CN110351377A - A kind of multistage linking control method and system - Google Patents

A kind of multistage linking control method and system Download PDF

Info

Publication number
CN110351377A
CN110351377A CN201910646097.6A CN201910646097A CN110351377A CN 110351377 A CN110351377 A CN 110351377A CN 201910646097 A CN201910646097 A CN 201910646097A CN 110351377 A CN110351377 A CN 110351377A
Authority
CN
China
Prior art keywords
node
control
destination node
information
control instruction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910646097.6A
Other languages
Chinese (zh)
Inventor
杜大兵
杨海军
林松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Xinxin Electronic Technology Co Ltd
Original Assignee
Chengdu Xinxin Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Xinxin Electronic Technology Co Ltd filed Critical Chengdu Xinxin Electronic Technology Co Ltd
Priority to CN201910646097.6A priority Critical patent/CN110351377A/en
Publication of CN110351377A publication Critical patent/CN110351377A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/02Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]
    • H04L67/025Protocols based on web technology, e.g. hypertext transfer protocol [HTTP] for remote control or remote monitoring of applications
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04MTELEPHONIC COMMUNICATION
    • H04M1/00Substation equipment, e.g. for use by subscribers
    • H04M1/72Mobile telephones; Cordless telephones, i.e. devices for establishing wireless links to base stations without route selection
    • H04M1/724User interfaces specially adapted for cordless or mobile telephones
    • H04M1/72403User interfaces specially adapted for cordless or mobile telephones with means for local support of applications that increase the functionality
    • H04M1/72409User interfaces specially adapted for cordless or mobile telephones with means for local support of applications that increase the functionality by interfacing with external accessories
    • H04M1/72415User interfaces specially adapted for cordless or mobile telephones with means for local support of applications that increase the functionality by interfacing with external accessories for remote control of appliances
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/70Services for machine-to-machine communication [M2M] or machine type communication [MTC]

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Human Computer Interaction (AREA)
  • Computer And Data Communications (AREA)

Abstract

The embodiment of the present application provides a kind of multistage linking control method and system, id information and subordinate relation information including obtaining nodes at different levels;Inquiry instruction is issued to nodes at different levels according to the id information, obtain the original operating state information of nodes at different levels and is kept in status list;Control instruction is received, respective operations are executed according to the control instruction and status list control destination node, update status list;According to the subordinate relation information analysis destination node with the presence or absence of linkage node, if it exists, then control instruction is sent to linkage node, control linkage node executes respective operations, it updates status list and controls its linkage control node from destination node, the time delay for saving control, improves work efficiency.

Description

A kind of multistage linking control method and system
Technical field
This application involves field of intelligent control technology, in particular to a kind of multistage linking control method and system.
Background technique
Currently, all there are the needs of multistage linking control in many application scenarios.But existing cascade Mach-Zehnder interferometer method In be sequentially connected between each control system and equipment, when issuing control instruction, opened from first order control system or equipment Begin, control systems or equipment at different levels inquire the control instruction needed to be implemented step by step, refer to even if the equipment does not need to execute to control Operation in order, it is also desirable to control instruction be parsed, operating process complexity, low efficiency.
Summary of the invention
The embodiment of the present application is designed to provide a kind of multistage linking control method and system, to realize improve it is multistage The technical effect of linkage control efficiency.
In a first aspect, the embodiment of the present application provides a kind of multistage linking control method, the ID including obtaining nodes at different levels Information and subordinate relation information;Inquiry instruction is issued to nodes at different levels according to the id information, obtains the initial work of nodes at different levels Make status information and keeps in status list;Control instruction is received, mesh is controlled according to the control instruction and the status list It marks node and executes respective operations, update status list;It whether there is according to destination node described in the subordinate relation information analysis Link node, and if it exists, then sends control instruction to the linkage node, controls the linkage node and execute respective operations, more New state list.
During above-mentioned realization, multistage linking control method provided by the embodiment of the present application obtains nodes at different levels first Id information and subordinate relation information;Then, inquiry instruction is issued to nodes at different levels according to id information and obtains the first of each node Beginning working condition is simultaneously stored in status list.Secondly, being compared according to the control instruction and status list that receive, control Destination node executes respective operations and updates status list;Finally, linkage node whether there is according to subordinate relation information analysis, If it exists, then control instruction is sent to linkage node, control linkage node executes respective operations, updates status list.Above-mentioned mistake Journey carries out multistage linking control, simplifies operating process, improve control efficiency from destination node.
Further, the method also includes: analyze when the destination node executes respective operations with the presence or absence of limit at the same level Node processed, and if it exists, then the destination node according to the control instruction independent control received executes respective operations, more new state List.
During above-mentioned realization, method provided by the embodiments of the present application further includes that analysis destination node executes respective operations When with the presence or absence of limitation node at the same level, and if it exists, correspondence is then executed according to the control instruction independent control destination node received Operation, updates status list, and the above process, with the presence or absence of limitation node at the same level, is avoided and directly controlled by analysis destination node Linkage node and influence limit node working condition.
Further, before the step of id information and subordinate relation information for obtaining nodes at different levels further include: at different levels Node is connect according to preset key and IP address with control platform.
During above-mentioned realization, before the step of obtaining the id information and subordinate relation information of nodes at different levels, need It is attached according to preset key and IP address with control platform, prevents illegal connection, improve the safe and reliable of control process Property.
Further, the method also includes: verify the destination node whether successful execution respective operations, if not successfully Respective operations are executed, then issues control instruction again and controls the destination node execution respective operations.
During above-mentioned realization, after issuing control instruction, destination node executes respective operations not successfully, this The method that application embodiment provides also verifies the operating result of destination node, is detecting that destination node executes not successfully After respective operations, a control instruction just is issued to destination node again, executes respective operations to control destination node.
Further, the method also includes: if the number that the destination node executes corresponding control instruction not successfully reaches The work state information that destination node can not be obtained to preset value or control platform then notifies maintenance personnel to the target section Point is overhauled.
During above-mentioned realization, when the number that destination node executes corresponding control instruction not successfully reach preset value or When control platform can not obtain the work state information of destination node, notification information will be sent to maintenance personnel, in order to tie up Shield personnel in time overhaul destination node.
Second aspect, the embodiment of the present application provide a kind of multistage linking control system, including control platform, gateway and not low In the node of two-stage;The gateway and the node communicate to connect, for obtaining the id information and subordinate relation letter of nodes at different levels It ceases and is sent to the control platform;The control platform is connect with the gateway communication, for according to the id information to each Grade node issues inquiry instruction, obtains the work state information of nodes at different levels and keeps in status list;The control platform is also For receiving control instruction, respective operations are executed according to the control instruction and status list control destination node;It is described Control platform is also used to the destination node according to the subordinate relation information analysis with the presence or absence of linkage node, and if it exists, then Control instruction is sent to the linkage node, the linkage node is controlled and executes respective operations, update status list.
During above-mentioned realization, gateway and node are established and are communicated to connect, and the id information and subordinate for obtaining each node close It is information and is sent to control platform;Then control platform issues inquiry instruction to nodes at different levels according to receiving id information, obtains It takes the work state information of nodes at different levels and keeps in status list;Secondly, control platform is according to control instruction and status list It controls destination node and executes respective operations;Finally, control platform is according to subordinate relation information analysis destination node with the presence or absence of connection Dynamic node, and if it exists, then send control instruction to linkage node, control linkage node executes respective operations, updates status list. Above process console first controls destination node and completes respective operations, and the linkage of destination node is directly controlled further according to subordinate relation Node reduces control delay, improves the efficiency of system without transmission instruction step by step.
Further, the node includes wireless communication module and power supply unit.
During above-mentioned realization, node is also provided with wireless communication module and power supply unit, passes through the channel radio of setting The letter each node of module can be carried out telecommunication directly with console, by directly controlling to each node, be reduced Time delay improves efficiency.
Further, the power supply unit includes solar panel and energy-storage travelling wave tube.
During above-mentioned realization, solar panel by the power storage of generation into energy-storage travelling wave tube, for wireless communication Module and node power supply, have saved cost.
Further, the multistage linking control system further includes accident warning device, when destination node executes not successfully The number of corresponding control instruction, which reaches preset value or control platform, can not obtain the work state information of destination node, failure report Alarm device triggering, control platform send the id information of malfunctioning node to maintenance personnel.
During above-mentioned realization, multistage linking control system is also provided with accident warning device, as destination node Cheng Wei The number that function executes corresponding control instruction, which reaches preset value or control platform, can not obtain the work state information of destination node When, accident warning device triggering, control platform sends the id information of malfunctioning node to maintenance personnel, and personnel convenient for safeguarding are right in time Malfunctioning node is overhauled, and discovery failure, the technical effect of debugging in time is realized.
Further, the multistage linking control system further includes mobile terminal, and the mobile terminal and the control are flat Platform communication connection.
During above-mentioned realization, multistage linking control system further includes the mobile terminal with control platform communication connection, By the mobile terminal of setting, user can obtain the data of control node in real time and carry out remote control.
Detailed description of the invention
Technical solution in ord to more clearly illustrate embodiments of the present application will make below to required in the embodiment of the present application Attached drawing is briefly described, it should be understood that the following drawings illustrates only some embodiments of the application, therefore should not be seen Work is the restriction to range, for those of ordinary skill in the art, without creative efforts, can be with Other relevant attached drawings are obtained according to these attached drawings.
Fig. 1 is multistage linking control method overall procedure schematic diagram provided by the embodiments of the present application;
Fig. 2 is multistage linking control method control logic schematic diagram provided by the embodiments of the present application;
Fig. 3 is multistage linking control system hierarchical structure schematic diagram provided by the embodiments of the present application.
Icon: 10- multistage linking control system;100- gateway;200- first nodes;300- two-level node;400- three-level Node;500- input equipment;600- control platform;700- mobile terminal.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present application, technical solutions in the embodiments of the present application is described.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.Meanwhile the application's In description, term " first ", " second " etc. are only used for distinguishing description, are not understood to indicate or imply relative importance.
Fig. 1 is please referred to, Fig. 1 is multistage linking control method overall procedure schematic diagram provided by the embodiments of the present application.
It is issued and step-by-step analysis control instruction, caused influence step by step to solve existing cascade control system use The problem of control efficiency, the embodiment of the present application provide a kind of multistage linking control method, and particular content is as described below.
Step S101 obtains the id information and subordinate relation information of nodes at different levels.
In order to realize the control to nodes at different levels, control platform needs first to obtain the id information and subordinate relation of nodes at different levels Information, in order to establish monitoring network.
In a kind of possible embodiment, the id information of nodes at different levels can be used input equipment and obtain, such as using Keyboard directly inputs;Corresponding identification code can also be set to each node, control platform is by carrying out communication acquisition with node Corresponding identification code has included at least the id information and subordinate relation information of node in identification code.
In order to avoid illegal node accesses monitoring network, when establishing monitoring network, nodes at different levels can also pass through setting Key and IP address be directly attached with control platform, then control platform again through the above way obtain node ID letter Breath and subordinate relation information.
Step S102 issues inquiry instruction to nodes at different levels according to the id information, obtains the initialization of nodes at different levels Status information is simultaneously kept in status list.
After the id information for obtaining each node, control platform will issue inquiry instruction to nodes at different levels, obtain each The original operating state information of node, is stored in status list.
Step S103 receives control instruction, is executed according to the control instruction and status list control destination node Respective operations update status list.
Console just controls destination node according to control instruction and status list after getting control instruction, Respective operations are completed, then the real-time update status list after destination node completes operation.
Specifically, control platform first inquires status list after receiving control instruction, analyzes the work shape of destination node Whether state is consistent with the operation that control instruction needs to be implemented, if the original operating state of destination node and control instruction are different It causes, just issues control instruction to destination node, control destination node executes respective operations, then updates status list.If mesh The original operating state for marking node is consistent with the operation that control instruction needs to be implemented, then terminates the step.
Step S104, according to destination node described in the subordinate relation information analysis with the presence or absence of linkage node, and if it exists, Control instruction then is sent to the linkage node, the linkage node is controlled and executes respective operations, update status list.
After completing to the control of destination node, control platform can also be according to the subordinate relation information analysis mesh of destination node Node is marked with the presence or absence of linkage node, link node if it exists, then sends control instruction, control linkage node to the linkage node It executes respective operations and updates status list.
In a kind of possible embodiment, linkage is directly controlled when there is limitation node at the same level in order to avoid destination node Node impacts limitation node, also needs before sending control instruction to linkage node according to subordinate relation information analysis Destination node is with the presence or absence of limitation node at the same level;Limitation node at the same level if it exists, control platform just stop sending to linkage node Control instruction.To linkage node send control instruction before, control platform can also inquire linkage node working condition whether It is consistent with control instruction;If the node working condition that links is consistent with the operation that control instruction needs to be implemented, finishing control process.
In order to avoid destination node failure, after control platform issues control instruction, destination node is not performing properly correspondence Operation, multistage linking control method provided by the present embodiment further include: verifying destination node whether the corresponding control of successful execution System instruction issues control instruction control destination node again and executes respective operations if executing corresponding control instruction not successfully. When the number that destination node is not carried out corresponding control instruction reaches preset value (preset value be integer) not less than 1 or control When platform processed can not obtain the work state information of destination node, control platform is just issued a notice information to maintenance personnel, so as to Maintenance personnel in time overhauls destination node.
Specifically, it is assumed that during once-through operation, control platform has issued control instruction to destination node, but first It is secondary issue control instruction after, verifying when discovery destination node be not carried out respective operations, control platform will be again to target Node issues a control instruction, if destination node is still not carried out respective operations, sends the communication information to maintenance personnel, with Just maintenance personnel in time overhauls the destination node.
Fig. 2 is please referred to, Fig. 2 is multistage linking control method control logic schematic diagram provided by the embodiments of the present application.
In a kind of possible embodiment, cascade connection between nodes at different levels, grade joint control are inputted by input equipment The information such as the original operating state of logic processed and destination node and be stored in the form of status list control equipment (can be Control platform is also possible to gateway) in.After manual Trig control signal, control platform is raw according to the control signal received At corresponding control instruction, and judged whether to need to control interdependent node (destination node or linkage node) according to status list Execute respective operations.If necessary to control destination node, then control instruction is sent to destination node;Otherwise, finishing control process.
Then, control platform by implementing result analyze destination node whether successful execution control instruction, if successfully held Row, then destination node is analyzed with the presence or absence of linkage node;If destination node has linkage node, is analyzed and joined according to status list Whether dynamic node needs to be implemented control instruction;If linkage node needs to be implemented control instruction, control platform is to linkage node Control instruction is issued, after interdependent node links node there is no upper level, finishing control process.
If the number that destination node executes control instruction not successfully, which reaches preset value or control platform, can not obtain mesh The work state information of node is marked, then sends the communication information to maintenance personnel, so that maintenance personnel carry out to malfunctioning node Maintenance.
Whether control method provided by the embodiment of the present application further includes being deposited according to subordinate relation information analysis destination node Node is limited in peer, otherwise finishing control process;If there is no limitation nodes at the same level for destination node, to the connection of destination node Dynamic node sends control instruction, and control linkage node executes respective operations;If destination node has limitation node at the same level, stop Control instruction, finishing control process are sent to linkage node.Accidentally control, which is avoided, by above-mentioned control process links node to same The normal operation of grade limitation node impacts, and ensure that the reliability of control process.
Fig. 3 is please referred to, Fig. 3 is multistage linking control system hierarchical structure schematic diagram provided by the embodiments of the present application.
Multistage linking control system provided by the embodiments of the present application includes control platform, gateway, first nodes, second level section Point, three-level node.Gateway is located locally the top layer of system, followed by first nodes, followed by two-level node, is finally three-level section Point.
Each node is provided with wireless communication module and power supply unit and module is communicated with gateway foundation by wireless communication Connection, gateway and control platform remotely establish communication connection by communication base station.Gateway is used to obtain the id information of nodes at different levels With subordinate relation information and be sent to control platform;Control platform issues inquiry instruction according to id information and subordinate relation information, It obtains the work state information of nodes at different levels and keeps in status list;Then, according to the control instruction and status Bar received Table controls destination node and executes respective operations.After destination node executes respective operations, whether control platform analyzes destination node In the presence of linkage node, link node if it exists, then sends control instruction to the linkage node, controls the linkage node and executes Respective operations;Link node if it does not exist, then finishing control process.
It should be noted that the id information and subordinate relation information of nodes at different levels are not limited to through gateway from sections at different levels Point is obtained, and can also be inputted according to preset connection relationship using input equipment;Input equipment can be with keyboard, touching Touch screen etc..Gateway also can replace control platform and execute the above process.
Multistage linking control system provided by the embodiments of the present application further includes mobile terminal, and mobile terminal and control platform are logical Letter connection, user can be used mobile terminal and remotely operate to control process.Wherein mobile terminal can be mobile phone, plate Computer etc..
Illustratively, user uses mobile phone as mobile terminal, is connect by the key of setting with control platform, Yong Huke To issue control instruction to control platform by the corresponding control program being arranged on mobile phone, control platform issues control instruction To gateway, then gateway controls corresponding nodal operation according to control instruction.
It should be noted that mobile terminal can also be directly attached with gateway by the key of setting.Remotely to net Pass issues control instruction, and gateway controls corresponding node further according to the control instruction received and executes operation.
In order to find node failure in time, reduce node failure influences caused by control system, reality provided by the present application It applies and is also provided with accident warning device in example, accident warning device is connect with control platform, when control platform detects target section The failed number for executing corresponding control instruction of point, which reaches preset value or control platform, can not obtain the work shape of destination node State information, accident warning device triggering, control platform to maintenance personnel send malfunctioning node id information, personnel convenient for safeguarding and When malfunctioning node is overhauled, realize in time discovery failure, the technical effect of debugging.
Illustratively, accident warning device includes buzzer, indicator light, and buzzer and indicator light are arranged at control platform On.When control platform detects that destination node executes the number of corresponding control instruction not successfully and reaches preset value or control platform When can not obtain the work state information of destination node, buzzer warning, indicator light is lighted, while in display circle of control platform The id information of malfunctioning node is shown on face.In order to arrange maintenance personnel to overhaul in time, control platform can also be according to setting Contact method the id information of malfunctioning node is sent to maintenance personnel, the position of personnel's timely learning malfunctioning node convenient for safeguarding It sets, is overhauled.
In a kind of possible embodiment, telephone number, the postal of maintenance personnel can be stored in advance in control platform The information such as case.When control platform detects that destination node executes the number of corresponding control instruction not successfully and reaches preset value or control When platform processed can not obtain the work state information of destination node, so that it may send mobile phone from failure to maintenance personnel or mailbox The id information of node, notifies maintenance personnel to overhaul, and debugs in time.
In conclusion the embodiment of the present application provides a kind of multistage linking control method and system, including obtain nodes at different levels Id information and subordinate relation information;Inquiry instruction is issued to nodes at different levels according to id information, obtains the initial work of nodes at different levels Make status information and keeps in status list;Control instruction is received, is held according to control instruction and status list control destination node Row respective operations update status list;According to subordinate relation information analysis destination node with the presence or absence of linkage node, and if it exists, Control instruction then is sent to linkage node, control linkage node executes respective operations, updates status list, go out from destination node Hair, controls its linkage control node, saves the time delay of control, improve work efficiency.
It is worth noting that the above, the only specific embodiment of the application, but the protection scope of the application is not It is confined to this, anyone skilled in the art within the technical scope of the present application, can readily occur in variation Or replacement, should all it cover within the scope of protection of this application.Therefore, the protection scope of the application is answered described with claim Subject to protection scope.

Claims (10)

1. a kind of multistage linking control method, which is characterized in that the described method includes:
Obtain the id information and subordinate relation information of nodes at different levels;
Inquiry instruction is issued to nodes at different levels according to the id information, obtain the original operating state information of nodes at different levels and is kept in To status list;
Control instruction is received, respective operations are executed according to the control instruction and status list control destination node, are updated Status list;
According to destination node described in the subordinate relation information analysis with the presence or absence of linkage node, and if it exists, then to the linkage Node sends control instruction, controls the linkage node and executes respective operations, updates status list.
2. the method according to claim 1, wherein the method also includes:
It analyzes when the destination node executes respective operations with the presence or absence of limitation node at the same level, and if it exists, then basis receives Destination node described in control instruction independent control executes respective operations, updates status list.
3. the method according to claim 1, wherein the id information for obtaining nodes at different levels and subordinate relation letter Before the step of breath further include:
Nodes at different levels are connect according to preset key and IP address with control platform.
4. the method according to claim 1, wherein the method also includes:
Verify the destination node whether the corresponding control instruction of successful execution, if executing corresponding control instruction not successfully, Control instruction is issued again controls the destination node execution respective operations.
5. according to the method described in claim 4, it is characterized in that, the method also includes:
If the number that the destination node executes corresponding control instruction not successfully, which reaches preset value or control platform, to be obtained The work state information of destination node then notifies maintenance personnel to overhaul the destination node.
6. a kind of multistage linking control system, which is characterized in that including control platform, gateway and not less than the node of two-stage;
The gateway and the node communicate to connect, for obtaining the id information of nodes at different levels and subordinate relation information and being sent to The control platform;
The control platform is connect with the gateway communication, for issuing and looking into according to the id information and the subordinate relation information Instruction is ask, the work state information of nodes at different levels is obtained and keeps in status list;
The control platform is also used to receive control instruction, controls destination node according to the control instruction and the status list Execute respective operations;The destination node is analyzed with the presence or absence of linkage node, and if it exists, then send and control to the linkage node Instruction controls the linkage node and executes respective operations.
7. multistage linking control system according to claim 6, which is characterized in that the node includes wireless communication module And power supply unit.
8. multistage linking control system according to claim 7, which is characterized in that the power supply unit includes solar-electricity Pond plate and energy-storage travelling wave tube.
9. multistage linking control system according to claim 6, which is characterized in that the multistage linking control system is also wrapped Include accident warning device, when the number that destination node executes corresponding control instruction not successfully reach preset value or control platform without Method obtains the work state information of destination node, accident warning device triggering, and control platform sends malfunctioning node to maintenance personnel Id information.
10. multistage linking control system according to claim 6, which is characterized in that the multistage linking control system is also Including mobile terminal, the mobile terminal and the control platform are communicated to connect.
CN201910646097.6A 2019-07-17 2019-07-17 A kind of multistage linking control method and system Pending CN110351377A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910646097.6A CN110351377A (en) 2019-07-17 2019-07-17 A kind of multistage linking control method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910646097.6A CN110351377A (en) 2019-07-17 2019-07-17 A kind of multistage linking control method and system

Publications (1)

Publication Number Publication Date
CN110351377A true CN110351377A (en) 2019-10-18

Family

ID=68176566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910646097.6A Pending CN110351377A (en) 2019-07-17 2019-07-17 A kind of multistage linking control method and system

Country Status (1)

Country Link
CN (1) CN110351377A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112566213A (en) * 2021-02-22 2021-03-26 成都鑫芯电子科技有限公司 Automatic relay method of low-power-consumption wireless irrigation control system
WO2024051708A1 (en) * 2022-09-08 2024-03-14 上海美控智慧建筑有限公司 Control method, system and apparatus, electronic device, storage medium, and program product

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1929487A (en) * 2006-09-25 2007-03-14 杭州华为三康技术有限公司 Method for linkage with other separate systems and separate systems supporting linkage
CN102904930A (en) * 2012-09-17 2013-01-30 中兴通讯股份有限公司 Content-network-linked dual acceleration method and system
CN103685507A (en) * 2013-12-11 2014-03-26 华南理工大学 Secret place intelligent management monitoring platform based on Internet of Things
CN105187499A (en) * 2015-08-07 2015-12-23 北京思特奇信息技术股份有限公司 Distributed scheduling method and system based on zookeeper biplanar data architecture
CN106411562A (en) * 2016-06-17 2017-02-15 全球能源互联网研究院 Electric power information network safety linkage defense method and system
CN106790215A (en) * 2017-01-10 2017-05-31 厦门雅迅网络股份有限公司 A kind of particular service interactive controlling strategy and system
CN107154143A (en) * 2017-06-21 2017-09-12 国网山东省电力公司诸城市供电公司 A kind of electric energy meter remote reading system of platform of internet of things
CN107196829A (en) * 2016-03-15 2017-09-22 中国电信股份有限公司 Intelligent home furnishing control method, node and node interlock method and system
CN107342875A (en) * 2016-04-28 2017-11-10 北京京东尚科信息技术有限公司 The method that main controlled node is produced in intelligence networks network
CN108092862A (en) * 2017-12-15 2018-05-29 四川爱联科技有限公司 WiFi ad hoc network control systems based on Internet of Things

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1929487A (en) * 2006-09-25 2007-03-14 杭州华为三康技术有限公司 Method for linkage with other separate systems and separate systems supporting linkage
CN102904930A (en) * 2012-09-17 2013-01-30 中兴通讯股份有限公司 Content-network-linked dual acceleration method and system
CN103685507A (en) * 2013-12-11 2014-03-26 华南理工大学 Secret place intelligent management monitoring platform based on Internet of Things
CN105187499A (en) * 2015-08-07 2015-12-23 北京思特奇信息技术股份有限公司 Distributed scheduling method and system based on zookeeper biplanar data architecture
CN107196829A (en) * 2016-03-15 2017-09-22 中国电信股份有限公司 Intelligent home furnishing control method, node and node interlock method and system
CN107342875A (en) * 2016-04-28 2017-11-10 北京京东尚科信息技术有限公司 The method that main controlled node is produced in intelligence networks network
CN106411562A (en) * 2016-06-17 2017-02-15 全球能源互联网研究院 Electric power information network safety linkage defense method and system
CN106790215A (en) * 2017-01-10 2017-05-31 厦门雅迅网络股份有限公司 A kind of particular service interactive controlling strategy and system
CN107154143A (en) * 2017-06-21 2017-09-12 国网山东省电力公司诸城市供电公司 A kind of electric energy meter remote reading system of platform of internet of things
CN108092862A (en) * 2017-12-15 2018-05-29 四川爱联科技有限公司 WiFi ad hoc network control systems based on Internet of Things

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112566213A (en) * 2021-02-22 2021-03-26 成都鑫芯电子科技有限公司 Automatic relay method of low-power-consumption wireless irrigation control system
WO2024051708A1 (en) * 2022-09-08 2024-03-14 上海美控智慧建筑有限公司 Control method, system and apparatus, electronic device, storage medium, and program product

Similar Documents

Publication Publication Date Title
CN100479575C (en) Method and apparatus for realizing scheduled operation in equipment management
CN101540095B (en) Mobile-network-based system for remotely controlling turning on and turning off of home appliances by cell phone
CN107053143A (en) A kind of industrial robot teaching device and application method based on WEB controls
CN110351377A (en) A kind of multistage linking control method and system
CN105072191A (en) Method for determining target communication channel and server
CN106877508A (en) A kind of grid switching operation monitor in real time anti-error system and its control method
CN105978147B (en) The long-range fixed value modification system of automatic safety device based on file interaction
CN109660399A (en) A kind of method and system of remote debugging
CN107819611B (en) Client test method based on IEC61850 multi-server simulation
CN103941240A (en) Radar system communication extension detection device and detection methods
CN109639756A (en) A kind of terminal network incidence relation is shown and equipment accesses real-time monitoring system
CN105680441B (en) Simulation based on stimulated replacement technology is to a device
CN109654777A (en) A kind of intelligence heat pump tele-control system
CN105978146B (en) Communication mode between D5000 dispatching automation main station system and fail safe system for transformer substation
CN113079051A (en) Parallel simulation method based on transformer substation localization communication protocol
CN101661842A (en) Integrated mis-logical locking prevention system of digital substation
CN113326204A (en) Transformer substation system testing method and device, terminal equipment and storage medium
CN103414252A (en) Transformer substation communication service configuration information real-time synchronization system and method thereof
CN113629878B (en) Remote control verification method and system for three-remote switch of power distribution network
CN108132664B (en) Automatic relay protection information point aligning method suitable for intelligent substation
CN215006368U (en) Remote debugger and remote debugging system for intelligent tablet
CN108491221A (en) Update, fault detection system and the method for embedded system
CN110175736B (en) Automatic card disassembling and hanging method for power system regulation and control center
CN108541385A (en) A kind of control method, control device and control system
CN100458617C (en) Computer monitoring anti-misoperation system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191018