CN110390487A - A kind of technological project management system applied to medium-sized and small enterprises - Google Patents

A kind of technological project management system applied to medium-sized and small enterprises Download PDF

Info

Publication number
CN110390487A
CN110390487A CN201910683193.8A CN201910683193A CN110390487A CN 110390487 A CN110390487 A CN 110390487A CN 201910683193 A CN201910683193 A CN 201910683193A CN 110390487 A CN110390487 A CN 110390487A
Authority
CN
China
Prior art keywords
project
module
setting
enterprise
facilitating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910683193.8A
Other languages
Chinese (zh)
Inventor
罗毅杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910683193.8A priority Critical patent/CN110390487A/en
Publication of CN110390487A publication Critical patent/CN110390487A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Data Mining & Analysis (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of technological project management systems applied to medium-sized and small enterprises, including management terminal, the management terminal includes login interface, login interface includes business administration unit, project personnel's administrative unit and visit from visitors unit, when need the technological project management system to medium-sized and small enterprises carry out using when, initially enter login interface, further according to itself being enterprise, project work personnel and tourist carry out separating selection, it then needs to log in again after registering first if it is enterprise or project work personnel, enterprises registration can accept project after logging in, the management such as audit operation, project implementation progress msg can be uploaded after project work personnel registration login or carry out exchange of technology etc., it is then not necessarily to carry out registering and logging if it is tourist that project essential information inquiry can be carried out, it is easy to operate, convenient for medium and small Type enterprise itself and project work personnel are managed science and technology item, and running is rationally and function is more comprehensive.

Description

A kind of technological project management system applied to medium-sized and small enterprises
Technical field
The present invention relates to a kind of management system, specifically a kind of technological project management system applied to medium-sized and small enterprises.
Background technique
Medium-sized enterprise, small business and minuscule-type-enterprise's criteria for classifying are responsible for medium-sized and small enterprises by State Council and promote work integrated pipe The department of reason can be with relevant department, State Council, according to indexs such as enterprise practitioner, operating income, total assets, in conjunction with industry Feature is formulated, and reports to the State Council to ratify.Such enterprise can usually be provided with funds by single people or a few peoples and be formed, employ number with The turnover is all little, therefore is directly managed by owner mostly in operation, less by external world's interference.Medium-sized and small enterprises are to implement greatly Crowd start an undertaking, millions of people innovation important carrier, create more jobs, boost economic growth, scientific and technical innovation and social harmony stablize etc. side Face has irreplaceable role, has important strategic importance to national economy and social development.
The technological project management system operatio of existing medium-sized and small enterprises is complicated, and afunction is more, is not easy to middle-size and small-size Enterprise itself and project work personnel are managed operation to science and technology item.
Summary of the invention
It is above-mentioned to solve the purpose of the present invention is to provide a kind of technological project management system applied to medium-sized and small enterprises The problem of being proposed in background technique.
To achieve the above object, the invention provides the following technical scheme:
A kind of technological project management system applied to medium-sized and small enterprises, including management terminal, the management terminal include Login interface, login interface include business administration unit, project personnel's administrative unit and visit from visitors unit.
As a further solution of the present invention: the business administration unit includes registration module, login module, projects accepting Module, project auditing module, project release module, project process enquiry module, project follow-up module, project quality control mould Block, project personnel's management module, project achievement summarizing module, data memory module and exit module.
As further scheme of the invention: the registration module is used for for facilitating enterprise to upload company information data Registered enterprise's login account, setting login module are arranged for being logged in after facilitating enterprises registration using enterprise's login account Projects accepting module accepts the project of submission for enterprise, and setting project auditing module is for the item after accepting to enterprise Mesh is audited, and audit includes project situation analysis and project cycle assessment, thus finally judge whether project can be carried out, if Project release module is set for issuing project audit after the approval by information in project, setting project progress queries module is used In facilitating enterprise's queried for items progress of implementation after the project implementation, so that grasping project carries out information, setting project follow-up module For facilitating enterprise to be tracked follow-up to project, to grasp project status in real time, setting project quality control module is used for The fund generated in the project implementation process is managed, examination & approval including fund and dialling are put, guarantee the normal operation of project, Setting project personal management module for being managed to the staff participated in project, criticize by asking for leave including staff Multiple, transfer and switch in the up position etc., after setting project achievement gathering module is used for during project implementation or project completes Acquired phasic results carry out record and summarize, and facilitate summing up experience, and setting data memory module is used for the items to project Data information carries out storage record, and convenient for the inquiry in later period, setting exits module for carrying out after the completion of enterprise customer's use It exits.
As further scheme of the invention: project personnel's administrative unit includes registration module, login module, item Mesh progress uploading module, exchange of technology module, fund declare module, programmatic recommendation module, data memory module and exit module.
As further scheme of the invention: the registration module uploads personal information registration individual for project personnel Login account, setting login module are used to that project work personnel to be facilitated to log in using the personal login account after registration, if Set project process uploading module for facilitate project work personnel upload project implementation progress msg, thus facilitate enterprise customer and Tourist inquires project progress message, and setting exchange of technology module is for facilitating progress technology friendship between project work personnel It flows or seeks advice from experts, convenient for the normal implementation of project, setting fund declares module and fills in and upload for project work personnel Fund information that project generates, including required appropriation fund information, reimbursement fund information etc., setting project suggestion module is for side Just project work personnel carry out suggestion message to project implementation, and setting data memory module is for facilitating staff to project Data information carries out storage record, inquires convenient for the later period, and setting exits module for laggard using completing in project work personnel Row exits.
As the present invention further scheme: the visit from visitors unit includes that project query module, project process are looked into Ask module and message module.
As further scheme of the invention: the project query module is for facilitating tourist basic to project name etc. Information carries out quick search, and setting project progress queries module is used to that tourist to be facilitated to inquire project implementation progress msg, Setting message module is for facilitating tourist to leave a message after use.
Compared with prior art, the beneficial effects of the present invention are:
System integrated operation is simple, is managed convenient for medium-sized and small enterprises itself and project work personnel to science and technology item, Running is rationally and function is more comprehensive, while tourist being facilitated to carry out quick search to project essential information.
Detailed description of the invention
Fig. 1 is the flow chart of the technological project management system applied to medium-sized and small enterprises.
Fig. 2 is the system framework figure of the technological project management system applied to medium-sized and small enterprises.
Fig. 3 is the frame diagram applied to business administration unit in the technological project management system of medium-sized and small enterprises.
Fig. 4 is the frame diagram applied to project personal management unit in the technological project management system of medium-sized and small enterprises.
Fig. 5 is the frame diagram applied to tourist's access unit in the technological project management system of medium-sized and small enterprises.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1~5, in the embodiment of the present invention, a kind of technological project management system applied to medium-sized and small enterprises, packet Management terminal is included, the management terminal includes login interface, and login interface includes business administration unit, project personnel's administrative unit With visit from visitors unit, the business administration unit includes registration module, login module, projects accepting module, project audit mould Block, project release module, project process enquiry module, project follow-up module, project quality control module, project personnel manage mould Block, project achievement summarizing module, data memory module and module is exited, setting registration module is for facilitating enterprise to upload enterprise's letter Breath data is used for registered enterprise's login account, and setting login module after facilitating enterprises registration for using enterprise's login account to carry out It logs in, setting projects accepting module accepts the project of submission for enterprise, and setting project auditing module is used for enterprise Project after accepting is audited, and audit includes assessing project situation analysis and the project cycle, to finally whether judge project Can carry out, setting project release module is used to issue project audit after the approval by information in project, setting project into Degree enquiry module is for facilitating enterprise's queried for items progress of implementation after the project implementation, so that grasping project carries out information, setting Project follow-up module is for facilitating enterprise to be tracked follow-up to project, to grasp project status in real time, project funds are arranged Management module for being managed to the fund generated in the project implementation process, put by examination & approval including fund and dialling, and guarantees item Purpose normal operation, setting project personal management module is used to be managed the staff participated in project, including work Reply of asking for leave, transfer and switch in the up position of personnel etc., setting project achievement gathering module are used for during project implementation Or acquired phasic results carry out record and summarize after project completion, facilitate summing up experience, setting data memory module is used for Storage record is carried out to all data information of project, convenient for the inquiry in later period, setting exits module for making in enterprise customer With being exited after completion, project personnel's administrative unit include registration module, login module, project process uploading module, Exchange of technology module, fund declare module, programmatic recommendation module, data memory module and exit module, and setting registration module is used Personal information is uploaded in project personnel and registers personal login account, and setting login module is for facilitating project work personnel to use note Personal login account after volume is logged in, and setting project process uploading module is real for facilitating project work personnel to upload project Progress msg is applied, so that enterprise customer and tourist be facilitated to inquire project progress message, setting exchange of technology module is used for Facilitate and carry out exchange of technology between project work personnel or seek advice from experts, convenient for the normal implementation of project, setting fund is declared Module fills in and uploads the fund information of project generation, including required appropriation fund information, reimbursement money for project work personnel Number is arranged for facilitating project work personnel to carry out suggestion message to project implementation in golden information etc., setting project suggestion module It according to memory module for facilitating staff to carry out storage record to project data information, is inquired convenient for the later period, mould is exited in setting For block for exiting after the completion of project work personnel's use, the visit from visitors unit includes project query module, project Progress queries module and message module, setting project enquiry module are fast for facilitating tourist to carry out the essential informations such as project name Quick checking is ask, and setting project progress queries module is for facilitating tourist to inquire project implementation progress msg, setting message mould Block is for facilitating tourist to leave a message after use.
The working principle of the invention is:
When needing to carry out the technological project management systems of medium-sized and small enterprises in use, login interface is initially entered, into one Step is then needed according to itself being that enterprise, project work personnel and tourist carry out separating selection if it is enterprise or project work personnel It is logged in again after registering first, enterprises registration can be accepted to project, be audited etc. management operation, project work after logging in Personnel register log in after project implementation progress msg can be uploaded or carry out exchange of technology etc., be then not necessarily to if it is tourist into Row registering and logging can carry out project essential information inquiry, easy to operate, convenient for medium-sized and small enterprises itself and project work people Member is managed science and technology item, and running is rationally and function is more comprehensive.
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, It is still possible to modify the technical solutions described in the foregoing embodiments, or part of technical characteristic is carried out etc. With replacement, all within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in this Within the protection scope of invention.

Claims (7)

1. a kind of technological project management system applied to medium-sized and small enterprises, including management terminal, it is characterised in that: the management Terminal includes login interface, and login interface includes business administration unit, project personnel's administrative unit and visit from visitors unit.
2. the technological project management system according to claim 1 applied to medium-sized and small enterprises, it is characterised in that: the enterprise Industry administrative unit include registration module, login module, projects accepting module, project auditing module, project release module, project into Spend enquiry module, project follow-up module, project quality control module, project personnel's management module, project achievement summarizing module, number According to memory module and exit module.
3. the technological project management system according to claim 2 applied to medium-sized and small enterprises, it is characterised in that: the note Volume module is for facilitating enterprise to upload company information data for registered enterprise's login account, and setting login module is for facilitating enterprise Industry registration after logged in using enterprise's login account, setting projects accepting module for enterprise to the project of submission carry out by Reason, the project after setting project auditing module is used to accept enterprise are audited, and audit includes project situation analysis and project Cycle evaluation, to finally judge whether project can be carried out, setting project release module for sending out after the approval in project The audit of cloth project by information, setting project progress queries module for facilitate enterprise's queried for items after the project implementation implement into Degree, so that grasping project carries out information, setting project follow-up module is for facilitating enterprise to be tracked follow-up to project, thus real When grasp project status, setting project quality control module is wrapped for being managed to the fund generated in the project implementation process It includes the examination & approval of fund and dials and put, guarantee the normal operation of project, setting project personal management module is used for participating in project Staff be managed, reply of asking for leave, transfer and switch in the up position including staff etc., be arranged project achievement gathering Module carries out record for phasic results acquired during project implementation or after project completion and summarizes, and facilitates summary Experience, setting data memory module is for carrying out storage record to all data information of project, convenient for the inquiry in later period, setting Module is exited for exiting after the completion of enterprise customer's use.
4. the technological project management system according to claim 1 applied to medium-sized and small enterprises, it is characterised in that: the item Mesh personal management unit includes that registration module, login module, project process uploading module, exchange of technology module, fund declare mould Block, programmatic recommendation module, data memory module and exit module.
5. the technological project management system according to claim 4 applied to medium-sized and small enterprises, it is characterised in that: the note Volume module uploads personal information for project personnel and registers personal login account, and setting login module is for facilitating project work people Member is logged in using the personal login account after registration, and setting project process uploading module is for facilitating project work personnel Project implementation progress msg is passed, so that enterprise customer and tourist be facilitated to inquire project progress message, exchange of technology is set Module is for facilitating progress exchange of technology between project work personnel or seeking advice from experts, convenient for the normal implementation of project, setting Fund declares the fund information that module filled in and uploaded project generation for project work personnel, including required appropriation fund letter Breath, reimbursement fund information etc., setting project suggestion module is stayed for facilitating project work personnel to carry out suggestion to project implementation Speech, setting data memory module are inquired for facilitating staff to carry out storage record to project data information convenient for the later period, if It sets and exits module for exiting after the completion of project work personnel's use.
6. the technological project management system according to claim 1 applied to medium-sized and small enterprises, it is characterised in that: the trip Objective access unit includes project query module, project process enquiry module and message module.
7. the technological project management system according to claim 6 applied to medium-sized and small enterprises, it is characterised in that: the item Mesh enquiry module for facilitating tourist to carry out quick search to essential informations such as project names, use by setting project progress queries module In facilitating tourist to inquire project implementation progress msg, setting message module is for facilitating tourist to stay after use Speech.
CN201910683193.8A 2019-07-26 2019-07-26 A kind of technological project management system applied to medium-sized and small enterprises Pending CN110390487A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910683193.8A CN110390487A (en) 2019-07-26 2019-07-26 A kind of technological project management system applied to medium-sized and small enterprises

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910683193.8A CN110390487A (en) 2019-07-26 2019-07-26 A kind of technological project management system applied to medium-sized and small enterprises

Publications (1)

Publication Number Publication Date
CN110390487A true CN110390487A (en) 2019-10-29

Family

ID=68287685

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910683193.8A Pending CN110390487A (en) 2019-07-26 2019-07-26 A kind of technological project management system applied to medium-sized and small enterprises

Country Status (1)

Country Link
CN (1) CN110390487A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111898984A (en) * 2020-07-29 2020-11-06 海南中金德航科技股份有限公司 Merchant background project management system
CN112084477A (en) * 2020-09-03 2020-12-15 上海容基工程项目管理有限公司 Enterprise project management method, system, storage medium and electronic equipment
CN112769604A (en) * 2020-12-30 2021-05-07 南京博尔英科技有限公司 User management platform based on cloud network SaaS mode
CN113592420A (en) * 2021-06-11 2021-11-02 上海兮润信息科技有限公司 Enterprise information management system integration platform

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107451794A (en) * 2017-07-31 2017-12-08 苏州大成有方数据科技有限公司 A kind of science service online management system
CN108960627A (en) * 2018-07-02 2018-12-07 王红岩 A kind of full Schedule monitoring management system and method based on scientific research project

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107451794A (en) * 2017-07-31 2017-12-08 苏州大成有方数据科技有限公司 A kind of science service online management system
CN108960627A (en) * 2018-07-02 2018-12-07 王红岩 A kind of full Schedule monitoring management system and method based on scientific research project

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘楠: "地市供电公司科技创新项目管理***的设计与实现", 《中国优秀硕士论文全文数据库信息科技辑》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111898984A (en) * 2020-07-29 2020-11-06 海南中金德航科技股份有限公司 Merchant background project management system
CN112084477A (en) * 2020-09-03 2020-12-15 上海容基工程项目管理有限公司 Enterprise project management method, system, storage medium and electronic equipment
CN112769604A (en) * 2020-12-30 2021-05-07 南京博尔英科技有限公司 User management platform based on cloud network SaaS mode
CN113592420A (en) * 2021-06-11 2021-11-02 上海兮润信息科技有限公司 Enterprise information management system integration platform

Similar Documents

Publication Publication Date Title
CN110390487A (en) A kind of technological project management system applied to medium-sized and small enterprises
Abdel-Wahab et al. Trends of productivity growth in the construction industry across Europe, US and Japan
CN104361445A (en) Real-time labor management system and management method
Niemi et al. Competence management as a dynamic capability: a strategic enterprise system for a knowledge-intensive project organization
Grenzfurtner et al. Performance measurement and management practices of on-site activities in industrialized housebuilding
CN110619563A (en) Salary management system operated by mobile phone
Goundar Introduction to Enterprise Systems and Technological Convergence
CN107633376A (en) A kind of enterprise management method and device
Tin AComparative ANALYSIS OF COST-VOLUME-PROFIT (CVP) ANALYSIS AND ACTIVITY-BASED COSTING (ABC) IN IMPROVING MANAGERIAL DECISION-MAKING
CN111445117A (en) Fixed asset dynamic management system based on tracing technology
Markova et al. Features of management information systems and technologies in the organization of the automated accounting and analytical process at the enterprise
CN206271029U (en) A kind of intellectual capital management system based on bluetooth 4.0BLE intelligent labels
CN110175813A (en) A kind of coordinated operation system based on mine Life cycle operation flow
Mwenda The Use Of Information Communication Technology And Performance Of Micro And Small Enterprises In Kenya: A Case Study Of Selected Smes In Isiolo County
Zinina Informational and Analytical Support for the Sustainable Development of Agribusiness Enterprises
Al Marri et al. Measuring the Effects of Employee Face-to-Face interactions on their Productivity Through IR Badges
Yanlun Research on the Impact of Project Management Scheme Selection on Project Economic Achievements Based on Information Construction
Mirza Role of Incubation Centers in Growth of Small-Scaled Businesses in Afghanistan
CN109087226B (en) Conceptual framework design method of intelligent asset management system software system
Stefanovic et al. ICT industry in Serbia: Condition and improvement by QMS
Antsiferova et al. Information and Communication Technologies as a Trigger for the Development of Companies in the Agro-Industrial Complex
Torbacka et al. BSC methodology for determining strategy of manufacturing enterprises of SME sector
Mahamuni et al. From Paper to Digital: Transitioning Employee Processes with an Employee Management System
Ungemach wiwi-Bosch Hackathon
Wekesa et al. Effect of enterprise Resource Planning on Performance of Public Entities: A Case Study of Jomo Kenyatta University of Agriculture and Technology, Kenya

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191029

RJ01 Rejection of invention patent application after publication