CN110273385A - A kind of across concrete box girder method for dismounting in cross-line hole - Google Patents

A kind of across concrete box girder method for dismounting in cross-line hole Download PDF

Info

Publication number
CN110273385A
CN110273385A CN201910267686.3A CN201910267686A CN110273385A CN 110273385 A CN110273385 A CN 110273385A CN 201910267686 A CN201910267686 A CN 201910267686A CN 110273385 A CN110273385 A CN 110273385A
Authority
CN
China
Prior art keywords
cross
line
box beam
dismounting
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910267686.3A
Other languages
Chinese (zh)
Other versions
CN110273385B (en
Inventor
江湧
王永鹏
林一宁
何雨
杨先权
陈志敏
应杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Wuhan Bridge Special Technology Co Ltd of MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
Wuhan Bridge Special Technology Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC, Wuhan Bridge Special Technology Co Ltd of MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201910267686.3A priority Critical patent/CN110273385B/en
Publication of CN110273385A publication Critical patent/CN110273385A/en
Application granted granted Critical
Publication of CN110273385B publication Critical patent/CN110273385B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of across concrete box girder method for dismounting in cross-line hole, comprising the following steps: sets up protecting canopy frame below cross-line box beam;Remove bridge floor affiliated facility;By the flange plate of cross-line box beam from being respectively cut in bridge span, removing to both ends;By the top plate and bottom plate of cross-line box beam from being respectively cut in bridge span, removing to both ends;Button anchor cable system for carrying cross-line box beam is set;By the web of cross-line box beam from being respectively cut in bridge span, removing to both ends;The button anchor cable system is removed, across the concrete box girder dismounting in cross-line hole is completed, is related to technical field of bridge construction.The present invention substantially reduces difficulty of the cross-line hole across concrete box girder Demolition Construction, improves safety and construction efficiency in work progress, and the influence to existing line normal pass under bridge is smaller, practical.

Description

A kind of across concrete box girder method for dismounting in cross-line hole
Technical field
The present invention relates to technical field of bridge construction, are specifically related to a kind of across concrete box girder method for dismounting in cross-line hole.
Background technique
As what urban transportation amount and traffic axis carried sharply increases, the capacity and level-of-service of bridge is required continuous It improving, most of early concrete box-type bridge has been difficult to meet the driving demand under current heavy traffic, high load, and with The appearance of concrete box-beam bridge itself panel construction defect and engineering disease, more influence existed concrete bridge box-type bridge knot Structure safety and normal pass, therefore comprehensively consider and need to remove such box-type bridge, bridging toughening is mainly organic at present Tool crush method, loop wheel machine hanging shift method etc..
And there is many cross-line bridges in city comprising across the cross-line box beam (1) of highway or railway, and be located at The non-cross-line box beam (2) of cross-line box beam (1) two sides, for this bridge, using above two method remove there is The disadvantages of construction effect is low, at high cost and constructional difficulties, while there is also very big security risks.Therefore, it studies and proposes It is a kind of to be of great significance for cross-line hole across the demolition technique method of concrete box girder.
Summary of the invention
The purpose of the invention is to overcome the shortcomings of above-mentioned background technique, a kind of high-efficient, safety easy for construction is provided Good across the concrete box girder method for dismounting in cross-line hole of property.
The present invention provides a kind of across concrete box girder method for dismounting in cross-line hole, comprising the following steps:
S1, protecting canopy frame is set up below cross-line box beam;
S2, bridge floor affiliated facility is removed;
S3, by the flange plate of cross-line box beam from being respectively cut in bridge span, removing to both ends;
S4, by the top plate and bottom plate of cross-line box beam from being respectively cut in bridge span, removing to both ends;
S5, button anchor cable system for carrying cross-line box beam is set;
S6, by the web of cross-line box beam from being respectively cut in bridge span, removing to both ends;
S7, the button anchor cable system is removed, completes across the concrete box girder dismounting in cross-line hole.
Based on the above technical solution, in step sl, the protecting canopy frame uses strip footing frame.
Based on the above technical solution, in step s 2, the affiliated facility include street lamp on bridge floor, monitoring, Anti- throwing net and bridge surface waterproof layer, protective layer.
Based on the above technical solution, in step s3, the flange plate cuts to piecemeal along vertical bridge, removes.
Based on the above technical solution, in step s 4, the top plate and bottom plate is cut to piecemeal along vertical bridge, is removed, Concrete stick is reserved between adjacent two pieces.
Based on the above technical solution, in step s 5, the button anchor cable system includes being set to non-cross-line box beam On column and one end be anchored at the top of the column, the other end is anchored in the button anchor cable of the cross-line box beam.
Based on the above technical solution, the button anchor cable system further includes that one end is anchored at the top of the column, separately One end is anchored in the anchor cable of the non-cross-line box beam.
Based on the above technical solution, the button anchorage cable anchoring is on the web of the cross-line box beam.
Based on the above technical solution, the button anchor cable includes proximal end of the anchor point close to cross-line box beam end The distal end rope of rope and anchor point far from cross-line box beam end.
Compared with prior art, advantages of the present invention is as follows:
Across the box beam method for dismounting in cross-line hole of the invention is dividing cross-line box beam flange plate concret block, concrete roof It after block, underplate concrete block, successively cuts, remove cross-line box beam flange plate concret block, concrete roof block, bottom Board concrete block forms frame structure, after ensuring that frame structure cantilever end stablizes safety by setting button anchor cable system, by bridge It is respectively cut in girder span to both ends, removes cross-line box girder web, until the dismounting of cross-line box beam finishes, remove button anchor cable system, greatly Difficulty of the cross-line hole across concrete box girder Demolition Construction is reduced greatly, improves safety and construction efficiency in work progress, And the influence to existing line normal pass under bridge is smaller, it is practical.
Detailed description of the invention
Fig. 1 is across the concrete box girder cut state schematic diagram in cross-line hole of the embodiment of the present invention;
Fig. 2 is across the concrete box girder cross-section diagram in cross-line hole of the embodiment of the present invention;
Fig. 3 is across the concrete box girder button anchor cable system scheme of installation in cross-line hole of the embodiment of the present invention;
Fig. 4 is the structural schematic diagram after across the concrete box girder distal end rope in cross-line hole of the embodiment of the present invention is removed.
Appended drawing reference: 1-cross-line box beam, 2-non-cross-line box beams, 3-flange plates, 4-top plates, 5-bottom plates, 6-button anchors Cable system, 61-columns, 62-button anchor cables, 621-proximal end ropes, 622-distal end ropes, 63-anchor cables, 7-webs, 8-concrete Stick.
Specific embodiment
With reference to the accompanying drawing and specific embodiment the present invention is described in further detail.
Referring to FIG. 1 to FIG. 4, the embodiment of the present invention provides a kind of across concrete box girder method for dismounting in cross-line hole, including Following steps:
S1, protecting canopy frame is set up below cross-line box beam 1;
The operational safety of bridge lower section existing line, sets up below cross-line box beam 1 when in order to ensure removing cross-line box beam 1 Protecting canopy frame, protecting canopy frame uses strip footing frame in the present embodiment, and along existing line direction, every 3m lays 500 × 8mm of φ Steel pipe post, frame crossbeam use I20 fashioned iron, protecting canopy frame set up range along direction across bridge stretch out the outer 5m model of bridge flange plate 3 It encloses.
S2, bridge floor affiliated facility is removed;
The affiliated facility includes street lamp on bridge floor, monitoring, anti-throwing net and bridge surface waterproof layer, protective layer, work progress After the facilities such as street lamp, monitoring, anti-throwing net on middle dismounting bridge floor, bridge surface waterproof layer and protective layer are removed using milling machine milling, Reduce concrete box girder weight to be torn open.
S3, by the flange plate 3 of cross-line box beam 1 from being respectively cut in bridge span, removing to both ends;
As shown in Figure 1, in work progress using rope saw by the flange plate 3 of cross-line box beam 1 along vertical bridge to, from bridge span to Piecemeal cutting in both ends is removed, in the present embodiment, from start in bridge span by flange plate 3 along vertical bridge to cut every 1.5m piecemeal, It removes, lifting.
S4, by the top plate 4 of cross-line box beam 1, bottom plate 5 from being respectively cut in bridge span, removing to both ends;
It is sawed the top plate 4 of cross-line box beam 1, bottom plate 5 along vertical bridge using rope to from dividing in bridge span to both ends in work progress Block cutting is removed, in the present embodiment, from start in bridge span by top plate 3, bottom plate 4 along vertical bridge to every the cutting of 2m piecemeal, tear open It removes, lift, and be reserved with the concrete stick 8 of 50cm width between adjacent two pieces of top plates 3, between adjacent two pieces of bottom plates 4;? When close to 1 end of cross-line box beam, top plate 3, bottom plate 4 block can suitably increase, to improve cutting, remove efficiency.
S5, button anchor cable system 6 for carrying cross-line box beam 1 is set;
As shown in figure 3, the button anchor cable system 6 includes the column 61 being set in non-cross-line box beam 2, one end is anchored in institute 61 top of column is stated, the other end is anchored in the button anchor cable 62 of the cross-line box beam 1 and one end is anchored in the column 61 and pushes up Portion, the other end are anchored in the anchor cable 63 of the non-cross-line box beam 2;Column 61, button anchor cable 62 and anchor cable 63 collectively constitute carrying across The load-carrying construction of 1 cantilever part of line box beam detains the abdomen that anchor cable 62 is anchored in the cross-line box beam 1 using fixing end anchorage form On plate 7.
It is described button anchor cable 62 include anchor point close to 1 end of cross-line box beam proximal end rope 621 and anchor point far from institute State the distal end rope 622 of 1 end of cross-line box beam;In the present embodiment, the proximal end rope 621 in anchor cable 62 is detained, distal end rope 622 anchors respectively At away from the 1 end position 6m, 12m of cross-line box beam, rear end anchor cable 63 is anchored in the side web of non-cross-line box beam 2, and column 61, which divides, is Two groups, every group of 2 φ 500 × 6mm specification steel pipes using 8m high, it is two groups that button anchor cable 62, which is divided to, and every group is set as 8 diameters The steel strand wires of 15.24mm, intensity 1860M Pa, it is 2 groups that anchor cable 63, which divides, and every group is set as 10 diameter 15.24mm, intensity The steel strand wires of 1860MPa.
S6, by the web 7 of cross-line box beam 1 from being respectively cut in bridge span, removing to both ends;
State as shown in Figure 3, in work progress using rope saw by the web 7 of cross-line box beam 1 from bridge span to both ends edge Vertical bridge when removing to 622 neighbouring position of distal end rope, discharges 622 anchored end of distal end rope to every the cutting of 2m piecemeal, dismounting Pulling force then removes distal end rope 622, until state shown in Fig. 4;The web 7 of remaining cross-line box beam 1 equally from bridge span to both ends Along bridge is indulged to every the cutting of 2m piecemeal, dismounting, when removing to 621 neighbouring position of proximal end rope, 1 cantilever end of cross-line box beam is answered Power meets concrete box girder allowable stress, therefore, can remove proximal end rope 621, then removes the web 7 of remaining cross-line box beam 1.
S7, the button anchor cable system 6 is removed, completes across the concrete box girder dismounting in cross-line hole.
After removing proximal end rope 621,6 overall pulling down of anchor cable system can will be detained, and until the whole cross-line box beams 1 of dismounting, are completed Dismounting of the cross-line hole across concrete box girder.
Across the box beam method for dismounting in cross-line hole of the invention is mixed in division 1 flange plate of cross-line box beam, 3 concret block, top plate 4 After solidifying soil block body, 5 concret block of bottom plate, successively cuts, removes 1 flange plate of cross-line box beam, 3 concret block, 4 coagulation of top plate Soil block body, 5 concret block of bottom plate form frame structure, ensure that frame structure cantilever end is stablized by setting button anchor cable system 6 After safety, from being respectively cut, removing 1 web 7 of cross-line box beam in bridge span to both ends, until the dismounting of cross-line box beam 1 finishes, remove Anchor cable system 6 is detained, difficulty of the cross-line hole across concrete box girder Demolition Construction is substantially reduced, improves the safety in work progress Property and construction efficiency, and the influence to existing line normal pass under bridge is smaller, it is practical.
Those skilled in the art can carry out various modifications to the embodiment of the present invention and modification, if these modifications and change For type within the scope of the claims in the present invention and its equivalent technologies, then these modifications and variations are also in protection scope of the present invention Within.
The prior art that the content being not described in detail in specification is known to the skilled person.

Claims (9)

1. a kind of across concrete box girder method for dismounting in cross-line hole, which comprises the following steps:
S1, protecting canopy frame is set up below cross-line box beam (1);
S2, bridge floor affiliated facility is removed;
S3, by the flange plate (3) of cross-line box beam (1) from being respectively cut in bridge span, removing to both ends;
S4, by the top plate (4) of cross-line box beam (1), bottom plate (5) from being respectively cut in bridge span, removing to both ends;
S5, button anchor cable system (6) for carrying cross-line box beam (1) is set;
S6, by the web (7) of cross-line box beam (1) from being respectively cut in bridge span, removing to both ends;
S7, the button anchor cable system (6) is removed, completes across the concrete box girder dismounting in cross-line hole.
2. across the concrete box girder method for dismounting in cross-line hole as described in claim 1, it is characterised in that: in step sl, described Protecting canopy frame uses strip footing frame.
3. across the concrete box girder method for dismounting in cross-line hole as described in claim 1, it is characterised in that: in step s 2, described Affiliated facility includes street lamp on bridge floor, monitoring, anti-throwing net and bridge surface waterproof layer, protective layer.
4. across the concrete box girder method for dismounting in cross-line hole as described in claim 1, it is characterised in that: in step s3, described Flange plate (3) cuts to piecemeal along vertical bridge, removes.
5. across the concrete box girder method for dismounting in cross-line hole as described in claim 1, it is characterised in that: in step s 4, described Top plate (4), bottom plate (5) cut to piecemeal along vertical bridge, remove, and reserve concrete stick (8) between adjacent two pieces.
6. across the concrete box girder method for dismounting in cross-line hole as described in claim 1, it is characterised in that: in step s 5, described Button anchor cable system (6) includes that the column (61) being set on non-cross-line box beam (2) and one end are anchored in the column (61) top Portion, the other end are anchored in the button anchor cable (62) of the cross-line box beam (1).
7. across the concrete box girder method for dismounting in cross-line hole as claimed in claim 6, it is characterised in that: the button anchor cable system It (6) further include that one end is anchored at the top of the column (61), the other end is anchored in the anchor cable (63) of the non-cross-line box beam (2).
8. across the concrete box girder method for dismounting in cross-line hole as claimed in claim 6, it is characterised in that: button anchor cable (62) anchor It is fixed on the web (7) of the cross-line box beam (1).
9. across the concrete box girder method for dismounting in cross-line hole as claimed in claim 6, it is characterised in that: button anchor cable (62) packet Anchor point is included close to the proximal end rope (621) and anchor point of cross-line box beam (1) end far from cross-line box beam (1) end Distal end rope (622).
CN201910267686.3A 2019-04-03 2019-04-03 Method for dismantling cross-line hole cross-concrete box girder Active CN110273385B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910267686.3A CN110273385B (en) 2019-04-03 2019-04-03 Method for dismantling cross-line hole cross-concrete box girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910267686.3A CN110273385B (en) 2019-04-03 2019-04-03 Method for dismantling cross-line hole cross-concrete box girder

Publications (2)

Publication Number Publication Date
CN110273385A true CN110273385A (en) 2019-09-24
CN110273385B CN110273385B (en) 2021-03-02

Family

ID=67959358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910267686.3A Active CN110273385B (en) 2019-04-03 2019-04-03 Method for dismantling cross-line hole cross-concrete box girder

Country Status (1)

Country Link
CN (1) CN110273385B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111172902A (en) * 2020-01-09 2020-05-19 南京林业大学 Construction method for quickly dismantling box girder bridge without support

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3861100B1 (en) * 2005-10-19 2006-12-20 有限会社 松岡知的所有権事務所 Bridge girder dismantling method
CN103938557A (en) * 2014-03-11 2014-07-23 卢耒运 Overpass bridge dismounting method
CN104480868A (en) * 2014-12-13 2015-04-01 中铁十九局集团第二工程有限公司 Beam detaching method for road bridge overpassing operation railway
CN106284109A (en) * 2016-08-17 2017-01-04 中铁二十局集团第三工程有限公司 On across the most wired bridge main beam method for dismounting
JP2017122356A (en) * 2016-01-08 2017-07-13 Jfeスチール株式会社 Replacement steel plate deck of concrete slab and replacement method of concrete slab
CN107165062A (en) * 2017-07-07 2017-09-15 中铁七局集团第工程有限公司 A kind of method for removing Existing Railway Line gate-type pier capping beam protecting canopy frame

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3861100B1 (en) * 2005-10-19 2006-12-20 有限会社 松岡知的所有権事務所 Bridge girder dismantling method
CN103938557A (en) * 2014-03-11 2014-07-23 卢耒运 Overpass bridge dismounting method
CN104480868A (en) * 2014-12-13 2015-04-01 中铁十九局集团第二工程有限公司 Beam detaching method for road bridge overpassing operation railway
JP2017122356A (en) * 2016-01-08 2017-07-13 Jfeスチール株式会社 Replacement steel plate deck of concrete slab and replacement method of concrete slab
CN106284109A (en) * 2016-08-17 2017-01-04 中铁二十局集团第三工程有限公司 On across the most wired bridge main beam method for dismounting
CN107165062A (en) * 2017-07-07 2017-09-15 中铁七局集团第工程有限公司 A kind of method for removing Existing Railway Line gate-type pier capping beam protecting canopy frame

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111172902A (en) * 2020-01-09 2020-05-19 南京林业大学 Construction method for quickly dismantling box girder bridge without support

Also Published As

Publication number Publication date
CN110273385B (en) 2021-03-02

Similar Documents

Publication Publication Date Title
CN104480868B (en) On tear beam method open across the highway bridge of railway in operation
CN108532465A (en) A kind of construction method of Through Steel case arch bridge
CN111155451A (en) Method for dismantling highway-span iron bridge
CN111560864B (en) Method for dismantling old bridge
CN107165062B (en) A method of removing Existing Railway Line gate-type pier capping beam protecting canopy frame
CN208167540U (en) Cable stayed Bridge Main Tower and suspension cable synchronous construction system
CN209652741U (en) Across the rail yard large span overpass of one kind
CN107747282A (en) On across both wired old bridge overall pulling down methods
CN111270618B (en) Bridge reconstruction construction method based on half-width traffic protection
CN110468713A (en) It is a kind of as Pier Formwork and the dual-purpose apparatus and its construction method of pre-loaded support struts
JPH0841826A (en) Erection method of bridge and equipment thereof and main girder unit
CN208346656U (en) A kind of hanging basket for the construction of bridge coping prestress wire two times tensioning
CN110273385A (en) A kind of across concrete box girder method for dismounting in cross-line hole
CN112921838B (en) Method for dismantling suspension line non-hinge rib arch bridge
CN109371852A (en) A kind of high-level bridge construction method across rail yard
JP6999295B2 (en) How to remove the deck
JP2006265899A (en) Scaffolding construction method
CN110984002A (en) Bridge deck auxiliary structure and method for dismantling cantilever box girder of main bridge T-shaped structure
CN115538340A (en) Rapid dismantling device and construction method for old bridge precast beam plate
CN112144424B (en) Construction method for removing arch ribs of steel pipe concrete arch bridge with dumbbell-shaped cross section
CN201046888Y (en) Bridge-dismantling hoisting device
WO2019047300A1 (en) Attachment type protection roof extending across highway for continuous girder
CN110396946B (en) Method for replacing bridge expansion device
CN211171638U (en) Reverse beam erecting construction platform of bridge girder erection machine
JP2023000184A (en) Mobile protective device and method for dismantling construction scaffold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant