Underground chamber tee T intersection excavation supporting construction method Download PDF

Info

Publication number
CN107975383B
CN107975383B CN201711156378.0A CN201711156378A CN107975383B CN 107975383 B CN107975383 B CN 107975383B CN 201711156378 A CN201711156378 A CN 201711156378A CN 107975383 B CN107975383 B CN 107975383B
Authority
CN
China
Prior art keywords
construction
main hole
door frame
excavation supporting
arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711156378.0A
Other languages
Chinese (zh)
Other versions
CN107975383A (en
Inventor
韩华超
赵新波
吉玉亮
孟江波
胡森映
孟丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201711156378.0A priority Critical patent/CN107975383B/en
Publication of CN107975383A publication Critical patent/CN107975383A/en
Application granted granted Critical
Publication of CN107975383B publication Critical patent/CN107975383B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • E21D11/183Supporting means for arch members, not provided for in E21D11/22

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention relates to a kind of underground chamber tee T intersection excavation supporting construction methods.The object of the present invention is to provide a kind of underground chamber tee T intersection excavation supporting construction methods that cost is relatively low, safe and reliable to shorten construction period to reduce difficulty of construction.The technical scheme is that a kind of underground chamber tee T intersection excavation supporting construction method, it is characterised in that steps are as follows: 1, the transposition section between excavation supporting working tunnel and main hole;2, the construction channel in the main hole of excavation supporting;3, the main hole of excavation supporting.The present invention is suitable for hydraulic and hydroelectric engineering, geotechnical engineering.

Description

Underground chamber tee T intersection excavation supporting construction method
Technical field
The present invention relates to a kind of underground chamber tee T intersection excavation supporting construction methods.Suitable for water conservancy and hydropower work Journey, geotechnical engineering.
Background technique
It is larger by influence on groundwater in " fourth " the font intersection engineering that the unfavorable geology region of no self-stability is arranged, it applies Work span is big, and structure is complicated, and stress is concentrated, and excavates difficult forming, and the supporting construction set-up time is long, and country rock and supporting construction are difficult Overall structure is formed to combine closely, there are larger difficulty of construction and security risks.If reserved rock pillar is excavated, due to country rock rock Body intensity is lower, and a large amount of concrete of inevitable requirement cast in situs can largely form temporary support;And most steel arch-shelf figures are not Together, steel arch-shelf processing can be faced, the problem that installation difficulty is big, the time is long;Effect of the prestress anchorage cable in weak surrounding rock is difficult to Guarantee.
Summary of the invention
The technical problem to be solved by the present invention is in view of the above problems, providing one kind, cost is relatively low, safe and reliable Underground chamber tee T intersection excavation supporting construction method shorten construction period to reduce difficulty of construction.
The technical scheme adopted by the invention is that: a kind of underground chamber tee T intersection excavation supporting construction method, It is characterized in that steps are as follows:
1, the transposition section between excavation supporting working tunnel and main hole;
Transposition section includes the horn mouth transition of working tunnel end and the branch hole positioned at branch hole and main hole intersection Door frame construction space installs steel construction door frame in the door frame construction space of branch hole;
2, the construction channel in the main hole of excavation supporting;
It axially, from the branch hole door frame construction space in main hole is excavated to apart from another side wall in main hole poor one along working tunnel A cycle operation position, excavated section are rectangle, and using several Jiong word shape steel arch-shelfs arranged along working tunnel axis direction Carry out supporting;
Continue to be excavated to main hole boundary, is formed from branch hole door frame construction space to the construction channel on main hole boundary, gone forward side by side The main hole circumferential direction steel arch-shelf construction of row construction channel roof;
3, the main hole of excavation supporting;
3.1, the Jiong word shape steel arch-shelf arch springing of Demolition Construction channel side, carries out the excavation supporting in the main hole in the side;
3.2, the Jiong word shape steel arch-shelf arch springing of the Demolition Construction channel other side, carries out the excavation supporting in the main hole in the side.
There is the steel construction door frame several Pin, every Pin individually to erect, and it is whole to be welded as one for steel construction door frame after erection Body.
The steel construction door frame has the interior arch of gateway opening shape and the outer arch of Jiong word shape, and interior arch and outer arch are through even Bar is linked to be entirety.
The excavated section of the horn mouth transition gradually becomes rectangle by gateway opening shape.
The beneficial effects of the present invention are: present invention convenience, safety carry out intersection engineering in unfavorable geological condition area Operation reduces the difficulty of construction that reserved rock pillar needs to process multiclass shaped steel arch;Subregion step-by-step construction is taken, supporting knot is convenient for Structure installation is implemented, and can reduce Stress relieving of surrounding rocks and deformation, it is therefore prevented that collapse as early as possible to the country rock formation closing disclosed is excavated Etc. safety accidents generation, it is ensured that construction personnel, equipment and engineering safety.
Detailed description of the invention
Fig. 1 is the plan view of embodiment.
Fig. 2 is the step excavation figure of embodiment.
Fig. 3 is II-II cross-sectional view of Fig. 1.
Fig. 4 is the C-C cross-sectional view of Fig. 1.
Fig. 5 is the E-E cross-sectional view of Fig. 1.
Specific embodiment
As shown in FIG. 1 to 3, it in the work progress of the present embodiment unfavorable geology underground chamber " fourth " font intersection, takes Subregion step-by-step construction is divided into Ith area, IIth area and IIIth area and carries out step excavation.
Wherein transposition section of Ith area between working tunnel 1 and main hole 2, the horn mouth transition including working tunnel end 101 and the branch hole door frame construction space 202 positioned at branch hole and main hole intersection, horn mouth transition 101 is used as I area a;Branch Hole door frame construction space 202 includes I area b and I area c, and I area b is the corresponding excavation area in 101 hole of horn mouth transition, I area c For the region at the I area edge b, for increasing 202 cross-sectional area of branch hole door frame construction space, to place steel construction door frame 3.
Excavation of 202 side of branch hole door frame construction space in II hole Qu Weizhu 2 to another lateral boundaries in main hole 2 in the present embodiment Region, IIth area includes II area a, II area b and II area c, from branch hole door frame construction space 202 to apart from main 2 abutment wall of hole only poor one The region of a cycle operation position is divided into II area a and II area b, from apart from main 2 abutment wall of hole only a poor cycle operation position to The region on main 2 boundary of hole is II area c.The excavation region in II area, main hole, two sides is IIIth area in this example.
The specific implementation of the present embodiment is as follows:
To guarantee construction safety, while considering horn mouth construction technology, advanced tubule, system are cooperated using shaped steel arch Anchor pole, reinforced mesh, gunite concrete reinforced supporting scheme, when construction takes " weak blast, short drilling depth, strong supporting " scheme It organizes and implements.
(1) transposition section between excavation supporting working tunnel 1 and main hole 2 (Ith area), sequence of excavation are followed successively by I area a, I area b With I area c.
I area's a excavated section fades to rectangle by gateway opening shape identical with 1 excavated section profile of working tunnel, close to Ith area Ductule layout angle in appropriate adjustment is answered when last ring ductule is constructed at b, makes to be located at ductule between the excavation area of I area b Advance support within the scope of.
I area's b, c excavated section is rectangle, and excavation length can be according to construction experience appropriate adjustment, to be able to satisfy installation steel knot The minimum space of structure door frame.I working cycles of area b, c mono- can be completed, and I area b is Blasting Excavation, I area c using pneumatic pick sled It digs.
Implement interim steel arch-shelf as early as possible after the completion of excavating, then 3 Pin install steel knot in branch hole door frame construction space 202 Structure door frame 3 (HW200x200 door frame), the every Pin of steel construction door frame 3 are individually erected, and door frame is welded as a whole after erection.
As shown in figure 4, steel construction door frame 3 has an interior arch of gateway opening shape and the outer arch of Jiong word shape, interior arch and outer Arch is linked to be entirety through connecting rod.
(2) in the main hole 2 of excavation supporting branch hole door frame construction space 202 arrive another lateral boundaries in main hole 2 construction channel 201 (IIth area), to form the excavation construction face for excavating main hole 2 on construction 201 two sides conduit wall of channel, sequence of excavation is followed successively by II Area a, II area b and II area c.
II area's a, b excavated section is rectangle, and II area b of Bing is used along 1 axis direction frame of working tunnel as early as possible after excavating Vertical several Jiong word shape steel arch-shelfs 4 carry out supporting (see Fig. 5), spray anchor, advanced tubule.
After the completion of II area c is excavated and the main hole circumferential direction steel arch-shelf 5 of II area's vault of progress is constructed, main 2 axis of hole of then constructing Advanced tubule in III area's span scope of direction.
(3) the main hole 2 (IIIth area) of excavation supporting.
It selects the unilateral side in IIth area to carry out excavation operation, first removes the arch springing of Jiong word shape steel arch-shelf 4 within the scope of the side excavation face 401, the excavation in the main hole 2 of city-gate section of the side is carried out, steel arch-shelf is erected;Main hole gateway opening~shape of a hoof transition is opened It digs, erects steel arch-shelf.
The arch springing of Jiong word shape steel arch-shelf 4 within the scope of the side excavation face is first removed in the excavation operation for carrying out the II area other side 401, the excavation in the main hole 2 of city-gate section of the side is carried out, steel arch-shelf is erected;Main hole gateway opening~shape of a hoof transition is opened It digs, erects steel arch-shelf.
Such subregion step-by-step construction is implemented convenient for supporting construction installation, can form closing to the country rock that excavation discloses as early as possible, Reach whole stressed effect, reduces Stress relieving of surrounding rocks and deformation, it is therefore prevented that the generation of the safety accidents such as collapsing, and ensure to apply Work safety and tunnel structure safety.

Claims (4)

1. a kind of underground chamber tee T intersection excavation supporting construction method, it is characterised in that steps are as follows:
1.1, the transposition section between excavation supporting working tunnel (1) and main hole (2);
Transposition section includes the horn mouth transition (101) of working tunnel (1) end and is located at branch hole and main hole (2) intersection Branch hole door frame construction space (202) installs steel construction door frame (3) in branch hole door frame construction space (202);
1.2, the construction channel (201) of the main hole of excavation supporting (2);
It axially, from the branch hole door frame construction space (202) of main hole (2) is excavated to along working tunnel (1) another apart from main hole (2) The poor cycle operation position of side wall, excavated section is rectangle, and several using arranging along working tunnel (1) axis direction Jiong word shape steel arch-shelf (4) carries out supporting;
Continue to be excavated to main hole (2) boundary, form the construction channel (201) from branch hole door frame construction space to main hole boundary, And carry out the construction of the main hole circumferential direction steel arch-shelf (5) at the top of construction channel (201);
1.3, the main hole of excavation supporting (2);
1.3.1, Jiong word shape steel arch-shelf (4) arch springing (401) of Demolition Construction channel (201) side, carries out opening for the side main hole (2) Dig supporting;
1.3.2, Jiong word shape steel arch-shelf (4) arch springing (401) of Demolition Construction channel (201) other side, carries out the main hole in the side (2) Excavation supporting.
2. underground chamber tee T according to claim 1 intersection excavation supporting construction method, it is characterised in that: described There is steel construction door frame (3) several Pin, every Pin individually to erect, and steel construction door frame (3) is welded as a whole after erection.
3. underground chamber tee T according to claim 1 or 2 intersection excavation supporting construction method, it is characterised in that: The steel construction door frame (3) has the interior arch of gateway opening shape and the outer arch of Jiong word shape, and interior arch connects with outer arch through connecting rod It is integral.
4. underground chamber tee T according to claim 1 intersection excavation supporting construction method, it is characterised in that: described The excavated section of horn mouth transition (101) gradually becomes rectangle by gateway opening shape.
CN201711156378.0A 2017-11-20 2017-11-20 Underground chamber tee T intersection excavation supporting construction method Active CN107975383B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711156378.0A CN107975383B (en) 2017-11-20 2017-11-20 Underground chamber tee T intersection excavation supporting construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711156378.0A CN107975383B (en) 2017-11-20 2017-11-20 Underground chamber tee T intersection excavation supporting construction method

Publications (2)

Publication Number Publication Date
CN107975383A CN107975383A (en) 2018-05-01
CN107975383B true CN107975383B (en) 2019-11-08

Family

ID=62010362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711156378.0A Active CN107975383B (en) 2017-11-20 2017-11-20 Underground chamber tee T intersection excavation supporting construction method

Country Status (1)

Country Link
CN (1) CN107975383B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108798731B (en) * 2018-05-31 2019-09-10 河南焦煤能源有限公司 A kind of coal road T-shaped mouth laneway support method
CN109404004B (en) * 2018-11-30 2024-02-20 中铁隧道集团二处有限公司 Cave for assembling in tunnel of pipe jacking machine and construction method of cave
CN110617091B (en) * 2019-10-29 2021-01-15 中铁十七局集团城市建设有限公司 Construction method of special-shaped steel arch frame at intersection of existing cavern
CN112576259B (en) * 2020-12-14 2022-04-15 中铁二院工程集团有限责任公司 Main body auxiliary construction method and structure for station by arch cover method
CN112576260B (en) * 2020-12-14 2022-04-22 中铁二院工程集团有限责任公司 Arch cover method tunnel entering construction method and arch cover method tunnel entering supporting structure
CN113586079B (en) * 2021-08-24 2024-02-13 中国电建集团中南勘测设计研究院有限公司 Tunnel cross intersection structure and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011032684A (en) * 2009-07-30 2011-02-17 Ohbayashi Corp Lining structure and lining method
JP2013129985A (en) * 2011-12-21 2013-07-04 Hikari Keikaku Sekkei Jimusyo Co Ltd Seismic strengthening method with reinforced inner lining of tunnel
CN103470275A (en) * 2013-10-16 2013-12-25 中国水利水电第十四工程局有限公司 Method for excavating and supporting large-span level-crossing fork of underground chamber
CN204312096U (en) * 2014-12-13 2015-05-06 中铁二十局集团第二工程有限公司 The braced structures of intersection between a kind of tunnel transverse passage-way and main hole
CN107130969A (en) * 2017-07-11 2017-09-05 北京市政建设集团有限责任公司 A kind of inclined shaft and main hole intersection substep Enlargement excavation method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011032684A (en) * 2009-07-30 2011-02-17 Ohbayashi Corp Lining structure and lining method
JP2013129985A (en) * 2011-12-21 2013-07-04 Hikari Keikaku Sekkei Jimusyo Co Ltd Seismic strengthening method with reinforced inner lining of tunnel
CN103470275A (en) * 2013-10-16 2013-12-25 中国水利水电第十四工程局有限公司 Method for excavating and supporting large-span level-crossing fork of underground chamber
CN204312096U (en) * 2014-12-13 2015-05-06 中铁二十局集团第二工程有限公司 The braced structures of intersection between a kind of tunnel transverse passage-way and main hole
CN107130969A (en) * 2017-07-11 2017-09-05 北京市政建设集团有限责任公司 A kind of inclined shaft and main hole intersection substep Enlargement excavation method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
地铁隧道浅埋段斜井进正洞交叉区施工技术;张孝伟;《路基工程》;20141231(第172期);122-130 *
复杂地质条件下大断面隧洞交叉口快速开挖技术;陈锡琪;《山西建筑》;20171031;第43卷(第28期);167-170 *
西山特长隧道斜井进入正洞交叉口施工技术;王鑫;《现代隧道技术》;20110831;第48卷(第4期);180-181 *

Also Published As

Publication number Publication date
CN107975383A (en) 2018-05-01

Similar Documents

Publication Publication Date Title
CN107975383B (en) Underground chamber tee T intersection excavation supporting construction method
CN102071947B (en) Construction method for soft surrounding rock section of large-span tunnel portal
CN106869944B (en) The extra small clear-distance tunnel construction method in underground interchange intersection under complex environment
CN104047623B (en) A kind of big across cavern excavation construction method
CN103195455B (en) Weak geological environment large cross-section tunnel construction supporting system and construction method
CN108286442A (en) Excavation method suitable for a Support System in Soft Rock Tunnels quick closure cyclization of two steps
CN106014424B (en) A kind of blasting digging method for shallow overlying strata shallow-depth-excavation tunnel
CN110409461A (en) A kind of base pit stand construction based on assembled large-diameter tubular pile
CN104653187B (en) Method for excavating geological large-section tunnel with water-rich sand layer
CN103244133B (en) The milling of coal measure strata tunnel is dug and is combined construction with explosion
CN104806267A (en) Shield end socket reinforcing system of scree soil layer advance large pipe roof and construction method thereof
CN109209392A (en) Loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel
CN110318762A (en) Advanced support method in hole at shallow buried covered excavation unsymmetrial loading tunnel roof fall
CN106555593B (en) A kind of big cross section soft rock tunnel is got out of a predicament or an embarrassing situation the construction method of excavation synchronous with inverted arch
CN107620600A (en) A kind of MJS engineering methods and pipe-roof method combined supporting big cross section small interval tunneling engineering method
CN104632227B (en) Subway station excavation technology of single-layer beam arch structure
CN108952732A (en) A kind of excavation construction method suitable for rich water fault belt large cross-section tunnel
CN110242305A (en) A kind of inclined shaft applies the construction technique in main hole into single side heading method
CN102817621B (en) Comprehensive construction method applicable to controlling arch basement sedimentation for tunnel in unfavorable geological conditions
CN107575237A (en) A kind of subsurface excavation method is combined the construction method of construction subway station with shield method
CN104141500A (en) Hardened sand gravel stratum cavern construction method
CN105909262B (en) A kind of bored tunnel driving method
CN104131566A (en) Method for constructing basement foundation pit without horizontal braces
CN109339800A (en) A kind of Rapid Construction of Tunnels method in the connected section of bridge tunnel
CN109594995A (en) A kind of Support System in Soft Rock Tunnels micro-disturbance machinery branch driving engineering method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant