CN110374139A - A kind of construction method of the underground space structure of covered back-digging construction - Google Patents

A kind of construction method of the underground space structure of covered back-digging construction Download PDF

Info

Publication number
CN110374139A
CN110374139A CN201910614726.7A CN201910614726A CN110374139A CN 110374139 A CN110374139 A CN 110374139A CN 201910614726 A CN201910614726 A CN 201910614726A CN 110374139 A CN110374139 A CN 110374139A
Authority
CN
China
Prior art keywords
side column
sides
soil
center pillar
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910614726.7A
Other languages
Chinese (zh)
Inventor
张延年
步友滨
吴金国
***
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201910614726.7A priority Critical patent/CN110374139A/en
Publication of CN110374139A publication Critical patent/CN110374139A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • E02D29/05Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
    • E02D29/055Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench further excavation of the cross-section proceeding underneath an already installed part of the structure, e.g. the roof of a tunnel
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars
    • E04B1/0015Cellars constructed from prefabricated units

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Electromagnetism (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention belongs to hypogee technical field, more particularly to a kind of construction method of the underground space structure of covered back-digging construction, comprising the following steps: a, in road surface two sides excavation pit to negative one layer bottom;B, compacting foundation, and carry out dealing with foundation;C, side column is poured above the foundation of two sides, after side column molding is firm, Retaining Wall is set;D, original road surface is removed;E, lid sets top plate above two sides side column and retaining wall;F, center pillar is set after excavating soil to certain position;G, crossbeam is set between two sides side column and center pillar;H, continue to excavate soil forward and repeat d, e operation;I, after soil excavates completely, it is laid with bottom plate.This method construction depth is shallow, and vertical supporting need not undertake soil body weight, increases reliability of structure, and upper and lower traffic forms unified entirety, increases the globality of structure, and lower part construction does not influence ground vehicle pass-through.

Description

A kind of construction method of the underground space structure of covered back-digging construction
Technical field
The invention belongs to hypogee technical field, more particularly to a kind of underground space structure of covered back-digging construction Construction method.
Background technique
Urban transportation construction at present is like a raging fire, and the new round that China big and medium-sized cities will start underground engineering construction is high Tide, due to the scarcity of the underground space, to collection, " Urban Underground pipe gallery, Urban Underground expressway, urban underground construction are empty Between " Urban Underground Complex demand it is huge.
The exploitation and construction of Japan and the American-European underground space maintain the leading position, and advocate at first and propose underground city and city The synthesization of city's underground space and three-dimensional utility strategies, nineteen ninety propose Tokyo Declaration: the Devoting Major Efforts To Developing underground space, start people Class new cave period, International Tunnelling Association in 2010 expand to tunnel and underground space association and declare: 21 century is underground The century in space.
To mark international metropolis, become extensive style, booth large flat bread urban development pattern into intensive, solid mode, to underground Want space;Break through urban land, air, water source, greenery patches, the per capita constraint of the resource environments total amount such as city space, the energy, environment; Sea, greening deficiency, real estate finance transition, old town are seen to traffic congestion, air dirt, noise pollution, visual pollution, city The urban disease that the tricks such as vigor decline incur life carries out comprehensive improvement;Change made in China cultivates height leading in the world into Created in China Hold industry cluster.
Cities of Foreign Countries underground space development is with a long history, mostly combines commercial facility with Large Underground transport hub and stops Parking lot holds a variety of traffic forms in the underground space synthesis type presentation of one.In the world, Japan and America and Europe are in underground sky Between exploitation and construction maintain the leading position, advocate and propose the synthesization and solid of underground city and urban underground space at first Change utility strategies.Totally see have out when including many countries of underground space synthesis of multiple transportation modes or multiple functions It is existing, but underground structure cutting depth is deeper at present, material utilization amount is larger, and risk is larger in the construction process, and underground is empty Between utilization rate it is lower.
Summary of the invention
In order to solve the above-mentioned technical problems, the present invention provides a kind of constructions of the underground space structure of covered back-digging construction Method the problems such as to solve " underground space utilization rate is low, and material utilization amount is big ", not only saves construction investment, but also increase The safety of construction and reliability of structure.
Technical scheme is as follows:
A kind of construction method of the underground space structure of sheltered reverse excavation construction, comprising the following steps:
A, in road surface two sides excavation pit to negative one layer bottom;
B, compacting foundation, and carry out dealing with foundation;
C, side column is poured in the foundation pit above the foundation of two sides, after side column molding is firm, Retaining Wall is set;
D, original road surface is removed;
E, lid sets top plate above two sides side column and retaining wall;
F, center pillar is set after excavating soil to certain position;
G, crossbeam is set between two sides side column and center pillar;
H, continue to excavate soil forward, and repeat d, e operation;
I, after soil excavates completely, it is laid with bottom plate.
Further, it is excavated when the excavation of foundation pit along original road surface two sides, when excavation does not destroy original road surface, excavates Width is 2 ~ 3 times of side column width, is convenient for cast in situs side column.
Further, for the excavation of foundation pit to bottom plate lower part 2m or so, foundation top edge and bottom plate lower edge are flat Together, foundation width and foundation pit are of same size, and foundation is uniformly poured with side column.
Further, the top plate width is greater than the distance between two side columns, and top plate two sides are more than that the edge of side column is taken On soil, top plate and its top weight a part are undertaken by side column and retaining wall, and a part is undertaken by two sides soil.
Further, in the same horizontal line, crossbeam two sides and two side column assembleds connect for the side column and center pillar setting It connects, is connect among crossbeam with center pillar assembled.
Further, underground is divided into first interval, second interval to along the longitudinal direction by the side columnnSection is opened Dig first interval when, soil is directly transported by shield machine rear, excavate first interval after, stop excavate, setting center pillar and Crossbeam, after setting completed, continuation excavate forward second interval, and soil is transported by the traffic aisle between center pillar and two sides side column It is defeated, center pillar is set and crossbeam repeats above operation after setting completed, is excavated until completing all section soil.
Further, the soil cutting depth is to basic top edge, after excavation, carries out base plate paving, bottom plate It gets around side column and center pillar is arranged between the retaining wall of two sides.
Further, the side column, retaining wall, center pillar are connect with top plate assembled.
The beneficial effects of the present invention are: this method is constructed using sheltered reverse excavation, construction depth is shallow, and vertical supporting need not be held Soil body weight is carried on a shoulder pole, reliability of structure is increased, upper and lower traffic forms unified entirety, increases the globality of structure, lower part is applied Work does not influence ground vehicle pass-through, and the present invention greatly improves the security performance of structure, shortens construction period, saves construction material, Reduce production cost.
Detailed description of the invention
Fig. 1 is present invention setting Toft foundation structure schematic diagram.
Fig. 2 is present invention setting side column and retaining wall structure schematic diagram.
Fig. 3 is that present invention lid sets top board structure schematic diagram.
Fig. 4 is present invention setting centre-pillar structure schematic diagram.
Fig. 5 is present invention setting beam structure schematic diagram.
Fig. 6 is present invention setting structural diagram of base plate.
In figure, 1 it is foundation, 2 is foundation pit, 3 is side column, 4 is retaining wall, 5 is top plate, 6 is center pillar, 7 is crossbeam, 8 For bottom plate.
Specific embodiment
In order to further illustrate the present invention, the present invention is described in detail with reference to the accompanying drawings and embodiments, but not They can be interpreted as limiting the scope of the present invention.
Embodiment: as shown in Fig. 1 ~ 6, a kind of construction method of the underground space structure of covered back-digging construction mainly includes Following steps:
A, in road surface two sides excavation pit 2 to negative one layer bottom;
B, compacting foundation, and carry out the processing of foundation 1;
C, side column 3 is poured above two sides foundation 1, and after the molding of side column 3 is firm, Retaining Wall 4 is set;
D, original road surface is removed;
E, lid sets top plate 5 above two sides side column 3 and retaining wall 4;
F, center pillar 6 is set after excavating soil to certain position;
G, crossbeam 7 is set between two sides side column 3 and center pillar 6;
H, continue to excavate soil forward and repeat d, e operation;
I, after soil excavates completely, it is laid with bottom plate 8.
It is excavated when foundation pit 2 excavates along original road surface two sides, when excavation does not destroy original road surface, and excavation width is about side column 3 2 ~ 3 times of width are convenient for cast in situs side column 3.
Foundation pit 2 is excavated to 8 lower part 2 of bottom platemLeft and right, 1 top edge of foundation is concordant with 8 lower edge of bottom plate, width and base It cheats 2 of same size, is uniformly poured with side column 3.
5 width of top plate is greater than the distance between two side columns 3, and 5 two sides of top plate are more than that 3 edge of side column rides on soil, top plate 5 And its top weight a part is undertaken by side column 3 and retaining wall 4, a part is undertaken by two sides soil.
In the same horizontal line, 7 two sides of crossbeam are connected with two side columns 3 for side column 3 and the setting of center pillar 6, centre and 6 phase of center pillar Even.
Underground is divided into first interval, second interval to along the longitudinal direction by side column 3nSection, when excavating first interval, soil Earth is directly transported by shield machine rear, after excavating first interval, is stopped excavating, center pillar 6 and crossbeam 7 is arranged, setting completed Afterwards, continue to excavate second interval forward, center pillar 6 is arranged by the traffic aisle transport between center pillar 6 and two sides side column 3 in soil It repeats above operation with crossbeam 7, is excavated until completing all section soil after setting completed.
Underground cutting depth after excavation, carries out bottom plate 8 and is laid with, bottom plate 8 is arranged two to basic 1 top edge Between side block cob wall 4, side column 3 and center pillar 6 are got around.
Side column 3, retaining wall 4, center pillar 6 are connect with 5 assembled of top plate.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (8)

1. a kind of construction method of the underground space structure of sheltered reverse excavation construction, it is characterised in that: the following steps are included:
A, in road surface two sides excavation pit (2) to negative one layer bottom;
B, compacting foundation, and carry out foundation (1) processing;
C, side column (3) are poured in the foundation pit (2) above two sides foundation (1), after side column (3) molding is firm, setting dress With formula retaining wall (4);
D, original road surface is removed;
E, lid sets top plate (5) above two sides side column (3) and retaining wall (4);
F, center pillar (6) are set after excavating soil to certain position;
G, crossbeam (7) are set between two sides side column (3) and center pillar (6);
H, continue to excavate soil forward, and repeat d, e operation;
I, it after soil excavates completely, is laid with bottom plate (8).
2. a kind of construction method of the underground space structure of covered back-digging construction according to claim 1, it is characterised in that: It is excavated when the foundation pit (2) excavates along original road surface two sides, when excavation does not destroy original road surface, and excavation width is side column (3) 2 ~ 3 times of width are convenient for cast in situs side column (3).
3. a kind of construction method of the underground space structure of covered back-digging construction according to claim 1, it is characterised in that: The foundation pit (2) is excavated to bottom plate (8) lower part 2m or so, and foundation (1) top edge is concordant with bottom plate (8) lower edge, ground Base basis (1) width and foundation pit (2) are of same size, and foundation (1) same to side column (3) uniformly pours.
4. a kind of construction method of the underground space structure of covered back-digging construction according to claim 1, it is characterised in that: Top plate (5) width is greater than the distance between two side columns (3), and top plate (5) two sides are more than that the edge of side column (3) rides over soil On, top plate (5) and its top weight a part are undertaken by side column (3) and retaining wall (4), and a part is undertaken by two sides soil.
5. a kind of construction method of the underground space structure of covered back-digging construction according to claim 1, it is characterised in that: In the same horizontal line, crossbeam (7) two sides are connect with two side columns (3) assembled, horizontal for the side column (3) and center pillar (6) setting It is connect among beam (7) with center pillar (6) assembled.
6. a kind of construction method of the underground space structure of covered back-digging construction according to claim 1, it is characterised in that: Underground is divided into first interval, second interval to the n-th section along the longitudinal direction by the side column (3), when excavating first interval, soil Earth is directly transported by shield machine rear, after excavating first interval, stops excavating, center pillar (6) and crossbeam (7), setting is arranged After, second interval is excavated forward in continuation, and soil is transported by the traffic aisle between center pillar (6) and two sides side column (3), if It sets center pillar (6) and crossbeam (7) repeats above operation after setting completed, excavated until completing all section soil.
7. a kind of construction method of the underground space structure of covered back-digging construction according to claim 1, it is characterised in that: The soil cutting depth after excavation, carries out bottom plate (8) and is laid with, bottom plate (8) gets around side column to basic (1) top edge (3) it is arranged between two sides retaining wall (4) with center pillar (6).
8. a kind of construction method of the underground space structure of covered back-digging construction according to claim 1, it is characterised in that: The side column (3), retaining wall (4), center pillar (6) are connect with top plate (5) assembled.
CN201910614726.7A 2019-07-09 2019-07-09 A kind of construction method of the underground space structure of covered back-digging construction Pending CN110374139A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910614726.7A CN110374139A (en) 2019-07-09 2019-07-09 A kind of construction method of the underground space structure of covered back-digging construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910614726.7A CN110374139A (en) 2019-07-09 2019-07-09 A kind of construction method of the underground space structure of covered back-digging construction

Publications (1)

Publication Number Publication Date
CN110374139A true CN110374139A (en) 2019-10-25

Family

ID=68250739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910614726.7A Pending CN110374139A (en) 2019-07-09 2019-07-09 A kind of construction method of the underground space structure of covered back-digging construction

Country Status (1)

Country Link
CN (1) CN110374139A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111997086A (en) * 2020-08-28 2020-11-27 长沙学院 Assembled retaining wall and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101509263A (en) * 2009-03-09 2009-08-19 上海隧道工程股份有限公司 Digging method foundation pit structure of steel cover and plate cover, and construction method
CN102704957A (en) * 2012-05-11 2012-10-03 北京工业大学 Shed-frame method for shallowly burying large-sized underground structure construction
CN104532813A (en) * 2014-12-16 2015-04-22 江西省城建建设集团有限公司 Overwater building construction platform and erecting method and use method thereof
CN107190630A (en) * 2017-07-04 2017-09-22 重庆大学 Road changes the new cap excavation method of stealthy bridge type
CN108239995A (en) * 2018-01-31 2018-07-03 广东工业大学 A kind of open cut is without column Metro Station Structure
CN108487252A (en) * 2018-03-13 2018-09-04 中铁第四勘察设计院集团有限公司 A kind of deep foundation pit open cutting is suitable to make construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101509263A (en) * 2009-03-09 2009-08-19 上海隧道工程股份有限公司 Digging method foundation pit structure of steel cover and plate cover, and construction method
CN102704957A (en) * 2012-05-11 2012-10-03 北京工业大学 Shed-frame method for shallowly burying large-sized underground structure construction
CN104532813A (en) * 2014-12-16 2015-04-22 江西省城建建设集团有限公司 Overwater building construction platform and erecting method and use method thereof
CN107190630A (en) * 2017-07-04 2017-09-22 重庆大学 Road changes the new cap excavation method of stealthy bridge type
CN108239995A (en) * 2018-01-31 2018-07-03 广东工业大学 A kind of open cut is without column Metro Station Structure
CN108487252A (en) * 2018-03-13 2018-09-04 中铁第四勘察设计院集团有限公司 A kind of deep foundation pit open cutting is suitable to make construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
谢仁德: "谈谈盖挖法", 《地铁与轻轨》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111997086A (en) * 2020-08-28 2020-11-27 长沙学院 Assembled retaining wall and construction method thereof

Similar Documents

Publication Publication Date Title
CN203308470U (en) Cover arch structure suitable for large-section unsymmetrical loading tunnel portal section
CN105887889B (en) A kind of ultra-wide hyposmosis mud method of excavation of deep foundation pit
CN108385714A (en) A kind of ecological revetment soil-baffling structure and its construction method
CN201746828U (en) Geogrid enclosed type reinforced road embankment
CN105756073A (en) Ecological slope protection building block of ion type rare earth mine and ecological slope protection system of ion type rare earth mine
CN102182464A (en) Construction structure and construction method of channel structure
CN106958264A (en) A kind of highway greenbelt and its construction method
CN104541643B (en) A kind of sinking land in coalmining areas land control method of region of no relief
CN110374139A (en) A kind of construction method of the underground space structure of covered back-digging construction
CN105951667A (en) Riverway structure reserved in reclamation district through mud filling pipe bags and construction method of riverway structure
CN111636894A (en) Open cut tunnel structure of high and steep slope tunnel portal and method for preventing avalanche falling of rocks
CN208121811U (en) Pipe gallery integration exploitation and subway are total to the open-cut station of structure
CN214169103U (en) Steep slope surface reinforcing and greening system
CN105350637B (en) Urban green space subsurface stormwater is regulated and stored device
WO2021253925A1 (en) Space layout method suitable for urban updating construction
CN213836692U (en) Novel assembled side slope protection view wall
CN210975402U (en) Highway roadbed structure
CN113737722A (en) Have concurrently stone concrete barricade shore protection of view nature suitable for city river course
CN106012951A (en) Method for constructing reservoir away from karst caves in limestone areas and constructed reservoir structure
CN202628108U (en) Caisson structure used as tunnel mouth segment
CN110331739A (en) A kind of lid digging is suitable to make construction method
CN208501694U (en) A kind of prefabricated component for close to type foundation pit
CN112695774A (en) Steep slope surface reinforcing and greening system and construction method thereof
CN201952776U (en) Bank protection structure
CN101603327B (en) Hillside land house in loess plateau and soil and water preservation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination