CN110329676A - A kind of smart city dustbin load monitoring method and device - Google Patents

A kind of smart city dustbin load monitoring method and device Download PDF

Info

Publication number
CN110329676A
CN110329676A CN201910617758.2A CN201910617758A CN110329676A CN 110329676 A CN110329676 A CN 110329676A CN 201910617758 A CN201910617758 A CN 201910617758A CN 110329676 A CN110329676 A CN 110329676A
Authority
CN
China
Prior art keywords
dustbin
loading
degree
data
load level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910617758.2A
Other languages
Chinese (zh)
Inventor
杨金东
刘红文
王科
聂鼎
李彦生
董涛
李维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Yunnan Power System Ltd
Original Assignee
Electric Power Research Institute of Yunnan Power System Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Yunnan Power System Ltd filed Critical Electric Power Research Institute of Yunnan Power System Ltd
Priority to CN201910617758.2A priority Critical patent/CN110329676A/en
Publication of CN110329676A publication Critical patent/CN110329676A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65FGATHERING OR REMOVAL OF DOMESTIC OR LIKE REFUSE
    • B65F1/00Refuse receptacles; Accessories therefor
    • B65F1/14Other constructional features; Accessories
    • B65F1/1484Other constructional features; Accessories relating to the adaptation of receptacles to carry identification means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65FGATHERING OR REMOVAL OF DOMESTIC OR LIKE REFUSE
    • B65F2210/00Equipment of refuse receptacles
    • B65F2210/138Identification means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Refuse Collection And Transfer (AREA)

Abstract

The application discloses a kind of smart city dustbin load monitoring method and device, and the method includes obtaining the image data and dustbin specification data of the shooting of preset time point dustbin periphery camera;Image recognition is carried out to image data using training pattern, the degree of loading of dustbin is calculated according to image recognition result and dustbin specification data;The load level of dustbin is determined according to degree of loading;Determined whether to alert and alert grade according to load level.The application passes through timing acquisition dustbin periphery video monitoring data and dustbin specifications and models, monitoring dustbin degree of loading in real time, and according to dustbin degree of loading is monitored, alerted in various degree, reminds environmental sanitation responsible department or person liable's reasonable arrangement garbage collection follow-up work in real time.And then can solve by regular timed collection rubbish, it is caused to collect overload rubbish in time, or the problem of frequently collect unloaded, underloading rubbish, improve garbage truck utilization efficiency, avoid the wasting of resources.

Description

A kind of smart city dustbin load monitoring method and device
Technical field
This application involves municipal environmental sanitation garbage collection administrative skill field, in particular to a kind of smart city dustbin load Monitoring method and device.
Background technique
The monitoring of China's municipal refuse bucket degree of loading, does not use advanced technological means, the load condition of dustbin cannot Effective monitoring.Environmental sanitation department easily causes rubbish to overload according only to periodically recycling rubbish is estimated rubbish in advance, but without Arrange garbage collection work.Or the period collects rubbish to garbage truck according to schedule, but due to the underloading of rubbish point rubbish along the line or empty It carries, causes the low wasting of resources of garbage truck utilization efficiency.
Summary of the invention
The application's is designed to provide a kind of smart city dustbin load monitoring method, negative to solve current dustbin Lotus monitors improper the problem of leading to low garbage truck utilization efficiency, the wasting of resources.
On the one hand, according to an embodiment of the present application, a kind of smart city dustbin load monitoring method is provided, comprising:
Obtain the image data and dustbin specification data of the shooting of preset time point dustbin periphery camera;
Image recognition is carried out to the image data using training pattern, is advised according to image recognition result and the dustbin Lattice data calculate the degree of loading of the dustbin;
The load level of the dustbin is determined according to the degree of loading;
Determined whether to alert and alert grade according to the load level.
Further, the step of load level that the dustbin is determined according to degree of loading, comprising:
When the degree of loading is less than or equal to 30%, the load level of the dustbin is underloading;
When the degree of loading is greater than 30% and is less than or equal to 80%, the load level of the dustbin is normal;
When the degree of loading is greater than or equal to 80% and is less than or equal to 100%, the load level of the dustbin is Heavy duty;
When the degree of loading is greater than 100%, the load level of the dustbin is overload.
It is further, described that the step of alerting and alerting grade is determined whether according to load level, comprising:
When the load level is underloading or is normal, do not alert;
When the load level is that when overloaded, alarm grade is heavy duty alarm;
When the load level is overload, alarm grade is overload alarm.
Further, the alarm mode include short message push, intelligent sound calling, mobile terminal application prompts and/ Or website pushed information.
Further, the method also includes:
Extract the image data and the corresponding degree of loading of the influence data;
The image data and the audit data for influencing the corresponding degree of loading of data after acquisition manual examination and verification;
The training audit data, obtain training pattern;
Update the training pattern.
Further, the method also includes:
Preliminary treatment is carried out to the image data.
On the other hand, according to an embodiment of the present application, a kind of smart city dustbin load monitoring device is provided, is wrapped It includes:
First acquisition unit, for obtaining the image data and dustbin of the shooting of preset time point dustbin periphery camera Specification data;
Image recognition and computing unit, for carrying out image recognition to the image data using training pattern, according to figure As recognition result and the dustbin specification data, the degree of loading of the dustbin is calculated;
Load level determination unit, for determining the load level of the dustbin according to the degree of loading;
Alarm Unit alerts and alerts grade for determining whether according to the load level.
Further, described device further include:
Extraction unit, for extracting the image data and the corresponding degree of loading of the influence data;
Second acquisition unit, for obtaining the image data and the corresponding degree of loading of the influence data after manual examination and verification Audit data;
Training unit obtains training pattern for training the audit data;
Updating unit, for updating the training pattern.
Further, described device further include:
Preliminary treatment unit, for carrying out preliminary treatment to the image data.
From the above technical scheme, the embodiment of the present application provides a kind of smart city dustbin load monitoring method and dress It sets, which comprises obtain the image data and dustbin specification data of the shooting of preset time point dustbin periphery camera; Image recognition is carried out to the image data using training pattern, according to image recognition result and the dustbin specification data, Calculate the degree of loading of the dustbin;The load level of the dustbin is determined according to the degree of loading;According to described load etc. Grade determines whether to alert and alert grade.The application passes through timing acquisition dustbin periphery video monitoring data and dustbin specification Model data monitors the dustbin load of machinery systems in real time, and can carry out different degrees of announcement according to dustbin degree of loading is monitored It is alert, environmental sanitation responsible department or person liable's reasonable arrangement garbage collection follow-up work are reminded in real time.And then it can solve by periodically timing Rubbish is collected, it is caused to collect overload rubbish in time, or frequently collect zero load, be lightly loaded the problem of rubbish, improve garbage truck Utilization efficiency avoids the wasting of resources.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the application Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is the flow chart that a kind of smart city dustbin load monitoring method is shown according to the embodiment of the present application;
Fig. 2 is the structural block diagram that a kind of smart city dustbin load monitoring device is shown according to the embodiment of the present application.
Specific embodiment
Refering to fig. 1, the embodiment of the present application provides a kind of smart city dustbin load monitoring method, comprising:
Step S1, the image data and dustbin specification data of the shooting of preset time point dustbin periphery camera are obtained;
The image data of each time point is recorded by camera, image data includes the photo of dustbin, and image is adopted Sample transmission can once be transferred to backstage in every ten minutes or 15 minutes, and image data can also include rubbish impressions and dispensing Amount.
Step S2, image recognition is carried out to the image data using training pattern, according to image recognition result and described Dustbin specification data calculates the degree of loading of the dustbin;
It estimates dustbin is loaded with how many quantity of refuse in conjunction with the specification data of dustbin by image recognition, calculates rubbish Bucket degree of loading.
Optionally, main to monitor dustbin inner case inside camera radiation dustbin.
Optionally, dustbin inner wall is built-in or outer installing (by inlay or bonding method) pressure of placing bar shaped passes Sensor, and including the setting of dustbin height.It is comparable to accurately calculate dustbin according to pre-set dustbin radius Residual capacity.
Its calculation formula is as follows: Li=π * r2*(H-Hi)
L in formulaiFor the dustbin residual capacity at the i-th moment, r is dustbin radius, and H is the height of dustbin, HiFor rubbish The load at the i-th moment of bucket.
Step S3, the load level of the dustbin is determined according to the degree of loading;
Specifically, the step of load level that the dustbin is determined according to degree of loading, comprising:
When the degree of loading is less than or equal to 30%, the load level of the dustbin is underloading;
When the degree of loading is greater than 30% and is less than or equal to 80%, the load level of the dustbin is normal;
When the degree of loading is greater than or equal to 80% and is less than or equal to 100%, the load level of the dustbin is Heavy duty;
When the degree of loading is greater than 100%, the load level of the dustbin is overload.
Step S4, determined whether to alert and alert grade according to the load level.
It is further, described that the step of alerting and alerting grade is determined whether according to load level, comprising:
When the load level is underloading or is normal, do not alert;
When the load level is that when overloaded, alarm grade is heavy duty alarm;
When the load level is overload, alarm grade is overload alarm.
From the above technical scheme, the application is advised by timing acquisition dustbin periphery video monitoring data and dustbin Lattice number monitors the dustbin load of machinery systems in real time, and can carry out different degrees of announcement according to dustbin degree of loading is monitored It is alert, environmental sanitation responsible department or person liable's reasonable arrangement garbage collection follow-up work are reminded in real time.And then it can solve by periodically timing Rubbish is collected, it is caused to collect overload rubbish in time, or frequently collect zero load, be lightly loaded the problem of rubbish, improve garbage truck Utilization efficiency avoids the wasting of resources.
Further, the alarm mode include short message push, intelligent sound calling, mobile terminal application prompts and/ Or website pushed information.A variety of alarm modes remind environmental sanitation responsible department or the subsequent work of person liable's reasonable arrangement garbage collection in real time Make.
Further, method provided by the present application needs to regularly schedule business personnel and identifies to the picture of intelligent decision Audit, therefore, the method also includes:
Extract the image data and the corresponding degree of loading of the influence data;
The application extracts part intelligent decision picture recognition at random as a result, i.e. partial image data and its corresponding load Degree, manual examination and verification, which are mainly staff, abandons processing to partial error picture or the higher image of the distortion factor, it is remaining just True picture and result are audit data.
The image data and the audit data for influencing the corresponding degree of loading of data after acquisition manual examination and verification;
The training audit data, obtain training pattern;
Update the training pattern.
It regularly schedules business personnel and identification audit is carried out to the picture of intelligent decision, help to improve the correct of picture recognition Rate.
Further, the method also includes:
Preliminary treatment is carried out to the image data.
The application needs the image data to acquisition, especially photo, carries out preliminary treatment, the purpose of preliminary treatment is to keep away Exempt from abnormal data and unqualified data to background transfer, occupies communication channel, increase and calculate pressure.Preliminary treatment can be by working Personnel complete, and can also delete the picture apparently without dustbin feature by carrying out simple scanning identification to picture to equipment.
Referring to Fig.2, the embodiment of the present application provides a kind of smart city dustbin load monitoring device, comprising:
First acquisition unit 101, for obtaining the image data and rubbish of the shooting of preset time point dustbin periphery camera Rubbish bucket specification data;
Image recognition and computing unit 102, for carrying out image recognition to the image data using training pattern, according to Image recognition result and the dustbin specification data, calculate the degree of loading of the dustbin;
Load level determination unit 103, for determining the load level of the dustbin according to the degree of loading;
Alarm Unit 104 alerts and alerts grade for determining whether according to the load level.
Further, described device further include:
Extraction unit, for extracting the image data and the corresponding degree of loading of the influence data;
Second acquisition unit, for obtaining the image data and the corresponding degree of loading of the influence data after manual examination and verification Audit data;
Training unit obtains training pattern for training the audit data;
Updating unit, for updating the training pattern.
Further, described device further include:
Preliminary treatment unit, for carrying out preliminary treatment to the image data.
From the above technical scheme, the embodiment of the present application provides a kind of smart city dustbin load monitoring method and dress It sets, which comprises obtain the image data and dustbin specification data of the shooting of preset time point dustbin periphery camera; Image recognition is carried out to the image data using training pattern, according to image recognition result and the dustbin specification data, Calculate the degree of loading of the dustbin;The load level of the dustbin is determined according to the degree of loading;According to described load etc. Grade determines whether to alert and alert grade.The application passes through timing acquisition dustbin periphery video monitoring data and dustbin specification Model data monitors the dustbin load of machinery systems in real time, and can carry out different degrees of announcement according to dustbin degree of loading is monitored It is alert, environmental sanitation responsible department or person liable's reasonable arrangement garbage collection follow-up work are reminded in real time.And then it can solve by periodically timing Rubbish is collected, it is caused to collect overload rubbish in time, or frequently collect zero load, be lightly loaded the problem of rubbish, improve garbage truck Utilization efficiency avoids the wasting of resources.
Those skilled in the art will readily occur to its of the application after considering specification and practicing application disclosed herein Its embodiment.This application is intended to cover any variations, uses, or adaptations of the application, these modifications, purposes or Person's adaptive change follows the general principle of the application and including the undocumented common knowledge in the art of the application Or conventional techniques.The description and examples are only to be considered as illustrative, and the true scope and spirit of the application are by following Claim is pointed out.
It should be understood that the application is not limited to the precise structure that has been described above and shown in the drawings, and And various modifications and changes may be made without departing from the scope thereof.Scope of the present application is only limited by the accompanying claims.

Claims (9)

1. a kind of smart city dustbin load monitoring method characterized by comprising
Obtain the image data and dustbin specification data of the shooting of preset time point dustbin periphery camera;
Image recognition is carried out to the image data using training pattern, according to image recognition result and the dustbin specification number According to calculating the degree of loading of the dustbin;
The load level of the dustbin is determined according to the degree of loading;
Determined whether to alert and alert grade according to the load level.
2. the method according to claim 1, wherein the load etc. for determining the dustbin according to degree of loading The step of grade, comprising:
When the degree of loading is less than or equal to 30%, the load level of the dustbin is underloading;
When the degree of loading is greater than 30% and is less than or equal to 80%, the load level of the dustbin is normal;
When the degree of loading is greater than or equal to 80% and is less than or equal to 100%, the load level of the dustbin is heavy duty;
When the degree of loading is greater than 100%, the load level of the dustbin is overload.
3. according to the method described in claim 2, it is characterized in that, described determine whether to alert and alert etc. according to load level The step of grade, comprising:
When the load level is underloading or is normal, do not alert;
When the load level is that when overloaded, alarm grade is heavy duty alarm;
When the load level is overload, alarm grade is overload alarm.
4. intelligent sound is exhaled the method according to claim 1, wherein the alarm mode includes short message push It cries, mobile terminal application prompts and/or website pushed information.
5. the method according to claim 1, wherein further include:
Extract the image data and the corresponding degree of loading of the influence data;
The image data and the audit data for influencing the corresponding degree of loading of data after acquisition manual examination and verification;
The training audit data, obtain training pattern;
Update the training pattern.
6. the method according to claim 1, wherein further include:
Preliminary treatment is carried out to the image data.
7. a kind of smart city dustbin load monitoring device characterized by comprising
First acquisition unit, for obtaining the image data and dustbin specification of the shooting of preset time point dustbin periphery camera Data;
Image recognition and computing unit are known for carrying out image recognition to the image data using training pattern according to image Other result and the dustbin specification data, calculate the degree of loading of the dustbin;
Load level determination unit, for determining the load level of the dustbin according to the degree of loading;
Alarm Unit alerts and alerts grade for determining whether according to the load level.
8. device according to claim 7, which is characterized in that further include:
Extraction unit, for extracting the image data and the corresponding degree of loading of the influence data;
Second acquisition unit, for obtaining after manual examination and verification the image data and described influencing examining for the corresponding degree of loading of data Nuclear Data;
Training unit obtains training pattern for training the audit data;
Updating unit, for updating the training pattern.
9. device according to claim 7, which is characterized in that further include:
Preliminary treatment unit, for carrying out preliminary treatment to the image data.
CN201910617758.2A 2019-07-10 2019-07-10 A kind of smart city dustbin load monitoring method and device Pending CN110329676A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910617758.2A CN110329676A (en) 2019-07-10 2019-07-10 A kind of smart city dustbin load monitoring method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910617758.2A CN110329676A (en) 2019-07-10 2019-07-10 A kind of smart city dustbin load monitoring method and device

Publications (1)

Publication Number Publication Date
CN110329676A true CN110329676A (en) 2019-10-15

Family

ID=68144925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910617758.2A Pending CN110329676A (en) 2019-07-10 2019-07-10 A kind of smart city dustbin load monitoring method and device

Country Status (1)

Country Link
CN (1) CN110329676A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207192043U (en) * 2017-09-18 2018-04-06 广东瀚蓝生物环保科技有限公司 Intelligent garbage bin
CN108001898A (en) * 2018-01-12 2018-05-08 安徽理工大学 One kind is based on Internet of Things intelligent classification garbage container
US20190019167A1 (en) * 2016-07-13 2019-01-17 GreenQ Ltd. Device, system and method for the monitoring, control and optimization of a waste pickup service
CN109389161A (en) * 2018-09-28 2019-02-26 广州大学 Rubbish identification evolutionary learning method, apparatus, system and medium based on deep learning
CN109867059A (en) * 2019-03-29 2019-06-11 克拉玛依市诚谊科技服务有限公司 Garbage classification intelligence jettison system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20190019167A1 (en) * 2016-07-13 2019-01-17 GreenQ Ltd. Device, system and method for the monitoring, control and optimization of a waste pickup service
CN207192043U (en) * 2017-09-18 2018-04-06 广东瀚蓝生物环保科技有限公司 Intelligent garbage bin
CN108001898A (en) * 2018-01-12 2018-05-08 安徽理工大学 One kind is based on Internet of Things intelligent classification garbage container
CN109389161A (en) * 2018-09-28 2019-02-26 广州大学 Rubbish identification evolutionary learning method, apparatus, system and medium based on deep learning
CN109867059A (en) * 2019-03-29 2019-06-11 克拉玛依市诚谊科技服务有限公司 Garbage classification intelligence jettison system

Similar Documents

Publication Publication Date Title
CN105947476B (en) Dustbin intelligent monitor method based on image recognition
KR101401037B1 (en) System for managing food waste
CN109343502A (en) A kind of dustbin supervisory systems and method
CN105960653A (en) Method of determining resource usage information for a facility, data collection device, data collection system and data collection method
CN110087193A (en) Information uploading method, device, electronic equipment and the readable storage medium storing program for executing of dustbin
CN110633638A (en) Garbage collection and transportation supervision method and device, storage medium and intelligent equipment
CN104717674A (en) Number attribute recognition method and device, terminal and server
CN106022980A (en) Garbage dumping and recycling system
CN109829592B (en) Loss prediction method, device, equipment and storage medium for express cabinet users
CN105955118A (en) Garbage dumping and recycling system
CN102056351A (en) Push service system and method
CN111942207A (en) Electric automobile intelligent charging management system based on big data
CN110329676A (en) A kind of smart city dustbin load monitoring method and device
CN110427838A (en) A kind of rubbish method for cleaning, computer equipment and readable storage medium storing program for executing
CN107181601B (en) Flow reminding method and device
CN105576752A (en) Charging remind method of intelligent terminal and intelligent terminal
CN107844884B (en) Early warning information processing method and network equipment
CN112446803A (en) Monitoring system, monitoring method, monitoring device, and monitoring medium
CN113222082B (en) Intelligent garbage station management and control method, system, device and storage medium
CN208570115U (en) A kind of clinical waste online monitoring and management system
CN116477233A (en) Classification metering system and method for garbage transfer station
CN105931137A (en) Method and device for determining barrelled water delivery quantity
CN109740581A (en) A kind of intelligent garbage, which is collected, monitors system with scene
CN114971456A (en) Cloud storage intelligent management method for dangerous waste
CN113870989B (en) Medical waste management method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191015

RJ01 Rejection of invention patent application after publication