CN110331981A - A kind of roadway segmentation system of attack - Google Patents

A kind of roadway segmentation system of attack Download PDF

Info

Publication number
CN110331981A
CN110331981A CN201910532778.XA CN201910532778A CN110331981A CN 110331981 A CN110331981 A CN 110331981A CN 201910532778 A CN201910532778 A CN 201910532778A CN 110331981 A CN110331981 A CN 110331981A
Authority
CN
China
Prior art keywords
roadway
working face
attack
snubber
segmented
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910532778.XA
Other languages
Chinese (zh)
Inventor
游志全
石远方
韩科江
杨莉
顾伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Kailin Group Co Ltd
Original Assignee
Guizhou Kailin Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Kailin Group Co Ltd filed Critical Guizhou Kailin Group Co Ltd
Priority to CN201910532778.XA priority Critical patent/CN110331981A/en
Publication of CN110331981A publication Critical patent/CN110331981A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

The present invention provides a kind of roadways to be segmented the system of attack, including choosing working face, water hole is visited in center of working face Drilling, on working face and visit the multiple snubbers of water hole surrounding Drilling, on working face and in the multiple relievers of snubber surrounding Drilling, to placing appropriate explosive within snubber and ignite, tunnel one section of cyclic advance along the direction vertical with working face, above-mentioned steps are repeated, roadway digging is completed.Using technical solution of the present invention, before each digging driving, judged with the presence or absence of ponding by several eyelets dug out within the ore body of front, to within every section of cyclic advance, guarantee normally going on smoothly for mining operation, avoid the occurrence of infiltration water leak accident, furthermore, by digging out several periphery holes on working face, so that molding roadway wall surface is more straight, the surrounding shape of control molding roadway, excavated technology method of the invention has construction technique simple, it is low in cost, the features such as security and reliability is high.

Description

A kind of roadway segmentation system of attack
Technical field
The invention belongs to mining engineering technical fields more particularly to a kind of roadway to be segmented the system of attack.
Background technique
In mining engineering field, with the driving of digging roadway, some preservations are with karst area morphotectonics Mineral deposit on feature massif is often accompanied by dark solution cavity, underground river or crack in ore body, deposits sometimes in these dark solution cavity, underground river or cracks In a large amount of ponding, this ponding is encountered during underground mine digging operation, hardship does not detect in advance, unexpected when blowing out Gush out, easily cause mine, equipment to be submerged, personnel casualty accidents, or even the weight of extinction, especially big thing are caused to entire mine Therefore.Therefore, in order to avoid generating such case, need to design a kind of safe roadway system of attack.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of roadways to be segmented the system of attack.
The present invention is achieved by the following technical programs.
A kind of roadway provided by the invention is segmented the system of attack, comprising the following steps:
Step 1: choosing ore body surface portion region as working face, along the direction vertical with the working face from institute Center of working face is stated using rock drilling equipment to digging within ore body into obtaining and visiting water hole, if not finding there is water within the spy water hole Exudation carries out in next step;
Step 2: along with the working face at appropriate inclination angle direction using rock drilling equipment to dig within ore body into, The spy water hole surrounding obtains multiple snubbers, and makes each snubber and the spy the water hole not phase within the ore body It hands over, if not finding there is water exudation within the snubber, carries out in next step;
Step 3: all snubber centers are formed on the working face in step 2 line periphery, along with institute The vertical direction of working face is stated using rock drilling equipment to digging within ore body into several relievers being obtained, if not finding described auxiliary Helping within eye has water exudation, carries out in next step;
Step 4: placing appropriate explosive and ignite within Xiang Suoshu snubber, explosion face is formed after explosion, if not finding institute There is water exudation in the explosion face of stating, carries out in next step;
Step 5: a distance obtaining unit roadway is tunneled along the direction vertical with the working face, this section distance is made For cyclic advance;
Step 6: step 1 is repeated to step 5, so that all unit roadways obtained is successively joined end to end, roadway digging It completes.
The roadway segmentation system of attack further includes walking after carrying out step 3 with below carrying out before progress step 4 It is rapid:
Along the direction vertical with the working face (1) using rock drilling equipment from the working face edge to ore body within It digs into obtaining several periphery holes, periphery hole has a water exudation if not finding, carries out in next step.
The quantity of the periphery hole is no less than 4.
Spy water hole depth described in step 1 is 5m.
Cyclic advance described in step 5 is 3m.
Snubber aperture described in step 2 is identical as reliever aperture described in step 3.
Snubber quantity described in step 2 is no less than 4.
Inclination angle between snubber central axis described in step 2 and the working face is less than 80 °.
The quantity of reliever described in step 3 is no less than 4.
The beneficial effects of the present invention are: technical solution of the present invention is used, by segmentation digging driving, in each digging Before driving, several eyelets are dug out first, judged within the ore body of front in advance with the presence or absence of ponding, to follow at every section Within ring drilling depth, guarantees normally going on smoothly for mining operation, infiltration water leak accident is avoided the occurrence of, in addition, by working face Several periphery holes are dug out, so that molding roadway wall surface is more straight, the surrounding shape of control molding roadway, digging of the invention The features such as process has construction technique simple, low in cost, and security and reliability is high.
Detailed description of the invention
Fig. 1 is digging of the present invention roadway structural schematic diagram obtained.
In figure: 1- working face, 2- visit water hole, 3- snubber, 4- reliever, 5- periphery hole.
Specific embodiment
Be described further below technical solution of the present invention, but claimed range be not limited to it is described.
As shown in Figure 1, the present invention provides a kind of roadway segmentation system of attack, comprising the following steps:
Step 1: choosing ore body surface portion region as working face 1, along the direction vertical with working face 1 from work 1 center of face using rock drilling equipment to dig within ore body into, obtain and visit water hole 2, if not finding to visit within water hole 2 has water exudation, into Row is in next step;Further, it is preferable to which visiting 2 depth of water hole in step 1 is 5m.
Step 2: along with working face 1 at the direction at appropriate inclination angle using rock drilling equipment to digging within ore body into water is being visited 2 surrounding of hole obtains multiple snubbers 3, and keeps each snubber 3 and spy water hole 2 non-intersecting within ore body, if not finding to draw There is water exudation within slotted eyes 3, carries out in next step;Further, 3 aperture of snubber and 4 hole of reliever in step 3 in step 2 Diameter is identical.3 quantity of snubber is no less than 4 in step 2.Inclining between 3 central axis of snubber and working face 1 in step 2 Angle is less than 80 °.
Step 3: all 3 centers of snubber are formed on working face 1 in step 2 line periphery, along with work The vertical direction in face 1 is using rock drilling equipment to digging within ore body into several relievers 4 being obtained, if not finding within reliever 4 There is water exudation, carries out in next step;Further, it is preferable to which the quantity of reliever 4 is no less than 4 in step 3.
Step 4: placing appropriate explosive and ignite within to snubber 3, explosion face is formed after explosion, if not finding explosion There is water exudation in face, carries out in next step;
Step 5: a distance obtaining unit roadway is tunneled along the direction vertical with working face 1, this section distance, which is used as, to be followed Ring drilling depth;Further, it is preferable to which cyclic advance is 3m in step 5.
Step 6: step 1 is repeated to step 5, so that all unit roadways obtained is successively joined end to end, roadway digging It completes.
Using technical solution of the present invention, dug out first several before each digging driving by segmentation digging driving A eyelet, judged within the ore body of front in advance with the presence or absence of ponding, to guarantee digging work within every section of cyclic advance Normally going on smoothly for journey, avoids the occurrence of infiltration water leak accident, in addition, by digging out several periphery holes on working face, so that Molding roadway wall surface is more straight, and the surrounding shape of control molding roadway, excavated technology method of the invention has construction technology The features such as method is simple, low in cost, and security and reliability is high.
Further, roadway segmentation the system of attack further include after carrying out step 3 with carry out step 4 before progress with Lower step:
Along the direction vertical with working face 1 using rock drilling equipment from 1 edge of working face to ore body within dig into, obtain Several periphery holes 5, if not finding, periphery hole 5 has water exudation, carries out in next step.It is preferred that the quantity of periphery hole 5 is no less than 4.

Claims (9)

1. a kind of roadway is segmented the system of attack, it is characterised in that: the following steps are included:
Step 1: choosing ore body surface portion region as working face (1), along the direction vertical with the working face (1) from Working face (1) center is using rock drilling equipment to digging within ore body into obtaining and visiting water hole (2), if not finding the spy water hole (2) there is water exudation within, carry out in next step;
Step 2: along with the working face (1) at the direction at appropriate inclination angle using rock drilling equipment to digging into institute within ore body It states and visits the multiple snubbers (3) of water hole (2) surrounding acquisition, and make each snubber (3) and the spy water hole (2) in the ore body Within it is non-intersecting, if not finding there is water exudation within the snubber (3), carry out in next step;
Step 3: all snubber (3) centers are formed on the working face (1) in step 2 line periphery, along with The vertical direction of the working face (1) is using rock drilling equipment to digging within ore body into several relievers (4) being obtained, if not sending out There is water exudation within the existing reliever (4), carries out in next step;
Step 4: placing appropriate explosive and ignite within Xiang Suoshu snubber (3), explosion face is formed after explosion, if not finding institute There is water exudation in the explosion face of stating, carries out in next step;
Step 5: a distance obtaining unit roadway is tunneled along the direction vertical with the working face (1), the section is apart from conduct Cyclic advance;
Step 6: step 1 is repeated to step 5, so that all unit roadways obtained is successively joined end to end, roadway digging is complete At.
2. a kind of roadway as described in claim 1 is segmented the system of attack, it is characterised in that: the roadway segmentation system of attack is also It is included in after carrying out step 3 and followed the steps below before step 4:
Along the direction vertical with the working face (1) using rock drilling equipment from the working face (1) edge to ore body within It digs into obtaining several periphery holes (5), periphery hole (5) has a water exudation if not finding, carries out in next step.
3. a kind of roadway as claimed in claim 2 is segmented the system of attack, it is characterised in that: the quantity of the periphery hole (5) is not Less than 4.
4. a kind of roadway as described in claim 1 is segmented the system of attack, it is characterised in that: visit water hole (2) described in step 1 Depth is 5m.
5. a kind of roadway as described in claim 1 is segmented the system of attack, it is characterised in that: cyclic advance described in step 5 is 3m。
6. a kind of roadway as described in claim 1 is segmented the system of attack, it is characterised in that: snubber described in step 2 (3) Aperture is identical as (4) aperture of reliever described in step 3.
7. a kind of roadway as described in claim 1 is segmented the system of attack, it is characterised in that: snubber described in step 2 (3) Quantity is no less than 4.
8. a kind of roadway as described in claim 1 is segmented the system of attack, it is characterised in that: snubber described in step 2 (3) Inclination angle between central axis and the working face (1) is less than 80 °.
9. a kind of roadway as described in claim 1 is segmented the system of attack, it is characterised in that: reliever described in step 3 (4) Quantity be no less than 4.
CN201910532778.XA 2019-06-19 2019-06-19 A kind of roadway segmentation system of attack Pending CN110331981A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910532778.XA CN110331981A (en) 2019-06-19 2019-06-19 A kind of roadway segmentation system of attack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910532778.XA CN110331981A (en) 2019-06-19 2019-06-19 A kind of roadway segmentation system of attack

Publications (1)

Publication Number Publication Date
CN110331981A true CN110331981A (en) 2019-10-15

Family

ID=68142147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910532778.XA Pending CN110331981A (en) 2019-06-19 2019-06-19 A kind of roadway segmentation system of attack

Country Status (1)

Country Link
CN (1) CN110331981A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700843A (en) * 2019-11-20 2020-01-17 中铁二十局集团有限公司 Tunnel three-step synchronous excavation construction method based on partition blasting
CN111485890A (en) * 2020-04-08 2020-08-04 内蒙古金陶股份有限公司 Tunneling method of roadway
CN112112657A (en) * 2020-09-25 2020-12-22 中煤第三建设(集团)有限责任公司 New construction method for digging and building inclined shaft of coal mine

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3974656A (en) * 1975-02-21 1976-08-17 Kenly Donald F Method and apparatus for excluding water or other material from a blast hole in rock
CN101349533A (en) * 2008-08-05 2009-01-21 山东科技大学科技产业总公司 Dip laneway digging hole layout mode
CN103234403A (en) * 2013-04-24 2013-08-07 中国科学院武汉岩土力学研究所 Static blasting construction method for highway tunnel
CN105823387A (en) * 2016-02-25 2016-08-03 中铁十八局集团有限公司 Rapid construction method for deep hole blasting of vertical shaft frozen bedrock
CN106895752A (en) * 2017-02-20 2017-06-27 湖北兴发化工集团股份有限公司 A kind of stratiform phosphorite ore body tunnel deep hole sinking and blasting method
CN207095427U (en) * 2017-08-11 2018-03-13 中铁四局集团有限公司 The bilateral V-cut distributed architecture of Super-large-section tunnel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3974656A (en) * 1975-02-21 1976-08-17 Kenly Donald F Method and apparatus for excluding water or other material from a blast hole in rock
CN101349533A (en) * 2008-08-05 2009-01-21 山东科技大学科技产业总公司 Dip laneway digging hole layout mode
CN103234403A (en) * 2013-04-24 2013-08-07 中国科学院武汉岩土力学研究所 Static blasting construction method for highway tunnel
CN105823387A (en) * 2016-02-25 2016-08-03 中铁十八局集团有限公司 Rapid construction method for deep hole blasting of vertical shaft frozen bedrock
CN106895752A (en) * 2017-02-20 2017-06-27 湖北兴发化工集团股份有限公司 A kind of stratiform phosphorite ore body tunnel deep hole sinking and blasting method
CN207095427U (en) * 2017-08-11 2018-03-13 中铁四局集团有限公司 The bilateral V-cut distributed architecture of Super-large-section tunnel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李福贤等: "大强煤矿主井井筒快速施工工艺", 《煤矿安全》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700843A (en) * 2019-11-20 2020-01-17 中铁二十局集团有限公司 Tunnel three-step synchronous excavation construction method based on partition blasting
CN111485890A (en) * 2020-04-08 2020-08-04 内蒙古金陶股份有限公司 Tunneling method of roadway
CN111485890B (en) * 2020-04-08 2022-03-15 内蒙古金陶股份有限公司 Tunneling method of roadway
CN112112657A (en) * 2020-09-25 2020-12-22 中煤第三建设(集团)有限责任公司 New construction method for digging and building inclined shaft of coal mine
CN112112657B (en) * 2020-09-25 2022-04-19 中煤第三建设(集团)有限责任公司 New construction method for digging and building inclined shaft of coal mine

Similar Documents

Publication Publication Date Title
CN110331981A (en) A kind of roadway segmentation system of attack
CN104790978B (en) The tunnel ring-shaped base tunnel construction method of small interval crossings on different level
CN104564085B (en) Large section tunnel excavation comprehensive construction method under an ultra shallow underground layering part of city
CN104532818A (en) Treatment method for strip mine goaf
CN103899318B (en) The milling of medium ground tunnel is dug and supporting machinery construction
CN106089240B (en) Support System in Soft Rock Tunnels segments in a circular shape excavation supporting system and its method for protecting support
CN107975383B (en) Underground chamber tee T intersection excavation supporting construction method
CN108286442A (en) Excavation method suitable for a Support System in Soft Rock Tunnels quick closure cyclization of two steps
CN104748632A (en) Underwater rock plug blasting construction method
CN103016027B (en) Tunnel or roadway excavating method under weak and broken complicated geological conditions
CN108331573A (en) The abandoned well administering method of bank
CN101915104A (en) Rock burst control method for deep tunnel excavation by adopting TBM (Tunnel Boring Machine)
CN106869936A (en) It is a kind of to be suitable to the surface mining new method of steep slope topography
CN102518470A (en) Method for preventing and controlling water by using freezing pipes in annular water intercepting tunnel
CN107489433A (en) A kind of tunnel CRD engineering methods anti-leakage structure and Antiseep method
CN106121659A (en) The narrow-bore tunnel excavation method of major urban arterial highway upper-soft lower-hard ground is worn under one
CN110905536A (en) Construction method for receiving complex stratum earth pressure shield in underground excavation tunnel
CN110374091A (en) A kind of rectangle friction pile mechanical hole building construction method
CN103470263A (en) New-level development method for open-pit metal mine
CN204327107U (en) The TBM of a kind of fragmented rock body hole section tunnels structure
CN102337893B (en) Method for processing suspension top by medium-deep hole blasting on upper and lower shoes
CN109594988A (en) A kind of big cross section soft rock tunnel excavation construction method
CN109208594A (en) Processing method, steel pile casting structure and the drilled pile of sinking steel protecting canister chance boulder
KR20160047228A (en) Cross-Section Tunnel Construction Method Using Rock Mass Quality Rating
CN110030001A (en) A kind of construction method that mountain tunnel is appeared

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191015

RJ01 Rejection of invention patent application after publication