CN110405938A - Precast T-Beam web reinforcement binding auxiliary moulding bed construction - Google Patents

Precast T-Beam web reinforcement binding auxiliary moulding bed construction Download PDF

Info

Publication number
CN110405938A
CN110405938A CN201910695189.3A CN201910695189A CN110405938A CN 110405938 A CN110405938 A CN 110405938A CN 201910695189 A CN201910695189 A CN 201910695189A CN 110405938 A CN110405938 A CN 110405938A
Authority
CN
China
Prior art keywords
binding
reinforcing bar
reinforcement
moulding bed
precast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910695189.3A
Other languages
Chinese (zh)
Other versions
CN110405938B (en
Inventor
仲甡
施旭升
周平
田昌凤
杜洁力
刘波
张永礼
黄智雄
杨显亮
周自强
林明辉
杨京云
李本佑
刘伟群
普乔德
朱明�
赵正春
李茂鸿
胡子毅
顾木青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction and Investment Holding Group Co Ltd
Original Assignee
Yunnan Construction and Investment Holding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction and Investment Holding Group Co Ltd filed Critical Yunnan Construction and Investment Holding Group Co Ltd
Priority to CN201910695189.3A priority Critical patent/CN110405938B/en
Publication of CN110405938A publication Critical patent/CN110405938A/en
Application granted granted Critical
Publication of CN110405938B publication Critical patent/CN110405938B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/022Means for inserting reinforcing members into the mould or for supporting them in the mould
    • B28B23/024Supporting means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/04Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses Precast T-Beam web reinforcements to bind auxiliary moulding bed construction, which comprises the following steps: A assists moulding bed to prepare, the binding of the lower part B horseshoe muscle, the vertical web reinforcement binding of C, D diaphragm plate reinforcing bar bind diaphragm plate reinforcing bar and carry out muscle binding, the binding of E longitudinal reinforcement using hanger;F examination, handling;The present invention can effectively improve the efficiency of Precast T-Beam reinforcing bar binding, and labor intensity of workers is effectively reduced, accelerates construction progress, and save the construction period;The binding quality for effectively improving reinforcing bar, many common quality problems such as spacing and different design, out of plumb after avoiding reinforcing bar binding, improves disposable acceptable quality level;The present invention is primary investment, is used in turn often, can be effectively reduced construction cost from many aspects.

Description

Precast T-Beam web reinforcement binding auxiliary moulding bed construction
Technical field
The present invention relates to the realm of building construction, specially a kind of Precast T-Beam web reinforcement binding auxiliary moulding bed construction.
Background technique
With the economic rapid growth in China, southwest creates highway and is increasing, because southwest mountainous region is more Mountain shape is steeper, and for freeway bridge tunnel than usually higher, highway often selects the side of Precast T-Beam lifting when across mountain valley Formula construction.
The reinforcing bar of Precast T-Beam web is densely distributed, substantial amounts, and during T is beam prefabricated, the binding of reinforcing bar is to restrict Duration and the critical process for influencing quality.
The low efficiency of current construction method construction method Precast T-Beam reinforcing bar binding, labor intensity of workers is high, construct into Degree is slow, and the construction period is long;The binding of reinforcing bar is of low quality, spacing and different design, out of plumb after often there is reinforcing bar binding Etc. many common quality problems, disposable acceptable quality level is low, and input cost is high, and construction cost is high.
Summary of the invention
Precast T-Beam reinforcing bar binding auxiliary moulding bed is made according to design drawing the present invention provides a kind of, auxiliary moulding bed is main It is made of body frame, reinforcing bar locating slot, hanger, is mainly used to position T web and diaphragm plate reinforcing bar.It is bound in Precast T-Beam reinforcing bar When, using body frame and the positioning of reinforcing bar locating slot and support webs reinforcing bar (including horseshoe reinforcing bar, vertical web reinforcement), utilize hanger Positioning and support diaphragm plate reinforcing bar, so that it is determined that spacer bar spacing, improving the disposable qualification rate of steel corrosion quantity, improving worker and apply The Precast T-Beam web reinforcement binding auxiliary moulding bed construction of work efficiency rate.
The object of the present invention is achieved like this: Precast T-Beam web reinforcement binding auxiliary moulding bed construction, comprising:
A assists moulding bed to prepare
Preparation auxiliary moulding bed body frame each section of A1 auxiliary moulding bed body frame is formed by steel pipe and reinforcement welding;
A2 assist moulding bed reinforcing bar locating slot combination design drawing, design the reinforcing bar locating slot for meeting bar spacing modulus and Hanger, auxiliary moulding bed reinforcing bar locating slot are formed using steel processing and fabricating, are installed on pedestal, the aperture position of locating slot must Must be accurate, it can come into operation after qualified by inspection;
The preparation hanger suspending of A3 hanger is fixed on body frame, is welded using seamless steel HPB steel bar meter;
Awning is welded in body frame topmost by the preparation of A4 awning;
Horseshoe muscle binding in the lower part B is bound using reinforcing bar locating slot spacer bar spacing, is controlled by way of bracing wire The lateral position of vertical web reinforcement;
The vertical web reinforcement binding of C is bound using reinforcing bar locating slot with the reinforcing bar positioning spacing bound, vertically Before web reinforcement binding, the lateral position of vertical web reinforcement is controlled by way of bracing wire;
D diaphragm plate reinforcing bar binds diaphragm plate reinforcing bar using hanger progress muscle binding, and when binding needs to pay attention to different-diameter Position where diaphragm plate reinforcing bar
The binding of E longitudinal reinforcement carries out the binding of longitudinal reinforcement after completing the positioning binding of vertical web reinforcement,
F examination, handling
Further, in step A1, the longitudinal steel pipe and supporting steel pipe of body frame use 60 × 4 seamless steel pipe of Φ, body frame Truss bars and hanging ring use the HPB reinforcement fabrication of diameter 10mm.Body frame must assure that enough intensity, rigidity and stability, The position of hanging ring must be accurate, can come into operation after qualification by inspection of marching into the arena.
Further, in step A2, the reinforcing bar locating slot is mounted on pedestal, and pedestal concrete strength reaches must It must specification.
Further, in step A3, the hanger is using the welding of the HPB steel bar meter of 60 × 4 seamless steel pipe of Φ and 8mm It forms, welding position of the reinforcing bar on steel pipe must be accurate, can come into operation after qualified by inspection.
Further, in step B, bottom longitudinal reinforcement is placed after horseshoe reinforcing bar in lower part is first installed, then carry out horseshoe reinforcing bar With the binding of longitudinal reinforcement;Before carrying out the binding of horseshoe reinforcing bar and longitudinal reinforcement, bar spacing is checked, it is wrong timely Adjustment.
Further, in step C, T beam both ends end portion vertical reinforcement is needed from the bottom plate longitudinal reinforcement bound Under be inserted in, be then put into the reinforcing bar locating slot one by one;The vertical web reinforcement of T beam during installation, close by vertical web reinforcement Ring will be inserted in lifting connecting steel wire ropes, and lifting connecting steel wire ropes penetrate body frame hanging ring before vertical reinforcement binding.
Further, in step E, when binding should be noted is inserted in every square meter much not 4 circles in advance on longitudinal reinforcement Minimum Concrete Protective Coating Thickness controls cushion block, and cushion block presses quincuncial arrangement and fixation.
Further, in step E, the T web and diaphragm plate reinforcing bar bound is inspected by random samples, it is ensured that binding is secured;It utilizes Body frame carries out T web and the handling of diaphragm plate reinforcing bar, it is noted that safety, handling relevant regulations meet relevant safety regulations when handling It is required that;It needs to penetrate bellows before handling, simultaneously fixation;After being hoisted to beam making bench, T beam steel position is carried out again It examines, underproof place re-starts adjustment, after self-test is qualified, asks Party A, management to check and accept reinforcing bar, installs mould after acceptance(check) T beam roof steel bar is bound after plate, template installation.
The present invention can effectively improve the efficiency of Precast T-Beam reinforcing bar binding, be effectively reduced labor intensity of workers, quickening construct into Degree saves the construction period;
The binding quality for effectively improving reinforcing bar, the spacing and different design, out of plumb etc. after avoiding reinforcing bar binding are many Common quality problems improve disposable acceptable quality level;
The present invention is primary investment, is used in turn often, can be effectively reduced construction cost from many aspects.
Positive beneficial effect: due to use of the invention, improving the quality of T beam steel bar colligation, to improve T joist steel Muscle binds disposable acceptable quality level, reduces trimming of doing over again, and saves human resources, and then not only reduce required wave of doing over again The time of expense can also establish flat image, to obtain the approval of management, owner, Quality Supervision Station and personages of various circles of society.
Expense, duration are carried out to score by taking the binding of a piece of 30m Precast T-Beam reinforcing bar (by 8 worker's bindings for radix) as an example Analysis analyzes result as shown in following table 10.1.
The a piece of 30mT beam steel bar colligation expense of table 1, duration comparative analysis table
As can be seen from the above table, a piece of 30 meters of T beam steel bar colligations, if labour cost about 800 can be saved using auxiliary moulding bed Member, the duration about 0.5 day.It can be seen that the present invention can generate very considerable economic benefit.
Detailed description of the invention
Fig. 1 is auxiliary moulding bed body frame of the invention;
Fig. 2 is auxiliary moulding bed reinforcing bar locating slot of the invention;
Fig. 3 is auxiliary moulding bed hanger of the invention;
Fig. 4 is that auxiliary moulding bed of the invention does not install awning effect picture;
Fig. 5 is auxiliary moulding bed overall effect figure of the invention;
Fig. 6 is that web lower rebar of the invention binds schematic diagram;
Fig. 7 is that web vertical reinforcing bar of the invention binds schematic diagram;
Fig. 8 is that diaphragm plate reinforcing bar of the invention binds schematic diagram;
Fig. 9 is process flow chart of the invention
Wherein, 1 is supporting steel pipe;2 be hanging ring;3 be longitudinal steel pipe;4 be truss bars;5 be locating slot;6 be hanger;7 For horseshoe reinforcing bar;8 be diaphragm plate reinforcing bar;9 be vertical web reinforcement.
Specific embodiment
With reference to the accompanying drawing, the present invention is described further:
A assists moulding bed to prepare,
A1 assists the preparation of moulding bed body frame as shown in Figure 1, and auxiliary moulding bed body frame each section is formed by steel pipe and reinforcement welding, The longitudinal steel pipe 3 and supporting steel pipe 1 of body frame use 60 × 4 seamless steel pipe of Φ, and the truss bars 4 and hanging ring 2 of body frame use diameter The HPB reinforcement fabrication of 10mm.Body frame must assure that enough intensity, rigidity and stability, and the position of hanging ring 2 must be accurate, into It can come into operation after field is qualified by inspection.
A2 assists the preparation of moulding bed reinforcing bar locating slot as shown in Fig. 2, in conjunction with design drawing, designs and meets bar spacing mould Several reinforcing bar locating slots 5 and hanger, auxiliary moulding bed reinforcing bar locating slot 5 are formed using steel processing and fabricating, are installed on pedestal, together When pedestal concrete strength reach specification, the aperture position of locating slot 5 must be accurate, can come into operation after qualified by inspection;
As shown in figure 3, the suspension of hanger 6 is fixed on body frame, hanger 6 uses 60 × 4 seamless steel pipe of Φ for the preparation of A3 hanger It is welded with the HPB steel bar meter of 8mm, welding position of the reinforcing bar on steel pipe must be accurate;
Awning is welded in body frame topmost by the preparation of A4 awning, can be come into operation after qualified by inspection;
Horseshoe muscle binding in the lower part B passes through drawing as shown in figure 4, bound using 5 spacer bar spacing of reinforcing bar locating slot The mode of line controls the lateral position of vertical web reinforcement 9, places bottom longitudinal reinforcement after first installing lower part horseshoe reinforcing bar 7, then Carry out the binding of horseshoe reinforcing bar 7 and longitudinal reinforcement;Before the binding for carrying out horseshoe reinforcing bar 7 and longitudinal reinforcement, to check between reinforcing bar Away from wrong to adjust in time.
The binding of C vertical web reinforcement as shown in figure 5, using reinforcing bar locating slot 5 and the reinforcing bar positioning spacing that has bound into Row binding controls the lateral position of vertical web reinforcement 9 before vertical web reinforcement 9 is bound by way of bracing wire;T beam both ends End portion vertical reinforcement needs are inserted under the bottom plate longitudinal reinforcement bound, are then being put into the reinforcing bar positioning one by one Slot 5;During installation, vertical 9 closed-loop of web reinforcement will be inserted in lifting connecting steel wire ropes, lifting connection to the vertical web reinforcement 9 of T beam Wirerope penetrates body frame hanging ring 2 before vertical reinforcement binding.
As shown in fig. 6, diaphragm plate reinforcing bar 8 is using the progress reinforcing bar binding of hanger 6, when binding, needs the binding of D diaphragm plate reinforcing bar Pay attention to the position where the diaphragm plate reinforcing bar 8 of different-diameter
The binding of E longitudinal reinforcement carries out longitudinal reinforcement as shown in fig. 7, after completing the positioning binding of vertical web reinforcement 9 Binding, when binding should be noted is inserted in every square meter much not 4 round Minimum Concrete Protective Coating Thickness in advance on longitudinal reinforcement Cushion block is controlled, cushion block presses quincuncial arrangement and fixation.
F is checked and accepted, the vertical web reinforcement 9 of T beam and diaphragm plate reinforcing bar 8 bound is inspected in handling by random samples, it is ensured that binding is secured;Benefit The vertical web reinforcement of T beam 9 and 8 handling of diaphragm plate reinforcing bar are carried out with body frame, it is noted that safety, handling relevant regulations meet when handling Relevant safety regulations requirement;It needs to penetrate bellows before handling, simultaneously fixation;After being hoisted to beam making bench, again to T beam Reinforcement location is tested, and underproof place re-starts adjustment, after self-test is qualified, is asked Party A, management to check and accept reinforcing bar, is checked and accepted T beam roof steel bar is bound after installation template, template installation after qualification.
Case history
(moral) the highway Baoshan to Shidian section is the province height net S41 Wei Xiyong planned to Yunnan Province height net S41 dimension (west) forever The Important Sections of moral highway and the longitudinally connected line of Hangzhou to Ruili highway (G56).Project starting point meets Hang Ruigao Speed, by Hang Rui high-speed transitions can connect Baoshan City around city high speed and prosperous guarantors high speed, stop and planning tie up forever high speed Shidian to forever Moral section drop-over, to create two-way four-lane expressway works.Route is overall by north orientation south spread, connects apply (pasture) card (this) in the recent period Highway, long term connect planning S41 dimension (west) (moral) highway Shidian to Yongde section forever.33.49 kilometers of route overall length is (in comprehensive Journey), project start-stop point mileage: K0+000~K33+447.662.For the recessed bridge of family, prefabricated by bridges such as prosperous bridges in this project T beam is worked well using " Precast T-Beam web reinforcement binding auxiliary moulding bed construction ", is won good demonstration effect.
The Baoshan to Shidian highway is located at by prosperous overpass mainline K19+603.5, to set across E ring road by prosperous bridge. The controlled factordiseases such as road and landform, landforms, geological hydrology under bridge cloth hole conjugative bridge, left width span distribution are as follows: 40+ (4 × 29)+(3 × 30)+(4 × 29)+(55)+2 × (3 × 30) rice, right width span distribution are as follows: 40+ (4 × 29)+30+30+30+ (4 × 29)+(55)+2 × (3 × 30) rice, in addition to left 1,5 and right 1,7 using steel box-girder, remaining each connection is all made of pre- answer Power concrete T-shaped beam, wherein right the 3rd~5 is Simple T-Girders.Substructure bridge pier is column pier, cast-in-situ bored pile;Two sides Abutment is all made of gravity water wheel, and left and right width bridge overall length is 605.08 meters.
By prosperous bridge plane be located at straight line and JD15 left-hand rotation curve (R=1000 meters, Ls=200 meters, a=34 ° of 16' 29").Facade is located on R=25000 meters (convexs) and R=1500 meters of (spill) vertical curves, and longitudinal slope is by i1=1.8% (length of grade 680 meters) become i2=0.8% (1110 meters of length of grade), vertical curve knick point mileage is K19+880, and knick point elevation is 1533.538;Full-bridge amounts to 18 expansion joints.
K20+607 is located on the highway monoblock type section of the Baoshan to Shidian for the recessed bridge of family.This bridge is across intermountain ditch Gu Ershe, span arrangement and structure type are 30 meters of 13 hole (left width), 30 meters of 13 hole (right width) prestressing force (post-tensioning) concrete T Beam.This bridge uses the hole 4+5+4 (left width), 4+5+4 (right width) each one, and simple-supported thencontinuous, full-bridge sets 8 expansion joints altogether.
30 meters of Prestressed T shape continuous beams and simply supported beam.Continuous beam continuously locates pier top using structure continuation mode after first freely-supported Longitudinal is single support.
2.0 meters of the beam prefabricated height of T above sets the 10 cast-in-place bridge deck concretes of cm thick C50,10 centimetres of asphalt concrete bridge surface pavings Dress.2.4 meters of T case bay, 1.8 meters of central sill width prefabricated, there are the wet seams of 0.6 meter of transverse direction between flange plate;The prefabricated T shape of span centre section Beam beam rib width uses 20cm, horseshoe width 50cm, and beam rib is by 20cm gradual change to 50cm when leaning on close end, with horseshoe with wide, Tapered length is 3.6 meters, and then for beam rib width by 50cm gradual change to 60cm, tapered length is 1.2 meters, 1~1.4 meter of end Range inner beam rib width is 60cm.Cantilever slab adjustment forming curves are linear outside spanning Precast T-Beam in curve ranges;Bridge Every hole sets partition in 3, and continuous beam sets one of diaphragm plate by simply supported end, does not set diaphragm plate by continuously holding, therefore only horizontal together Partition;Simply supported end has twice endplate;Middle partition is orthogonal with girder, and endplate is arranged radially.Prefabricated T ellbeam back horizontal slope is The average value of every hole both ends horizontal slope.Interval board bottom face horizontal slope is consistent with back horizontal slope, and endplate bottom surface horizontal slope and every hole both ends are horizontal Slope is consistent.Deck transverse slope is adjusted by bent cap and bearing pad stone, to keep support horizontally disposed, is arranged in prefabricated tee girder simply supported end and is led The beam boots of beam longitudinal slope;It is solid section that pier top, which continuously locates wet seam,.

Claims (8)

1. Precast T-Beam web reinforcement binding auxiliary moulding bed construction, which comprises the following steps:
A assists moulding bed to prepare
Preparation auxiliary moulding bed body frame each section of A1 auxiliary moulding bed body frame is formed by steel pipe and reinforcement welding;
A2 assists moulding bed reinforcing bar locating slot combination design drawing, designs the reinforcing bar locating slot and extension for meeting bar spacing modulus Frame, auxiliary moulding bed reinforcing bar locating slot are formed using steel processing and fabricating, are installed on pedestal, and the aperture position of locating slot must be quasi- Really, it can come into operation after qualification by inspection;
The preparation hanger suspending of A3 hanger is fixed on body frame, is welded using seamless steel HPB steel bar meter;
Awning is welded in body frame topmost by the preparation of A4 awning;
Horseshoe muscle binding in the lower part B is bound using reinforcing bar locating slot spacer bar spacing, is controlled by way of bracing wire vertical The lateral position of web reinforcement;
The vertical web reinforcement binding of C is bound using reinforcing bar locating slot with the reinforcing bar positioning spacing bound, vertical web Before reinforcing bar binding, the lateral position of vertical web reinforcement is controlled by way of bracing wire;
D diaphragm plate reinforcing bar binds diaphragm plate reinforcing bar using hanger progress muscle binding, and when binding needs to pay attention to the tabula of different-diameter Position where slab muscle;
The binding of E longitudinal reinforcement carries out the binding of longitudinal reinforcement after completing the positioning binding of vertical web reinforcement;F is checked and accepted, is hung Fortune.
2. Precast T-Beam web reinforcement binding auxiliary moulding bed construction according to claim 1, which is characterized in that step In A1, the longitudinal steel pipe and supporting steel pipe of body frame use 60 × 4 seamless steel pipe of Φ, and the truss bars and hanging ring of body frame use diameter The HPB reinforcement fabrication of 10mm, body frame must assure that enough intensity, rigidity and stability, and the position of hanging ring must be accurate, marches into the arena It can come into operation after qualified by inspection.
3. Precast T-Beam web reinforcement binding auxiliary moulding bed construction according to claim 1, which is characterized in that step In A2, the reinforcing bar locating slot is mounted on pedestal, and pedestal concrete strength, which reaches, to be standardized.
4. Precast T-Beam web reinforcement binding auxiliary moulding bed construction according to claim 1, which is characterized in that step In A3, the hanger is welded using the HPB steel bar meter of 60 × 4 seamless steel pipe of Φ and 8mm, weldering of the reinforcing bar on steel pipe Connecing position must be accurate, can come into operation after qualified by inspection.
5. Precast T-Beam web reinforcement binding auxiliary moulding bed construction according to claim 1, which is characterized in that step B In, bottom longitudinal reinforcement is placed after horseshoe reinforcing bar in lower part is first installed, then carry out the binding of horseshoe reinforcing bar and longitudinal reinforcement;Carry out Before the binding of horseshoe reinforcing bar and longitudinal reinforcement, bar spacing is checked, it is wrong to adjust in time.
6. Precast T-Beam web reinforcement binding auxiliary moulding bed construction according to claim 1, which is characterized in that step C In, end portion vertical web reinforcement needs in T beam both ends are inserted under the bottom plate longitudinal reinforcement bound, are then being put one by one Enter the reinforcing bar locating slot;During installation, vertical web reinforcement closed-loop will be inserted in lifting connection steel wire to the vertical web reinforcement of T beam Rope, lifting connecting steel wire ropes penetrate body frame hanging ring before vertical reinforcement binding.
7. Precast T-Beam web reinforcement binding auxiliary moulding bed construction according to claim 1, which is characterized in that, step In E, when binding should be noted is inserted in the much not 4 round Minimum Concrete Protective Coating Thickness controls of every square meter in advance on longitudinal reinforcement Cushion block processed, cushion block press quincuncial arrangement and fixation.
8. Precast T-Beam web reinforcement binding auxiliary moulding bed construction according to claim 1, which is characterized in that step E In, inspect the T web and diaphragm plate reinforcing bar bound by random samples, it is ensured that binding is secured;T web and diaphragm plate are carried out using body frame Reinforcing bar handling, it is noted that safety, handling relevant regulations meet relevant safety regulations requirement when handling;It is needed before handling by bellows It penetrates, simultaneously fixation;After being hoisted to beam making bench, test again to T beam steel position, it is underproof place again into Row adjustment after self-test is qualified, asks Party A, management to check and accept reinforcing bar, binds T back after installation template, template installation after acceptance(check) Slab muscle.
CN201910695189.3A 2019-07-30 2019-07-30 Construction method for prefabricated T-shaped beam web plate reinforcement auxiliary jig frame Expired - Fee Related CN110405938B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910695189.3A CN110405938B (en) 2019-07-30 2019-07-30 Construction method for prefabricated T-shaped beam web plate reinforcement auxiliary jig frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910695189.3A CN110405938B (en) 2019-07-30 2019-07-30 Construction method for prefabricated T-shaped beam web plate reinforcement auxiliary jig frame

Publications (2)

Publication Number Publication Date
CN110405938A true CN110405938A (en) 2019-11-05
CN110405938B CN110405938B (en) 2021-03-23

Family

ID=68364089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910695189.3A Expired - Fee Related CN110405938B (en) 2019-07-30 2019-07-30 Construction method for prefabricated T-shaped beam web plate reinforcement auxiliary jig frame

Country Status (1)

Country Link
CN (1) CN110405938B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4228968A1 (en) * 1991-09-12 1993-04-15 Straengbetong Ab T=shaped Concrete beam design - has reinforcements in concrete web and steel plates running length of beam along flange edges
CN102744784A (en) * 2012-07-13 2012-10-24 中铁十六局集团铁运工程有限公司宁阳制梁场 Heavy-load railway pre-cast T beam overall binding carcass and construction method thereof
CN104002377A (en) * 2014-06-12 2014-08-27 中铁五局(集团)有限公司 Steel bar binding and corrugated pipe locating device for precasting box girder
CN204076498U (en) * 2014-07-28 2015-01-07 中国建筑第六工程局有限公司 A kind of Precast T-Beam beam rib steel-bar binding location moulding bed
CN105171914A (en) * 2015-08-27 2015-12-23 江苏省交通工程集团有限公司 Precast box girder steel bar binding mould and mounting method thereof
CN106142338A (en) * 2016-06-30 2016-11-23 中交航局第四工程有限公司 A kind of prefabricated case beam framework of steel reinforcement loose tool binding construction method
CN207210963U (en) * 2017-08-23 2018-04-10 中国水利水电第八工程局有限公司 Jig structure for T beam steel bar colligations
CN108818919A (en) * 2018-06-28 2018-11-16 广西长长路桥建设有限公司 Precast T-Beam reinforcing bar is bound in advance and the construction method of integral installation
CN208618274U (en) * 2018-06-29 2019-03-19 中交二公局第四工程有限公司 A kind of assembled steel reinforced binding moulding bed group suitable for different size Precast T-Beams
CN208733470U (en) * 2018-07-18 2019-04-12 云南省建设投资控股集团有限公司 A kind of T beam steel bar colligation ancillary equipment support device
CN208733473U (en) * 2018-07-24 2019-04-12 云南省建设投资控股集团有限公司 A kind of T beam diaphragm plate reinforcing bar binding positioning auxiliary device

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4228968A1 (en) * 1991-09-12 1993-04-15 Straengbetong Ab T=shaped Concrete beam design - has reinforcements in concrete web and steel plates running length of beam along flange edges
CN102744784A (en) * 2012-07-13 2012-10-24 中铁十六局集团铁运工程有限公司宁阳制梁场 Heavy-load railway pre-cast T beam overall binding carcass and construction method thereof
CN104002377A (en) * 2014-06-12 2014-08-27 中铁五局(集团)有限公司 Steel bar binding and corrugated pipe locating device for precasting box girder
CN204076498U (en) * 2014-07-28 2015-01-07 中国建筑第六工程局有限公司 A kind of Precast T-Beam beam rib steel-bar binding location moulding bed
CN105171914A (en) * 2015-08-27 2015-12-23 江苏省交通工程集团有限公司 Precast box girder steel bar binding mould and mounting method thereof
CN106142338A (en) * 2016-06-30 2016-11-23 中交航局第四工程有限公司 A kind of prefabricated case beam framework of steel reinforcement loose tool binding construction method
CN207210963U (en) * 2017-08-23 2018-04-10 中国水利水电第八工程局有限公司 Jig structure for T beam steel bar colligations
CN108818919A (en) * 2018-06-28 2018-11-16 广西长长路桥建设有限公司 Precast T-Beam reinforcing bar is bound in advance and the construction method of integral installation
CN208618274U (en) * 2018-06-29 2019-03-19 中交二公局第四工程有限公司 A kind of assembled steel reinforced binding moulding bed group suitable for different size Precast T-Beams
CN208733470U (en) * 2018-07-18 2019-04-12 云南省建设投资控股集团有限公司 A kind of T beam steel bar colligation ancillary equipment support device
CN208733473U (en) * 2018-07-24 2019-04-12 云南省建设投资控股集团有限公司 A kind of T beam diaphragm plate reinforcing bar binding positioning auxiliary device

Also Published As

Publication number Publication date
CN110405938B (en) 2021-03-23

Similar Documents

Publication Publication Date Title
CN101781879B (en) Construction method of single-pylon cable-stayed bridge without dorsal cables
CN105345926B (en) The precast construction method of prestressed concrete box girder
CN101748681B (en) Pretensioning method construction technology of 50m broken line reinforced concrete T-shaped beam
CN103382704B (en) Unbonded prestress of box girder or T-shaped girder, and steel-concrete combined reinforcement structure and construction method
CN101368371A (en) Cast-in-situ continuous beam construction method for special railway line stands
CN111455859A (en) Construction method for bracket of No. 0 and No. 1 steel bridge with high piers and continuous steel structure
CN205025086U (en) Strength nature skeleton concrete beam construction suspend template in midair
CN113638304B (en) Concrete beam type bridge hidden cover beam structure system and construction method thereof
CN114892552B (en) Box girder type bridge reconstruction construction method
CN109518864A (en) A kind of inversion steel bar girder concrete folding plate and its construction method
CN106351129A (en) Construction method for long-span continuous beam neighboring existing lines
CN109162204A (en) A kind of construction method of the quick spelling of bridge substructure transverse direction piecemeal
CN110374012A (en) A kind of prefabricated engineering method of T beam original position Support Method
CN207177027U (en) One kind is inverted steel bar girder concrete folding plate
CN114892813B (en) Large-span building main body supporting steel structure and construction method
CN108517779B (en) Across the high speed door opening assembling Method for Installation of low clearance variable cross-section curved box girder
CN110405938A (en) Precast T-Beam web reinforcement binding auxiliary moulding bed construction
CN112726517A (en) Construction method of aqueduct above bridge
CN105200927B (en) Beam-making construction method on science of bridge building beam
CN114045855B (en) Soft soil foundation large-span reinforced concrete beam construction method
CN220117023U (en) Bridge floor concrete placement structure
CN220166696U (en) Cast-in-situ box girder template and wing plate bearing integrated structure with variable width
CN216864787U (en) Curve simply supported bridge structure with variable cross-section bent cap
CN116377862B (en) Seam test method for prefabricated component pier column, bearing platform and capping beam
CN216839039U (en) Multi-span crossover continuous beam combined support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210323

Termination date: 20210730

CF01 Termination of patent right due to non-payment of annual fee