CN110409407A - A kind of laying process of long piled wharf lower section geotextiles - Google Patents

A kind of laying process of long piled wharf lower section geotextiles Download PDF

Info

Publication number
CN110409407A
CN110409407A CN201910624032.1A CN201910624032A CN110409407A CN 110409407 A CN110409407 A CN 110409407A CN 201910624032 A CN201910624032 A CN 201910624032A CN 110409407 A CN110409407 A CN 110409407A
Authority
CN
China
Prior art keywords
yardage roll
geotechnological
geotextiles
overlap joint
geotechnological yardage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910624032.1A
Other languages
Chinese (zh)
Other versions
CN110409407B (en
Inventor
刘亮亮
延刚
孙文声
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201910624032.1A priority Critical patent/CN110409407B/en
Publication of CN110409407A publication Critical patent/CN110409407A/en
Application granted granted Critical
Publication of CN110409407B publication Critical patent/CN110409407B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • E02B3/068Landing stages for vessels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/005Soil-conditioning by mixing with fibrous materials, filaments, open mesh or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Revetment (AREA)

Abstract

The present invention provides a kind of laying process of long piled wharf lower section geotextiles, which comprises the following steps: (one) cuts out;(2) early-stage preparations;(3) it positions;(4) it is laid with geotechnological yardage roll;(5) it is laid with overlap joint yardage roll.The present invention adjusts the sequencing of pile sinking and geotextile laying, after the completion of pile sinking, then carries out the laying of geotextiles under harbour, efficiently solves drawbacks described above;And upper sandbag is pressed while geotechnological yardage roll and overlap joint yardage roll are laid in this technique, so that geotextile laying is more smooth, not easily shifted, laying effect is preferable.

Description

A kind of laying process of long piled wharf lower section geotextiles
Technical field
The present invention relates to a kind of laying works of geotextiles below geotextile laying technical field more particularly to long piled wharf Skill.
Background technique
At present below long piled wharf geotextile laying multiselect dredge repair slope when laying, then carry out pile sinking again and jackstone applied Work, but there is following defects for this paving mode: (1) work surface needed for floating piling operation ship is big, pile sinking operation by Geotextile laying speed restrict, need geotextiles along bank slope be laid with complete it is 150-200 meters wide after can carry out pile sinking operation;(2) native Work cloth is accomplished to jackstone ballast time interval length (can carry out after needing pile sinking) from laying, and geotextiles are rushed by subsea current It dissipates, the geotextiles more than water surface are easy aging for a long time by the sun according to shining on the bank;(3) when pile sinking, pile top penetrates geotextiles rear It can sink under mud face, geotextiles should be easy to happen in the process and slide, tear;(4) when pile sinking, when stake position is located just at compress When on packed rubble or other compress building stones, it is easy to happen stake position deviation;So being badly in need of studying the new laying geotextiles of one kind Technique solves the above problems.
Summary of the invention
The present invention exactly against the above technical problems, provides a kind of laying process of long piled wharf lower section geotextiles.
The present invention to achieve the above object, using following technical scheme: the laying work of geotextiles below a kind of long piled wharf Skill, which comprises the following steps:
(1) cut out: geotextiles are divided into the production of two kinds of forms, the geotechnological yardage roll between a kind of framed bent for odd number;One kind is adjacent Overlap joint yardage roll between two width geotechnique's yardage rolls;
(2) early-stage preparations: geotechnological yardage roll is unfolded on the ground, according to drawing size in corresponding even number stake position G row and B A circular hole is cut at two piling bars at row, then using the nylon rope of two 20m long by two of geotechnological yardage roll one end Angle toggles, and the other end of two nylon ropes ties up on batching roller bearing, is rotated further by batching roller bearing, by the neat volume of geotechnological yardage roll at this On batching roller bearing;
(3) it positions: batching roller bearing is placed on positioning floating drum, positioning floating drum is dragged to wharf apron in position, positioning is floating Position side is stayed after cylinder in parallel to refute, refutes in position side and is fixed using four anchor hawsers, and four anchor hawsers are arranged in eight words;
(4) it is laid with geotechnological yardage roll:
After the completion of A1 positioning, first then the other end bolt jail of geotechnological yardage roll is spread by cloth people using the nylon rope of a 50m long Member's seating towboat send the nylon rope of root 50m long on the bank, and then the other end of geotechnological yardage roll is dragged to by waterfall personnel on the bank Bank side, then the circular hole of cutting is set on two piling bars at corresponding even number stake position G row and B row, so that geotechnological yardage roll is open and flat On the water surface;
After the completion of A2 spread, enclosed using nylon rope around piling bar one in the contact position of geotechnological yardage roll and piling bar, the two of nylon rope End and the label position bolt jail on geotechnological yardage roll;
After A3 fastens geotechnological yardage roll, the sandbag of 24-26kg is tied up on geotechnological yardage roll at piling bar first, it then will be husky Bag is placed on driving cap, after the sandbag at all piling bars is all fastened, is pushed into water from the land side Ce Xianghai by sandbag, so that native Work yardage roll sinks, until seabed;
After the completion of geotechnological yardage roll at A4 piling bar is laid with, to the mobile station keeping ship in extra large side, paving cloth personnel, which rotate batching roller bearing, to be made It obtains geotechnological yardage roll to fall off from batching roller bearing, station keeping ship is every two meters mobile to extra large side, and paving cloth personnel are just one on geotechnological yardage roll Then geotechnological yardage roll is sunk to seabed by sand discharge bag;After all geotechnological yardage rolls sink to marine, continue to move backward station keeping ship, one Side running fix ship, nylon rope of one side loose winding on batching roller bearing, until geotextiles sink to seabed completely, then by nylon rope solution It opens, extracts out;During spreading cloth, diver observes the laying condition of geotextiles under water, to the place for having contraction flattening in time, uses Sandbag presses;
(5) it is laid with overlap joint yardage roll:
B1 is laid with the overlap joint yardage roll at piling bar: the overlap joint yardage roll cut out is placed between the geotechnological yardage roll of adjacent two, Then overlap joint yardage roll is pressed with sandbag;
B2 is laid with the overlap joint yardage roll at the 30m of wharf apron: the paving mode for overlapping yardage roll and the geotechnique at the 30m of wharf apron The paving mode of yardage roll is identical.
The uniformly distributed roller bearing is the seamless steel pipe that a diameter is 10cm, and bearing, bearing are welded in the both ends of seamless steel pipe It is welded on the bracket welded with fashioned iron, bracket is welded on positioning floating drum, and the both ends of batching ball, which are welded, prevents geotextiles The limit plate to fall off from batching ball is rolled up, and the distance between limit plate is 6m.
In the A2 of the step (4), there are the gaps of 20-30cm between nylon rope and piling bar.
Geotechnological yardage roll every breadth 6m, long 77m in the step (1);Overlap the every breadth 2.3m of yardage roll, long 77m.
It preferably, further include after geotechnological yardage roll is all completed with overlap joint yardage roll, paving cloth personnel take towboat and are being laid with Geotechnological yardage roll and overlap joint yardage roll on random throwing sandbag, realize the compacting to geotechnological yardage roll and overlap joint yardage roll.
The beneficial effects of the present invention are: the present invention adjusts the sequencing of pile sinking and geotextile laying, heavy After the completion of stake, then the laying of geotextiles under harbour is carried out, efficiently solves drawbacks described above;And in geotechnological yardage roll in this technique Upper sandbag is pressed while laying with overlap joint yardage roll, so that geotextile laying is more smooth, not easily shifted, laying effect is preferable.
Detailed description of the invention
Fig. 1 is geotextile laying cross-section diagram;
In figure: 1, geotextiles;2, piling bar.
Specific embodiment
Below with reference to embodiment, the invention will be further described:
A kind of laying process of long piled wharf lower section geotextiles, which comprises the following steps:
(1) cut out: geotextiles 1 are divided to be made for two kinds of forms, the geotechnological yardage roll between a kind of framed bent for odd number;One kind is phase Overlap joint yardage roll between adjacent two width geotechnique's yardage rolls;
(2) early-stage preparations: geotechnological yardage roll is unfolded on the ground, according to drawing size in corresponding even number stake position G row and B A circular hole is cut at two piling bars 2 at row, then using the nylon rope of two 20m long by two of geotechnological yardage roll one end Angle toggles, and the other end of two nylon ropes ties up on batching roller bearing, is rotated further by batching roller bearing, by the neat volume of geotechnological yardage roll at this On batching roller bearing;
(3) it positions: batching roller bearing is placed on positioning floating drum, positioning floating drum is dragged to wharf apron in position, positioning is floating Position side is stayed after cylinder in parallel to refute, refutes in position side and is fixed using four anchor hawsers, and four anchor hawsers are arranged in eight words;
(4) it is laid with geotechnological yardage roll:
After the completion of A1 positioning, first then the other end bolt jail of geotechnological yardage roll is spread by cloth people using the nylon rope of a 50m long Member's seating towboat send the nylon rope of root 50m long on the bank, and then the other end of geotechnological yardage roll is dragged to by waterfall personnel on the bank Bank side, then the circular hole of cutting is set on two piling bars 2 at corresponding even number stake position G row and B row, so that geotechnological yardage roll is open and flat On the water surface;
After the completion of A2 spread, enclosed using nylon rope around piling bar 2 one in the contact position of geotechnological yardage roll and piling bar 2, nylon rope Label position bolt jail on both ends and geotechnological yardage roll;
After A3 fastens geotechnological yardage roll, the sandbag of 24-26kg is tied up on geotechnological yardage roll at piling bar 2 first, then will Sandbag is placed on driving cap, after the sandbag at all piling bars 2 is all fastened, is pushed into water, is made from the land side Ce Xianghai by sandbag It obtains geotechnological yardage roll to sink, until seabed;
After the completion of geotechnological yardage roll at A4 piling bar 2 is laid with, to the mobile station keeping ship in extra large side, paving cloth personnel, which rotate batching roller bearing, to be made It obtains geotechnological yardage roll to fall off from batching roller bearing, station keeping ship is every two meters mobile to extra large side, and paving cloth personnel are just one on geotechnological yardage roll Then geotechnological yardage roll is sunk to seabed by sand discharge bag;After all geotechnological yardage rolls sink to marine, continue to move backward station keeping ship, one Side running fix ship, nylon rope of one side loose winding on batching roller bearing, until geotextiles 1 sink to seabed completely, then by nylon rope It unlocks, extracts out;During spreading cloth, diver observes the laying condition of geotextiles 1 under water, to the place for having contraction exhibition in time It is flat, it is pressed with sandbag;
(5) it is laid with overlap joint yardage roll:
B1 is laid with the overlap joint yardage roll at piling bar 2: the overlap joint yardage roll cut out is placed between the geotechnological yardage roll of adjacent two, Then overlap joint yardage roll is pressed with sandbag;
B2 is laid with the overlap joint yardage roll at the 30m of wharf apron: the paving mode for overlapping yardage roll and the geotechnique at the 30m of wharf apron The paving mode of yardage roll is identical.
The uniformly distributed roller bearing is the seamless steel pipe that a diameter is 10cm, and bearing, bearing are welded in the both ends of seamless steel pipe It is welded on the bracket welded with fashioned iron, bracket is welded on positioning floating drum, and the both ends of batching ball, which are welded, prevents geotextiles The limit plate to fall off from batching ball is rolled up, and the distance between limit plate is 6m.
In the A2 of the step (4), there are the gaps of 20-30cm between nylon rope and piling bar 2.
Geotechnological yardage roll every breadth 6m, long 77m in the step (1);Overlap the every breadth 2.3m of yardage roll, long 77m.
It preferably, further include after geotechnological yardage roll is all completed with overlap joint yardage roll, paving cloth personnel take towboat and are being laid with Geotechnological yardage roll and overlap joint yardage roll on random throwing sandbag, realize the compacting to geotechnological yardage roll and overlap joint yardage roll.
The laying process of geotextiles below a kind of long piled wharf of embodiment 1, comprising the following steps:
(1) cut out: geotextiles 1 are divided to be made for two kinds of forms, the geotechnological yardage roll between a kind of framed bent for odd number;One kind is phase Overlap joint yardage roll between adjacent two width geotechnique's yardage rolls;
(2) early-stage preparations: geotechnological yardage roll is unfolded on the ground, according to drawing size in corresponding even number stake position G row and B A circular hole is cut at two piling bars 2 at row, then using the nylon rope of two 20m long by two of geotechnological yardage roll one end Angle toggles, and the other end of two nylon ropes ties up on batching roller bearing, is rotated further by batching roller bearing, by the neat volume of geotechnological yardage roll at this On batching roller bearing;
(3) it positions: batching roller bearing is placed on positioning floating drum, positioning floating drum is dragged to wharf apron in position, positioning is floating Position side is stayed after cylinder in parallel to refute, refutes in position side and is fixed using four anchor hawsers, and four anchor hawsers are arranged in eight words;
(4) it is laid with geotechnological yardage roll:
After the completion of A1 positioning, first then the other end bolt jail of geotechnological yardage roll is spread by cloth people using the nylon rope of a 50m long Member's seating towboat send the nylon rope of root 50m long on the bank, and then the other end of geotechnological yardage roll is dragged to by waterfall personnel on the bank Bank side, then the circular hole of cutting is set on two piling bars 2 at corresponding even number stake position G row and B row, so that geotechnological yardage roll is open and flat On the water surface;
After the completion of A2 spread, enclosed using nylon rope around piling bar 2 one in the contact position of geotechnological yardage roll and piling bar 2, nylon rope Label position bolt jail on both ends and geotechnological yardage roll;
After A3 fastens geotechnological yardage roll, the sandbag of 24kg is tied up on geotechnological yardage roll at piling bar 2 first, then by sandbag It is placed on driving cap, after the sandbag at all piling bars 2 is all fastened, is pushed into water from the land side Ce Xianghai by sandbag, so that native Work yardage roll sinks, until seabed;
After the completion of geotechnological yardage roll at A4 piling bar 2 is laid with, to the mobile station keeping ship in extra large side, paving cloth personnel, which rotate batching roller bearing, to be made It obtains geotechnological yardage roll to fall off from batching roller bearing, station keeping ship is every two meters mobile to extra large side, and paving cloth personnel are just one on geotechnological yardage roll Then geotechnological yardage roll is sunk to seabed by sand discharge bag;After all geotechnological yardage rolls sink to marine, continue to move backward station keeping ship, one Side running fix ship, nylon rope of one side loose winding on batching roller bearing, until geotextiles 1 sink to seabed completely, then by nylon rope It unlocks, extracts out;During spreading cloth, diver observes the laying condition of geotextiles 1 under water, to the place for having contraction exhibition in time It is flat, it is pressed with sandbag;
(5) it is laid with overlap joint yardage roll:
B1 is laid with the overlap joint yardage roll at piling bar 2: the overlap joint yardage roll cut out is placed between the geotechnological yardage roll of adjacent two, Then overlap joint yardage roll is pressed with sandbag;
B2 is laid with the overlap joint yardage roll at the 30m of wharf apron: the paving mode for overlapping yardage roll and the geotechnique at the 30m of wharf apron The paving mode of yardage roll is identical.
The uniformly distributed roller bearing is the seamless steel pipe that a diameter is 10cm, and bearing, bearing are welded in the both ends of seamless steel pipe It is welded on the bracket welded with fashioned iron, bracket is welded on positioning floating drum, and the both ends of batching ball, which are welded, prevents geotextiles The limit plate to fall off from batching ball is rolled up, and the distance between limit plate is 6m.
In the A2 of the step (4), there are the gaps of 20cm between nylon rope and piling bar 2.
Geotechnological yardage roll every breadth 6m, long 77m in the step (1);Overlap the every breadth 2.3m of yardage roll, long 77m.
It preferably, further include after geotechnological yardage roll is all completed with overlap joint yardage roll, paving cloth personnel take towboat and are being laid with Geotechnological yardage roll and overlap joint yardage roll on random throwing sandbag, realize the compacting to geotechnological yardage roll and overlap joint yardage roll.
The laying process of geotextiles below a kind of long piled wharf of embodiment 2, comprising the following steps:
(1) cut out: geotextiles 1 are divided to be made for two kinds of forms, the geotechnological yardage roll between a kind of framed bent for odd number;One kind is phase Overlap joint yardage roll between adjacent two width geotechnique's yardage rolls;
(2) early-stage preparations: geotechnological yardage roll is unfolded on the ground, according to drawing size in corresponding even number stake position G row and B A circular hole is cut at two piling bars 2 at row, then using the nylon rope of two 20m long by two of geotechnological yardage roll one end Angle toggles, and the other end of two nylon ropes ties up on batching roller bearing, is rotated further by batching roller bearing, by the neat volume of geotechnological yardage roll at this On batching roller bearing;
(3) it positions: batching roller bearing is placed on positioning floating drum, positioning floating drum is dragged to wharf apron in position, positioning is floating Position side is stayed after cylinder in parallel to refute, refutes in position side and is fixed using four anchor hawsers, and four anchor hawsers are arranged in eight words;
(4) it is laid with geotechnological yardage roll:
After the completion of A1 positioning, first then the other end bolt jail of geotechnological yardage roll is spread by cloth people using the nylon rope of a 50m long Member's seating towboat send the nylon rope of root 50m long on the bank, and then the other end of geotechnological yardage roll is dragged to by waterfall personnel on the bank Bank side, then the circular hole of cutting is set on two piling bars 2 at corresponding even number stake position G row and B row, so that geotechnological yardage roll is open and flat On the water surface;
After the completion of A2 spread, enclosed using nylon rope around piling bar 2 one in the contact position of geotechnological yardage roll and piling bar 2, nylon rope Label position bolt jail on both ends and geotechnological yardage roll;
After A3 fastens geotechnological yardage roll, the sandbag of 26kg is tied up on geotechnological yardage roll at piling bar 2 first, then by sandbag It is placed on driving cap, after the sandbag at all piling bars 2 is all fastened, is pushed into water from the land side Ce Xianghai by sandbag, so that native Work yardage roll sinks, until seabed;
After the completion of geotechnological yardage roll at A4 piling bar 2 is laid with, to the mobile station keeping ship in extra large side, paving cloth personnel, which rotate batching roller bearing, to be made It obtains geotechnological yardage roll to fall off from batching roller bearing, station keeping ship is every two meters mobile to extra large side, and paving cloth personnel are just one on geotechnological yardage roll Then geotechnological yardage roll is sunk to seabed by sand discharge bag;After all geotechnological yardage rolls sink to marine, continue to move backward station keeping ship, one Side running fix ship, nylon rope of one side loose winding on batching roller bearing, until geotextiles 1 sink to seabed completely, then by nylon rope It unlocks, extracts out;During spreading cloth, diver observes the laying condition of geotextiles 1 under water, to the place for having contraction exhibition in time It is flat, it is pressed with sandbag;
(5) it is laid with overlap joint yardage roll:
B1 is laid with the overlap joint yardage roll at piling bar 2: the overlap joint yardage roll cut out is placed between the geotechnological yardage roll of adjacent two, Then overlap joint yardage roll is pressed with sandbag;
B2 is laid with the overlap joint yardage roll at the 30m of wharf apron: the paving mode for overlapping yardage roll and the geotechnique at the 30m of wharf apron The paving mode of yardage roll is identical.
The uniformly distributed roller bearing is the seamless steel pipe that a diameter is 10cm, and bearing, bearing are welded in the both ends of seamless steel pipe It is welded on the bracket welded with fashioned iron, bracket is welded on positioning floating drum, and the both ends of batching ball, which are welded, prevents geotextiles The limit plate to fall off from batching ball is rolled up, and the distance between limit plate is 6m.
In the A2 of the step (4), there are the gaps of 30cm between nylon rope and piling bar 2.
Geotechnological yardage roll every breadth 6m, long 77m in the step (1);Overlap the every breadth 2.3m of yardage roll, long 77m.
It preferably, further include after geotechnological yardage roll is all completed with overlap joint yardage roll, paving cloth personnel take towboat and are being laid with Geotechnological yardage roll and overlap joint yardage roll on random throwing sandbag, realize the compacting to geotechnological yardage roll and overlap joint yardage roll.
Above example is to the present invention have been described in detail, it is clear that the present invention implements not by the limit of aforesaid way System as long as using the various improvement that the inventive concept and technical scheme of the present invention carry out, or not improved directly applies to it Its occasion, it is within the scope of the present invention.

Claims (5)

1. the laying process of geotextiles below a kind of long piled wharf, which comprises the following steps:
(1) cut out: geotextiles (1) are divided into the production of two kinds of forms, the geotechnological yardage roll between a kind of framed bent for odd number;One kind is adjacent Overlap joint yardage roll between two width geotechnique's yardage rolls;
(2) early-stage preparations: geotechnological yardage roll is unfolded on the ground, according to drawing size at corresponding even number stake position G row and B row Two piling bars (2) at cut a circular hole, then using the nylon rope of two 20m long by two angles of geotechnological yardage roll one end It toggles, the other end of two nylon ropes ties up on batching roller bearing, batching roller bearing is rotated further by, by the neat volume of geotechnological yardage roll in the volume On cloth roller bearing;
(3) it positions: batching roller bearing is placed on positioning floating drum, positioning floating drum is dragged to wharf apron in position, after positioning floating drum Position side is stayed in parallel to refute, and is refuted in position side and is fixed using four anchor hawsers, and four anchor hawsers are arranged in eight words;
(4) it is laid with geotechnological yardage roll:
After the completion of A1 positioning, first using the nylon rope of a 50m long then the other end bolt jail of geotechnological yardage roll is spread cloth personnel and multiplied Towboat is sat to send the nylon rope of root 50m long on the bank, then the other end of geotechnological yardage roll is dragged to bank side by waterfall personnel on the bank, Again by the circular hole of cutting be set in corresponding even number stake position G row and B row place two piling bars (2) on so that geotechnique yardage roll it is open and flat On the water surface;
After the completion of A2 spread, enclosed using nylon rope around piling bar (2) one in the contact position of geotechnological yardage roll Yu piling bar (2), nylon rope Label position bolt jail on both ends and geotechnological yardage roll;
After A3 fastens geotechnological yardage roll, the sandbag of 24-26kg is tied up on geotechnological yardage roll at piling bar (2) first, it then will be husky Bag is placed on driving cap, after the sandbag at all piling bars (2) is all fastened, is pushed into water, is made from the land side Ce Xianghai by sandbag It obtains geotechnological yardage roll to sink, until seabed;
After the completion of geotechnological yardage roll at A4 piling bar (2) is laid with, to the mobile station keeping ship in extra large side, paving cloth personnel rotate batching roller bearing and make Geotechnological yardage roll falls off from batching roller bearing, and station keeping ship is every two meters mobile to extra large side, and paving cloth personnel are just a row on geotechnological yardage roll Then geotechnological yardage roll is sunk to seabed by sandbag;After all geotechnological yardage roll sinks to marine, continue to move backward station keeping ship, on one side Running fix ship, nylon rope of one side loose winding on batching roller bearing, until geotextiles (1) sink to seabed completely, then by nylon rope It unlocks, extracts out;During spreading cloth, diver observes the laying condition of geotextiles (1) under water, to the place for having contraction exhibition in time It is flat, it is pressed with sandbag;
(5) it is laid with overlap joint yardage roll:
B1 is laid with the overlap joint yardage roll at piling bar (2): the overlap joint yardage roll cut out being placed between the geotechnological yardage roll of adjacent two, so Overlap joint yardage roll is pressed with sandbag afterwards;
B2 is laid with the overlap joint yardage roll at the 30m of wharf apron: the paving mode and the geotechnological yardage roll at the 30m of wharf apron for overlapping yardage roll Paving mode it is identical.
2. the laying process of geotextiles below a kind of long piled wharf according to claim 1, which is characterized in that described uniformly distributed Roller bearing is the seamless steel pipe that a diameter is 10cm, and bearing is welded at the both ends of seamless steel pipe, and bearing is welded on to be welded with fashioned iron Bracket on, bracket is welded on positioning floating drum, and the both ends of batching ball, which welds, prevents geotechnological yardage roll de- from batching ball The limit plate fallen, and the distance between limit plate is 6m.
3. the laying process of geotextiles below a kind of long piled wharf according to claim 1, which is characterized in that the step (4) in A2, there are the gaps of 20-30cm between nylon rope and piling bar (2).
4. the laying process of geotextiles below a kind of long piled wharf according to claim 1, which is characterized in that the step (1) geotechnological yardage roll every breadth 6m, long 77m in;Overlap the every breadth 2.3m of yardage roll, long 77m.
5. the laying process of geotextiles below a kind of long piled wharf according to claim 1, which is characterized in that further include working as After geotechnological yardage roll and overlap joint yardage roll are all completed, paving cloth personnel take towboat on the geotechnological yardage roll that has been laid with and overlap joint yardage roll with Machine throwing sandbag realizes the compacting to geotechnological yardage roll and overlap joint yardage roll.
CN201910624032.1A 2019-07-11 2019-07-11 Laying process of earthwork cloth below high-pile wharf Active CN110409407B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910624032.1A CN110409407B (en) 2019-07-11 2019-07-11 Laying process of earthwork cloth below high-pile wharf

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910624032.1A CN110409407B (en) 2019-07-11 2019-07-11 Laying process of earthwork cloth below high-pile wharf

Publications (2)

Publication Number Publication Date
CN110409407A true CN110409407A (en) 2019-11-05
CN110409407B CN110409407B (en) 2021-07-30

Family

ID=68361081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910624032.1A Active CN110409407B (en) 2019-07-11 2019-07-11 Laying process of earthwork cloth below high-pile wharf

Country Status (1)

Country Link
CN (1) CN110409407B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115233745A (en) * 2022-07-26 2022-10-25 中交三航局第三工程有限公司 Geotextile wrapping method for preventing penetration around pile body of pipe pile of revetment structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005299337A (en) * 2004-04-15 2005-10-27 Nippon Steel Corp Consolidation accelerating method for blast-furnace slag back-filling material
CN101289860A (en) * 2008-04-10 2008-10-22 中交三航局第二工程有限公司 Underwater slope protection construction method for foundation ditch in water
CN102277853A (en) * 2011-04-26 2011-12-14 中交四航工程研究院有限公司 Novel quick and reliable underwater arrangement technology
CN103485308A (en) * 2012-06-09 2014-01-01 浙江科技学院 Underwater geotextile fabric laying method
CN105256817A (en) * 2015-09-24 2016-01-20 佛山市水利水电建筑设计有限公司 Underwater mould bag sand weir body construction method
CN105908673A (en) * 2016-04-28 2016-08-31 中交二航局第三工程有限公司 Soft body mattress underwater arrangement device and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005299337A (en) * 2004-04-15 2005-10-27 Nippon Steel Corp Consolidation accelerating method for blast-furnace slag back-filling material
CN101289860A (en) * 2008-04-10 2008-10-22 中交三航局第二工程有限公司 Underwater slope protection construction method for foundation ditch in water
CN102277853A (en) * 2011-04-26 2011-12-14 中交四航工程研究院有限公司 Novel quick and reliable underwater arrangement technology
CN103485308A (en) * 2012-06-09 2014-01-01 浙江科技学院 Underwater geotextile fabric laying method
CN105256817A (en) * 2015-09-24 2016-01-20 佛山市水利水电建筑设计有限公司 Underwater mould bag sand weir body construction method
CN105908673A (en) * 2016-04-28 2016-08-31 中交二航局第三工程有限公司 Soft body mattress underwater arrangement device and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115233745A (en) * 2022-07-26 2022-10-25 中交三航局第三工程有限公司 Geotextile wrapping method for preventing penetration around pile body of pipe pile of revetment structure
CN115233745B (en) * 2022-07-26 2023-06-30 中交三航局第三工程有限公司 Geotextile wrapping method for preventing permeation around pile body of pile in revetment structure

Also Published As

Publication number Publication date
CN110409407B (en) 2021-07-30

Similar Documents

Publication Publication Date Title
CN106351242B (en) A kind of exposed high intensity sea area the Dou Yan steel trestle of the big flow velocity of deep water and its construction method
CN109113020B (en) Seaport breakwater structure and construction method thereof
CN205822279U (en) A kind of marine structure anti-scouring system
CN110593325A (en) Offshore wind power foundation curtain anti-scouring structure and anti-scouring method
KR100818758B1 (en) Structure for establish mat of river slope
Corbella et al. Geotextile sand filled containers as coastal defence: South African experience
CN108999142A (en) The construction method of dome rectangular light-duty caisson and pile foundation combined type deep water breakwater
CN102261519B (en) Method for assisting sliding, floating and down-ditching of pipeline by air bags
CN110409407A (en) A kind of laying process of long piled wharf lower section geotextiles
CN205152888U (en) An anchor bag and a concrete interlocking software volleyball association body structure
CN104452665B (en) Abyssal region seawall sand quilt laying method
CN104612128B (en) Vacuum preloading reinforcement construction method applicable to underwater silt environment
CN106759132B (en) A kind of underwater concrete panel lash-up recovering method and the tool for clearing up attachment
CN103866738B (en) For the rock-fill concrete construction method of wave wall basic platform
CN105089058A (en) Method and device for quickly forming ballast collecting platform at high and steep slope
CN206467659U (en) Large-scale U-shaped steel sheet pile construction leading truck
CN205975551U (en) A construction platform for construction of aquatic steel sheet pile
CN204510181U (en) A kind of phytal zone drilling platform
CN216999735U (en) Underwater geotechnical pad paving equipment
CN208965494U (en) The rectangular light-duty caisson of dome and pile foundation combined type breakwater
CN206815338U (en) Hydraulic sheeting operation fluidic device
CN106677121A (en) Movable type permeable spur structure capable of preventing coast erosion and construction method
CN109024470A (en) The rectangular light-duty caisson of dome and pile foundation combined type breakwater
CN206088950U (en) Water -level fluctuation district gravel material conveyor system
CN114457805A (en) Underwater geotechnical pad paving equipment and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant