second limit inserted block are inserted into location hole and scaffold board
Portion, rotation expansible plug is, it can be achieved that first limits the connection of inserted block, the second limit inserted block and expansible plug, and then realizes foot hand
The fixed installation of plate, to solve the problems mentioned in the above background technology.
To achieve the above object, the invention provides the following technical scheme: a kind of scaffold for being easily installed scaffold board and setting
Method, including vertical bar are set, the top side of the vertical bar is fixedly connected with cross bar, and there are two the quantity settings of the cross bar, and
The peripheral side outer wall of two cross bars is arranged with scaffold board, and the both ends of the surface axial section shape of the scaffold board is disposed as arc;
The inside of the scaffold board, which is run through, offers location hole, and the top end surface of scaffold board is set close to the top of location hole
It is equipped with gasket, being internally embedded for the location hole is provided with the first limit inserted block, and the inside of location hole is inserted close to the first limit
The side of block is provided with the second limit inserted block, the vertical center of the first limit inserted block and the second limit inserted block about location hole
Axis is symmetrical set, and the first limit inserted block is identical as the second limit structure of inserted block.
Preferably, the peripheral side inner wall of the first limit inserted block offers screw channel, and the bottom end of the first limit inserted block is set
It is equipped with protruding end, the first limit inserted block is an integral structure with protruding end setting.
Preferably, the lateral axial section shape of the first limit inserted block is set as arc, and the first limit inserted block and the
It is provided with expansible plug between two limit inserted blocks, is threadedly coupled between the expansible plug and screw channel.
Preferably, the side of the vertical bar is provided with climbing frame close to the bottom of cross bar, and welds between vertical bar and climbing frame
It connects, the side of the vertical bar is provided with expansion bracket, and the junction of vertical bar and expansion bracket is provided with pin shaft.
Preferably, the bottom end of the vertical bar is provided with pedestal, and the bottom end side of vertical bar is provided with the first supporting mechanism, institute
The bottom end other side for stating vertical bar is provided with the second supporting mechanism, and second supporting mechanism and the first supporting mechanism are about vertical bar
Vertical central axis is symmetrical set.
Preferably, first supporting mechanism includes fixed block, and one end of the fixed block is provided with connector, the company
The bottom end of fitting is provided with supporting block, and connector is an integral structure with supporting block setting.
A kind of setting method for the scaffold being easily installed scaffold board, comprising the following steps:
The first step, vertical bar and cross bar select non-corroding, the steel pipe without bending deformation, and are welded and fixed;
Second step first sets up falsework and fixes vertical bar, and the bottom of vertical bar covers upper bed-plate, when the load of column is more than pedestal
Loaded area subgrade reaction when, the lower section of pedestal should pad slab or layers of concrete;
Third step, with steel pipe or wormwood artemisia bamboo that the bottom connection of the vertical bar of unified plane is firm, the roll line of vertical bar should interlock;
4th step, scaffold board are supported on two cross bars, and the both ends of scaffold board and cross bar are socketed, and realize scaffold board in cross
Laying on bar, and scaffold is fixed.
Technical effect and advantage of the invention:
1, the present invention is by being provided with the first limit inserted block, the second limit inserted block and expansible plug, by the both ends of scaffold board
It covers the peripheral side outer wall in cross bar, and the first limit inserted block and the second limit inserted block is inserted into location hole and scaffold board
Inside, rotation expansible plug is, it can be achieved that first limits the connection of inserted block, the second limit inserted block and expansible plug, and then realizes foot
The fixed installation of palm;
2, the present invention is by being provided with the first supporting mechanism and the second supporting mechanism, the first supporting mechanism and the second support machine
The common vertical supporting rod of structure, increases the contact area on vertical bar and ground.Being used cooperatively for supporting block and pedestal, increases scaffold
Stability, avoid the phenomenon that scaffold shakes.
Detailed description of the invention
Fig. 1 is overall structure diagram of the invention.
Fig. 2 is expansible plug mounting structure schematic diagram of the invention.
Fig. 3 is the first limit inserted block schematic perspective view of the invention.
Fig. 4 is the structure enlargement diagram of part A in Fig. 1.
Appended drawing reference are as follows: 1 vertical bar, 2 cross bars, 3 scaffold boards, 4 gaskets, 5 expansible plugs, 6 expansion brackets, 7 pin shafts, 8 climbing frames, 9
Pedestal, 10 first supporting mechanisms, 11 fixed blocks, 12 connectors, 13 supporting blocks, 14 protruding ends, 15 second supporting mechanisms, 16 positioning
Hole, 17 first limit inserted blocks, 18 second limit inserted blocks, 19 screw channels.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description.Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
The scaffold for being easily installed scaffold board of one embodiment of the invention, including vertical bar 1, the top side of the vertical bar 1
It is fixedly connected with cross bar 2, there are two the quantity settings of the cross bar 2, and the peripheral side outer wall of two cross bars 2 is arranged with foot hand
The both ends of the surface axial section shape of plate 3, the scaffold board 3 is disposed as arc.
Referring to Figure of description 1-3, the scaffold for being easily installed scaffold board of the embodiment includes location hole 16, the foot
The inside of palm 3, which is run through, offers location hole 16, and the top end surface of scaffold board 3 is provided with gasket close to the top of location hole 16
4, being internally embedded for the location hole 16 is provided with the first limit inserted block 17, and the inside of location hole 16 is close to the first limit inserted block
17 side is provided with the second limit inserted block 18, and the first limit inserted block 17 and the second limit inserted block 18 are about location hole 16
Vertical central axis is symmetrical set, and the first limit inserted block 17 is identical as the second limit structure of inserted block 18.
Further, the peripheral side inner wall of the first limit inserted block 17 offers screw channel 19, and the first limit inserted block 17
Bottom end be provided with protruding end 14, the first limit inserted block 17 and protruding end 14, which are arranged, to be an integral structure.
Further, the lateral axial section shape of the first limit inserted block 17 is set as arc, and the first limit inserted block
17 and second limit inserted block 18 between be provided with expansible plug 5, be threadedly coupled between the expansible plug 5 and screw channel 19.
Implement scene specifically: in actual use, by two end caps of scaffold board 3 cross bar 2 peripheral side outer wall,
First limit inserted block 17 and the second limit inserted block 18 are then sequentially inserted into the inside of location hole 16 and scaffold board 3, with
Expansible plug 5 is put between the first limit inserted block 17 and the second limit inserted block 18 afterwards, then rotates expansible plug 5, expansible plug 5
With the first limit inserted block 17 and the second limit 18 threads turn of inserted block, it can realize that the first limit inserted block 17, second limits at this time
The connection of inserted block 18 and expansible plug 5, and realize the fixed installation of scaffold board 3, installing and dismounting is simple.
Referring to Figure of description 1 and Fig. 4, the scaffold for being easily installed scaffold board of the embodiment includes climbing frame 8, described
The side of vertical bar 1 is provided with climbing frame 8 close to the bottom of cross bar 2, and welds between vertical bar 1 and climbing frame 8, the vertical bar 1
Side is provided with expansion bracket 6, and the junction of vertical bar 1 and expansion bracket 6 is provided with pin shaft 7.
Further, the bottom end of the vertical bar 1 is provided with pedestal 9, and the bottom end side of vertical bar 1 is provided with the first support machine
Structure 10, the bottom end other side of the vertical bar 1 are provided with the second supporting mechanism 15, second supporting mechanism 15 and the first support machine
Structure 10 is symmetrical set about the vertical central axis of vertical bar 1.
Further, first supporting mechanism 10 includes fixed block 11, and one end of the fixed block 11 is provided with connection
Part 12, the bottom end of the connector 12 is provided with supporting block 13, and connector 12 is an integral structure with the setting of supporting block 13.
A kind of setting method for the scaffold being easily installed scaffold board, the specific steps are as follows:
The first step, vertical bar 1 and cross bar 2 select non-corroding, the steel pipe without bending deformation, and are welded and fixed;
Second step first sets up falsework and fixes vertical bar 1, and the bottom of vertical bar 1 covers upper bed-plate 9, when the load of column is more than
When the loaded area subgrade reaction of pedestal 9, the lower section of pedestal 9 should pad slab or layers of concrete;
Third step, with steel pipe or wormwood artemisia bamboo that the bottom connection of the vertical bar 1 of unified plane is firm, the roll line of vertical bar 1 should interlock;
4th step, scaffold board 3 are supported on two cross bars 2, and the both ends of scaffold board 3 and cross bar 2 are socketed, and realize scaffold board
3 laying on cross bar 2, and it is fixed to scaffold 3.
Implement scene specifically: when in use, after scaffold is installed, the first supporting mechanism 10 and the second support machine
The common vertical supporting rod 1 of structure 15, increases the contact area of vertical bar 1 Yu ground.Supporting block 13 is used cooperatively with pedestal 9, is increased
The stability of scaffold, avoids the phenomenon that scaffold shakes, and subsequent construction personnel can pass through climbing frame 8 and reach foot hand
The top end surface of plate 3 is convenient for construction usage.
Working principle of the present invention:
Referring to Figure of description 1-3, it is provided with the first limit inserted block 17, second and limits inserted block 18 and expansible plug 5, by foot
Two end caps of palm 3 cross bar 2 peripheral side outer wall, and the first limit inserted block 17 and the second limit inserted block 18 be inserted into it is fixed
Position hole 16 and the inside of scaffold board 3, rotation expansible plug 5 is, it can be achieved that the first limit inserted block 17, second limits inserted block 18 and swollen
The connection of swollen bolt 5, and realize the fixed installation of scaffold board 3.
Referring to Figure of description 1 and Fig. 4, it is provided with the first supporting mechanism 10 and the second supporting mechanism 15, the first support machine
Structure 10 and the common vertical supporting rod 1 of the second supporting mechanism 15 increase the contact area of vertical bar 1 Yu ground, supporting block 13 and pedestal 9
Be used cooperatively, increase the stability of scaffold, avoid the phenomenon that scaffold shakes.
The several points that should finally illustrate are: firstly, in the description of the present application, it should be noted that unless otherwise prescribed and
It limits, term " installation ", " connected ", " connection " shall be understood in a broad sense, can be mechanical connection or electrical connection, be also possible to two
Connection inside element, can be directly connected, and "upper", "lower", "left", "right" etc. are only used for indicating relative positional relationship, when
The absolute position for being described object changes, then relative positional relationship may change;
Secondly: the present invention discloses in embodiment attached drawing, relates only to the structure being related to the embodiment of the present disclosure, other knots
Structure, which can refer to, to be commonly designed, and under not conflict situations, the same embodiment of the present invention and different embodiments be can be combined with each other;
Last: the foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, all in the present invention
Spirit and principle within, any modification, equivalent substitution, improvement and etc. done, should be included in protection scope of the present invention it
It is interior.
Claims (7)
1. a kind of scaffold for being easily installed scaffold board, including vertical bar (1), it is characterised in that: the top side of the vertical bar (1)
It is fixedly connected with cross bar (2), there are two the quantity settings of the cross bar (2), and the peripheral side outer wall of two cross bars (2) is arranged
Have scaffold board (3), the both ends of the surface axial section shape of the scaffold board (3) is disposed as arc, and the inside of the scaffold board (3) is passed through
It wears and offers location hole (16), and the top end surface of scaffold board (3) is provided with gasket (4), institute close to the top of location hole (16)
It states being internally embedded for location hole (16) and is provided with the first limit inserted block (17), and the inside of location hole (16) is inserted close to the first limit
The side of block (17) is provided with the second limit inserted block (18), first limit inserted block (17) and the second limit inserted block (18) about
The vertical central axis of location hole (16) is symmetrical set, and the structure of the first limit inserted block (17) and the second limit inserted block (18)
It is identical.
2. a kind of scaffold for being easily installed scaffold board according to claim 1, it is characterised in that: first limit is inserted
The peripheral side inner wall of block (17) offers screw channel (19), and the bottom end of the first limit inserted block (17) is provided with protruding end (14), institute
The first limit inserted block (17) is stated to be an integral structure with protruding end (14) setting.
3. a kind of scaffold for being easily installed scaffold board according to claim 2, it is characterised in that: first limit is inserted
The lateral axial section shape of block (17) is set as arc, and is arranged between the first limit inserted block (17) and the second limit inserted block (18)
Have expansible plug (5), is threadedly coupled between the expansible plug (5) and screw channel (19).
4. a kind of scaffold for being easily installed scaffold board according to claim 1, it is characterised in that: the vertical bar (1)
Side is provided with climbing frame (8) close to the bottom of cross bar (2), and is welded between vertical bar (1) and climbing frame (8), the vertical bar (1)
Side be provided with expansion bracket (6), and the junction of vertical bar (1) and expansion bracket (6) is provided with pin shaft (7).
5. a kind of scaffold for being easily installed scaffold board according to claim 1, it is characterised in that: the vertical bar (1)
Bottom end is provided with pedestal (9), and the bottom end side of vertical bar (1) is provided with the first supporting mechanism (10), the bottom end of the vertical bar (1)
The other side is provided with the second supporting mechanism (15), and second supporting mechanism (15) and the first supporting mechanism (10) are about vertical bar
(1) vertical central axis is symmetrical set.
6. a kind of scaffold for being easily installed scaffold board according to claim 5, it is characterised in that: the first support machine
Structure (10) includes fixed block (11), and one end of the fixed block (11) is provided with connector (12), the bottom of the connector (12)
End is provided with supporting block (13), and connector (12) is an integral structure with supporting block (13) setting.
7. a kind of setting method of scaffold for being easily installed scaffold board according to claim 1-6, feature
It is, the specific steps are as follows:
The first step, non-corroding, the steel pipe without bending deformation are selected in vertical bar (1) and cross bar (2), and are welded and fixed;
Second step first sets up falsework and fixes vertical bar (1), and the bottom of vertical bar (1) covers upper bed-plate (9), when the load of column is super
When crossing the loaded area subgrade reaction of pedestal (9), the lower section of pedestal (9) should pad slab or layers of concrete;
Third step, with steel pipe or wormwood artemisia bamboo that the bottom connection of the vertical bar (1) of unified plane is firm, the roll line of vertical bar (1) should interlock;
4th step, scaffold board (3) are supported on two cross bars (2), and the both ends and cross bar (2) of scaffold board (3) are socketed, and realize foot
Laying of the palm (3) on cross bar (2), and it is fixed to scaffold (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910688129.9A CN110512849A (en) | 2019-07-29 | 2019-07-29 | A kind of scaffold being easily installed scaffold board and setting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910688129.9A CN110512849A (en) | 2019-07-29 | 2019-07-29 | A kind of scaffold being easily installed scaffold board and setting method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110512849A true CN110512849A (en) | 2019-11-29 |
Family
ID=68624063
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910688129.9A Pending CN110512849A (en) | 2019-07-29 | 2019-07-29 | A kind of scaffold being easily installed scaffold board and setting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110512849A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112878647A (en) * | 2021-02-26 | 2021-06-01 | 陈兴梅 | Steel constructs scaffold |
CN113482305A (en) * | 2021-06-17 | 2021-10-08 | 中交一公局集团有限公司 | Scaffold for building curtain wall construction |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1133386A (en) * | 1995-04-14 | 1996-10-16 | 小野辰雄 | Scaffold plate |
ZA200205979B (en) * | 2001-06-28 | 2003-05-29 | Waco Internat Distrib Pty Ltd | Scaffold toe board. |
AU2009201267A1 (en) * | 2008-06-20 | 2010-01-14 | Fabquip Construction Systems Pty Ltd | A scaffolding plank and a scaffolding system incorporating a plurality of planks |
CN204418645U (en) * | 2015-01-27 | 2015-06-24 | 巫志丰 | A kind of scaffold walking plate for building |
CN206233531U (en) * | 2016-11-15 | 2017-06-09 | 中国建筑第八工程局有限公司 | Door-type scaffold and the attachment means for the door-type scaffold |
CN107476599A (en) * | 2017-07-27 | 2017-12-15 | 中国建筑第八工程局有限公司 | Tile type overlaps packway and its construction method |
CN108474400A (en) * | 2016-01-26 | 2018-08-31 | 喜利得股份公司 | The expansion anchor of swelling part with clamping |
CN207847063U (en) * | 2017-10-25 | 2018-09-11 | 诸暨益通网络科技有限公司 | A kind of scaffold easy to disassemble with installation |
CN211007555U (en) * | 2019-07-29 | 2020-07-14 | 南昌大学 | Scaffold convenient to installation scaffold board |
-
2019
- 2019-07-29 CN CN201910688129.9A patent/CN110512849A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1133386A (en) * | 1995-04-14 | 1996-10-16 | 小野辰雄 | Scaffold plate |
ZA200205979B (en) * | 2001-06-28 | 2003-05-29 | Waco Internat Distrib Pty Ltd | Scaffold toe board. |
AU2009201267A1 (en) * | 2008-06-20 | 2010-01-14 | Fabquip Construction Systems Pty Ltd | A scaffolding plank and a scaffolding system incorporating a plurality of planks |
CN204418645U (en) * | 2015-01-27 | 2015-06-24 | 巫志丰 | A kind of scaffold walking plate for building |
CN108474400A (en) * | 2016-01-26 | 2018-08-31 | 喜利得股份公司 | The expansion anchor of swelling part with clamping |
CN206233531U (en) * | 2016-11-15 | 2017-06-09 | 中国建筑第八工程局有限公司 | Door-type scaffold and the attachment means for the door-type scaffold |
CN107476599A (en) * | 2017-07-27 | 2017-12-15 | 中国建筑第八工程局有限公司 | Tile type overlaps packway and its construction method |
CN207847063U (en) * | 2017-10-25 | 2018-09-11 | 诸暨益通网络科技有限公司 | A kind of scaffold easy to disassemble with installation |
CN211007555U (en) * | 2019-07-29 | 2020-07-14 | 南昌大学 | Scaffold convenient to installation scaffold board |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112878647A (en) * | 2021-02-26 | 2021-06-01 | 陈兴梅 | Steel constructs scaffold |
CN113482305A (en) * | 2021-06-17 | 2021-10-08 | 中交一公局集团有限公司 | Scaffold for building curtain wall construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6247273B1 (en) | Adjustable form brace | |
KR100969992B1 (en) | Concrete Sheeting System for A Bridge Pier | |
CN110512849A (en) | A kind of scaffold being easily installed scaffold board and setting method | |
JP2009091123A (en) | Crane for steel tower | |
CN201116267Y (en) | Externally hung supporting device for internally climbing tower crane | |
KR102144434B1 (en) | Installation of temporary apparatus for curtain wall and temporary apparatus for curtain wall | |
JP4796202B1 (en) | Lifting scaffold | |
CN114197325A (en) | Pier shaft construction safety protection platform | |
CN211007555U (en) | Scaffold convenient to installation scaffold board | |
CN109019140A (en) | A kind of power construction cable fixture | |
CN210887832U (en) | Assembled stair installing support | |
KR20180075178A (en) | Moving device for system support and form for upper slab | |
CN215484876U (en) | Auxiliary frame for replacing connecting rod of bolt ball net rack | |
KR20060037137A (en) | Space preservation device for construction support | |
KR20120049687A (en) | Pipe support for construction | |
CN111778875B (en) | Roller type supporting leg, bridge turning system and construction method | |
CN205502561U (en) | Scaffold pedestal | |
KR101545865B1 (en) | Building support | |
CN210067436U (en) | Formwork support for steel structure floor slab construction | |
CN208415693U (en) | Suspension column structure and pillar | |
KR100804554B1 (en) | Steel stand for working reinforcing rod for bridge for constructing bridge pier | |
KR100482272B1 (en) | A supprot pipe for construction | |
CN220539314U (en) | Prestressed laminated slab supporting device | |
KR100879930B1 (en) | Sight rail for concrete mold form | |
CN216476245U (en) | Outer frame post design operation platform that encorbelments |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |