CN110409407A - A kind of laying process of long piled wharf lower section geotextiles - Google Patents
A kind of laying process of long piled wharf lower section geotextiles Download PDFInfo
- Publication number
- CN110409407A CN110409407A CN201910624032.1A CN201910624032A CN110409407A CN 110409407 A CN110409407 A CN 110409407A CN 201910624032 A CN201910624032 A CN 201910624032A CN 110409407 A CN110409407 A CN 110409407A
- Authority
- CN
- China
- Prior art keywords
- yardage roll
- geotechnological
- geotextiles
- overlap joint
- geotechnological yardage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000004746 geotextile Substances 0.000 title claims abstract description 50
- 238000000034 method Methods 0.000 title claims abstract description 17
- 238000002360 preparation method Methods 0.000 claims abstract description 6
- 239000004677 Nylon Substances 0.000 claims description 45
- 229920001778 nylon Polymers 0.000 claims description 45
- 239000004744 fabric Substances 0.000 claims description 27
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 16
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 10
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- 230000008602 contraction Effects 0.000 claims description 5
- 238000005520 cutting process Methods 0.000 claims description 5
- 239000000284 extract Substances 0.000 claims description 5
- 229910052742 iron Inorganic materials 0.000 claims description 5
- 238000003892 spreading Methods 0.000 claims description 5
- 238000004804 winding Methods 0.000 claims description 5
- 238000004519 manufacturing process Methods 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 2
- 238000012163 sequencing technique Methods 0.000 abstract description 2
- 239000004576 sand Substances 0.000 description 4
- 230000032683 aging Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
- E02B3/068—Landing stages for vessels
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/005—Soil-conditioning by mixing with fibrous materials, filaments, open mesh or the like
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Soil Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Revetment (AREA)
Abstract
The present invention provides a kind of laying process of long piled wharf lower section geotextiles, which comprises the following steps: (one) cuts out;(2) early-stage preparations;(3) it positions;(4) it is laid with geotechnological yardage roll;(5) it is laid with overlap joint yardage roll.The present invention adjusts the sequencing of pile sinking and geotextile laying, after the completion of pile sinking, then carries out the laying of geotextiles under harbour, efficiently solves drawbacks described above;And upper sandbag is pressed while geotechnological yardage roll and overlap joint yardage roll are laid in this technique, so that geotextile laying is more smooth, not easily shifted, laying effect is preferable.
Description
Technical field
The present invention relates to a kind of laying works of geotextiles below geotextile laying technical field more particularly to long piled wharf
Skill.
Background technique
At present below long piled wharf geotextile laying multiselect dredge repair slope when laying, then carry out pile sinking again and jackstone applied
Work, but there is following defects for this paving mode: (1) work surface needed for floating piling operation ship is big, pile sinking operation by
Geotextile laying speed restrict, need geotextiles along bank slope be laid with complete it is 150-200 meters wide after can carry out pile sinking operation;(2) native
Work cloth is accomplished to jackstone ballast time interval length (can carry out after needing pile sinking) from laying, and geotextiles are rushed by subsea current
It dissipates, the geotextiles more than water surface are easy aging for a long time by the sun according to shining on the bank;(3) when pile sinking, pile top penetrates geotextiles rear
It can sink under mud face, geotextiles should be easy to happen in the process and slide, tear;(4) when pile sinking, when stake position is located just at compress
When on packed rubble or other compress building stones, it is easy to happen stake position deviation;So being badly in need of studying the new laying geotextiles of one kind
Technique solves the above problems.
Summary of the invention
The present invention exactly against the above technical problems, provides a kind of laying process of long piled wharf lower section geotextiles.
The present invention to achieve the above object, using following technical scheme: the laying work of geotextiles below a kind of long piled wharf
Skill, which comprises the following steps:
(1) cut out: geotextiles are divided into the production of two kinds of forms, the geotechnological yardage roll between a kind of framed bent for odd number;One kind is adjacent
Overlap joint yardage roll between two width geotechnique's yardage rolls;
(2) early-stage preparations: geotechnological yardage roll is unfolded on the ground, according to drawing size in corresponding even number stake position G row and B
A circular hole is cut at two piling bars at row, then using the nylon rope of two 20m long by two of geotechnological yardage roll one end
Angle toggles, and the other end of two nylon ropes ties up on batching roller bearing, is rotated further by batching roller bearing, by the neat volume of geotechnological yardage roll at this
On batching roller bearing;
(3) it positions: batching roller bearing is placed on positioning floating drum, positioning floating drum is dragged to wharf apron in position, positioning is floating
Position side is stayed after cylinder in parallel to refute, refutes in position side and is fixed using four anchor hawsers, and four anchor hawsers are arranged in eight words;
(4) it is laid with geotechnological yardage roll:
After the completion of A1 positioning, first then the other end bolt jail of geotechnological yardage roll is spread by cloth people using the nylon rope of a 50m long
Member's seating towboat send the nylon rope of root 50m long on the bank, and then the other end of geotechnological yardage roll is dragged to by waterfall personnel on the bank
Bank side, then the circular hole of cutting is set on two piling bars at corresponding even number stake position G row and B row, so that geotechnological yardage roll is open and flat
On the water surface;
After the completion of A2 spread, enclosed using nylon rope around piling bar one in the contact position of geotechnological yardage roll and piling bar, the two of nylon rope
End and the label position bolt jail on geotechnological yardage roll;
After A3 fastens geotechnological yardage roll, the sandbag of 24-26kg is tied up on geotechnological yardage roll at piling bar first, it then will be husky
Bag is placed on driving cap, after the sandbag at all piling bars is all fastened, is pushed into water from the land side Ce Xianghai by sandbag, so that native
Work yardage roll sinks, until seabed;
After the completion of geotechnological yardage roll at A4 piling bar is laid with, to the mobile station keeping ship in extra large side, paving cloth personnel, which rotate batching roller bearing, to be made
It obtains geotechnological yardage roll to fall off from batching roller bearing, station keeping ship is every two meters mobile to extra large side, and paving cloth personnel are just one on geotechnological yardage roll
Then geotechnological yardage roll is sunk to seabed by sand discharge bag;After all geotechnological yardage rolls sink to marine, continue to move backward station keeping ship, one
Side running fix ship, nylon rope of one side loose winding on batching roller bearing, until geotextiles sink to seabed completely, then by nylon rope solution
It opens, extracts out;During spreading cloth, diver observes the laying condition of geotextiles under water, to the place for having contraction flattening in time, uses
Sandbag presses;
(5) it is laid with overlap joint yardage roll:
B1 is laid with the overlap joint yardage roll at piling bar: the overlap joint yardage roll cut out is placed between the geotechnological yardage roll of adjacent two,
Then overlap joint yardage roll is pressed with sandbag;
B2 is laid with the overlap joint yardage roll at the 30m of wharf apron: the paving mode for overlapping yardage roll and the geotechnique at the 30m of wharf apron
The paving mode of yardage roll is identical.
The uniformly distributed roller bearing is the seamless steel pipe that a diameter is 10cm, and bearing, bearing are welded in the both ends of seamless steel pipe
It is welded on the bracket welded with fashioned iron, bracket is welded on positioning floating drum, and the both ends of batching ball, which are welded, prevents geotextiles
The limit plate to fall off from batching ball is rolled up, and the distance between limit plate is 6m.
In the A2 of the step (4), there are the gaps of 20-30cm between nylon rope and piling bar.
Geotechnological yardage roll every breadth 6m, long 77m in the step (1);Overlap the every breadth 2.3m of yardage roll, long 77m.
It preferably, further include after geotechnological yardage roll is all completed with overlap joint yardage roll, paving cloth personnel take towboat and are being laid with
Geotechnological yardage roll and overlap joint yardage roll on random throwing sandbag, realize the compacting to geotechnological yardage roll and overlap joint yardage roll.
The beneficial effects of the present invention are: the present invention adjusts the sequencing of pile sinking and geotextile laying, heavy
After the completion of stake, then the laying of geotextiles under harbour is carried out, efficiently solves drawbacks described above;And in geotechnological yardage roll in this technique
Upper sandbag is pressed while laying with overlap joint yardage roll, so that geotextile laying is more smooth, not easily shifted, laying effect is preferable.
Detailed description of the invention
Fig. 1 is geotextile laying cross-section diagram;
In figure: 1, geotextiles;2, piling bar.
Specific embodiment
Below with reference to embodiment, the invention will be further described:
A kind of laying process of long piled wharf lower section geotextiles, which comprises the following steps:
(1) cut out: geotextiles 1 are divided to be made for two kinds of forms, the geotechnological yardage roll between a kind of framed bent for odd number;One kind is phase
Overlap joint yardage roll between adjacent two width geotechnique's yardage rolls;
(2) early-stage preparations: geotechnological yardage roll is unfolded on the ground, according to drawing size in corresponding even number stake position G row and B
A circular hole is cut at two piling bars 2 at row, then using the nylon rope of two 20m long by two of geotechnological yardage roll one end
Angle toggles, and the other end of two nylon ropes ties up on batching roller bearing, is rotated further by batching roller bearing, by the neat volume of geotechnological yardage roll at this
On batching roller bearing;
(3) it positions: batching roller bearing is placed on positioning floating drum, positioning floating drum is dragged to wharf apron in position, positioning is floating
Position side is stayed after cylinder in parallel to refute, refutes in position side and is fixed using four anchor hawsers, and four anchor hawsers are arranged in eight words;
(4) it is laid with geotechnological yardage roll:
After the completion of A1 positioning, first then the other end bolt jail of geotechnological yardage roll is spread by cloth people using the nylon rope of a 50m long
Member's seating towboat send the nylon rope of root 50m long on the bank, and then the other end of geotechnological yardage roll is dragged to by waterfall personnel on the bank
Bank side, then the circular hole of cutting is set on two piling bars 2 at corresponding even number stake position G row and B row, so that geotechnological yardage roll is open and flat
On the water surface;
After the completion of A2 spread, enclosed using nylon rope around piling bar 2 one in the contact position of geotechnological yardage roll and piling bar 2, nylon rope
Label position bolt jail on both ends and geotechnological yardage roll;
After A3 fastens geotechnological yardage roll, the sandbag of 24-26kg is tied up on geotechnological yardage roll at piling bar 2 first, then will
Sandbag is placed on driving cap, after the sandbag at all piling bars 2 is all fastened, is pushed into water, is made from the land side Ce Xianghai by sandbag
It obtains geotechnological yardage roll to sink, until seabed;
After the completion of geotechnological yardage roll at A4 piling bar 2 is laid with, to the mobile station keeping ship in extra large side, paving cloth personnel, which rotate batching roller bearing, to be made
It obtains geotechnological yardage roll to fall off from batching roller bearing, station keeping ship is every two meters mobile to extra large side, and paving cloth personnel are just one on geotechnological yardage roll
Then geotechnological yardage roll is sunk to seabed by sand discharge bag;After all geotechnological yardage rolls sink to marine, continue to move backward station keeping ship, one
Side running fix ship, nylon rope of one side loose winding on batching roller bearing, until geotextiles 1 sink to seabed completely, then by nylon rope
It unlocks, extracts out;During spreading cloth, diver observes the laying condition of geotextiles 1 under water, to the place for having contraction exhibition in time
It is flat, it is pressed with sandbag;
(5) it is laid with overlap joint yardage roll:
B1 is laid with the overlap joint yardage roll at piling bar 2: the overlap joint yardage roll cut out is placed between the geotechnological yardage roll of adjacent two,
Then overlap joint yardage roll is pressed with sandbag;
B2 is laid with the overlap joint yardage roll at the 30m of wharf apron: the paving mode for overlapping yardage roll and the geotechnique at the 30m of wharf apron
The paving mode of yardage roll is identical.
The uniformly distributed roller bearing is the seamless steel pipe that a diameter is 10cm, and bearing, bearing are welded in the both ends of seamless steel pipe
It is welded on the bracket welded with fashioned iron, bracket is welded on positioning floating drum, and the both ends of batching ball, which are welded, prevents geotextiles
The limit plate to fall off from batching ball is rolled up, and the distance between limit plate is 6m.
In the A2 of the step (4), there are the gaps of 20-30cm between nylon rope and piling bar 2.
Geotechnological yardage roll every breadth 6m, long 77m in the step (1);Overlap the every breadth 2.3m of yardage roll, long 77m.
It preferably, further include after geotechnological yardage roll is all completed with overlap joint yardage roll, paving cloth personnel take towboat and are being laid with
Geotechnological yardage roll and overlap joint yardage roll on random throwing sandbag, realize the compacting to geotechnological yardage roll and overlap joint yardage roll.
The laying process of geotextiles below a kind of long piled wharf of embodiment 1, comprising the following steps:
(1) cut out: geotextiles 1 are divided to be made for two kinds of forms, the geotechnological yardage roll between a kind of framed bent for odd number;One kind is phase
Overlap joint yardage roll between adjacent two width geotechnique's yardage rolls;
(2) early-stage preparations: geotechnological yardage roll is unfolded on the ground, according to drawing size in corresponding even number stake position G row and B
A circular hole is cut at two piling bars 2 at row, then using the nylon rope of two 20m long by two of geotechnological yardage roll one end
Angle toggles, and the other end of two nylon ropes ties up on batching roller bearing, is rotated further by batching roller bearing, by the neat volume of geotechnological yardage roll at this
On batching roller bearing;
(3) it positions: batching roller bearing is placed on positioning floating drum, positioning floating drum is dragged to wharf apron in position, positioning is floating
Position side is stayed after cylinder in parallel to refute, refutes in position side and is fixed using four anchor hawsers, and four anchor hawsers are arranged in eight words;
(4) it is laid with geotechnological yardage roll:
After the completion of A1 positioning, first then the other end bolt jail of geotechnological yardage roll is spread by cloth people using the nylon rope of a 50m long
Member's seating towboat send the nylon rope of root 50m long on the bank, and then the other end of geotechnological yardage roll is dragged to by waterfall personnel on the bank
Bank side, then the circular hole of cutting is set on two piling bars 2 at corresponding even number stake position G row and B row, so that geotechnological yardage roll is open and flat
On the water surface;
After the completion of A2 spread, enclosed using nylon rope around piling bar 2 one in the contact position of geotechnological yardage roll and piling bar 2, nylon rope
Label position bolt jail on both ends and geotechnological yardage roll;
After A3 fastens geotechnological yardage roll, the sandbag of 24kg is tied up on geotechnological yardage roll at piling bar 2 first, then by sandbag
It is placed on driving cap, after the sandbag at all piling bars 2 is all fastened, is pushed into water from the land side Ce Xianghai by sandbag, so that native
Work yardage roll sinks, until seabed;
After the completion of geotechnological yardage roll at A4 piling bar 2 is laid with, to the mobile station keeping ship in extra large side, paving cloth personnel, which rotate batching roller bearing, to be made
It obtains geotechnological yardage roll to fall off from batching roller bearing, station keeping ship is every two meters mobile to extra large side, and paving cloth personnel are just one on geotechnological yardage roll
Then geotechnological yardage roll is sunk to seabed by sand discharge bag;After all geotechnological yardage rolls sink to marine, continue to move backward station keeping ship, one
Side running fix ship, nylon rope of one side loose winding on batching roller bearing, until geotextiles 1 sink to seabed completely, then by nylon rope
It unlocks, extracts out;During spreading cloth, diver observes the laying condition of geotextiles 1 under water, to the place for having contraction exhibition in time
It is flat, it is pressed with sandbag;
(5) it is laid with overlap joint yardage roll:
B1 is laid with the overlap joint yardage roll at piling bar 2: the overlap joint yardage roll cut out is placed between the geotechnological yardage roll of adjacent two,
Then overlap joint yardage roll is pressed with sandbag;
B2 is laid with the overlap joint yardage roll at the 30m of wharf apron: the paving mode for overlapping yardage roll and the geotechnique at the 30m of wharf apron
The paving mode of yardage roll is identical.
The uniformly distributed roller bearing is the seamless steel pipe that a diameter is 10cm, and bearing, bearing are welded in the both ends of seamless steel pipe
It is welded on the bracket welded with fashioned iron, bracket is welded on positioning floating drum, and the both ends of batching ball, which are welded, prevents geotextiles
The limit plate to fall off from batching ball is rolled up, and the distance between limit plate is 6m.
In the A2 of the step (4), there are the gaps of 20cm between nylon rope and piling bar 2.
Geotechnological yardage roll every breadth 6m, long 77m in the step (1);Overlap the every breadth 2.3m of yardage roll, long 77m.
It preferably, further include after geotechnological yardage roll is all completed with overlap joint yardage roll, paving cloth personnel take towboat and are being laid with
Geotechnological yardage roll and overlap joint yardage roll on random throwing sandbag, realize the compacting to geotechnological yardage roll and overlap joint yardage roll.
The laying process of geotextiles below a kind of long piled wharf of embodiment 2, comprising the following steps:
(1) cut out: geotextiles 1 are divided to be made for two kinds of forms, the geotechnological yardage roll between a kind of framed bent for odd number;One kind is phase
Overlap joint yardage roll between adjacent two width geotechnique's yardage rolls;
(2) early-stage preparations: geotechnological yardage roll is unfolded on the ground, according to drawing size in corresponding even number stake position G row and B
A circular hole is cut at two piling bars 2 at row, then using the nylon rope of two 20m long by two of geotechnological yardage roll one end
Angle toggles, and the other end of two nylon ropes ties up on batching roller bearing, is rotated further by batching roller bearing, by the neat volume of geotechnological yardage roll at this
On batching roller bearing;
(3) it positions: batching roller bearing is placed on positioning floating drum, positioning floating drum is dragged to wharf apron in position, positioning is floating
Position side is stayed after cylinder in parallel to refute, refutes in position side and is fixed using four anchor hawsers, and four anchor hawsers are arranged in eight words;
(4) it is laid with geotechnological yardage roll:
After the completion of A1 positioning, first then the other end bolt jail of geotechnological yardage roll is spread by cloth people using the nylon rope of a 50m long
Member's seating towboat send the nylon rope of root 50m long on the bank, and then the other end of geotechnological yardage roll is dragged to by waterfall personnel on the bank
Bank side, then the circular hole of cutting is set on two piling bars 2 at corresponding even number stake position G row and B row, so that geotechnological yardage roll is open and flat
On the water surface;
After the completion of A2 spread, enclosed using nylon rope around piling bar 2 one in the contact position of geotechnological yardage roll and piling bar 2, nylon rope
Label position bolt jail on both ends and geotechnological yardage roll;
After A3 fastens geotechnological yardage roll, the sandbag of 26kg is tied up on geotechnological yardage roll at piling bar 2 first, then by sandbag
It is placed on driving cap, after the sandbag at all piling bars 2 is all fastened, is pushed into water from the land side Ce Xianghai by sandbag, so that native
Work yardage roll sinks, until seabed;
After the completion of geotechnological yardage roll at A4 piling bar 2 is laid with, to the mobile station keeping ship in extra large side, paving cloth personnel, which rotate batching roller bearing, to be made
It obtains geotechnological yardage roll to fall off from batching roller bearing, station keeping ship is every two meters mobile to extra large side, and paving cloth personnel are just one on geotechnological yardage roll
Then geotechnological yardage roll is sunk to seabed by sand discharge bag;After all geotechnological yardage rolls sink to marine, continue to move backward station keeping ship, one
Side running fix ship, nylon rope of one side loose winding on batching roller bearing, until geotextiles 1 sink to seabed completely, then by nylon rope
It unlocks, extracts out;During spreading cloth, diver observes the laying condition of geotextiles 1 under water, to the place for having contraction exhibition in time
It is flat, it is pressed with sandbag;
(5) it is laid with overlap joint yardage roll:
B1 is laid with the overlap joint yardage roll at piling bar 2: the overlap joint yardage roll cut out is placed between the geotechnological yardage roll of adjacent two,
Then overlap joint yardage roll is pressed with sandbag;
B2 is laid with the overlap joint yardage roll at the 30m of wharf apron: the paving mode for overlapping yardage roll and the geotechnique at the 30m of wharf apron
The paving mode of yardage roll is identical.
The uniformly distributed roller bearing is the seamless steel pipe that a diameter is 10cm, and bearing, bearing are welded in the both ends of seamless steel pipe
It is welded on the bracket welded with fashioned iron, bracket is welded on positioning floating drum, and the both ends of batching ball, which are welded, prevents geotextiles
The limit plate to fall off from batching ball is rolled up, and the distance between limit plate is 6m.
In the A2 of the step (4), there are the gaps of 30cm between nylon rope and piling bar 2.
Geotechnological yardage roll every breadth 6m, long 77m in the step (1);Overlap the every breadth 2.3m of yardage roll, long 77m.
It preferably, further include after geotechnological yardage roll is all completed with overlap joint yardage roll, paving cloth personnel take towboat and are being laid with
Geotechnological yardage roll and overlap joint yardage roll on random throwing sandbag, realize the compacting to geotechnological yardage roll and overlap joint yardage roll.
Above example is to the present invention have been described in detail, it is clear that the present invention implements not by the limit of aforesaid way
System as long as using the various improvement that the inventive concept and technical scheme of the present invention carry out, or not improved directly applies to it
Its occasion, it is within the scope of the present invention.
Claims (5)
1. the laying process of geotextiles below a kind of long piled wharf, which comprises the following steps:
(1) cut out: geotextiles (1) are divided into the production of two kinds of forms, the geotechnological yardage roll between a kind of framed bent for odd number;One kind is adjacent
Overlap joint yardage roll between two width geotechnique's yardage rolls;
(2) early-stage preparations: geotechnological yardage roll is unfolded on the ground, according to drawing size at corresponding even number stake position G row and B row
Two piling bars (2) at cut a circular hole, then using the nylon rope of two 20m long by two angles of geotechnological yardage roll one end
It toggles, the other end of two nylon ropes ties up on batching roller bearing, batching roller bearing is rotated further by, by the neat volume of geotechnological yardage roll in the volume
On cloth roller bearing;
(3) it positions: batching roller bearing is placed on positioning floating drum, positioning floating drum is dragged to wharf apron in position, after positioning floating drum
Position side is stayed in parallel to refute, and is refuted in position side and is fixed using four anchor hawsers, and four anchor hawsers are arranged in eight words;
(4) it is laid with geotechnological yardage roll:
After the completion of A1 positioning, first using the nylon rope of a 50m long then the other end bolt jail of geotechnological yardage roll is spread cloth personnel and multiplied
Towboat is sat to send the nylon rope of root 50m long on the bank, then the other end of geotechnological yardage roll is dragged to bank side by waterfall personnel on the bank,
Again by the circular hole of cutting be set in corresponding even number stake position G row and B row place two piling bars (2) on so that geotechnique yardage roll it is open and flat
On the water surface;
After the completion of A2 spread, enclosed using nylon rope around piling bar (2) one in the contact position of geotechnological yardage roll Yu piling bar (2), nylon rope
Label position bolt jail on both ends and geotechnological yardage roll;
After A3 fastens geotechnological yardage roll, the sandbag of 24-26kg is tied up on geotechnological yardage roll at piling bar (2) first, it then will be husky
Bag is placed on driving cap, after the sandbag at all piling bars (2) is all fastened, is pushed into water, is made from the land side Ce Xianghai by sandbag
It obtains geotechnological yardage roll to sink, until seabed;
After the completion of geotechnological yardage roll at A4 piling bar (2) is laid with, to the mobile station keeping ship in extra large side, paving cloth personnel rotate batching roller bearing and make
Geotechnological yardage roll falls off from batching roller bearing, and station keeping ship is every two meters mobile to extra large side, and paving cloth personnel are just a row on geotechnological yardage roll
Then geotechnological yardage roll is sunk to seabed by sandbag;After all geotechnological yardage roll sinks to marine, continue to move backward station keeping ship, on one side
Running fix ship, nylon rope of one side loose winding on batching roller bearing, until geotextiles (1) sink to seabed completely, then by nylon rope
It unlocks, extracts out;During spreading cloth, diver observes the laying condition of geotextiles (1) under water, to the place for having contraction exhibition in time
It is flat, it is pressed with sandbag;
(5) it is laid with overlap joint yardage roll:
B1 is laid with the overlap joint yardage roll at piling bar (2): the overlap joint yardage roll cut out being placed between the geotechnological yardage roll of adjacent two, so
Overlap joint yardage roll is pressed with sandbag afterwards;
B2 is laid with the overlap joint yardage roll at the 30m of wharf apron: the paving mode and the geotechnological yardage roll at the 30m of wharf apron for overlapping yardage roll
Paving mode it is identical.
2. the laying process of geotextiles below a kind of long piled wharf according to claim 1, which is characterized in that described uniformly distributed
Roller bearing is the seamless steel pipe that a diameter is 10cm, and bearing is welded at the both ends of seamless steel pipe, and bearing is welded on to be welded with fashioned iron
Bracket on, bracket is welded on positioning floating drum, and the both ends of batching ball, which welds, prevents geotechnological yardage roll de- from batching ball
The limit plate fallen, and the distance between limit plate is 6m.
3. the laying process of geotextiles below a kind of long piled wharf according to claim 1, which is characterized in that the step
(4) in A2, there are the gaps of 20-30cm between nylon rope and piling bar (2).
4. the laying process of geotextiles below a kind of long piled wharf according to claim 1, which is characterized in that the step
(1) geotechnological yardage roll every breadth 6m, long 77m in;Overlap the every breadth 2.3m of yardage roll, long 77m.
5. the laying process of geotextiles below a kind of long piled wharf according to claim 1, which is characterized in that further include working as
After geotechnological yardage roll and overlap joint yardage roll are all completed, paving cloth personnel take towboat on the geotechnological yardage roll that has been laid with and overlap joint yardage roll with
Machine throwing sandbag realizes the compacting to geotechnological yardage roll and overlap joint yardage roll.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910624032.1A CN110409407B (en) | 2019-07-11 | 2019-07-11 | Laying process of earthwork cloth below high-pile wharf |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910624032.1A CN110409407B (en) | 2019-07-11 | 2019-07-11 | Laying process of earthwork cloth below high-pile wharf |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110409407A true CN110409407A (en) | 2019-11-05 |
CN110409407B CN110409407B (en) | 2021-07-30 |
Family
ID=68361081
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910624032.1A Active CN110409407B (en) | 2019-07-11 | 2019-07-11 | Laying process of earthwork cloth below high-pile wharf |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110409407B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115233745A (en) * | 2022-07-26 | 2022-10-25 | 中交三航局第三工程有限公司 | Geotextile wrapping method for preventing penetration around pile body of pipe pile of revetment structure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005299337A (en) * | 2004-04-15 | 2005-10-27 | Nippon Steel Corp | Consolidation accelerating method for blast-furnace slag back-filling material |
CN101289860A (en) * | 2008-04-10 | 2008-10-22 | 中交三航局第二工程有限公司 | Underwater slope protection construction method for foundation ditch in water |
CN102277853A (en) * | 2011-04-26 | 2011-12-14 | 中交四航工程研究院有限公司 | Novel quick and reliable underwater arrangement technology |
CN103485308A (en) * | 2012-06-09 | 2014-01-01 | 浙江科技学院 | Underwater geotextile fabric laying method |
CN105256817A (en) * | 2015-09-24 | 2016-01-20 | 佛山市水利水电建筑设计有限公司 | Underwater mould bag sand weir body construction method |
CN105908673A (en) * | 2016-04-28 | 2016-08-31 | 中交二航局第三工程有限公司 | Soft body mattress underwater arrangement device and method |
-
2019
- 2019-07-11 CN CN201910624032.1A patent/CN110409407B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005299337A (en) * | 2004-04-15 | 2005-10-27 | Nippon Steel Corp | Consolidation accelerating method for blast-furnace slag back-filling material |
CN101289860A (en) * | 2008-04-10 | 2008-10-22 | 中交三航局第二工程有限公司 | Underwater slope protection construction method for foundation ditch in water |
CN102277853A (en) * | 2011-04-26 | 2011-12-14 | 中交四航工程研究院有限公司 | Novel quick and reliable underwater arrangement technology |
CN103485308A (en) * | 2012-06-09 | 2014-01-01 | 浙江科技学院 | Underwater geotextile fabric laying method |
CN105256817A (en) * | 2015-09-24 | 2016-01-20 | 佛山市水利水电建筑设计有限公司 | Underwater mould bag sand weir body construction method |
CN105908673A (en) * | 2016-04-28 | 2016-08-31 | 中交二航局第三工程有限公司 | Soft body mattress underwater arrangement device and method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115233745A (en) * | 2022-07-26 | 2022-10-25 | 中交三航局第三工程有限公司 | Geotextile wrapping method for preventing penetration around pile body of pipe pile of revetment structure |
CN115233745B (en) * | 2022-07-26 | 2023-06-30 | 中交三航局第三工程有限公司 | Geotextile wrapping method for preventing permeation around pile body of pile in revetment structure |
Also Published As
Publication number | Publication date |
---|---|
CN110409407B (en) | 2021-07-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106351242B (en) | A kind of exposed high intensity sea area the Dou Yan steel trestle of the big flow velocity of deep water and its construction method | |
CN109113020B (en) | Seaport breakwater structure and construction method thereof | |
CN205822279U (en) | A kind of marine structure anti-scouring system | |
CN110593325A (en) | Offshore wind power foundation curtain anti-scouring structure and anti-scouring method | |
KR100818758B1 (en) | Structure for establish mat of river slope | |
Corbella et al. | Geotextile sand filled containers as coastal defence: South African experience | |
CN108999142A (en) | The construction method of dome rectangular light-duty caisson and pile foundation combined type deep water breakwater | |
CN102261519B (en) | Method for assisting sliding, floating and down-ditching of pipeline by air bags | |
CN110409407A (en) | A kind of laying process of long piled wharf lower section geotextiles | |
CN205152888U (en) | An anchor bag and a concrete interlocking software volleyball association body structure | |
CN104452665B (en) | Abyssal region seawall sand quilt laying method | |
CN104612128B (en) | Vacuum preloading reinforcement construction method applicable to underwater silt environment | |
CN106759132B (en) | A kind of underwater concrete panel lash-up recovering method and the tool for clearing up attachment | |
CN103866738B (en) | For the rock-fill concrete construction method of wave wall basic platform | |
CN105089058A (en) | Method and device for quickly forming ballast collecting platform at high and steep slope | |
CN206467659U (en) | Large-scale U-shaped steel sheet pile construction leading truck | |
CN205975551U (en) | A construction platform for construction of aquatic steel sheet pile | |
CN204510181U (en) | A kind of phytal zone drilling platform | |
CN216999735U (en) | Underwater geotechnical pad paving equipment | |
CN208965494U (en) | The rectangular light-duty caisson of dome and pile foundation combined type breakwater | |
CN206815338U (en) | Hydraulic sheeting operation fluidic device | |
CN106677121A (en) | Movable type permeable spur structure capable of preventing coast erosion and construction method | |
CN109024470A (en) | The rectangular light-duty caisson of dome and pile foundation combined type breakwater | |
CN206088950U (en) | Water -level fluctuation district gravel material conveyor system | |
CN114457805A (en) | Underwater geotechnical pad paving equipment and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |