CN110331981A - A kind of roadway segmentation system of attack - Google Patents
A kind of roadway segmentation system of attack Download PDFInfo
- Publication number
- CN110331981A CN110331981A CN201910532778.XA CN201910532778A CN110331981A CN 110331981 A CN110331981 A CN 110331981A CN 201910532778 A CN201910532778 A CN 201910532778A CN 110331981 A CN110331981 A CN 110331981A
- Authority
- CN
- China
- Prior art keywords
- roadway
- working face
- attack
- snubber
- segmented
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000011218 segmentation Effects 0.000 title claims description 8
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 36
- 238000005553 drilling Methods 0.000 claims abstract description 17
- 125000004122 cyclic group Chemical group 0.000 claims abstract description 8
- 239000002360 explosive Substances 0.000 claims abstract description 4
- 239000011435 rock Substances 0.000 claims description 12
- 238000004880 explosion Methods 0.000 claims description 9
- 238000000034 method Methods 0.000 abstract description 7
- 238000000465 moulding Methods 0.000 abstract description 6
- 238000005065 mining Methods 0.000 abstract description 4
- 238000010276 construction Methods 0.000 abstract description 3
- 238000005516 engineering process Methods 0.000 abstract description 3
- 230000008595 infiltration Effects 0.000 abstract description 3
- 238000001764 infiltration Methods 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008033 biological extinction Effects 0.000 description 1
- 238000007664 blowing Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 229910052500 inorganic mineral Inorganic materials 0.000 description 1
- 239000011707 mineral Substances 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Road Signs Or Road Markings (AREA)
Abstract
The present invention provides a kind of roadways to be segmented the system of attack, including choosing working face, water hole is visited in center of working face Drilling, on working face and visit the multiple snubbers of water hole surrounding Drilling, on working face and in the multiple relievers of snubber surrounding Drilling, to placing appropriate explosive within snubber and ignite, tunnel one section of cyclic advance along the direction vertical with working face, above-mentioned steps are repeated, roadway digging is completed.Using technical solution of the present invention, before each digging driving, judged with the presence or absence of ponding by several eyelets dug out within the ore body of front, to within every section of cyclic advance, guarantee normally going on smoothly for mining operation, avoid the occurrence of infiltration water leak accident, furthermore, by digging out several periphery holes on working face, so that molding roadway wall surface is more straight, the surrounding shape of control molding roadway, excavated technology method of the invention has construction technique simple, it is low in cost, the features such as security and reliability is high.
Description
Technical field
The invention belongs to mining engineering technical fields more particularly to a kind of roadway to be segmented the system of attack.
Background technique
In mining engineering field, with the driving of digging roadway, some preservations are with karst area morphotectonics
Mineral deposit on feature massif is often accompanied by dark solution cavity, underground river or crack in ore body, deposits sometimes in these dark solution cavity, underground river or cracks
In a large amount of ponding, this ponding is encountered during underground mine digging operation, hardship does not detect in advance, unexpected when blowing out
Gush out, easily cause mine, equipment to be submerged, personnel casualty accidents, or even the weight of extinction, especially big thing are caused to entire mine
Therefore.Therefore, in order to avoid generating such case, need to design a kind of safe roadway system of attack.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of roadways to be segmented the system of attack.
The present invention is achieved by the following technical programs.
A kind of roadway provided by the invention is segmented the system of attack, comprising the following steps:
Step 1: choosing ore body surface portion region as working face, along the direction vertical with the working face from institute
Center of working face is stated using rock drilling equipment to digging within ore body into obtaining and visiting water hole, if not finding there is water within the spy water hole
Exudation carries out in next step;
Step 2: along with the working face at appropriate inclination angle direction using rock drilling equipment to dig within ore body into,
The spy water hole surrounding obtains multiple snubbers, and makes each snubber and the spy the water hole not phase within the ore body
It hands over, if not finding there is water exudation within the snubber, carries out in next step;
Step 3: all snubber centers are formed on the working face in step 2 line periphery, along with institute
The vertical direction of working face is stated using rock drilling equipment to digging within ore body into several relievers being obtained, if not finding described auxiliary
Helping within eye has water exudation, carries out in next step;
Step 4: placing appropriate explosive and ignite within Xiang Suoshu snubber, explosion face is formed after explosion, if not finding institute
There is water exudation in the explosion face of stating, carries out in next step;
Step 5: a distance obtaining unit roadway is tunneled along the direction vertical with the working face, this section distance is made
For cyclic advance;
Step 6: step 1 is repeated to step 5, so that all unit roadways obtained is successively joined end to end, roadway digging
It completes.
The roadway segmentation system of attack further includes walking after carrying out step 3 with below carrying out before progress step 4
It is rapid:
Along the direction vertical with the working face (1) using rock drilling equipment from the working face edge to ore body within
It digs into obtaining several periphery holes, periphery hole has a water exudation if not finding, carries out in next step.
The quantity of the periphery hole is no less than 4.
Spy water hole depth described in step 1 is 5m.
Cyclic advance described in step 5 is 3m.
Snubber aperture described in step 2 is identical as reliever aperture described in step 3.
Snubber quantity described in step 2 is no less than 4.
Inclination angle between snubber central axis described in step 2 and the working face is less than 80 °.
The quantity of reliever described in step 3 is no less than 4.
The beneficial effects of the present invention are: technical solution of the present invention is used, by segmentation digging driving, in each digging
Before driving, several eyelets are dug out first, judged within the ore body of front in advance with the presence or absence of ponding, to follow at every section
Within ring drilling depth, guarantees normally going on smoothly for mining operation, infiltration water leak accident is avoided the occurrence of, in addition, by working face
Several periphery holes are dug out, so that molding roadway wall surface is more straight, the surrounding shape of control molding roadway, digging of the invention
The features such as process has construction technique simple, low in cost, and security and reliability is high.
Detailed description of the invention
Fig. 1 is digging of the present invention roadway structural schematic diagram obtained.
In figure: 1- working face, 2- visit water hole, 3- snubber, 4- reliever, 5- periphery hole.
Specific embodiment
Be described further below technical solution of the present invention, but claimed range be not limited to it is described.
As shown in Figure 1, the present invention provides a kind of roadway segmentation system of attack, comprising the following steps:
Step 1: choosing ore body surface portion region as working face 1, along the direction vertical with working face 1 from work
1 center of face using rock drilling equipment to dig within ore body into, obtain and visit water hole 2, if not finding to visit within water hole 2 has water exudation, into
Row is in next step;Further, it is preferable to which visiting 2 depth of water hole in step 1 is 5m.
Step 2: along with working face 1 at the direction at appropriate inclination angle using rock drilling equipment to digging within ore body into water is being visited
2 surrounding of hole obtains multiple snubbers 3, and keeps each snubber 3 and spy water hole 2 non-intersecting within ore body, if not finding to draw
There is water exudation within slotted eyes 3, carries out in next step;Further, 3 aperture of snubber and 4 hole of reliever in step 3 in step 2
Diameter is identical.3 quantity of snubber is no less than 4 in step 2.Inclining between 3 central axis of snubber and working face 1 in step 2
Angle is less than 80 °.
Step 3: all 3 centers of snubber are formed on working face 1 in step 2 line periphery, along with work
The vertical direction in face 1 is using rock drilling equipment to digging within ore body into several relievers 4 being obtained, if not finding within reliever 4
There is water exudation, carries out in next step;Further, it is preferable to which the quantity of reliever 4 is no less than 4 in step 3.
Step 4: placing appropriate explosive and ignite within to snubber 3, explosion face is formed after explosion, if not finding explosion
There is water exudation in face, carries out in next step;
Step 5: a distance obtaining unit roadway is tunneled along the direction vertical with working face 1, this section distance, which is used as, to be followed
Ring drilling depth;Further, it is preferable to which cyclic advance is 3m in step 5.
Step 6: step 1 is repeated to step 5, so that all unit roadways obtained is successively joined end to end, roadway digging
It completes.
Using technical solution of the present invention, dug out first several before each digging driving by segmentation digging driving
A eyelet, judged within the ore body of front in advance with the presence or absence of ponding, to guarantee digging work within every section of cyclic advance
Normally going on smoothly for journey, avoids the occurrence of infiltration water leak accident, in addition, by digging out several periphery holes on working face, so that
Molding roadway wall surface is more straight, and the surrounding shape of control molding roadway, excavated technology method of the invention has construction technology
The features such as method is simple, low in cost, and security and reliability is high.
Further, roadway segmentation the system of attack further include after carrying out step 3 with carry out step 4 before progress with
Lower step:
Along the direction vertical with working face 1 using rock drilling equipment from 1 edge of working face to ore body within dig into, obtain
Several periphery holes 5, if not finding, periphery hole 5 has water exudation, carries out in next step.It is preferred that the quantity of periphery hole 5 is no less than 4.
Claims (9)
1. a kind of roadway is segmented the system of attack, it is characterised in that: the following steps are included:
Step 1: choosing ore body surface portion region as working face (1), along the direction vertical with the working face (1) from
Working face (1) center is using rock drilling equipment to digging within ore body into obtaining and visiting water hole (2), if not finding the spy water hole
(2) there is water exudation within, carry out in next step;
Step 2: along with the working face (1) at the direction at appropriate inclination angle using rock drilling equipment to digging into institute within ore body
It states and visits the multiple snubbers (3) of water hole (2) surrounding acquisition, and make each snubber (3) and the spy water hole (2) in the ore body
Within it is non-intersecting, if not finding there is water exudation within the snubber (3), carry out in next step;
Step 3: all snubber (3) centers are formed on the working face (1) in step 2 line periphery, along with
The vertical direction of the working face (1) is using rock drilling equipment to digging within ore body into several relievers (4) being obtained, if not sending out
There is water exudation within the existing reliever (4), carries out in next step;
Step 4: placing appropriate explosive and ignite within Xiang Suoshu snubber (3), explosion face is formed after explosion, if not finding institute
There is water exudation in the explosion face of stating, carries out in next step;
Step 5: a distance obtaining unit roadway is tunneled along the direction vertical with the working face (1), the section is apart from conduct
Cyclic advance;
Step 6: step 1 is repeated to step 5, so that all unit roadways obtained is successively joined end to end, roadway digging is complete
At.
2. a kind of roadway as described in claim 1 is segmented the system of attack, it is characterised in that: the roadway segmentation system of attack is also
It is included in after carrying out step 3 and followed the steps below before step 4:
Along the direction vertical with the working face (1) using rock drilling equipment from the working face (1) edge to ore body within
It digs into obtaining several periphery holes (5), periphery hole (5) has a water exudation if not finding, carries out in next step.
3. a kind of roadway as claimed in claim 2 is segmented the system of attack, it is characterised in that: the quantity of the periphery hole (5) is not
Less than 4.
4. a kind of roadway as described in claim 1 is segmented the system of attack, it is characterised in that: visit water hole (2) described in step 1
Depth is 5m.
5. a kind of roadway as described in claim 1 is segmented the system of attack, it is characterised in that: cyclic advance described in step 5 is
3m。
6. a kind of roadway as described in claim 1 is segmented the system of attack, it is characterised in that: snubber described in step 2 (3)
Aperture is identical as (4) aperture of reliever described in step 3.
7. a kind of roadway as described in claim 1 is segmented the system of attack, it is characterised in that: snubber described in step 2 (3)
Quantity is no less than 4.
8. a kind of roadway as described in claim 1 is segmented the system of attack, it is characterised in that: snubber described in step 2 (3)
Inclination angle between central axis and the working face (1) is less than 80 °.
9. a kind of roadway as described in claim 1 is segmented the system of attack, it is characterised in that: reliever described in step 3 (4)
Quantity be no less than 4.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910532778.XA CN110331981A (en) | 2019-06-19 | 2019-06-19 | A kind of roadway segmentation system of attack |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910532778.XA CN110331981A (en) | 2019-06-19 | 2019-06-19 | A kind of roadway segmentation system of attack |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110331981A true CN110331981A (en) | 2019-10-15 |
Family
ID=68142147
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910532778.XA Pending CN110331981A (en) | 2019-06-19 | 2019-06-19 | A kind of roadway segmentation system of attack |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110331981A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110700843A (en) * | 2019-11-20 | 2020-01-17 | 中铁二十局集团有限公司 | Tunnel three-step synchronous excavation construction method based on partition blasting |
CN111485890A (en) * | 2020-04-08 | 2020-08-04 | 内蒙古金陶股份有限公司 | Tunneling method of roadway |
CN112112657A (en) * | 2020-09-25 | 2020-12-22 | 中煤第三建设(集团)有限责任公司 | New construction method for digging and building inclined shaft of coal mine |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3974656A (en) * | 1975-02-21 | 1976-08-17 | Kenly Donald F | Method and apparatus for excluding water or other material from a blast hole in rock |
CN101349533A (en) * | 2008-08-05 | 2009-01-21 | 山东科技大学科技产业总公司 | Dip laneway digging hole layout mode |
CN103234403A (en) * | 2013-04-24 | 2013-08-07 | 中国科学院武汉岩土力学研究所 | Static blasting construction method for highway tunnel |
CN105823387A (en) * | 2016-02-25 | 2016-08-03 | 中铁十八局集团有限公司 | Rapid construction method for deep hole blasting of vertical shaft frozen bedrock |
CN106895752A (en) * | 2017-02-20 | 2017-06-27 | 湖北兴发化工集团股份有限公司 | A kind of stratiform phosphorite ore body tunnel deep hole sinking and blasting method |
CN207095427U (en) * | 2017-08-11 | 2018-03-13 | 中铁四局集团有限公司 | The bilateral V-cut distributed architecture of Super-large-section tunnel |
-
2019
- 2019-06-19 CN CN201910532778.XA patent/CN110331981A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3974656A (en) * | 1975-02-21 | 1976-08-17 | Kenly Donald F | Method and apparatus for excluding water or other material from a blast hole in rock |
CN101349533A (en) * | 2008-08-05 | 2009-01-21 | 山东科技大学科技产业总公司 | Dip laneway digging hole layout mode |
CN103234403A (en) * | 2013-04-24 | 2013-08-07 | 中国科学院武汉岩土力学研究所 | Static blasting construction method for highway tunnel |
CN105823387A (en) * | 2016-02-25 | 2016-08-03 | 中铁十八局集团有限公司 | Rapid construction method for deep hole blasting of vertical shaft frozen bedrock |
CN106895752A (en) * | 2017-02-20 | 2017-06-27 | 湖北兴发化工集团股份有限公司 | A kind of stratiform phosphorite ore body tunnel deep hole sinking and blasting method |
CN207095427U (en) * | 2017-08-11 | 2018-03-13 | 中铁四局集团有限公司 | The bilateral V-cut distributed architecture of Super-large-section tunnel |
Non-Patent Citations (1)
Title |
---|
李福贤等: "大强煤矿主井井筒快速施工工艺", 《煤矿安全》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110700843A (en) * | 2019-11-20 | 2020-01-17 | 中铁二十局集团有限公司 | Tunnel three-step synchronous excavation construction method based on partition blasting |
CN111485890A (en) * | 2020-04-08 | 2020-08-04 | 内蒙古金陶股份有限公司 | Tunneling method of roadway |
CN111485890B (en) * | 2020-04-08 | 2022-03-15 | 内蒙古金陶股份有限公司 | Tunneling method of roadway |
CN112112657A (en) * | 2020-09-25 | 2020-12-22 | 中煤第三建设(集团)有限责任公司 | New construction method for digging and building inclined shaft of coal mine |
CN112112657B (en) * | 2020-09-25 | 2022-04-19 | 中煤第三建设(集团)有限责任公司 | New construction method for digging and building inclined shaft of coal mine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110331981A (en) | A kind of roadway segmentation system of attack | |
CN104790978B (en) | The tunnel ring-shaped base tunnel construction method of small interval crossings on different level | |
CN104564085B (en) | Large section tunnel excavation comprehensive construction method under an ultra shallow underground layering part of city | |
CN104532818A (en) | Treatment method for strip mine goaf | |
CN103899318B (en) | The milling of medium ground tunnel is dug and supporting machinery construction | |
CN106089240B (en) | Support System in Soft Rock Tunnels segments in a circular shape excavation supporting system and its method for protecting support | |
CN107975383B (en) | Underground chamber tee T intersection excavation supporting construction method | |
CN108286442A (en) | Excavation method suitable for a Support System in Soft Rock Tunnels quick closure cyclization of two steps | |
CN104748632A (en) | Underwater rock plug blasting construction method | |
CN103016027B (en) | Tunnel or roadway excavating method under weak and broken complicated geological conditions | |
CN108331573A (en) | The abandoned well administering method of bank | |
CN101915104A (en) | Rock burst control method for deep tunnel excavation by adopting TBM (Tunnel Boring Machine) | |
CN106869936A (en) | It is a kind of to be suitable to the surface mining new method of steep slope topography | |
CN102518470A (en) | Method for preventing and controlling water by using freezing pipes in annular water intercepting tunnel | |
CN107489433A (en) | A kind of tunnel CRD engineering methods anti-leakage structure and Antiseep method | |
CN106121659A (en) | The narrow-bore tunnel excavation method of major urban arterial highway upper-soft lower-hard ground is worn under one | |
CN110905536A (en) | Construction method for receiving complex stratum earth pressure shield in underground excavation tunnel | |
CN110374091A (en) | A kind of rectangle friction pile mechanical hole building construction method | |
CN103470263A (en) | New-level development method for open-pit metal mine | |
CN204327107U (en) | The TBM of a kind of fragmented rock body hole section tunnels structure | |
CN102337893B (en) | Method for processing suspension top by medium-deep hole blasting on upper and lower shoes | |
CN109594988A (en) | A kind of big cross section soft rock tunnel excavation construction method | |
CN109208594A (en) | Processing method, steel pile casting structure and the drilled pile of sinking steel protecting canister chance boulder | |
KR20160047228A (en) | Cross-Section Tunnel Construction Method Using Rock Mass Quality Rating | |
CN110030001A (en) | A kind of construction method that mountain tunnel is appeared |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191015 |
|
RJ01 | Rejection of invention patent application after publication |