CN110273699A - High-dipping resists soft ground coal layer stubbornly and stays coal column gob side entry retaining surrounding rock stability method for protecting support - Google Patents

High-dipping resists soft ground coal layer stubbornly and stays coal column gob side entry retaining surrounding rock stability method for protecting support Download PDF

Info

Publication number
CN110273699A
CN110273699A CN201910620879.2A CN201910620879A CN110273699A CN 110273699 A CN110273699 A CN 110273699A CN 201910620879 A CN201910620879 A CN 201910620879A CN 110273699 A CN110273699 A CN 110273699A
Authority
CN
China
Prior art keywords
complement
coal
anchor pole
anchor
dipping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910620879.2A
Other languages
Chinese (zh)
Other versions
CN110273699B (en
Inventor
唐建新
李成
王艳磊
代张音
刘庆
王育林
张择靖
孔令锐
候阳阳
熊飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Original Assignee
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University filed Critical Chongqing University
Priority to CN201910620879.2A priority Critical patent/CN110273699B/en
Publication of CN110273699A publication Critical patent/CN110273699A/en
Application granted granted Critical
Publication of CN110273699B publication Critical patent/CN110273699B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/152Laggings made of grids or nettings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

Soft ground coal layer is resisted stubbornly the invention discloses a kind of high-dipping stays coal column gob side entry retaining surrounding rock stability method for protecting support, comprising steps of 1) carry out encryption supporting to the suspension roof support of original rectangular array arrangement in such a way that reserved coal pier section is inserted into complement anchor pole using interval, the anchor pole after encryption supporting is arranged in five presbyopia formulas;2) in the middle and lower part of reserved coal pier, complement anchor cable, the anchor cable of every complement are arranged in the intermediate position between two laterally adjacent original anchor cables again;3) the axially extending steel bar ladder in tunnel, steel bar ladder and W-shaped steel band being evenly arranged and prolonged at the top of tunnel, cross mask effect is formed to back.The present invention passes through complement anchor pole, anchor cable and arrangement steel bar ladder, to roadway surrounding rock support reinforcement, supporting stability is more preferable, existing exploiting field is set only to arrange that the high-dipping of a coal working face resists soft ground coal layer mine stubbornly using edge air gallery technology, realize that driving can both send an air return lane less, shorten connecting time, and can largely save the costs such as fee of material, the expenditure that wage takes, promotes enterprise competitiveness.

Description

High-dipping resists soft ground coal layer stubbornly and stays coal column gob side entry retaining surrounding rock stability method for protecting support
Technical field
The present invention relates to a kind of mine roadway wall rock reinforcing technology field, in particular to soft base thickness coal is resisted in a kind of high-dipping stubbornly Layer future small coal pillar gob side entry retaining surrounding rock stability method for protecting support.
Background technique
The mine of a coal working face is only arranged for production exploiting field, supporting roadway surrounding rock generallys use in the prior art The anchor pole of steel wire, W-shaped steel band and rectangular array arrangement.
The mine of a coal working face is only arranged for this exploiting field, if not using edge air gallery technology, increase is applied The cost input of one air return lane of work, and cause the face of adopting can not normal continuance, influence mine normal production.
Mine has the modes such as top plate presplit blasting, the lane Rou Mohu, block code concrete block along the lane Kong Hu at present.For mine reality Border situation, the mine big for seam inclination, coal seam is thicker will be unable to complete presplitting borehole according to top plate presplitting technique Construction, and the quick-fried bulk rock mass fallen will pour transportation roadway under gravity, be unable to satisfy shield lane and require.According to soft mould Lane technology is protected, because of the big reason of mining height, and there are eye mouth oblique volumn supportings to construct, soft mould installation difficulty is big, can not ensure safely Problem, and it is higher using the lane Rou Mohu technical costs.
Therefore it to reduce cost input, reduce coal resources loss, shorten connecting time, needs a kind of new along the lane Kong Hu Technology.
Summary of the invention
Stay coal column gob side entry retaining country rock steady in view of this, resisting soft ground coal layer stubbornly the object of the present invention is to provide a kind of high-dipping Qualitative method for protecting support, to solve the problems, such as to gob side entry retaining surrounding rock consolidation supporting.
High-dipping of the present invention resists soft ground coal layer stubbornly and stays coal column gob side entry retaining surrounding rock stability method for protecting support, including following step It is rapid:
1) to the anchor pole branch of original rectangular array arrangement in such a way that reserved coal pier section is inserted into complement anchor pole using interval Shield carries out encryption supporting, and the anchor pole after encryption supporting is arranged in five presbyopia formulas;The five presbyopia formulas arrangement refers to that every four are in The original anchor pole of rectangular arrangement is trapped among outside the anchor pole of a complement, and the complement anchor pole is located at the center of rectangle;
2) in the middle and lower part of reserved coal pier, complement anchor cable, the anchor cable of every complement are arranged in two laterally adjacent originals again Intermediate position between beginning anchor cable, and the anchor cable of complement is driven into the length in floor strata not less than 2000mm, the anchor of complement The exposed parts of rope are anchored on the W steel band of original arrangement;
3) it is evenly arranged and prolongs the axially extending steel bar ladder in tunnel at the top of the tunnel, the steel bar ladder and original arrangement W steel band is in cross-shaped.
Beneficial effects of the present invention:
High-dipping of the present invention resists soft ground coal layer stubbornly and stays coal column gob side entry retaining surrounding rock stability method for protecting support, passes through complement anchor Bar, anchor cable and the arrangement steel bar ladder axially extending along tunnel, to roadway surrounding rock support reinforcement, supporting stability is more preferable, makes existing There is exploiting field only to arrange that the high-dipping of a coal working face resists soft ground coal layer mine stubbornly and can realize driving using edge air gallery technology Both an air return lane can be sent less, shortens connecting time, and can largely save the costs such as fee of material, the expenditure that wage takes, and mentioned Rise enterprise competitiveness.
Detailed description of the invention
Fig. 1 gob side entry retaining tunnel is along the original supporting expanded schematic diagram of country rock.
Five flower-shape of Fig. 2 anchors the supporting roadway surrounding rock expanded schematic diagram combined with cross mask.
Five flower-shape of Fig. 3 anchors the supporting roadway surrounding rock diagrammatic cross-section combined with cross mask.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and examples.
As shown, soft ground coal layer is resisted in the present embodiment high-dipping, which stubbornly, stays coal column gob side entry retaining surrounding rock stability method for protecting support, The following steps are included:
1) to the anchor pole branch of original rectangular array arrangement in such a way that reserved coal pier section is inserted into complement anchor pole 2 using interval Shield carries out encryption supporting, and the anchor pole after encryption supporting is arranged in five presbyopia formulas;The five presbyopia formulas arrangement refers to that every four are in The original anchor pole 1 of rectangular arrangement is trapped among outside the anchor pole 2 of a complement, and the complement anchor pole is located at the center of rectangle;In five presbyopia For the suspension roof support structure of formula arrangement relative to existing suspension roof support structure in rectangular layout, supporting construction reliability is higher.
2) in the middle and lower part of reserved coal pier complement anchor cable again, the anchor cable 3 of every complement be arranged in two it is laterally adjacent Intermediate position between original anchor cable 4, and the anchor cable of complement is driven into the length in floor strata and is not less than 2000mm, complement The exposed parts of anchor cable are anchored on the W steel band 5 of original arrangement;Complement anchor cable and the anchor cable and W steel band cooperation energy for making complement Preferably resist the radial deformation of roadway surrounding rock.
3) it is evenly arranged at the top of tunnel and prolongs the axially extending steel bar ladder 6 in tunnel, the steel bar ladder and original arrangement W steel band in cross-shaped.Since W steel band is circumferentially disposed along tunnel, because of drift section during deformation of the surrounding rock in tunnel It shrinks and W steel band changing of the relative positions cutting easily occurs, lose the effect of mask;The present embodiment will not generate change along axial in view of tunnel Shape, therefore axially arrange four placing of reinforcements ladder again along tunnel, with original W steel band in cross-shaped, cross-shaped mask is matched Better mask effect can be provided by closing wire netting 7.
Finally, it is stated that the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although referring to compared with Good embodiment describes the invention in detail, those skilled in the art should understand that, it can be to skill of the invention Art scheme is modified or replaced equivalently, and without departing from the objective and range of technical solution of the present invention, should all be covered at this In the scope of the claims of invention.

Claims (1)

1. high-dipping resists soft ground coal layer stubbornly and stays coal column gob side entry retaining surrounding rock stability method for protecting support, it is characterised in that: including following Step:
1) suspension roof support that original rectangular array is arranged in such a way that reserved coal pier section is using interval insertion complement anchor pole into Row encryption supporting, the anchor pole after encryption supporting are arranged in five presbyopia formulas;The five presbyopia formulas arrangement refers to that every four are in rectangle The original anchor pole of arrangement is trapped among outside the anchor pole of a complement, and the complement anchor pole is located at the center of rectangle;
2) in the middle and lower part of reserved coal pier, complement anchor cable, the anchor cable of every complement are arranged in two laterally adjacent original anchors again Intermediate position between rope, and the anchor cable of complement is driven into the length in floor strata and is not less than 2000mm, the anchor cable of complement Exposed parts are anchored on the W steel band of original arrangement;
3) the axially extending steel bar ladder in tunnel, the W steel of the steel bar ladder and original arrangement are evenly arranged and prolonged at the top of tunnel Band forms the effect of cross mask in cross-shaped, to back.
CN201910620879.2A 2019-07-10 2019-07-10 Method for supporting stability of gob-side entry retaining surrounding rock of coal retaining pillar of steeply inclined hard-top soft-bottom coal seam Expired - Fee Related CN110273699B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910620879.2A CN110273699B (en) 2019-07-10 2019-07-10 Method for supporting stability of gob-side entry retaining surrounding rock of coal retaining pillar of steeply inclined hard-top soft-bottom coal seam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910620879.2A CN110273699B (en) 2019-07-10 2019-07-10 Method for supporting stability of gob-side entry retaining surrounding rock of coal retaining pillar of steeply inclined hard-top soft-bottom coal seam

Publications (2)

Publication Number Publication Date
CN110273699A true CN110273699A (en) 2019-09-24
CN110273699B CN110273699B (en) 2020-08-21

Family

ID=67962979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910620879.2A Expired - Fee Related CN110273699B (en) 2019-07-10 2019-07-10 Method for supporting stability of gob-side entry retaining surrounding rock of coal retaining pillar of steeply inclined hard-top soft-bottom coal seam

Country Status (1)

Country Link
CN (1) CN110273699B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103397905A (en) * 2013-04-17 2013-11-20 唐建新 System and method for achieving natural striding, falling and filling of coal beds, flexible roadway protection and complete gob-side entry retaining
CN103470286A (en) * 2013-09-25 2013-12-25 四川省煤炭产业集团有限责任公司 Gob-side entry retaining method realizing support by intercepting self-slip gangue through strip reinforcing steel bar mesh
CN204783071U (en) * 2015-05-28 2015-11-18 四川川煤华荣能源股份有限公司大宝顶煤矿 Lane group stays lane with keeping off body structure
CN106761867A (en) * 2016-12-23 2017-05-31 四川广旺能源发展(集团)有限责任公司 High-dipping surrounding rock of actual mining roadway stabilization supporting facility and support process

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103397905A (en) * 2013-04-17 2013-11-20 唐建新 System and method for achieving natural striding, falling and filling of coal beds, flexible roadway protection and complete gob-side entry retaining
CN103470286A (en) * 2013-09-25 2013-12-25 四川省煤炭产业集团有限责任公司 Gob-side entry retaining method realizing support by intercepting self-slip gangue through strip reinforcing steel bar mesh
CN204783071U (en) * 2015-05-28 2015-11-18 四川川煤华荣能源股份有限公司大宝顶煤矿 Lane group stays lane with keeping off body structure
CN106761867A (en) * 2016-12-23 2017-05-31 四川广旺能源发展(集团)有限责任公司 High-dipping surrounding rock of actual mining roadway stabilization supporting facility and support process

Also Published As

Publication number Publication date
CN110273699B (en) 2020-08-21

Similar Documents

Publication Publication Date Title
CN105064397B (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN105041349A (en) Underground excavation construction method for expanded excavation of station on basis of metro regional shield tunnel
CN106761813B (en) Gob side entry driving unbalanced support design method under the unstable overlying strata in deep
CN104632220B (en) Mining method with adjustable and controllable structure size of gentle dip medium-thickness ore body strip column reconstructed stope
CN105003272A (en) Reversed construction method for expanding and excavating stations on sectional shield tunnel foundations of subways
CN111236276A (en) Protective structure for dangerous rock falling of high and steep side slope of tunnel and construction method
CN106321113B (en) A kind of lane space frame structure and its method for protecting support for being used to wear goaf
CN104806252A (en) Underground dome excavation construction arrangement structure and excavation method
CN111456735B (en) Method for filling false roof without interval column and maintaining stability of downward single access
CN105201524B (en) A kind of pre- spare anchor net right angle in extremely soft seam tunnel can contracting canopy Support Method
CN109538210A (en) A kind of soft extremely irregularcoal seam fully mechanized coal face gob-side entry retaining method of high methane three
JP2017096063A (en) Earth retaining excavation method and skeleton construction method
CN104265294A (en) Coal pillar-free mining technology for blasting mining face of steeply dipping seam
CN106761867A (en) High-dipping surrounding rock of actual mining roadway stabilization supporting facility and support process
CN206280090U (en) High-dipping surrounding rock of actual mining roadway stabilization supporting facility
CN111594168B (en) Pseudo-goaf-layer supporting and sinking-limiting stoping method formed by matching rock waste with rock waste
CN110273699A (en) High-dipping resists soft ground coal layer stubbornly and stays coal column gob side entry retaining surrounding rock stability method for protecting support
CN111894026A (en) Tunnel type pile foundation bearing platform combined anchorage structure and installation method thereof
CN107013215A (en) A kind of subregion domain construction filling mining is to reduce the method for safety pillar under wa ter bodies size
CN114592868B (en) Ore exploitation structure under condition of extremely crushing ore body and method thereof
CN107339114B (en) Mountain highway tunnel portal critical slope pre-balancing stable control structure and method
CN107503778A (en) The method that gob side entry retaining is realized using grouting cable anchor
CN112160785B (en) Rapid reinforcement pouring method for coal mine underground overpass
CN205047239U (en) Top of roadway board control system under mat
CN107859525A (en) A kind of large deformation stope drift active workings replace canopy Surrounding Rock Control Technology except Mao Kuo lanes

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200821