CN110306783A - A kind of chimney stalk runs derrick dislocation template inside-out formulation construction method - Google Patents
A kind of chimney stalk runs derrick dislocation template inside-out formulation construction method Download PDFInfo
- Publication number
- CN110306783A CN110306783A CN201910574881.0A CN201910574881A CN110306783A CN 110306783 A CN110306783 A CN 110306783A CN 201910574881 A CN201910574881 A CN 201910574881A CN 110306783 A CN110306783 A CN 110306783A
- Authority
- CN
- China
- Prior art keywords
- derrick
- chimney
- template
- construction method
- exterior sheathing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/062—Forms for curved walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/20—Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G2011/067—Integrated forms comprising shuttering skin, bracing or strutting arrangements, workplatforms and railings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
It runs derrick dislocation template inside-out formulation construction method the invention discloses a kind of chimney stalk, step a builds basic chimney shaft;Step b sets up and rises derrick and lifting system;Step c sets up first layer platform on basic chimney shaft;Step d checks chimney centralized positioning size again;Step e, chimney shaft reinforcement installation;Step f, template system installation, first installs exterior sheathing, then install inner template;Step g sets up second layer platform on the template system being installed, and after second layer platform building is good, carries out mixed leaching soil and pours, lifting system is risen one layer along derrick is risen, is repeated in step d, e, f, g operation by step h;Step j is removed and is risen derrick, lifting system and platform, completes construction, and plugging construction hole.The present invention promotes exterior sheathing plate, carries out reverse mould installation to inner template plate, and construction method is simple and easy, short time limit, reduces security risk and engineering cost, and promotional value is high, and application prospect is wide.
Description
Technical field
The present invention relates to building field construction method, run derrick dislocation template inside-out formulation more particularly to chimney stalk
Construction.
Background technique
Chimney stalk working procedure cycle-index is more, and the construction joint and degree control of barrel require height, and construction outer wall is adopted
It is easily deformed with thin aluminum top template, cylinder thickness, protective layer thickness and appearance Forming Quality control difficulty are big;Chimney stalk construction
Continuously, process inspection is checked and accepted intensive, and due to vertical height height, the current difficulty of inspection personnel is big, and mostly high altitude operation is more, right
People, object, the safety control measures requirement of environment are high.Most of technique of country's construction reinforced bar concrete chimney is using hydraulic at present
Sliding formwork, electronic (hydraulic) climbing form technique, but all there is more or less defect and higher construction cost in both construction technologies.
Summary of the invention
The purpose of the present invention is to solve disadvantages existing in the prior art, and propose that a kind of chimney stalk runs derrick shifting
Set template inside-out formulation construction method, comprising the following steps:
Step a builds basic chimney shaft;
Step b sets up and rises derrick and lifting system;
Step c sets up first layer platform on basic chimney shaft;
Step d checks chimney centralized positioning size again;
Step e, chimney shaft reinforcement installation;
Step f, template system installation, first installs exterior sheathing, then install inner template;
Step g sets up second layer platform on the template system being installed, and after second layer platform building is good, carries out mixed leaching soil
It pours,
Lifting system is risen one layer along derrick is risen, is repeated in step d, e, f, g operation by step h;
Step j is removed and is risen derrick, lifting system and platform, completes construction, and plugging construction hole.
Preferably, the template system installation steps in step f include:
F1: exterior sheathing is divided into four groups of sub- exterior sheathings and is assembled, and sub- exterior sheathing is thick, a length of 1000*2000mm of width thin by 2mm
Aluminium skin is made, and is attached between plate and plate using ball screw nut and U-shaped fixing card, and adjacent two U-shaped fixing card spacing is 110mm
, anchor bolt from inside to outside on, concordant inside template, every group of sub- exterior sheathing reserves the contracture side of 1m on both sides;
F2: the hook of one group of climbing shuttering is installed at interval of 2m in sub- exterior sheathing top, which uses the reinforcing bar system of Φ 14
At;
F3: being welded with stainless steel round steel on the corresponding stack shell reinforcing bar of exterior sheathing upper/lower terminal, stainless steel round steel end rests against thin
Spacing along the circumferential direction every 300mm mono- is arranged in the intradermal side of aluminium, stainless steel round steel;
F4: after sub- exterior sheathing is completed, being centered around outside stack shell reinforcing bar, the U-shaped fixing card of steel wire penetrating, and both ends are using locking
Bolt is controlled, and fastens external mold when pouring concrete;
F5: hook is connect with lifter, after concrete reaches strength of mould stripping 1.2N/mm2, is uniformly mentioned external mold section by section with lifter
It rises.
Preferably, the lifting system includes interior derrick, portal frame lifting beam and pulley blocks, and interior derrick installation is upper
On gug frame, portal frame lifting beam is fixedly mounted on interior derrick, and pulley blocks are mounted in portal frame lifting beam, and pulley blocks include
Top sheave and turning pulley, wirerope connect around pulley blocks with hoist engine.
Preferably, the first layer platform, second layer platform are that the wooden springboard is bound by iron wire securely in interior derrick steel
It is formed on pipe, interior derrick middle position reserves square hole of the 0.9m × 0.9m as channel.
Preferably, it is provided with guide rail below the square hole, is slidably fitted with loading plate on guide rail.
Preferably, the chimney shaft is provided with plug-in ladder.
Preferably, the rising derrick is 125 meters high, is set up using 48*3.6 steel pipe scaffold.
Compared with prior art, the beneficial effects of the present invention are: setting up lower channel inside chimney using scaffold, making
The form of industry platform and material hoisting system promotes exterior sheathing plate, and the one kind for carrying out reverse mould installation to inner template plate is applied
Work technique, construction method is simple and easy, shortens the duration, even more significantly reduces security risk and engineering cost, has good
Good promotional value and application prospect.
Detailed description of the invention
Fig. 1 is the block diagram of construction method of the invention;
Fig. 2 is lift system structural representation of the invention;
Fig. 3 is chimney structure schematic diagram of the invention;
Fig. 4 is that chimney of the invention overlooks figure structure schematic representation;
Fig. 5 is exterior sheathing structural schematic diagram of the invention;
Fig. 6 is that inside and outside calligraphy or painting model of the invention overlooks figure structure schematic representation;
Fig. 7 is plug-in ladder structural schematic diagram of the invention.
In figure: 1. chimney shafts;2. rising derrick;3. exterior sheathing;4. inner template;5. stainless steel round steel;Derrick in 6.;7.
Portal frame lifting beam;8. pulley blocks;9. top sheave;10. turning pulley;11. square hole;12. plug-in ladder.
Specific embodiment
It runs derrick dislocation template idea of the invention is that overcoming the deficiencies of the prior art and provide a kind of chimney stalk
Inside-out formulation construction method, construction method is simple and easy, shortens the duration, even more significantly reduces security risk and engineering
Cost.
It is described in detail below with reference to embodiment referring to attached drawing, to be carried out more to technical characteristic of the invention and advantage
Deep annotation.
It is of the invention as shown in Figure 1, the present invention is run derrick dislocation template inside-out formulation construction method using chimney stalk,
Include the following steps;
Step a builds basic chimney shaft 1;
Step b sets up and rises derrick 2 and lifting system;
Step c sets up first layer platform on basic chimney shaft;
Step d checks chimney centralized positioning size again;
Step e, chimney shaft reinforcement installation;
Step f, template system installation, first installs exterior sheathing 3, then install inner template 4;
Step g sets up second layer platform on the template system being installed, and after second layer platform building is good, carries out mixed leaching soil
It pours,
Lifting system is risen one layer along derrick is risen, is repeated in step d, e, f, g operation by step h;
Step j is removed and is risen derrick, lifting system and platform, completes construction, and plugging construction hole.
If Fig. 1-7 is specially work progress are as follows: carry out engineering survey, build 1.6 meters high of basic chimney shaft;It is constructed
Afterwards, the rising derrick that construction height is 125 meters in chimney barrel is specifically set up using 48*3.6 steel pipe scaffold;Lifting system
It is mounted on and rises on derrick, lifting system will be built wooden springboard etc. needed for the first platform and be promoted onto basic chimney barrel, pass through
Iron wire binding and fixing build first layer platform on rising derrick on basic chimney shaft;Again review chimney center is fixed
After the size of position, then by lifting system by chimney shaft reinforcing bar, template system etc. is promoted onto first layer platform, installs external mold
It after plate and inner membrance, is built on template system on second layer platform, lifting system will carry out in mixed leaching soil promotion to the second platform
It pours, completes level-one chimney shaft and pour;
Lifting system is lifted up one layer, reinforcing bar is promoted to progress chimney shaft reinforcing bar peace on the second platform by lifting system
Exterior sheathing after fractionation is integrally lifted up after one layer row assembling again after inner membrance disassembly by lifting system and passes through promotion by dress
System improving turns as new inner membrance to the second platform, while the first platform being promoted on the inside and outside template system newly assembled
Fang Hou, then the inside and outside template system newly assembled is poured, the chimney body for completing upper level pours;The chimney shaft
It is provided with plug-in ladder 12.Plug-in ladder upper end, which is fixed on, to be risen on derrick, chimney barrel outer wall is suspended on, for carrying work
People is convenient for the external template construction of worker.
It repeats the above process, lifting system is promoted along derrick is risen, and the first and second platform alternately moves up, and exterior sheathing is whole
Fractionation assembles after moving up, and inner membrance disassembly turns into new inner membrance, until removing after reaching chimney height and rising derrick, promote system
System and platform complete construction, and plugging construction hole.
As shown in figure 5, the specific manufacturing process of exterior sheathing are as follows: exterior sheathing selects material, and stack shell external mold is all made of 2mm thickness, wide
The thin aluminum top of a length of 1000 × 2000mm is made;Calculate contracture ratio, according to the diameter of chimney and shrinkage rates with CAD into
Row setting-out, calculates shrinkage rates;Exterior sheathing processing and fabricating, four groups of template point are processed, and every group of template reserves 1m on both sides
Contracture side, every aluminum alloy pattern plate processed by calculated shrinkage ratio degree, 1.9 meters of every section height, using circle between plate and plate
Hook bolt and U-shaped fixing card are attached, spacing 110mm, anchor bolt from inside to outside on, make concordant inside template;At every group
The top of plate uses the reinforcing bar of Φ 14, installation climbing shuttering hook every 2m spacing (i.e. every one block of plate);It is inside and outside to ensure
The clear spacing of mould, and thickness is protected, stainless steel round steel 5, stainless steel are welded on the corresponding stack shell reinforcing bar of exterior sheathing upper/lower terminal
Round steel end rests against on the inside of thin aluminum top, and spacing along the circumferential direction every 300mm mono- is arranged in stainless steel round steel;Sub- external mold board group
It after the completion of dress, is centered around outside stack shell reinforcing bar, the U-shaped fixing card of steel wire penetrating, both ends are controlled using clamping screw, pour concrete
When fasten external mold;Hook is connect with lifter, with lifter that external mold is uniform section by section after concrete reaches strength of mould stripping 1.2N/mm2
It is promoted.
Such as Fig. 2, the lifting system includes interior derrick 6, portal frame lifting beam 7 and pulley blocks 8, the interior derrick
It is mounted on and rises on derrick, portal frame lifting beam is fixedly mounted on interior derrick, and pulley blocks are mounted in portal frame lifting beam, sliding
Wheel group includes top sheave 9 and turning pulley 10, and wirerope connect around pulley blocks with hoist engine;Interior derrick middle position reserves
Square hole 11 of the 0.9m × 0.9m as channel;It is provided with guide rail below the square hole, is slidably fitted with loading plate on guide rail;Dress
There is the carrying ladle of reinforcing bar, mixed leaching soil etc. to be placed on loading plate, is moved to below square hole along guide rail, wirerope and carrying ladle connect
It connects, corresponding height is promoted by hoist engine, for constructing;Springboard, small handcart or other materials can also pass through
Hoist engine is promoted.
The present invention is existed compared with the construction method of traditional chimney stalk using scaffold using the construction method used
The form that lower channel, job platform and material hoisting system are set up inside chimney promotes exterior sheathing plate, to inner template
Plate carries out reverse mould installation, and the factors such as overcoming high altitude operation, difficulty of construction is big, and construction risk is big ensure that the same of construction period
When, so that construction quality is effectively controlled, substantially increases surface smoothness, entity quality and impression quality.
Clear, complete description is carried out to the present invention by the technical solution in above embodiments, it is clear that described reality
The embodiment that example is present invention a part is applied, instead of all the embodiments.Based on the embodiments of the present invention, this field is common
Technical staff's every other embodiment obtained without making creative work belongs to the model that the present invention protects
It encloses.
Claims (7)
- The dislocation template inside-out formulation construction method 1. a kind of chimney stalk runs derrick, it is characterised in that: the following steps are included:Step a builds basic chimney shaft (1);Step b sets up and rises derrick (2) and lifting system;Step c sets up first layer platform on basic chimney shaft;Step d checks chimney centralized positioning size again;Step e, chimney shaft reinforcement installation;Step f, template system installation, first installs exterior sheathing (3), then install inner template (4);Step g sets up second layer platform on the template system being installed, and after second layer platform building is good, carries out mixed leaching soil It pours,Lifting system is risen one layer along derrick is risen, is repeated in step d, e, f, g operation by step h;Step j is removed and is risen derrick, lifting system and platform, completes construction, and plugging construction hole.
- The dislocation template inside-out formulation construction method 2. 1 chimney stalk according to claim runs derrick, it is characterised in that: Template system installation steps in step f include:F1: exterior sheathing is divided into four groups of sub- exterior sheathings and is assembled, and sub- exterior sheathing is thick, a length of 1000*2000mm of width thin by 2mm Aluminium skin is made, and is attached between plate and plate using ball screw nut and U-shaped fixing card, and adjacent two U-shaped fixing card spacing is 110mm , anchor bolt from inside to outside on, concordant inside template, every group of sub- exterior sheathing reserves the contracture side of 1m on both sides;F2: the hook of one group of climbing shuttering is installed at interval of 2m in sub- exterior sheathing top, which uses the reinforcing bar system of Φ 14 At;F3: being welded with stainless steel round steel on the corresponding stack shell reinforcing bar of exterior sheathing upper/lower terminal, stainless steel round steel (5) end is supported On the inside of thin aluminum top, spacing along the circumferential direction every 300mm mono- is arranged in stainless steel round steel;F4: after sub- exterior sheathing is completed, being centered around outside stack shell reinforcing bar, the U-shaped fixing card of steel wire penetrating, and both ends are using locking Bolt is controlled, and fastens external mold when pouring concrete;F5: hook is connect with lifter, after concrete reaches strength of mould stripping 1.2N/mm2, is uniformly mentioned external mold section by section with lifter It rises.
- The dislocation template inside-out formulation construction method 3. chimney stalk according to claim 2 runs derrick, it is characterised in that: The lifting system includes interior derrick (6), portal frame lifting beam (7) and pulley blocks (8), and interior derrick installation is rising derrick On, portal frame lifting beam is fixedly mounted on interior derrick, and pulley blocks are mounted in portal frame lifting beam, and pulley blocks include top sheave (9) it is connect around pulley blocks with hoist engine with turning pulley (10), wirerope.
- The dislocation template inside-out formulation construction method 4. chimney stalk according to claim 3 runs derrick, it is characterised in that: The first layer platform, second layer platform are that the wooden springboard is bound by iron wire and securely formed on interior derrick steel pipe, interior derrick Middle position reserves square hole (11) of the 0.9m × 0.9m as channel.
- The dislocation template inside-out formulation construction method 5. chimney stalk according to claim 4 runs derrick, it is characterised in that: It is provided with guide rail below the square hole, is slidably fitted with loading plate on guide rail.
- The dislocation template inside-out formulation construction method 6. chimney stalk according to claim 5 runs derrick, it is characterised in that: The chimney shaft is provided with plug-in ladder (12).
- The dislocation template inside-out formulation construction method 7. chimney stalk according to claim 6 runs derrick, it is characterised in that: The rising derrick is 125 meters high, is set up using 48*3.6 steel pipe scaffold.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910574881.0A CN110306783A (en) | 2019-06-28 | 2019-06-28 | A kind of chimney stalk runs derrick dislocation template inside-out formulation construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910574881.0A CN110306783A (en) | 2019-06-28 | 2019-06-28 | A kind of chimney stalk runs derrick dislocation template inside-out formulation construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110306783A true CN110306783A (en) | 2019-10-08 |
Family
ID=68077837
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910574881.0A Pending CN110306783A (en) | 2019-06-28 | 2019-06-28 | A kind of chimney stalk runs derrick dislocation template inside-out formulation construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110306783A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110820569A (en) * | 2019-10-28 | 2020-02-21 | 同济大学 | Liftable suspension platform device for rollover construction and working method thereof |
CN110905193A (en) * | 2019-12-05 | 2020-03-24 | 荆门市佰思机械科技有限公司 | Inside-out sliding type creeping formwork device turns up |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2863982Y (en) * | 2005-12-02 | 2007-01-31 | 江西省第二建筑工程公司 | Column type external hydraulic construction device out of steel concrete cylinder body |
CN201495767U (en) * | 2009-04-15 | 2010-06-02 | 天津电力建设公司 | Die plate system for ribbed hyperbolic supporting wall |
CN101832049A (en) * | 2009-03-13 | 2010-09-15 | 中冶成工上海五冶建设有限公司 | Concrete-structured conjoined cylindrical shell construction device and method therefor |
RU2476653C1 (en) * | 2011-09-15 | 2013-02-27 | Закрытое Акционерное Общество "Спецжелезобетонстрой" | Method of erecting high-rise reinforced concrete structures, for example, industrial chimney-stacks and towers |
CN108590170A (en) * | 2018-06-07 | 2018-09-28 | 中建铁路投资建设集团有限公司 | A kind of rectangle chimney twin-well frame displacement type template integral lifting apparatus and its construction method |
-
2019
- 2019-06-28 CN CN201910574881.0A patent/CN110306783A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2863982Y (en) * | 2005-12-02 | 2007-01-31 | 江西省第二建筑工程公司 | Column type external hydraulic construction device out of steel concrete cylinder body |
CN101832049A (en) * | 2009-03-13 | 2010-09-15 | 中冶成工上海五冶建设有限公司 | Concrete-structured conjoined cylindrical shell construction device and method therefor |
CN201495767U (en) * | 2009-04-15 | 2010-06-02 | 天津电力建设公司 | Die plate system for ribbed hyperbolic supporting wall |
RU2476653C1 (en) * | 2011-09-15 | 2013-02-27 | Закрытое Акционерное Общество "Спецжелезобетонстрой" | Method of erecting high-rise reinforced concrete structures, for example, industrial chimney-stacks and towers |
CN108590170A (en) * | 2018-06-07 | 2018-09-28 | 中建铁路投资建设集团有限公司 | A kind of rectangle chimney twin-well frame displacement type template integral lifting apparatus and its construction method |
Non-Patent Citations (2)
Title |
---|
勒马望天: "烟囱滑模施工技术、烟囱施工措施", 《百度文库》 * |
杨进: "钢筋混凝土烟囱内井架翻模施工技术", 《城市建设理论研究(电子版)》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110820569A (en) * | 2019-10-28 | 2020-02-21 | 同济大学 | Liftable suspension platform device for rollover construction and working method thereof |
CN110905193A (en) * | 2019-12-05 | 2020-03-24 | 荆门市佰思机械科技有限公司 | Inside-out sliding type creeping formwork device turns up |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208543603U (en) | Precast prestressed floor production mould and production equipment | |
CN105839543B (en) | Construction process for self-lifting outer frame turnover formwork of bridge high pier | |
CN103758348B (en) | Profile steel framework structure concrete floor slab suspension mould pouring construction method | |
CN106150001A (en) | A kind of fabricated assembly overall stair construction method | |
CN110306783A (en) | A kind of chimney stalk runs derrick dislocation template inside-out formulation construction method | |
CN105220619A (en) | A kind of method of quick manufacture two-wire nose circle solid pier | |
CN111455837B (en) | Thin-wall hollow pier pouring connection structure and construction method thereof | |
CN203174510U (en) | Movable assembly type hanging basket for bridge anti-collision guardrail construction and formwork for construction | |
CN110562868A (en) | Hoisting construction method for unit type glass curtain wall of super high-rise building | |
CN211286601U (en) | Chimney construction device applying hydraulic lifting and rollover technology | |
CN111593676A (en) | Construction method of thin-wall hollow pier | |
CN113833263A (en) | Integral lantern type support circulating hoisting construction method for frame column | |
CN202401753U (en) | Sliding die device | |
CN110616706B (en) | Construction method for layering binding in large-diameter pile foundation reinforcing steel bar hole | |
CN107815971A (en) | High mound is from climbing hydraulic pressure mould system that turns over | |
CN106284997A (en) | The big punching block construction method for lifting whole of reinforced concrete chimney | |
CN115042316A (en) | Prefabricated construction method for assembled bridge pier column | |
CN2040128U (en) | Sectionally formwork-sliding unit used for concrete buildings | |
CN104948206B (en) | Slip form trolley for concrete casting of arched inclined shaft | |
CN208152551U (en) | There is the dedicated rack device that climbs of skin concrete structure outer | |
CN210621713U (en) | Circular foundation pit inside lining wall template construction system | |
CN106320662A (en) | Construction method for decorating superwide concrete lines on outer wall of building | |
CN213626366U (en) | Prefabricated staircase of assembled piecemeal | |
CN217419341U (en) | Hollow high mound construction is with outer formula construction equipment that hangs that climbs in | |
CN219654085U (en) | Positioning device for vertical ribs of sliding template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191008 |