CN205975551U - A construction platform for construction of aquatic steel sheet pile - Google Patents

A construction platform for construction of aquatic steel sheet pile Download PDF

Info

Publication number
CN205975551U
CN205975551U CN201620886431.7U CN201620886431U CN205975551U CN 205975551 U CN205975551 U CN 205975551U CN 201620886431 U CN201620886431 U CN 201620886431U CN 205975551 U CN205975551 U CN 205975551U
Authority
CN
China
Prior art keywords
steel
pipe pile
girder
construction
secondary beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620886431.7U
Other languages
Chinese (zh)
Inventor
宫东平
陶伊洛
曹磊
魏张闯
李高立
郝瑞丽
李敏
车圣君
李娟�
王萍莉
马宏杰
李利钦
周怡平
刘国显
王艳艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Water Construction Engineering Co Ltd
Original Assignee
Zhengzhou Water Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Water Construction Engineering Co Ltd filed Critical Zhengzhou Water Construction Engineering Co Ltd
Priority to CN201620886431.7U priority Critical patent/CN205975551U/en
Application granted granted Critical
Publication of CN205975551U publication Critical patent/CN205975551U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a construction platform for construction of aquatic steel sheet pile, including steel -pipe pile, girder, secondary beam, spreader beam, road deck, the steel -pipe pile insert the riverbed through mechanical oscillation hammered mode, the steel -pipe pile between be provided with horizontal linking beam and vertical linking beam, the top welding of steel -pipe pile have four brackets, the girder weld in the top of double -phase neighbour's steel -pipe pile, secondary beam equidistant welding in girder upper portion in proper order, spreader beam equidistant welding in secondary beam upper portion in proper order, the road deck weld in spreader beam upper portion, secondary beam and girder cross arrangement, spreader beam and secondary beam cross arrangement, the bracket arrange evenly at the top of steel -pipe pile that the bracket of double -phase adjacent steel -pipe pile sets up relatively, generally, the utility model has the advantages of construction quality is good, and factor of safety is high, and the installation is dismantled conveniently, and environmental pollution is little, and construction period is short, and economic benefits is good.

Description

A kind of operation platform for the construction of water Steel Sheet Pile
Technical field
This utility model belongs to steel sheet pile construction technical field, particularly to a kind of construction for the construction of water Steel Sheet Pile Platform.
Background technology
At present, a large amount of hydraulic engineerings are had to need in subaqueous work, using steel cofferdam in inland lake, reservoir, river course When, operation platform is particularly important.Widespread practice is to fill earth embankment now, or fills earth foundation.These filled ground sides , in the construction of some high water head water, reclamation work amount is very big for case, and the earthwork removes difficulty also very greatly, and construction cost is high, and in height Under the effect such as head, stormy waves, also there is the risk collapsing.For the high reservoir of some environmental requirements, lake filled ground scheme Enforcement difficulty is bigger.
Content of the invention
The purpose of this utility model is to provide a kind of operation platform for the construction of water Steel Sheet Pile, and this operation platform is complete Cheng Houwei steel sheet pile and succeeding body engineering construction provide trestle effect, have that construction quality is good, and safety coefficient is high, installing/dismounting Convenient, environmental pollution is little, and the construction period is short, good in economic efficiency, has high use value.
The purpose of this utility model is realized in:A kind of operation platform for the construction of water Steel Sheet Pile, including steel Pile tube, girder, secondary beam, spreader beam, road deck, described steel-pipe pile inserts riverbed by way of mechanical vibration hammer, described Steel-pipe pile between be provided with horizontal linking beam and longitudinal linking beam, the welded top of described steel-pipe pile has four brackets, institute In the top of two adjacent steel-pipe piles, described secondary beam is welded in girder top to the Main Girder Welding stated successively at equal intervals, described Spreader beam be welded in secondary beam top successively at equal intervals, described road deck is welded in spreader beam top.
Described secondary beam and girder are arranged in a crossed manner, and described spreader beam and secondary beam are arranged in a crossed manner.
2 times of a diameter of width of main beam of described steel-pipe pile.
Described girder is I40a I-steel.
Described bracket is evenly arranged at the top of steel-pipe pile, and the bracket of two adjacent steel-pipe piles is oppositely arranged.
This utility model produce beneficial effect be:A kind of operation platform for the construction of water Steel Sheet Pile, including steel pipe Stake, girder, secondary beam, branch's beam, road deck.Steel sheet pile, in profundal zone subaqueous work, is first laid steel-pipe pile in water, is subsequently taken Build operation platform, each building block of operation platform of the present utility model is transported to site welding technology by market purchasing and installs, operation platform After the completion of be that steel sheet pile and succeeding body engineering construction provide trestle effect, this utility model has that construction quality is good, and safety is Number is high, easy installation and removal, and environmental pollution is little, and the construction period is short, good in economic efficiency.
Brief description
The perspective view that Fig. 1 does not pave the way during panel for this utility model.
Fig. 2 is vertical section structure schematic diagram of the present utility model.
In figure:1st, steel-pipe pile 2, girder 3, secondary beam 4, spreader beam 5, road deck 6, horizontal linking beam 7, longitudinal direction link Beam 8, bracket.
Specific embodiment
Below in conjunction with the accompanying drawings to embodiment further instruction of the present utility model.
Embodiment 1
As shown in accompanying drawing 1-2, a kind of operation platform for the construction of water Steel Sheet Pile, including steel-pipe pile 1, girder 2, secondary beam 3rd, spreader beam 4, road deck 5, described steel-pipe pile 1 inserts riverbed by way of mechanical vibration hammer, described steel-pipe pile 1 it Between be provided with horizontal linking beam 6 and longitudinal linking beam 7, the welded top of described steel-pipe pile 1 has four brackets 8, described master Beam 2 is welded in the top of two adjacent steel-pipe piles 1, and described secondary beam 3 is welded in girder 2 top successively at equal intervals, described Spreader beam 4 is welded in secondary beam 3 top successively at equal intervals, and described road deck 5 is welded in spreader beam 4 top.
This utility model is when using:First, before injection steel-pipe pile, should set in upstream and downstream certain distance and two sides land Put theodolite observation point, in order to injection positioning, the embedded depth of each stake meets design requirement, from bank successively to center injection, Stake top plate and bracket is welded in pile crown after insertion.Secondly, connected between stake with Harvard joint respectively below the bracket on steel-pipe pile Connect horizontal linking beam and longitudinal linking beam.Then, in the upper weld girder of steel-pipe pile, secondary beam successively on request spacing be welded in Above girder, form an entirety, then weld spreader beam, spreader beam is equally using being welded to connect on secondary beam.Finally, dividing Cloth beam upper weld road deck.It is steel sheet pile and succeeding body engineering construction offer trestle effect after the completion of operation platform.Steel pipe The top of stake be provided with four direction bracket it is ensured that operation platform can to extending around, in construction one across one across according to Secondary installation, previous across as rear one across construction platform.The platform chi of different length and width can be designed according to actual needs Very little.
Embodiment 2
As shown in accompanying drawing 1-2, a kind of operation platform for the construction of water Steel Sheet Pile, including steel-pipe pile 1, girder 2, secondary beam 3rd, spreader beam 4, road deck 5, described steel-pipe pile 1 inserts riverbed by way of mechanical vibration hammer, described steel-pipe pile 1 it Between be provided with horizontal linking beam 6 and longitudinal linking beam 7, the welded top of described steel-pipe pile 1 has four brackets 8, described master Beam 2 is welded in the top of two adjacent steel-pipe piles 1, and described secondary beam 3 is welded in girder 2 top successively at equal intervals, described Spreader beam 4 is welded in secondary beam 3 top successively at equal intervals, and described road deck 5 is welded in spreader beam 4 top.
Described secondary beam 3 and girder 2 are arranged in a crossed manner, and described spreader beam 4 and secondary beam 3 are arranged in a crossed manner.
2 times of a diameter of girder 2 width of described steel-pipe pile 1.
Described girder 2 is I40a I-steel.
Described bracket 8 is evenly arranged at the top of steel-pipe pile 1, and the bracket 8 of two adjacent steel-pipe piles 1 is oppositely arranged.
This utility model is when using:First, before injection steel-pipe pile, should set in upstream and downstream certain distance and two sides land Put theodolite observation point, in order to injection positioning, the embedded depth of each stake meets design requirement, from bank successively to center injection, Stake top plate and bracket is welded in pile crown after insertion.Secondly, connected between stake with Harvard joint respectively below the bracket on steel-pipe pile Connect horizontal linking beam and longitudinal linking beam.Then, in the upper weld girder of steel-pipe pile, secondary beam successively on request spacing be welded in Above girder, form an entirety, then weld spreader beam, spreader beam is equally using being welded to connect on secondary beam.Finally, dividing Cloth beam upper weld road deck.It is steel sheet pile and succeeding body engineering construction offer trestle effect after the completion of operation platform.Steel pipe The top of stake is provided with the bracket of four direction, and the diameter design of steel-pipe pile is 2 times of width of main beam, so can protect Card operation platform can to extending around, in construction one across one across installing successively, previous across as rear one across construction platform.Can To design the platform size of different length and width according to actual needs, it is particularly suitable in deep subaqueous work.
Generally, to have a construction quality good for this utility model, and safety coefficient is high, easy installation and removal, and environmental pollution is little, applies Work short time limit, good in economic efficiency advantage.

Claims (5)

1. a kind of operation platform for the construction of water Steel Sheet Pile, including steel-pipe pile, girder, secondary beam, spreader beam, road deck, its It is characterised by:Described steel-pipe pile inserts riverbed by way of mechanical vibration hammer, and is provided with horizontal stroke between described steel-pipe pile To linking beam and longitudinal linking beam, the welded top of described steel-pipe pile has four brackets, and described Main Girder Welding is adjacent in two Steel-pipe pile top, described secondary beam is welded in girder top successively at equal intervals, and described spreader beam is equidistant successively It is welded in secondary beam top, described road deck is welded in spreader beam top.
2. according to claim 1 a kind of for water Steel Sheet Pile construction operation platform it is characterised in that:Described is secondary Beam and girder are arranged in a crossed manner, and described spreader beam and secondary beam are arranged in a crossed manner.
3. according to claim 1 a kind of for water Steel Sheet Pile construction operation platform it is characterised in that:Described steel 2 times of a diameter of width of main beam of pile tube.
4. according to claim 1 a kind of for water Steel Sheet Pile construction operation platform it is characterised in that:Described master Beam is I40a I-steel.
5. according to claim 1 a kind of for water Steel Sheet Pile construction operation platform it is characterised in that:Described cattle Lower limb is evenly arranged at the top of steel-pipe pile, and the bracket of two adjacent steel-pipe piles is oppositely arranged.
CN201620886431.7U 2016-08-16 2016-08-16 A construction platform for construction of aquatic steel sheet pile Expired - Fee Related CN205975551U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620886431.7U CN205975551U (en) 2016-08-16 2016-08-16 A construction platform for construction of aquatic steel sheet pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620886431.7U CN205975551U (en) 2016-08-16 2016-08-16 A construction platform for construction of aquatic steel sheet pile

Publications (1)

Publication Number Publication Date
CN205975551U true CN205975551U (en) 2017-02-22

Family

ID=58030496

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620886431.7U Expired - Fee Related CN205975551U (en) 2016-08-16 2016-08-16 A construction platform for construction of aquatic steel sheet pile

Country Status (1)

Country Link
CN (1) CN205975551U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222010A (en) * 2018-03-20 2018-06-29 南京市测绘勘察研究院股份有限公司 A kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled and construction method
TWI783501B (en) * 2021-05-31 2022-11-11 樂鑫開發工程有限公司 Water platform base frame and construction method of water platform using it

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222010A (en) * 2018-03-20 2018-06-29 南京市测绘勘察研究院股份有限公司 A kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled and construction method
TWI783501B (en) * 2021-05-31 2022-11-11 樂鑫開發工程有限公司 Water platform base frame and construction method of water platform using it

Similar Documents

Publication Publication Date Title
CN106351242B (en) A kind of exposed high intensity sea area the Dou Yan steel trestle of the big flow velocity of deep water and its construction method
CN106522242B (en) For soft stratum close to underground structure foundation pit supporting system construction method
CN206800412U (en) The foundation pit enclosure structure that a kind of steel-pipe pile is combined with Larsen steel sheet pile fore shaft
CN202530367U (en) Deepwater complex geology foundation construction system
CN103410156B (en) Support space enclosing structure and application process thereof before a kind of recyclable vertical type steel pipe
CN108487256B (en) Reinforced structure and method for deepening and super-digging foundation pit
CN105350526B (en) Method for setting up steel platform
CN208844415U (en) For changing the aqueduct of the flow direction in the river above piping lane to be onstructed
CN207109795U (en) A kind of recyclable HC engineering methods steel diaphram wall
CN108678751A (en) The shield cutter inspection-pit assembly construction method excavated after first jacking
CN108797404A (en) A kind of underground pipe gallery is across river section river water flow guiding structure and its construction method
CN203222809U (en) Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line
CN102677592A (en) Method for erecting deepwater steel trestle and platform on exposed bedrock in shallow sea
CN202323865U (en) Novel revetment combined structure
CN205975551U (en) A construction platform for construction of aquatic steel sheet pile
CN108708284A (en) A kind of steel trestle construction method for resisting flood discharge bed scour
CN111576452A (en) Double row pile supporting construction
CN104947697A (en) Construction method for rapidly enclosing weir by utilizing Larsen steel sheet piles
CN108824461B (en) Larsen steel sheet pile cofferdam and construction method thereof
CN108708727A (en) The shield cutter inspection-pit assembly construction method of jacking after half excavation
CN106498957B (en) Steel sheet pile cofferdam construction platform and integral construction method
CN109594530A (en) A kind of thin silt flood control dam new structure
CN104088288B (en) The preparation method of container caisson and application thereof
CN103410155B (en) A kind of recyclable preposition assembling braced cuts structure and application process thereof
CN107940102B (en) Underground raw water pipeline protection construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170222

Termination date: 20190816

CF01 Termination of patent right due to non-payment of annual fee