CN110435346A - A kind of gold and silver mistake artwork Ornament and preparation method thereof - Google Patents

A kind of gold and silver mistake artwork Ornament and preparation method thereof Download PDF

Info

Publication number
CN110435346A
CN110435346A CN201910652651.1A CN201910652651A CN110435346A CN 110435346 A CN110435346 A CN 110435346A CN 201910652651 A CN201910652651 A CN 201910652651A CN 110435346 A CN110435346 A CN 110435346A
Authority
CN
China
Prior art keywords
gold
cushion block
silver
embedding
mistake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910652651.1A
Other languages
Chinese (zh)
Other versions
CN110435346B (en
Inventor
袁军平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Panyu Polytechnic
Original Assignee
Guangzhou Panyu Polytechnic
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Panyu Polytechnic filed Critical Guangzhou Panyu Polytechnic
Priority to CN201910652651.1A priority Critical patent/CN110435346B/en
Publication of CN110435346A publication Critical patent/CN110435346A/en
Application granted granted Critical
Publication of CN110435346B publication Critical patent/CN110435346B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F3/00Manufacture of workpieces or articles from metallic powder characterised by the manner of compacting or sintering; Apparatus specially adapted therefor ; Presses and furnaces
    • B22F3/10Sintering only
    • B22F3/105Sintering only by using electric current other than for infrared radiant energy, laser radiation or plasma ; by ultrasonic bonding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F7/00Manufacture of composite layers, workpieces, or articles, comprising metallic powder, by sintering the powder, with or without compacting wherein at least one part is obtained by sintering or compression
    • B22F7/06Manufacture of composite layers, workpieces, or articles, comprising metallic powder, by sintering the powder, with or without compacting wherein at least one part is obtained by sintering or compression of composite workpieces or articles from parts, e.g. to form tipped tools
    • B22F7/08Manufacture of composite layers, workpieces, or articles, comprising metallic powder, by sintering the powder, with or without compacting wherein at least one part is obtained by sintering or compression of composite workpieces or articles from parts, e.g. to form tipped tools with one or more parts not made from powder
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B44DECORATIVE ARTS
    • B44CPRODUCING DECORATIVE EFFECTS; MOSAICS; TARSIA WORK; PAPERHANGING
    • B44C5/00Processes for producing special ornamental bodies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F3/00Manufacture of workpieces or articles from metallic powder characterised by the manner of compacting or sintering; Apparatus specially adapted therefor ; Presses and furnaces
    • B22F3/10Sintering only
    • B22F3/105Sintering only by using electric current other than for infrared radiant energy, laser radiation or plasma ; by ultrasonic bonding
    • B22F2003/1051Sintering only by using electric current other than for infrared radiant energy, laser radiation or plasma ; by ultrasonic bonding by electric discharge

Abstract

The invention discloses a kind of gold and silver mistake artwork Ornaments and preparation method thereof.Production method of the invention is by vacuum plasma sintering technology in conjunction with gold and silver mistake technique, with simple and effective, environmentally protective, the wide advantage of embedding mistake metal material selection range, by adjusting related process parameters, prepared gold and silver mistake artwork Ornament decorative pattern is fine, the division is clearly demarcated, embedding wrong secured, good metallurgical bonding is presented between base metal material and embedding wrong metal material, solve in existing gold and silver mistake technique occur easily at decorative pattern it is out of shape, be mingled with, sand holes, the problems such as falling off.

Description

A kind of gold and silver mistake artwork Ornament and preparation method thereof
Technical field
The present invention relates to artwork Ornament technical fields, and in particular to a kind of gold and silver mistake artwork Ornament and preparation method thereof.
Background technique
Gold and silver mistake technique is one of ancient Chinese conventional metals fine workmanship's decorative technique, be it is a kind of with metallized thread implements table The technique of decorative pattern or text is set on face.Gold and silver mistake technique is used primarily in bronze earliest first appeared in the bronze ware of quotient Zhou Shidai Decorative pattern on the practical implements such as various vessel, vehicle and horse utensil and the weapons of device.Not due to the natural colour of bronze and gold and silver Together, to show that golden (silver) bright, gorgeous brilliant decorative pattern, to significantly improve the decorative effect of implements.
Ancient Gold And Silver Ore mistake technique mainly comprises the steps that first is that make pottery mould, casts out bronze ware;Second is that in bronze ware Grain pattern is drawn on surface, and digs out shallow slot according to grain pattern engraving tool;Third is that metallized thread (piece) is mounted in groove;Fourth is that utilizing stone pair of laing Bronze, brass or copper ware surface carries out mill mistake, keeps metallized thread (piece) and bronze, brass or copper ware surface naturally smooth, reaches the stage to fit together perfectly.
The manufacture difficulty of traditional gold and silver mistake technique is very big, wire be entirely by force beat, squeeze insertion implements surface, cannot Using any adhesive, and the pattern line formed wants smooth, and strand thickness is consistent, and Yan Sihe is wanted in the cooperation with matrix Seam, therefore it is required that groove width and depth are accurate, otherwise wire can not be embedded in, insecure or not beautiful inadequate insertion See, processing and manufacturing difficulty as one can imagine, especially when with wire (piece) composition decorative pattern dense pattern, fluting precision is wanted Ask tightened up, manufacture difficulty is bigger.And in the selection of embedding wrong metal material, the intensity hardness of material must be very low, is easy to strike It beats and extends, in ability embedded groove;Once the intensity hardness of material is high, elasticity is big, when deformation is difficult, is just difficult to obtain satisfied embedding Wrong effect.
In recent years, it has carried out some research around how passing on and develop this technique.Such as:
CN201510205084.7 reports a kind of manufacturing method of gold and silver mistake ornaments, it is rotten using machining, chemistry The methods of erosion, processing depth at copper-based bottom is 0.8~1.4mm, and width is greater than the groove of 0.8mm, then by copper-tin alloy height Temperature is melted and is filled to formation gold and silver mistake effect in groove.This method can using the low metal of ductility as embedding wrong material, But it is difficult to be formed fine decorative pattern, and the compound of the copper-tin alloy of founding and copper-based bottom often occurs that profile is unclear, oxidation is pressed from both sides The problems such as miscellaneous.
CN201621377944.1 reports a kind of gold and silver mistake and inlays ring, and ring is decomposed into gold ring and two, silver circle by it Point, groove is cast out in the side Yin Quan, then covers gold ring in insertion groove.This method is still to beat extruding side using traditional forcing Formula, and groove is casting and forming, it is difficult to form fine decorative pattern.
CN201020219269.6 reports a kind of gold and silver mistake set jewelry, it be in jade surface layer depiction groove, Then proof gold filamentary silver (piece) is laid flat in percussion insertion groove.This method is no different with traditional gold and silver mistake technique, only substrate material Material is nonmetallic jade.
The production method that CN201210319988.9 reports a kind of metal embedding craft, it is to open on the metallic substrate Equipped with embedding wrong decoration groove, metallic substrates outer surface and the inner surface except insulating materials shield trenches are then used, electricity is recycled Casting process deposits the metal for wanting embedding mistake in the trench.Although this technique does not need manually to beat metal, it also requires being answered Miscellaneous grooving operations, and for fine decorative pattern, in the shielding of substrate surface brushing insulating materials, difficulty is too big, is easy to appear painting Swiped through boundary or problem that is not in place and causing decorative pattern out of shape, in addition electroforming process also brings severe environmental issue.
Summary of the invention
It is an object of the invention to a kind of gold and silver mistake artwork Ornament and its system are provided in place of overcome the deficiencies in the prior art Make method, using the gold and silver mistake artwork Ornament decorative pattern of this method production is fine, the division is clearly demarcated, it is embedding it is wrong securely, base metal with it is embedding Inlaying gold belong between good metallurgical bonding is presented, solve the prepared ornaments of existing method occur easily at decorative pattern it is out of shape, It is mingled with, sand holes, the problems such as falling off.
To achieve the above object, the technical solution adopted by the present invention is as follows:
A kind of production method of gold and silver mistake artwork Ornament, comprising the following steps:
(1) selection forms embedding inlaying gold category textured pattern with the apparent embedding wrong metal material of base material colour contrast, production;
(2) select the metal powder that granularity is 300~400 mesh as base material;
(3) push-down head is assembled in mold cavity, and the embedding inlaying gold category textured pattern that step (1) makes is placed in pushing Head surface adjusts position of the embedding inlaying gold category textured pattern in mold cavity and weighs metal according to the design requirement of artwork Ornament Powder adds it in mold cavity, and after seaming chuck is assembled in mold cavity, metal powder compression moulding is formed Blank, for the pressure that compression moulding uses for 9~12MPa, the dwell time is 60~90s, then takes out seaming chuck and push-down head, point Not after the working face of seaming chuck and push-down head places graphite paper gasket, mold is compressed again;
(4) it is sequentially placed lower bolster, lower cushion block on the lower electrodes base of vacuum plasma sintering furnace, it will be in step (3) The blank of compression moulding is placed on lower cushion block together with seaming chuck, push-down head and mold, and is sequentially placed above seaming chuck Cushion block and upper padding plate, the lower electrode of raising touch upper electrode holder and generate pressure up to upper cushion block and upper padding plate, the upper cushion block, The material of lower cushion block, upper padding plate and lower bolster can be conductive;
(5) after the completion of blank arrangement, the burner hearth of vacuum plasma sintering furnace is evacuated to 3~6Pa, increases lower electrode simultaneously It is pressurizeed by upper and lower pressure head to blank, the 28~35MPa of pressure for bearing jewellery blank, starting plasma agglomeration is set It is standby, pressure sintering is carried out under vacuum conditions, and sintering temperature is 700~850 DEG C, and soaking time is 1~2min;
(6) it polished sintered blank, polished, obtain gold and silver mistake artwork Ornament.
The present invention by vacuum plasma sintering technology in conjunction with gold and silver mistake technique, the production method simple and effective, green ring It protects, embedding mistake metal material selection range is wide, using the above method and passes through preferred suitable technological parameter, prepared gold and silver Wrong artwork Ornament decorative pattern is fine, the division is clearly demarcated, embedding wrong secured, and good metallurgical junction is presented between base metal and embedding inlaying gold category Close, solve in existing gold and silver mistake technique easily at decorative pattern occur it is out of shape, be mingled with, sand holes, the problems such as falling off.
Technological parameter in above-mentioned production method can accordingly be adjusted according to the embedding wrong metal material of selection and base material It is whole, for the metallurgical bonding effect for improving artwork Ornament, in step (5) by the vacuum degree control of vacuum plasma sintering furnace be 3~ 6Pa, the pressure control that jewellery blank is born are 28~35MPa, and sintering temperature control is 700~850 DEG C, and soaking time control is 1~2min.
The preferred embodiment of production method as gold and silver mistake artwork Ornament of the present invention, the upper cushion block, under The cross section of cushion block, upper padding plate and lower bolster is circle, and the upper cushion block and lower cushion block are combined by multiple circular pad module units It is formed.
The preferred embodiment of production method as gold and silver mistake artwork Ornament of the present invention, the upper cushion block is under Cushion block is combined to form step-like structure by multiple circular pad module units, lower cushion block circular pad module unit from bottom to top it is outer Diameter successively decreases according to 20%~40% ratio;The outer diameter of upper cushion block circular pad module unit from top to bottom is according to 20%~40% Ratio successively decrease.Step-like structure is set by upper cushion block and lower cushion block in the present invention, convenient for forming current convergence on blank Effect improves sintering efficiency, is conducive to improve the metallurgical bonding intensity between base metal and embedding inlaying gold category.
The preferred embodiment of production method as gold and silver mistake artwork Ornament of the present invention, in the step (1), It is wired inlay using craft, the embedding inlaying gold category textured pattern of method production of roll compacting, punching press, etching or cutting.
The preferred embodiment of production method as gold and silver mistake artwork Ornament of the present invention, the embedding wrong metal material Material is at least one of platinum, gold, silver, copper, palladium.
To enable inlaying gold silver textured pattern to highlight well, when production, is preferably anti-with artwork Ornament base material color Poor apparent embedding wrong metal material, such as: silver alloy, stainless steel, copper-nickel alloy, cobalt alloy etc. may be selected in white material;Red material Red copper, copper master alloy etc. may be selected;Proof gold, brass, bronze etc. may be selected in yellow material, after the completion of vacuum plasma sintering, base The color that the color of bottom material and embedding inlaying gold belong to has obvious contrast.The proof gold such as platinum, gold, silver, the copper excellent for ductility Material is preferentially fabricated to thin silk ribbon using the methods of roll compacting, drawing by category and high-purity alloy, then using method of wiring inlay by hand Produce textured pattern;For other materials, the methods of roll compacting, punching press, etching, cutting can be used and produce textured pattern.
The preferred embodiment of production method as gold and silver mistake artwork Ornament of the present invention, the inner wall of the mold For cylinder, outer wall is cylindrical, square column type or elliptical cylinder-shape, the shape of the graphite paper gasket and the inner wall shape one of mold It causes.
The preferred embodiment of production method as gold and silver mistake artwork Ornament of the present invention, the outer wall of the mold Middle position be equipped with blind hole for being inserted into temperature thermocouple, 1.5~2.5mm of aperture of the blind hole, depth is 3~5mm.
The preferred embodiment of production method as gold and silver mistake artwork Ornament of the present invention, the mold, upper pad Block, lower cushion block, upper padding plate and lower bolster material to select compression strength be the graphite of 50MPa or more.Graphite can be conductive, can hold By in sintering process high temperature and thermal shock, the pressure and workpiece expanded by heating when pressure sintering can be born, be conducive to be sintered Workpiece is smoothly taken out afterwards.
The present invention also provides according to the above-mentioned prepared gold and silver mistake artwork Ornament of method, the gold and silver mistake artwork Ornament Decorative pattern is fine, the division is clearly demarcated, embedding wrong secured, and bond strength is higher between base metal and embedding inlaying gold category.
Compared with prior art, the invention has the benefit that
The present invention by vacuum plasma sintering technology in conjunction with gold and silver mistake technique, the production method simple and effective, green ring It protects, embedding mistake metal material selection range is wide, passes through preferred suitable technological parameter, prepared gold and silver mistake artwork Ornament decorative pattern Finely, the division is clearly demarcated, embedding wrong secured, and good metallurgical bonding is presented between base metal material and embedding wrong metal material, solves Occur easily at decorative pattern in existing gold and silver mistake technique it is out of shape, be mingled with, sand holes, the problems such as falling off.
Detailed description of the invention
Fig. 1 is the gold and silver mistake artwork Ornament of embodiment 1, embedding wrong fine silver pattern in fine copper substrate.
Fig. 2 is the microscopic appearance and elemental line scan figure of the gold and silver mistake artwork Ornament of embodiment 1.
Fig. 3 is the gold and silver mistake artwork Ornament of embodiment 2, embedding wrong stainless steel pattern in copper master alloy substrate.
Fig. 4 is the gold and silver mistake artwork Ornament of embodiment 3, embedding wrong brass pattern on red copper substrate.
Fig. 5 is the gold and silver mistake artwork Ornament of embodiment 4, embedding wrong brass pattern in copper-nickel alloy substrate.
Specific embodiment
Purposes, technical schemes and advantages in order to better illustrate the present invention, below in conjunction with specific embodiment to the present invention It further illustrates.It will be appreciated by those skilled in the art that described herein, specific examples are only used to explain the present invention, not For limiting the present invention.
In embodiment, used experimental method is conventional method unless otherwise specified, material used, reagent etc., It is commercially available unless otherwise specified.
Embodiment 1
A kind of production method of gold and silver mistake artwork Ornament, comprising the following steps:
(1) using the excellent fine silver of ductility as embedding wrong metal material, by roll compacting after fine silver wire drawing at a thickness of The thin slice of 0.1mm, height 1mm;Using tissue sheet identical with mold inner-cavity diameter, required pattern is described on the scraps of paper, than Shape needed for being bent out fine silver thin slice using the method wired inlay by hand according to pattern, and put micro quick-drying gelatin and fix;
(2) using dry, non-oxidation fine copper powder as base material, powder size is 300 mesh;
(3) the embedding inlaying gold category textured pattern of step (1) is placed on push-down head table in mold cavity by push-down head assembly Face, weighs metal powder material according to the weight demands of artwork Ornament, powder is uniformly added in mold cavity, then fit on Pressure head, with hand-operated hydraulic press by powder pre-compacted, pressure 10MPa, dwell time 75s, then take out respectively seaming chuck and Push-down head, and upper graphite paper gasket, the graphite paper gasket under the placement of push-down head working face are placed in seaming chuck working face, then again It compresses;
Wherein, the material of mold, upper cushion block, lower cushion block, upper padding plate and lower bolster selects quality fine and close, and compression strength is The graphite of 60MPa;Mold is bucket cup structure, and the inner wall of the mold is cylinder, and the middle position of the outer wall of mold, which is equipped with, to be used In the blind hole of insertion temperature thermocouple, the aperture 2mm of the blind hole, depth 7mm;The shape of graphite paper gasket and mold it is interior Wall shape is consistent;Upper cushion block, lower cushion block, upper padding plate and lower bolster cross section be circle, the upper cushion block and lower cushion block by Multiple circular pad module units combine to form step-like structure, the lower cushion block from bottom to top circular pad module unit outer diameter according to 30% ratio is successively decreased;The outer diameter of upper cushion block circular pad module unit from top to bottom successively decreases according to 30% ratio, thickness root It requires to be arranged according to product size;
(4) it is sequentially placed lower bolster, lower cushion block on the lower electrodes base of vacuum plasma sintering furnace, the base that will be suppressed Part seaming chuck, push-down head and mold are placed on lower cushion block, are placed upper cushion block and upper padding plate in the top of seaming chuck, are increased lower electricity Pole is until upper cushion block and upper padding plate touch upper electrode holder and generate pressure, by the blind hole of temperature thermocouple insertion outer mold wall It is interior;
(5) after the completion of blank arrangement, burner hearth is evacuated down to 5Pa, lower electrode is increased and blank is carried out by upper push-down head Pressurization, the pressure for bearing blank are set as 30MPa, start plasma sintering equipment, carry out pressure sintering under vacuum conditions, Sintering temperature is 730 DEG C, soaking time 1.5min;
(6) blank of sinter molding polished, polished to get the artwork Ornament with exquisite inlaying gold decorative pattern is arrived, and Metallic substrates and embedding inlaying gold form good metallurgical bonding between belonging to, as depicted in figs. 1 and 2 respectively.
Embodiment 2
A kind of production method of gold and silver mistake artwork Ornament, comprising the following steps:
(1) it is cut on stainless steel substrates as embedding wrong metal material with wire cutting using the 316L stainless steel with a thickness of 1mm Required pattern out is dried after cleaning up its oil removing.
(2) using dry, non-oxidation copper master alloy powder as base material, powder size is 400 mesh;
(3) the embedding inlaying gold category textured pattern pinched is placed on pushing head surface, root in mold cavity by push-down head assembly Metal powder material is weighed according to the weight demands of artwork Ornament, powder is uniformly added in mold cavity, seaming chuck is then assembled, With hand-operated hydraulic press by powder pre-compacted, pressure 12MPa, dwell time 60s.Then seaming chuck and pushing are taken out respectively Head, and upper graphite paper gasket, the graphite paper gasket under the placement of push-down head working face are placed in seaming chuck working face, then press again Tightly;
Wherein, the material of mold, upper cushion block, lower cushion block, upper padding plate and lower bolster selects quality fine and close, and compression strength is The graphite of 70MPa;Mold is bucket cup structure, and the inner wall of the mold is elliptical cylinder-shape, and the middle position of the outer wall of mold is equipped with For being inserted into the blind hole of temperature thermocouple, the aperture 2.5mm of the blind hole, depth 5mm;The shape and mold of graphite paper gasket Inner wall shape it is consistent;Upper cushion block, lower cushion block, upper padding plate and lower bolster cross section be circle, the upper cushion block and lower cushion block It combines to form step-like structure by multiple circular pad module units, the outer diameter of lower cushion block circular pad module unit from bottom to top is pressed Successively decrease according to 40% ratio;The outer diameter of upper cushion block circular pad module unit from top to bottom successively decreases according to 40% ratio, thickness It requires to be arranged according to product size;
(4) it is sequentially placed lower bolster, lower cushion block on the lower electrodes base of vacuum plasma sintering furnace, the base that will be suppressed Part is placed on lower cushion block together with seaming chuck, push-down head and mold, is placed upper cushion block and upper padding plate in the top of seaming chuck, is increased Lower electrode is until upper cushion block and upper padding plate touch upper electrode holder and generate pressure, by the blind of temperature thermocouple insertion outer mold wall In hole;
(5) after the completion of blank arrangement, burner hearth is evacuated down to 6Pa, lower electrode is increased and blank is carried out by upper push-down head Pressurization, the pressure for bearing blank are set as 29MPa, start plasma sintering equipment, carry out pressure sintering under vacuum conditions, Sintering temperature is 700 DEG C, soaking time 2min;
(6) blank of sinter molding polished, polished to get the artwork Ornament with exquisite inlaying gold decorative pattern is arrived, such as Shown in Fig. 3, the division is clearly demarcated for the artwork Ornament, embedding wrong secured, and bond strength is higher between base metal and embedding inlaying gold category.
Embodiment 3
A kind of production method of gold and silver mistake artwork Ornament, comprising the following steps:
(1) institute is cut into wire cutting technology as embedding wrong metal material on brass sheet using the brass with a thickness of 1mm The pattern needed, is dried after its oil removing is cleaned up;
(2) using dry, non-oxidation red copper powder as base material, powder size is 350 mesh;
(3) the embedding inlaying gold category textured pattern pinched is placed on pushing head surface, root in mold cavity by push-down head assembly Metal powder material is weighed according to the weight demands of artwork Ornament, powder is uniformly added in mold cavity, seaming chuck is then assembled, With hand-operated hydraulic press by powder pre-compacted, pressure 11MPa, dwell time 70s.Then seaming chuck and pushing are taken out respectively Head, and upper graphite paper gasket, the graphite paper gasket under the placement of push-down head working face are placed in seaming chuck working face, then press again Tightly;
Wherein, the material of mold, upper cushion block, lower cushion block, upper padding plate and lower bolster selects quality fine and close, and compression strength is The graphite of 55MPa;Mold is bucket cup structure, and the inner wall of the mold is cylinder, and the middle position of the outer wall of mold, which is equipped with, to be used In the blind hole of insertion temperature thermocouple, the aperture 2.2mm of the blind hole, depth 6mm;The shape of graphite paper gasket and mold Inner wall shape is consistent;Upper cushion block, lower cushion block, upper padding plate and lower bolster cross section be circle, the upper cushion block and lower cushion block are equal Combined by multiple circular pad module units and form step-like structure, the lower cushion block from bottom to top circular pad module unit outer diameter according to 20% ratio is successively decreased;The outer diameter of upper cushion block circular pad module unit from top to bottom successively decreases according to 20% ratio, thickness root It requires to be arranged according to product size;
(4) it is sequentially placed lower bolster, lower cushion block on the lower electrodes base of vacuum plasma sintering furnace, the base that will be suppressed Part seaming chuck, push-down head and mold are placed on lower cushion block, are placed upper cushion block and upper padding plate in the top of seaming chuck, are increased lower electricity Pole touches upper electrode holder and generates pressure up to upper cushion block and upper padding plate, will be in the blind hole of thermocouple insertion outer mold wall;
(5) after the completion of blank arrangement, burner hearth is evacuated down to 4Pa, lower electrode is increased and blank is carried out by upper push-down head Pressurization, the pressure for bearing blank are set as 35MPa, start plasma sintering equipment, carry out pressure sintering under vacuum conditions, Sintering temperature is 800 DEG C, soaking time 1min;
(6) blank of sinter molding polished, polished to get the artwork Ornament with exquisite inlaying gold decorative pattern is arrived, such as Fig. 4, at the decorative pattern of the artwork Ornament without it is out of shape, be mingled with, sand holes, fall off phenomena such as.
Embodiment 4
A kind of production method of gold and silver mistake artwork Ornament, comprising the following steps:
(1) required pattern is formed with etch process as embedding wrong metal material using the brass with a thickness of 0.5mm, it will Its oil removing is dried after cleaning up;
(2) using dry, non-oxidation copper-nickel alloy powder as base material, powder size is 400 mesh;
(3) the embedding inlaying gold category textured pattern pinched is placed on pushing head surface, root in mold cavity by push-down head assembly Metal powder material is weighed according to the weight demands of artwork Ornament, powder is uniformly added in mold cavity, seaming chuck is then assembled, With hand-operated hydraulic press by powder pre-compacted, pressure 9MPa, the dwell time is 90 seconds.Then seaming chuck and pushing are taken out respectively Head, and upper graphite paper gasket, the graphite paper gasket under the placement of push-down head working face are placed in seaming chuck working face, then press again Tightly;
Wherein, the material of mold, upper cushion block, lower cushion block, upper padding plate and lower bolster selects quality fine and close, and compression strength is The graphite of 50MPa;Mold is bucket cup structure, and the inner wall of the mold is cylinder, and the middle position of the outer wall of mold, which is equipped with, to be used In the blind hole of insertion temperature thermocouple, the aperture 1.5mm of the blind hole, depth 8mm;The shape of graphite paper gasket and mold Inner wall shape is consistent;Upper cushion block, lower cushion block, upper padding plate and lower bolster cross section be circle, the upper cushion block and lower cushion block are equal Combined by multiple circular pad module units and form step-like structure, the lower cushion block from bottom to top circular pad module unit outer diameter according to 30% ratio is successively decreased;The outer diameter of upper cushion block circular pad module unit from top to bottom successively decreases according to 30% ratio, thickness root It requires to be arranged according to product size;
(4) it is sequentially placed lower bolster, lower cushion block on the lower electrodes base of vacuum plasma sintering furnace, the base that will be suppressed Part seaming chuck, push-down head and mold are placed on lower cushion block.Upper cushion block and upper padding plate are placed in the top of seaming chuck, increases lower electricity Pole is until upper cushion block and upper padding plate touch upper electrode holder and generate pressure.It will be in the blind hole of thermocouple insertion outer mold wall;
(5) after the completion of blank arrangement, burner hearth is evacuated down to 3Pa, lower electrode is increased and blank is carried out by upper push-down head Pressurization, the pressure for bearing blank are set as 29MPa, start plasma sintering equipment, carry out pressure sintering under vacuum conditions, Sintering temperature is 750 DEG C, soaking time 1.5min;
(6) blank of sinter molding polished, polished to get the artwork Ornament with exquisite inlaying gold decorative pattern is arrived, such as Shown in Fig. 5, the division is clearly demarcated for the artwork Ornament, embedding wrong secured, and bond strength is higher between base metal and embedding inlaying gold category.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention rather than protects to the present invention The limitation of range is protected, although the invention is described in detail with reference to the preferred embodiments, those skilled in the art should Understand, it can be with modification or equivalent replacement of the technical solution of the present invention are made, without departing from the essence of technical solution of the present invention And range.

Claims (9)

1. a kind of production method of gold and silver mistake artwork Ornament, which comprises the following steps:
(1) selection forms embedding inlaying gold category textured pattern with the apparent embedding wrong metal material of base material colour contrast, production;
(2) select the metal powder that granularity is 300~400 mesh as base material;
(3) push-down head is assembled in mold cavity, and the embedding inlaying gold category textured pattern that step (1) makes is placed in push-down head table Face adjusts position of the embedding inlaying gold category textured pattern in mold cavity and weighs metal powder according to the design requirement of artwork Ornament End adds it in mold cavity, after seaming chuck is assembled in mold cavity, by metal powder compression moulding, forms base Part, for the pressure that compression moulding uses for 9~12MPa, the dwell time is 60~90s, then takes out seaming chuck and push-down head, respectively After the working face of seaming chuck and push-down head places graphite paper gasket, mold is compressed again;
(4) it is sequentially placed lower bolster, lower cushion block on the lower electrodes base of vacuum plasma sintering furnace, by compacting in step (3) Molding blank is placed on lower cushion block together with seaming chuck, push-down head and mold, and upper cushion block is sequentially placed above seaming chuck And upper padding plate, the lower electrode of raising touch upper electrode holder and generate pressure up to upper cushion block and upper padding plate, the upper cushion block, underlay The material of block, upper padding plate and lower bolster can be conductive;
(5) after the completion of blank arrangement, the burner hearth of vacuum plasma sintering furnace is evacuated to 3~6Pa, increase lower electrode and is passed through Upper and lower pressure head pressurizes to blank, and the 28~35MPa of pressure for bearing jewellery blank starts plasma sintering equipment, In Pressure sintering is carried out under vacuum state, sintering temperature is 700~850 DEG C, and soaking time is 1~2min;
(6) it polished sintered blank, polished, obtain gold and silver mistake artwork Ornament.
2. the production method of gold and silver mistake artwork Ornament according to claim 1, which is characterized in that the upper cushion block, underlay The cross section of block, upper padding plate and lower bolster is circle, and the upper cushion block and lower cushion block combine shape by multiple circular pad module units At.
3. the production method of gold and silver mistake artwork Ornament according to claim 2, which is characterized in that the upper cushion block and underlay Block is combined to form step-like structure by multiple circular pad module units, the outer diameter of lower cushion block circular pad module unit from bottom to top Successively decrease according to 20%~40% ratio;The outer diameter of upper cushion block circular pad module unit from top to bottom is according to 20%~40% Ratio is successively decreased.
4. the production method of gold and silver mistake artwork Ornament according to claim 1, which is characterized in that in the step (1), adopt It wires inlay by hand, the embedding inlaying gold category textured pattern of method production of roll compacting, punching press, etching or cutting.
5. the production method of gold and silver mistake artwork Ornament according to claim 1 or 4, which is characterized in that the embedding inlaying gold category Material is at least one of platinum, gold, silver, copper, palladium.
6. the production method of gold and silver mistake artwork Ornament according to claim 1, which is characterized in that the inner wall of the mold is Cylinder, outer wall are cylindrical, square column type or elliptical cylinder-shape, the shape of the graphite paper gasket and the inner wall shape one of mold It causes.
7. the production method of gold and silver mistake artwork Ornament according to claim 6, which is characterized in that the outer wall of the mold Middle position is equipped with the blind hole for being inserted into temperature thermocouple, 1.5~2.5mm of aperture of the blind hole, and depth is 3~6mm.
8. the production method of gold and silver mistake artwork Ornament according to claim 1, which is characterized in that the mold, upper cushion block, It is the graphite of 50MPa or more that the material of lower cushion block, upper padding plate and lower bolster, which selects compression strength,.
9. the prepared gold and silver mistake artwork Ornament of described in any item methods according to claim 1~8.
CN201910652651.1A 2019-07-18 2019-07-18 Gold and silver staggered craft ornament and manufacturing method thereof Active CN110435346B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910652651.1A CN110435346B (en) 2019-07-18 2019-07-18 Gold and silver staggered craft ornament and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910652651.1A CN110435346B (en) 2019-07-18 2019-07-18 Gold and silver staggered craft ornament and manufacturing method thereof

Publications (2)

Publication Number Publication Date
CN110435346A true CN110435346A (en) 2019-11-12
CN110435346B CN110435346B (en) 2021-11-19

Family

ID=68430789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910652651.1A Active CN110435346B (en) 2019-07-18 2019-07-18 Gold and silver staggered craft ornament and manufacturing method thereof

Country Status (1)

Country Link
CN (1) CN110435346B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112371985A (en) * 2020-10-27 2021-02-19 上海工艺美术职业学院 Metal processing technology

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2055901A (en) * 1979-07-02 1981-03-11 Mitsubishi Metal Corp Sintered Decorative Metallic Composite
JPH04146703A (en) * 1990-10-09 1992-05-20 Citizen Watch Co Ltd Finger ring and manufacture thereof
CN1439487A (en) * 2003-02-28 2003-09-03 陈继锋 Diamond abrasion blocks and their sintering method
JP2008274418A (en) * 2007-03-30 2008-11-13 Kyocera Corp Composite material, ornament and method for manufacturing composite material
WO2011021672A1 (en) * 2009-08-19 2011-02-24 相田化学工業株式会社 Method for manufacturing decorative metal article and decorative metal article
CN103660754A (en) * 2012-09-03 2014-03-26 蒋荣昌 Metal embedding craft and making method thereof
CN103876407A (en) * 2012-12-21 2014-06-25 奥米加股份有限公司 Decorative piece produced by setting on amorphous metal
CH711065A2 (en) * 2015-05-12 2016-11-15 Eichenberger Futuretech Ag Construction of patterns, folding patterns, ornaments, characters, numbers, scales, logos and free forms in several metals, metal alloys and sinterable materials in the laser melting or sintering process.
CN106238732A (en) * 2016-08-30 2016-12-21 浙江晨华科技有限公司 A kind of discharge plasma sintering system
CN106498205A (en) * 2016-12-13 2017-03-15 合肥工业大学 A kind of manufacture method of the CuCr alloys of large scale high-compactness high uniformity
CN107716925A (en) * 2017-09-27 2018-02-23 西北工业大学 A kind of super-pressure anti-slip mould for discharge plasma sintering
CN107716926A (en) * 2017-09-27 2018-02-23 西北工业大学 A kind of school temperature mould for discharge plasma sintering
CN109663911A (en) * 2019-01-07 2019-04-23 哈尔滨工业大学 A kind of hard alloy 3-edge surgical knife tool thermal sintering integrated mould and preparation method
CN109750206A (en) * 2017-11-08 2019-05-14 斯沃奇集团研究及开发有限公司 For manufacturing the powder metallurgy molding composition and the product of the decoration or convering that are sintered blocky cermet form

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2055901A (en) * 1979-07-02 1981-03-11 Mitsubishi Metal Corp Sintered Decorative Metallic Composite
JPH04146703A (en) * 1990-10-09 1992-05-20 Citizen Watch Co Ltd Finger ring and manufacture thereof
CN1439487A (en) * 2003-02-28 2003-09-03 陈继锋 Diamond abrasion blocks and their sintering method
JP2008274418A (en) * 2007-03-30 2008-11-13 Kyocera Corp Composite material, ornament and method for manufacturing composite material
WO2011021672A1 (en) * 2009-08-19 2011-02-24 相田化学工業株式会社 Method for manufacturing decorative metal article and decorative metal article
CN103660754A (en) * 2012-09-03 2014-03-26 蒋荣昌 Metal embedding craft and making method thereof
CN103876407A (en) * 2012-12-21 2014-06-25 奥米加股份有限公司 Decorative piece produced by setting on amorphous metal
CH711065A2 (en) * 2015-05-12 2016-11-15 Eichenberger Futuretech Ag Construction of patterns, folding patterns, ornaments, characters, numbers, scales, logos and free forms in several metals, metal alloys and sinterable materials in the laser melting or sintering process.
CN106238732A (en) * 2016-08-30 2016-12-21 浙江晨华科技有限公司 A kind of discharge plasma sintering system
CN106498205A (en) * 2016-12-13 2017-03-15 合肥工业大学 A kind of manufacture method of the CuCr alloys of large scale high-compactness high uniformity
CN107716925A (en) * 2017-09-27 2018-02-23 西北工业大学 A kind of super-pressure anti-slip mould for discharge plasma sintering
CN107716926A (en) * 2017-09-27 2018-02-23 西北工业大学 A kind of school temperature mould for discharge plasma sintering
CN109750206A (en) * 2017-11-08 2019-05-14 斯沃奇集团研究及开发有限公司 For manufacturing the powder metallurgy molding composition and the product of the decoration or convering that are sintered blocky cermet form
CN109663911A (en) * 2019-01-07 2019-04-23 哈尔滨工业大学 A kind of hard alloy 3-edge surgical knife tool thermal sintering integrated mould and preparation method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
罗雁波 李关芳: "贵金属饰品材料及其制造", 《贵金属》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112371985A (en) * 2020-10-27 2021-02-19 上海工艺美术职业学院 Metal processing technology

Also Published As

Publication number Publication date
CN110435346B (en) 2021-11-19

Similar Documents

Publication Publication Date Title
CN104015009B (en) A kind of mobile phone center, the preparation method of bonnet
CN108067612B (en) A kind of preparation process of solderable sheet parallel construction silver graphite contact
JPS62202092A (en) Production of substantially hollow decorative product from metal by electroforming
CN110435346A (en) A kind of gold and silver mistake artwork Ornament and preparation method thereof
CN104399990B (en) A kind of hard alloy composite polycrystal-diamond of surface patterned and preparation method thereof
CN103263128B (en) Silver inlays the preparation method of gold jewelry
CN104433021A (en) Method for processing silverware of Miao people
CN208684759U (en) Curved glass panel is hot-forming to use graphite jig
CN108381127A (en) The production method of electronic product shell, electronic product shell, electronic product
CN102981392B (en) The manufacture method of hollow out pottery watchcase
CN108477780A (en) A kind of oil pressure technique of illusion-colour jewelry piece
CN110281683B (en) Method for manufacturing ceramic inlaid metal craft ornaments
GB9904205D0 (en) Moulds
CN106862870A (en) A kind of method for processing noble metal
EP3709327B1 (en) Fast compounding preparation method for long striped silver-graphite electrical contact material and solder tape
CN106515288A (en) Paper base and precious metal combined stamping process
CN107999747B (en) A kind of preparation method of the solderable band-like contact material of parallel construction silver graphite
CN110326861A (en) A kind of true color separation metal decoration and preparation method thereof with decorative pattern
CN211280458U (en) Inner container structure suitable for cloisonne enamel
CN208896737U (en) A kind of oil pressure and the firmly golden combination process product of electroforming
CN112119183B (en) Method for producing a decorative part
CN102452271A (en) Punched noble metal high relief handicraft article and process thereof
CN114807652B (en) Preparation method of powder metallurgy composite material for art
CN100569052C (en) Shell structure and manufacture method thereof
WO2010016744A2 (en) Method for manufacturing a fragrance-emitting sintered sheet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant