CN110322224A - A kind of fragmentary project management method and system of CHINA RFTCOM Co Ltd - Google Patents

A kind of fragmentary project management method and system of CHINA RFTCOM Co Ltd Download PDF

Info

Publication number
CN110322224A
CN110322224A CN201910592196.0A CN201910592196A CN110322224A CN 110322224 A CN110322224 A CN 110322224A CN 201910592196 A CN201910592196 A CN 201910592196A CN 110322224 A CN110322224 A CN 110322224A
Authority
CN
China
Prior art keywords
work order
engineering
user
project
background server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910592196.0A
Other languages
Chinese (zh)
Inventor
许宏图
陈龙腾
潘炜炜
郑传祥
黄嘉哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Radio And Television Network Group Co Ltd
Original Assignee
Fujian Radio And Television Network Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Radio And Television Network Group Co Ltd filed Critical Fujian Radio And Television Network Group Co Ltd
Priority to CN201910592196.0A priority Critical patent/CN110322224A/en
Publication of CN110322224A publication Critical patent/CN110322224A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of fragmentary project management method and system of CHINA RFTCOM Co Ltd, method includes: to carry out user's registration, user's login, process initiation, trouble ticket dispatch, the prompt of pending work order and user information using wechat small routine or public platform to safeguard;User's registration includes: to receive operator to click the personal information inputted after corresponding registration entrance according to own identification role and complete identity registration in background server;It includes: log-on message and the display corresponding operation interface that operator is checked according to personal information registered in background server that user, which logs in,;Trouble ticket dispatch successively circulates the work order after process initiation according to default approval process;Pending work order prompt includes: to prompt related personnel in such a way that message pushes after the work order for receiving circulation.The present invention is able to solve fragmentary engineering project approval process and executes by time and space restricted problem, it is ensured that project examination process can be promoted and be watched whenever and wherever possible, realize that execution efficiency improves and links up cost and reduces.

Description

A kind of fragmentary project management method and system of CHINA RFTCOM Co Ltd
Technical field
The present invention relates to the fragmentary project management technique field of CHINA RFTCOM Co Ltd more particularly to a kind of fragmentary engineering items of CHINA RFTCOM Co Ltd Mesh management method and system.
Background technique
With the continuous propulsion of " triple play " process, CHINA RFTCOM Co Ltd market competition is increasingly fierce, and exactly operator uses The power of chaotic state seizes the period of user, develops new user by quality services, keeps old user, is working as each operator It is engaged in anxious.I.e. intra-company will accomplish: in addition to " how building " carried out, should also focus on " how managing ".
In the fragmentary engineering construction of CHINA RFTCOM Co Ltd at present, management, in the actual operation that personnel, process, resource, tool combine In, control ability is not high, and resource allocation is unreasonable, specific manifestation such as: the relevant personnel need to be across multidisciplinary, polyphyly before and after engineering construction System examined, worksheet processing, the work such as examination, and the paperyization circulation of engineering list is on the high side, and working efficiency is not high, and process cycle is big It is big to extend, often there is the case where engineering cost excesses budget;Parent company does to whether branch company has according to fragmentary engineering management The regulation of method executes, and project progress locating for a large amount of fragmentary engineerings etc. can not be learnt in time, can not carry out accurate engineering and examine Core and supervision effectively can not manage and improve project progress.
In order to realize whole, the comprehensive management to engineering construction, the fine degree and the efficiency of management of management are promoted, one A little personnel propose a kind of project management cloud Internet-based as disclosed in the patent document of Publication No. CN106169131A Plateform system, comprising: management system, for the personnel of supervision control engineering project, material, data;Problem pending accounts supervise and manage system, For recording on-the-spot make an inspection tour in supervision process, examination, other the problem of finding in the process of standing;GPS working trajectory inquiry system, is used for Supervisor present position is inquired, and its working trajectory is uploaded into data automatic archiving system;With data automatic archiving system, For achieving input involved in each system included in the project management cloud platform system and each module automatically, exporting number According to.The management system includes at least following module: supervision module, sidegating effect module, and management is checked and accepted module, seen Card sampling and inspection module, management logging modle, management logging modle.With computerization, electronization instead of paper Part, but system can only effectively supervise management, can not confirm whether branch company has and do according to fragmentary engineering management The regulation of method executes, and can not further speed up the circulation examination & approval of engineering list in engineering project, can not supervise in engineering except management work Project process other than work.
Summary of the invention
The technical problem to be solved by the present invention is in view of the above shortcomings of the prior art, provide one kind to be able to solve fragmentary work Journey project examination process is executed by time and space restricted problem, it is ensured that project examination process can promote whenever and wherever possible, and progress is at any time It can be viewed everywhere, the CHINA RFTCOM Co Ltd for realizing that fragmentary engineering project approval process execution efficiency improves and communication cost reduces is fragmentary Project management method and system.
To achieve the goals above, the technical solution adopted by the present invention are as follows:
A kind of fragmentary project management method of CHINA RFTCOM Co Ltd, method include:
User's registration is carried out using wechat small routine or public platform, user's login, process initiation, trouble ticket dispatch, pending work order mention Show and user information is safeguarded;
The user's registration includes: to receive operator to be believed according to the individual inputted after the corresponding registration entrance of own identification role click It ceases and completes identity registration in background server, the identity role includes that grid manager, Town responsible person, engineering department are responsible People is in charge of vice president, maintenance department responsible person and spread superintendent;
It includes: the log-on message that operator is checked according to personal information registered in background server that the user, which logs in, when When log-on message is consistent with a certain personal information, operation interface corresponding with the identity role that the personal information matches is shown;
The process is initiated to be shown in the operation interface that grid is handled, comprising: receives grid manager and clicks the corresponding interior of input Hold item and form work order, the respective content item includes but is not limited to job location, the construction origin of an incident, photo site, estimated project amount And remarks;
The trouble ticket dispatch includes: to audit after process initiation according to Town responsible person audit, engineering department responsible person, be in charge of pair Total examination & approval, maintenance department's responsible person's worksheet processing, spread superintendent's order, spread superintendent's receipt and grid manager's examination approval process according to The secondary circulation work order, to improve or update the work order;
The pending work order prompt includes: to show pending work by message push or operation interface after the work order for receiving circulation The mode on single task column prompts related personnel to handle pending work order;
User information maintenance includes: to receive the request of the inquiry of operator's personal information, password modification and Account Closure simultaneously Response.
By using wechat small routine or public platform carry out user's registration, user's login, process initiation, trouble ticket dispatch, to Work order prompt and user information maintenance are done, solves the disadvantage that the no data of current short message, Advise By Wire examination & approval and circulation saves End solves currently with the time and space limitation in paper transmitting or the examination & approval of the end PC, realizes approval distributing anywhere or anytime, And work order and message arrival rate 100%, related personnel can be facilitated to handle pending work order and control project progress in time, be conducive to Greatly improve engineering efficiency and the cost payout for being effectively reduced engineering various aspects.
Further, method further include:
Personal management is carried out using the end PC;
The personal management includes: the newly-increased or modification personal information for receiving operator and the request and the response that reset password. When facilitating personnel's replacement or identity changing role, system can make and be adjusted flexibly.
Further, method further include:
Authority distribution is carried out using the end PC;
The authority distribution includes: to receive the adjustment of identity respective operations permission and the adjustment of trouble ticket dispatch approval process of operator Request and response.Facilitate the optimization of the identity corresponding operating right and trouble ticket dispatch approval process of system change operator;
Further, method further include:
Engineering statistics are carried out using the end PC;
The engineering statistics include: according to project amount, the work for selecting branch company in work order content statistics operator's seclected time period Cheng Jindu, completion situation and acceptance of work situation.
Further, method further include:
Material logistics are carried out using the end PC;
The material logistics include: according to the perhaps data management shipment object and shipment amount of engineering statistics in work order.
Further, the project amount of the engineering statistics includes estimated project amount and the finished construction quantity in work order, described Engineering statistics further include the comparison matching of project amount and finished construction quantity on the estimation, judge whether engineering is overspend, if over-expense, Statistics over-expense quantity and the amount of money.
By engineering statistics, solves the engineering examination of Xia Neige branch company, obtain project amount, the work in seclected time period Cheng Jindu, the completion data such as situation and the acceptance of work, can be used as examination standard, rationally manage project progress, promote fragmentary engineering Construction;Such as counted by project amount, it examines the project amount of Xia Neige branch company within a certain period of time, reasonably controls it Engineering cost promotes the clearing of fragmentary engineering.
By material logistics, the control of each fragmentary engineering material shipment amount and shipment object, or each point of public affairs are realized The supervision for taking charge of the shipment amount of certain time is conducive to tracing to the source for material consumption, convenient for parent company, city strength imparting material consumption supervision, With do Project Cost Control analysis.
A kind of fragmentary project management system of CHINA RFTCOM Co Ltd, system include mobile terminal and background server, the shifting Dynamic terminal is used to carry out user's registration, Yong Hudeng using wechat small routine or public platform and the background server data interaction Record, process initiation, trouble ticket dispatch, the prompt of pending work order and user information maintenance;The wechat small routine or public platform include:
User registration module, for showing the corresponding registration entrance of identity role, for receiving operator according to own identification angle Color dot hits the personal information inputted after corresponding registration entrance and the personal information is sent to the background server progress Identity registration is checked and completed to people's information, the identity role include grid manager, Town responsible person, engineering department responsible person, It is in charge of vice president, maintenance department responsible person and spread superintendent;
User log-in block, for receiving the log-on message of operator, is used for the log-on message for showing logentry It is sent to the background server, so that the background server is believed according to the login that registered personal information checks operator Breath is also used to after background server verification log-on message is consistent with a certain personal information, display and the personal information phase The corresponding operation interface of matched identity role;
Trouble ticket dispatch module, for according to the corresponding identity role of current log-on message and Town responsible person audit, engineering department Vice president's examination & approval, maintenance department's responsible person's worksheet processing, spread superintendent's order, spread superintendent's receipt and grid warp are in charge of in responsible person's audit The approval process checked and accepted is managed, the work order after circulating respective handling to the operation interface of respective identity role;
Pending work order cue module shows pending work order by message push or operation interface after the work order for receiving circulation The mode of taskbar prompts related personnel to handle pending work order;
User information maintenance module, the request Concurrency for receiving the inquiry of operator's personal information, password modification and Account Closure are sent To the background server, so that background server makes a response.
Further, the logentry is multiple, respectively corresponds multiple identity roles, the corresponding behaviour of each identity role Make the examination & approval progress that corresponding work order is shown in interface.
Further, system further includes computer, and the computer includes:
Personal management module, for receive the newly-increased of operator or modification personal information and reset the request Concurrency of password send to The background server, so that background server makes a response;
Authority distribution module, the identity respective operations permission for receiving operator adjusts and the adjustment of trouble ticket dispatch approval process Request Concurrency send to the background server, change the user log-in block after making a response so as to background server and show Operation interface and the trouble ticket dispatch module approval process;
Engineering statistics module, for according to project amount, the work for selecting branch company in work order content statistics operator's seclected time period Cheng Jindu, completion situation and acceptance of work situation;
Material logistics module, for the engineering statistics data management shipment object and shipment amount according to the engineering statistics module.
Further, the engineering statistics module includes project amount over-expense display unit: the estimated engineering for that will count Amount is compared with finished construction quantity to be matched, and judges whether engineering is overspend, if over-expense, is counted over-expense quantity and the amount of money and is shown Show.
After adopting the above technical scheme, the beneficial effects of the present invention are:
1, system positioning is clear.Based on entire CHINA RFTCOM Co Ltd is served, it is bonded the fragmentary feature of CHINA RFTCOM Co Ltd and individually carries out Adaptability design;
2, examination & approval efficiency is obviously improved.Online fragmentary engineering examination & approval are released based on wechat small routine or public platform, are solved from PC The time and space limitation of end examination & approval, it is ensured that project can be examined whenever and wherever possible and the progress of examining is checked, improves examination & approval efficiency.
3, accurate message push.It is pushed in conjunction with the pending work order cue module message of wechat small routine or public platform, in time Pending work order examination & approval prompt is sent, both save the cost, ensured that notification message arrival rate 100%.
4, linking up cost reduces.Typing job location and photo site in work order provide convenient and fast positioning for unit in charge of construction, Scene confirmation scene can be arrived in time and is constructed, and reduced and linked up cost.
5, project amount and cost control.By data statistics such as project amounts, examine each branch company within a certain period of time Project amount, project progress and checks and accepts situation, can reasonably programme, further control engineering cost, promote fragmentary engineering Clearing, match by the estimated project amount of work order with finished construction quantity comparison, judges whether engineering is overspend, obtain overspend item, Overspend quantity and the over-expense amount of money, investigated for reason, improve control and reduces unnecessary expenditure.
Detailed description of the invention
In order to illustrate the embodiments of the present invention more clearly or the technical solution of the prior art, attached drawing are as follows:
Fig. 1 is the fragmentary project management system block diagram of a kind of CHINA RFTCOM Co Ltd that the embodiment of the present invention 3 provides;
Fig. 2 is a kind of preferred fragmentary project management system block diagram of CHINA RFTCOM Co Ltd of the embodiment of the present invention 3.
Specific embodiment
Following is a specific embodiment of the present invention in conjunction with the accompanying drawings, technical scheme of the present invention will be further described, However, the present invention is not limited to these examples.
Embodiment 1
The present embodiment provides a kind of fragmentary project management method of CHINA RFTCOM Co Ltd, method includes:
User's registration is carried out using wechat small routine or public platform, user's login, process initiation, trouble ticket dispatch, pending work order mention Show and user information is safeguarded;
The user's registration includes: to receive operator to be believed according to the individual inputted after the corresponding registration entrance of own identification role click It ceases and completes identity registration in background server, the identity role includes at least grid manager, Town responsible person, engineering department Responsible person is in charge of vice president, maintenance department responsible person and spread superintendent, can carry out identity role's increase and decrease according to actual needs;Generally Ground, the corresponding responsibility of above-mentioned identity role are as follows: grid manager --- work order initiates, the project acceptance inspection, Town responsible person --- work Single audit, work order examination & approval, maintenance department responsible person --- work order distributes engineering department responsible person --- vice president is in charge of in work order audit --- Construction group is given, spread superintendent --- receive the work order that distributes of maintenance department responsible person and according to project construction actual conditions receipt, The project acceptance inspection of grid manager is exactly to execute after spread superintendent's receipt;
It includes: the log-on message that operator is checked according to personal information registered in background server that the user, which logs in, when When log-on message is consistent with a certain personal information, operation interface corresponding with the identity role that the personal information matches is shown, Its operation interface shown is slightly different according to the identity claim of operator after the operator of different identity role logs in, such as net The operation interface of lattice manager has process to initiate item, but the operation interface of other identity role does not have this;
The process is initiated to be shown in the operation interface that grid is handled, comprising: receives grid manager and clicks the corresponding interior of input Hold item and form work order, the respective content item includes but is not limited to job location, the construction origin of an incident, photo site, estimated project amount And remarks;The job location content of record need to be for what can be inquired and be reached by digital map navigation, and photo site is for convenient Related personnel after arrival checks scene and photo site match condition, realizes that job location quickly positions, it is contemplated that in project amount Project amount title, project amount unit of quantity and corresponding material requested detail are generally comprised, material specification includes title material, rule Lattice number, requirement unit etc.;Specific detailed content can be with reference to the paper table of the project amount statistics in existing broadcasting and TV engineering It is single;
The trouble ticket dispatch includes: to audit after process initiation according to Town responsible person audit, engineering department responsible person, be in charge of pair Total examination & approval, maintenance department's responsible person's worksheet processing, spread superintendent's order, spread superintendent's receipt and grid manager's examination approval process according to The secondary circulation work order, to improve or update the work order;Work order after i.e. process is initiated first circulates to Town responsible person Place is audited, and after audit, by auditing at Town responsible person circulation to engineering department responsible person, audit is finished Afterwards, then by engineering department responsible person circulation to being in charge of at vice president it examines, and so on, it sequentially circulates and improves work order;
The pending work order prompt includes: to show pending work by message push or operation interface after the work order for receiving circulation The mode on single task column prompts related personnel to handle pending work order;Message push is carried out using wechat small routine or public platform, Prompt related personnel has the pending work order of new circulation to need to handle;In addition, can also be after related personnel logs in, in its display Pending work order taskbar is specially set in operation interface for prompting;
User information maintenance includes: to receive the request of the inquiry of operator's personal information, password modification and Account Closure simultaneously Response.
By using wechat small routine or public platform carry out user's registration, user's login, process initiation, trouble ticket dispatch, to Work order prompt and user information maintenance are done, solves the disadvantage that the no data of current short message, Advise By Wire examination & approval and circulation saves End solves currently with the time and space limitation in paper transmitting or the examination & approval of the end PC, realizes approval distributing anywhere or anytime, And work order and message arrival rate 100%, related personnel can be facilitated to handle pending work order and control project progress in time, be conducive to Greatly improve engineering efficiency and the cost payout for being effectively reduced engineering various aspects.
Embodiment 2
Method provided in this embodiment further include:
Personal management is carried out using the end PC;
The personal management includes: the newly-increased or modification personal information for receiving operator and the request and the response that reset password. The modification that can carry out personal information and login password after response on background server, facilitates personnel's replacement or identity role to become When change, system can make and be adjusted flexibly.
Further include:
Authority distribution is carried out using the end PC;
The authority distribution includes: to receive the adjustment of identity respective operations permission and the adjustment of trouble ticket dispatch approval process of operator Request and response.On-demand tune can be made to operating right and trouble ticket dispatch approval process on background server after response It is whole, so as to the adjustment of background server database data, so that the corresponding behaviour shown eventually by wechat small routine or public platform The content for making interface makes change according to the adjustment of operator, facilitate system change operator the corresponding operating right of identity and The optimization of trouble ticket dispatch approval process.
Further include:
Engineering statistics are carried out using the end PC;
The engineering statistics include: according to project amount, the work for selecting branch company in work order content statistics operator's seclected time period Cheng Jindu, completion situation and acceptance of work situation.As each branch company's examination standard, convenient parent company, city is rationally managed respectively A project progress promotes the construction and service of fragmentary engineering.
Further include:
Material logistics are carried out using the end PC;
The material logistics include: according to the perhaps data management shipment object and shipment amount of engineering statistics in work order.It can be used for The shipment amount situation for counting shipment object this month, year, according to material in the estimated project amount of previous work order content and finished construction quantity The comparison of doses or the estimated quantity of material of engineering statistics and completion quantity of material data can analyze current engineering and may need Shipment amount, be conducive to help summarize shipment rule, adjust out reasonable material logistics scheme.
Further, the project amount of the engineering statistics includes estimated project amount and the finished construction quantity in work order, described Engineering statistics further include the comparison matching of project amount and finished construction quantity on the estimation, judge whether engineering is overspend, if over-expense, Statistics over-expense quantity and the amount of money.
By engineering statistics, solves the engineering examination of Xia Neige branch company, obtain project amount, the work in seclected time period Cheng Jindu, the completion data such as situation and the acceptance of work, can be used as examination standard, rationally manage project progress, promote fragmentary engineering Construction;Such as counted by project amount, it examines the project amount of Xia Neige branch company within a certain period of time, reasonably controls it Engineering cost promotes the clearing of fragmentary engineering.
By material logistics, the control of each fragmentary engineering material shipment amount and shipment object, or each point of public affairs are realized The supervision for taking charge of the shipment amount of certain time is conducive to tracing to the source for material consumption, convenient for parent company, city strength imparting material consumption supervision, With do Project Cost Control analysis.
Embodiment 3
As shown in Figure 1, the present embodiment provides a kind of fragmentary project management systems of CHINA RFTCOM Co Ltd, as above method embodiment Physical support, system includes mobile terminal 100 and background server, and the mobile terminal 100 is used to utilize wechat small routine Or public platform and the background server data interaction carry out user's registration, user's login, process initiation, trouble ticket dispatch, pending Work order prompt and user information maintenance, each operation can pass through click by oneself portable mobile terminal 100 per capita Downloading wechat small routine or concern wechat public platform log in realize;The wechat small routine or public platform include:
User registration module 110, for showing the corresponding registration entrance of identity role, for receiving operator according to own identification Role clicks the personal information inputted after corresponding registration entrance and the personal information is sent to the background server and carries out Identity registration is checked and completed to personal information, and the identity role includes that grid manager, Town responsible person, engineering department are responsible for People is in charge of vice president, maintenance department responsible person and spread superintendent;
User log-in block 120, for receiving the log-on message of operator, is used for the login for showing logentry Information is sent to the background server, so that the background server checks stepping on for operator according to registered personal information Information is recorded, is also used to after background server verification log-on message is consistent with a certain personal information, display is believed with the individual The corresponding operation interface of the matched identity role of manner of breathing shows that log-on message corresponds to corresponding operation circle of identity role of people The content in face, operation interface is handed down to user log-in block 120 according to the setting of database by background server, is logged in by user Module 120 is shown after login authentication success;
Trouble ticket dispatch module 130, for according to the corresponding identity role of current log-on message and Town responsible person audit, engineering Vice president's examination & approval, maintenance department's responsible person's worksheet processing, spread superintendent's order, spread superintendent's receipt and grid are in charge of in portion responsible person audit The approval process checked and accepted is handled, the work order after circulating respective handling to the operation interface of respective identity role, such as current login The corresponding identity role of information is grid manager, and corresponding work order content is that process is initiated, therefore trouble ticket dispatch module 130 can incite somebody to action Process initiates the work order to be formed and is circulated by background server into the task of Town responsible person, and passes through user log-in block 120 operation interface is shown that responsible person audits so as to Town, after Town responsible person logs in, trouble ticket dispatch mould Block 130 detects that Town responsible person audit finishes, the trouble ticket dispatch that can finish audit to engineering department responsible person, successively class It pushes away;
Pending work order cue module 140 is shown by message push or operation interface after the work order for receiving circulation pending The mode of work order taskbar prompts related personnel to handle pending work order;Pending work order cue module 140 detects trouble ticket dispatch module Whether 130 have the work order for receiving circulation, once receiving, will inform the feedback of background server and response server, hair Corresponding message pushes or shows that pending work order taskbar increases the pending work order item in operation interface out;
User information maintenance module 150 receives the request Concurrency of the inquiry of operator's personal information, password modification and Account Closure It send to the background server, so that background server makes a response.
Further, the logentry is multiple, respectively corresponds multiple identity roles, the corresponding behaviour of each identity role Make the examination & approval progress that corresponding work order is shown in interface.The correspondence work order includes work order to be processed and processed work order.
As shown in Figure 2, it is preferable that system further includes computer 200, is interacted with background server, and the computer 200 wraps It includes:
Personal management module 210, for receiving the newly-increased or modification personal information of operator and the request Concurrency for resetting password It send to the background server, so that background server makes a response;
Authority distribution module 220, the identity respective operations permission for receiving operator adjusts and trouble ticket dispatch approval process The request Concurrency of adjustment is sent to the background server, changes the user log-in block after making a response so as to background server The approval process of the operation interface of display and the trouble ticket dispatch module;
Engineering statistics module 230, for according in work order content statistics operator's seclected time period select branch company project amount, Project progress, completion situation and acceptance of work situation;
Material logistics module 240, for according to the engineering statistics data management shipment object of the engineering statistics module 230 and going out Goods amount.
Further, the engineering statistics module 230 includes that project amount overspends display unit 231: pre- for that will count Meter project amount is compared with finished construction quantity to be matched, and judges whether engineering is overspend, if over-expense, counts over-expense quantity and the amount of money And it shows.Administrative staff can be facilitated to manage over-expense situation in time, material logistics of rationally checking on, betterment works expenditure.
To sum up, this system is bonded the fragmentary feature of CHINA RFTCOM Co Ltd and individually carries out based on entire CHINA RFTCOM Co Ltd is served Adaptability design, system positioning is clear;Online fragmentary engineering project examination & approval are released based on wechat small routine or public platform, are solved The time and space limitation examined from the end PC, it is ensured that project can be examined whenever and wherever possible and the progress of examining is checked, improves examination & approval Efficiency;It is pushed in conjunction with pending 140 message of work order cue module of wechat small routine or public platform, sends pending work order examination & approval in time Prompt, both save the cost, ensured that notification message arrival rate 100%;Typing job location and photo site in work order, to apply Work order position provides easily positioning, can arrive at scene confirmation scene in time and construct, reduce and link up cost;Pass through project amount Equal data statistics examine the project amount of each branch company within a certain period of time, project progress and examination situation, can reasonably advise The scheme of drawing, further controls engineering cost, promotes the clearing of fragmentary engineering, pass through the estimated project amount and finished construction quantity of work order Comparison matching, judges whether engineering is overspend, and obtains over-expense item, over-expense quantity and the over-expense amount of money, investigates for reason, improve material Manage and reduce unnecessary expenditure.
Specific embodiment described herein is only an example for the spirit of the invention.The neck of technology belonging to the present invention The technical staff in domain can make various modifications or additions to the described embodiments or replace by a similar method In generation, however, it does not deviate from the spirit of the invention or beyond the scope of the appended claims.

Claims (10)

1. a kind of fragmentary project management method of CHINA RFTCOM Co Ltd, which is characterized in that method includes:
User's registration is carried out using wechat small routine or public platform, user's login, process initiation, trouble ticket dispatch, pending work order mention Show and user information is safeguarded;
The user's registration includes: to receive operator to be believed according to the individual inputted after the corresponding registration entrance of own identification role click It ceases and completes identity registration in background server, the identity role includes that grid manager, Town responsible person, engineering department are responsible People is in charge of vice president, maintenance department responsible person and spread superintendent;
It includes: the log-on message that operator is checked according to personal information registered in background server that the user, which logs in, when When log-on message is consistent with a certain personal information, operation interface corresponding with the identity role that the personal information matches is shown;
The process is initiated to be shown in the operation interface that grid is handled, comprising: receives grid manager and clicks the corresponding interior of input Hold item and form work order, the respective content item includes but is not limited to job location, the construction origin of an incident, photo site, estimated project amount And remarks;
The trouble ticket dispatch includes: to audit after process initiation according to Town responsible person audit, engineering department responsible person, be in charge of pair Total examination & approval, maintenance department's responsible person's worksheet processing, spread superintendent's order, spread superintendent's receipt and grid manager's examination approval process according to The secondary circulation work order, to improve or update the work order;
The pending work order prompt includes: to show pending work by message push or operation interface after the work order for receiving circulation The mode on single task column prompts related personnel to handle pending work order;
User information maintenance includes: to receive the request of the inquiry of operator's personal information, password modification and Account Closure simultaneously Response.
2. a kind of fragmentary project management method of CHINA RFTCOM Co Ltd according to claim 1, which is characterized in that method is also wrapped It includes:
Personal management is carried out using the end PC;
The personal management includes: the newly-increased or modification personal information for receiving operator and the request and the response that reset password.
3. a kind of fragmentary project management method of CHINA RFTCOM Co Ltd according to claim 1, which is characterized in that method is also wrapped It includes:
Authority distribution is carried out using the end PC;
The authority distribution includes: to receive the adjustment of identity respective operations permission and the adjustment of trouble ticket dispatch approval process of operator Request and response.
4. a kind of fragmentary project management method of CHINA RFTCOM Co Ltd according to claim 1, which is characterized in that method is also wrapped It includes:
Engineering statistics are carried out using the end PC;
The engineering statistics include: according to project amount, the work for selecting branch company in work order content statistics operator's seclected time period Cheng Jindu, completion situation and acceptance of work situation.
5. a kind of fragmentary project management method of CHINA RFTCOM Co Ltd according to claim 4, which is characterized in that method is also wrapped It includes:
Material logistics are carried out using the end PC;
The material logistics include: according to the perhaps data management shipment object and shipment amount of engineering statistics in work order.
6. a kind of fragmentary project management method of CHINA RFTCOM Co Ltd according to claim 4, which is characterized in that the engineering system The project amount of meter includes estimated project amount and finished construction quantity in work order, and the engineering statistics further include project amount on the estimation Comparison with finished construction quantity matches, and judges whether engineering is overspend, if over-expense, counts over-expense quantity and the amount of money.
7. a kind of fragmentary project management system of CHINA RFTCOM Co Ltd, which is characterized in that system includes mobile terminal and background service Device, the mobile terminal are used to carry out user's note using wechat small routine or public platform and the background server data interaction Volume, user's login, process initiation, trouble ticket dispatch, the prompt of pending work order and user information maintenance;The wechat small routine or public affairs Many numbers include:
User registration module, for showing the corresponding registration entrance of identity role, for receiving operator according to own identification angle Color dot hits the personal information inputted after corresponding registration entrance and the personal information is sent to the background server progress Identity registration is checked and completed to people's information, the identity role include grid manager, Town responsible person, engineering department responsible person, It is in charge of vice president, maintenance department responsible person and spread superintendent;
User log-in block, for receiving the log-on message of operator, is used for the log-on message for showing logentry It is sent to the background server, so that the background server is believed according to the login that registered personal information checks operator Breath is also used to after background server verification log-on message is consistent with a certain personal information, display and the personal information phase The corresponding operation interface of matched identity role;
Trouble ticket dispatch module, for according to the corresponding identity role of current log-on message and Town responsible person audit, engineering department Vice president's examination & approval, maintenance department's responsible person's worksheet processing, spread superintendent's order, spread superintendent's receipt and grid warp are in charge of in responsible person's audit The approval process checked and accepted is managed, the work order after circulating respective handling to the operation interface of respective identity role;
Pending work order cue module shows pending work order by message push or operation interface after the work order for receiving circulation The mode of taskbar prompts related personnel to handle pending work order;
User information maintenance module, the request Concurrency for receiving the inquiry of operator's personal information, password modification and Account Closure are sent To the background server, so that background server makes a response.
8. the fragmentary project management system of a kind of CHINA RFTCOM Co Ltd according to claim 7, which is characterized in that the login Entrance be it is multiple, respectively correspond multiple identity roles, show corresponding work order in the corresponding operation interface of each identity role Examination & approval progress.
9. the fragmentary project management system of a kind of CHINA RFTCOM Co Ltd according to claim 7, which is characterized in that system is also wrapped Computer is included, the computer includes:
Personal management module, for receive the newly-increased of operator or modification personal information and reset the request Concurrency of password send to The background server, so that background server makes a response;
Authority distribution module, the identity respective operations permission for receiving operator adjusts and the adjustment of trouble ticket dispatch approval process Request Concurrency send to the background server, change the user log-in block after making a response so as to background server and show Operation interface and the trouble ticket dispatch module approval process;
Engineering statistics module, for according to project amount, the work for selecting branch company in work order content statistics operator's seclected time period Cheng Jindu, completion situation and acceptance of work situation;
Material logistics module, for the engineering statistics data management shipment object and shipment amount according to the engineering statistics module.
10. the fragmentary project management system of a kind of CHINA RFTCOM Co Ltd according to claim 9, which is characterized in that the work Journey statistical module includes project amount over-expense display unit: estimated project amount for that will count and finished construction quantity compare Match, judge whether engineering is overspend, if over-expense, counts over-expense quantity and the amount of money and show.
CN201910592196.0A 2019-07-03 2019-07-03 A kind of fragmentary project management method and system of CHINA RFTCOM Co Ltd Pending CN110322224A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910592196.0A CN110322224A (en) 2019-07-03 2019-07-03 A kind of fragmentary project management method and system of CHINA RFTCOM Co Ltd

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910592196.0A CN110322224A (en) 2019-07-03 2019-07-03 A kind of fragmentary project management method and system of CHINA RFTCOM Co Ltd

Publications (1)

Publication Number Publication Date
CN110322224A true CN110322224A (en) 2019-10-11

Family

ID=68122380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910592196.0A Pending CN110322224A (en) 2019-07-03 2019-07-03 A kind of fragmentary project management method and system of CHINA RFTCOM Co Ltd

Country Status (1)

Country Link
CN (1) CN110322224A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112381501A (en) * 2020-11-05 2021-02-19 上海汇付数据服务有限公司 Product operation platform system
CN113344520A (en) * 2021-05-31 2021-09-03 珠海大横琴科技发展有限公司 Investigation management method and device of project management system
CN113344519A (en) * 2021-05-31 2021-09-03 珠海大横琴科技发展有限公司 Monthly report management method and device of project management system
CN113887936A (en) * 2021-09-29 2022-01-04 中核核电运行管理有限公司 Non-work order task management system and method based on digitization

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090204465A1 (en) * 2008-02-08 2009-08-13 Santosh Pradhan Process and system for facilitating communication and intergrating communication with the project management activities in a collaborative environment
CN103729735A (en) * 2013-12-19 2014-04-16 镇江锐捷信息科技有限公司 Engineering progress condition management method based on BS frame
CN107480959A (en) * 2017-09-06 2017-12-15 聊城市光明电力服务有限责任公司 A kind of power engineering project management and control application system
CN107705020A (en) * 2017-10-12 2018-02-16 山东联诚工程建设监理有限公司 A kind of overall process intelligence engineering supervisory information managing and control system
CN108320127A (en) * 2017-12-20 2018-07-24 国网山东省电力公司聊城供电公司 A kind of power engineering term computer management system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090204465A1 (en) * 2008-02-08 2009-08-13 Santosh Pradhan Process and system for facilitating communication and intergrating communication with the project management activities in a collaborative environment
CN103729735A (en) * 2013-12-19 2014-04-16 镇江锐捷信息科技有限公司 Engineering progress condition management method based on BS frame
CN107480959A (en) * 2017-09-06 2017-12-15 聊城市光明电力服务有限责任公司 A kind of power engineering project management and control application system
CN107705020A (en) * 2017-10-12 2018-02-16 山东联诚工程建设监理有限公司 A kind of overall process intelligence engineering supervisory information managing and control system
CN108320127A (en) * 2017-12-20 2018-07-24 国网山东省电力公司聊城供电公司 A kind of power engineering term computer management system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112381501A (en) * 2020-11-05 2021-02-19 上海汇付数据服务有限公司 Product operation platform system
CN112381501B (en) * 2020-11-05 2024-06-07 上海汇付支付有限公司 Product operation platform system
CN113344520A (en) * 2021-05-31 2021-09-03 珠海大横琴科技发展有限公司 Investigation management method and device of project management system
CN113344519A (en) * 2021-05-31 2021-09-03 珠海大横琴科技发展有限公司 Monthly report management method and device of project management system
CN113887936A (en) * 2021-09-29 2022-01-04 中核核电运行管理有限公司 Non-work order task management system and method based on digitization

Similar Documents

Publication Publication Date Title
CN110322224A (en) A kind of fragmentary project management method and system of CHINA RFTCOM Co Ltd
CN104200325B (en) Enterprise technique center management system and management method
CN105976119B (en) O2O mode cloud accounting method and system for aggregating fragmented resources
CN107886446A (en) A kind of distribution network failure rushes to repair workform management system
CN107705020A (en) A kind of overall process intelligence engineering supervisory information managing and control system
CN105118005B (en) Communities ' Integrated management system
CN104992308A (en) Enterprise informatization management system
CN207354333U (en) Instrument share management system based on cloud platform
CN108491935A (en) A kind of customer information visualized O&M management system and method
CN101251913A (en) Administrative system and method of self-help apply for reimbursement
KR100842231B1 (en) System for integrated performance management
CN106779104A (en) A kind of campus maintenance service system and method based on mobile terminal
CN104361445A (en) Real-time labor management system and management method
CN109064078A (en) A kind of enterprise tax risk control system and method
CN109189844A (en) A kind of inspection examining report business management system
CN108924466A (en) A kind of enterprise's conference system based on multimedia technology
CN107798489A (en) A kind of electric network operation site safety management method based on wechat platform
CN109360134A (en) A kind of government affairs service system Internet-based
CN109981267A (en) Large-scale consumer multi-key cipher scene cloud encrypting database system and storage querying method
CN107248110A (en) A kind of rental housing and floating population's information interactive management system
CN112270632A (en) Government affair service information processing method, device and system
CN109034406A (en) A kind of enterprise's electric power repair reporting system based on cell phone application
CN108416852A (en) Parking lot management method, multi-field model management server and readable storage medium storing program for executing
CN109102084A (en) A kind of electric power repair reporting system based on cell phone application
US9965339B2 (en) System and method for service provision in a multi-tenant environment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191011

RJ01 Rejection of invention patent application after publication