JP6999295B2 - How to remove the deck - Google Patents

How to remove the deck Download PDF

Info

Publication number
JP6999295B2
JP6999295B2 JP2017119350A JP2017119350A JP6999295B2 JP 6999295 B2 JP6999295 B2 JP 6999295B2 JP 2017119350 A JP2017119350 A JP 2017119350A JP 2017119350 A JP2017119350 A JP 2017119350A JP 6999295 B2 JP6999295 B2 JP 6999295B2
Authority
JP
Japan
Prior art keywords
floor slab
block
deck
sheet material
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017119350A
Other languages
Japanese (ja)
Other versions
JP2019002239A (en
Inventor
和也 ▲崎▼谷
明夫 正司
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Oriental Shiraishi Corp
Original Assignee
Oriental Shiraishi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oriental Shiraishi Corp filed Critical Oriental Shiraishi Corp
Priority to JP2017119350A priority Critical patent/JP6999295B2/en
Publication of JP2019002239A publication Critical patent/JP2019002239A/en
Application granted granted Critical
Publication of JP6999295B2 publication Critical patent/JP6999295B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

本発明は、橋桁上に設けられた床版を撤去するために用いられる床版の撤去方法に関する。 The present invention relates to a method for removing a floor slab used for removing a floor slab provided on a bridge girder.

橋梁や高架道路等は、年月の経過による老朽化や、大型車両の交通量増加等により、橋桁上に設けられた既設コンクリート床版等に損傷が発生した場合、損傷した床版を撤去する必要がある。 If the existing concrete deck, etc. installed on the bridge girder is damaged due to deterioration over time, traffic volume of large vehicles, etc., the damaged deck will be removed. There is a need.

従来の床版撤去方法は、橋桁上に設置されたコンクリート床版をコンクリートカッターで所定の大きさのブロックに切断し、橋桁に連結固定されたコンクリート床版をジャッキで持ち上げて橋桁から剥離し、剥離したコンクリート床版をクレーンで撤去するものである。 The conventional method of removing the deck is to cut the concrete deck installed on the bridge girder into blocks of a predetermined size with a concrete cutter, lift the concrete deck connected and fixed to the bridge girder with a jack, and peel it off from the bridge girder. The peeled concrete deck is removed with a crane.

また、従来、コンクリート床版を撤去する方法に関して、特許文献1の開示技術が提案されている。特許文献1に開示された橋梁床版の撤去方法は、高圧ウォータージェットによりコンクリートのみを除去して鋼桁の幅よりも狭い幅の切削帯域を形成し、該切削帯域にジベルおよび床版内に配設した鉄筋を露出させて鋼桁と床版との縁切りを行い、鋼桁上面のジベルをそのまま残してコンクリート床版を所要大きさのブロック片に切断して撤去するものである。 Further, conventionally, a disclosure technique of Patent Document 1 has been proposed as a method for removing a concrete deck. In the method for removing a bridge deck disclosed in Patent Document 1, only concrete is removed by a high-pressure water jet to form a cutting zone having a width narrower than the width of the steel girder, and the cutting zone is formed in a gibber and a deck. The arranged reinforcing bars are exposed to cut the edges between the steel girder and the deck, and the concrete deck is cut into block pieces of the required size and removed, leaving the gibber on the upper surface of the steel girder as it is.

しかしながら、従来の床版撤去方法及び特許文献1に開示された橋梁床版の撤去方法は、床版の撤去に際し、切断したコンクリート床版をクレーンにより吊り上げて旋回させた上でトレーラー等に積み込み、現場から搬出する必要がある。このとき、橋梁や高架道路等の下方側に他の道路が交差したり、住宅等が近接している場合には、一般車両や歩行者等が通行する領域の上空を、切断したブロックが通過する虞がある。さらに、従来の床版撤去方法及び特許文献1に開示された橋梁床版の撤去方法は、コンクリート床版の老朽化や交通量増加により損傷しているのみならず、凍結防止剤散布による塩害や、床版を橋桁から剥離する際に作用する衝撃等により、床版のコンクリートが損傷している可能性がある。このため、従来の床版撤去方法及び特許文献1に開示された橋梁床版の撤去方法は、切断したブロックを撤去するのに際し、損傷したコンクリート床版の破片が一般車両や歩行者等が通行する領域に落下する虞があり、より安全に施工することができる床版の撤去方法が求められている。 However, in the conventional floor slab removal method and the bridge deck removal method disclosed in Patent Document 1, when the floor slab is removed, the cut concrete deck is lifted by a crane, swiveled, and then loaded onto a trailer or the like. It is necessary to carry it out from the site. At this time, if another road intersects the lower side of a bridge or an elevated road, or if a house or the like is close to the road, the cut block passes over the area where general vehicles or pedestrians pass. There is a risk of Further, the conventional floor slab removal method and the bridge deck removal method disclosed in Patent Document 1 are not only damaged by the aging of the concrete deck and the increase in traffic volume, but also cause salt damage due to spraying of the antifreeze agent. There is a possibility that the concrete of the deck is damaged due to the impact that acts when the deck is peeled off from the bridge girder. Therefore, in the conventional floor slab removal method and the bridge deck removal method disclosed in Patent Document 1, when the cut block is removed, damaged concrete floor slab fragments are passed by general vehicles, pedestrians, and the like. There is a risk of falling into the area where the floor slab is to be removed, and there is a need for a method for removing the floor slab that can be installed more safely.

特開2012-207388号公報Japanese Unexamined Patent Publication No. 2012-207388

そこで、本発明は、上述した問題点に鑑みて案出されたものであり、その目的とするところは、橋桁の上側に設けられる床版を安全に撤去することが可能となる床版の撤去方法を提供することにある。 Therefore, the present invention has been devised in view of the above-mentioned problems, and the purpose thereof is to remove the floor slab provided on the upper side of the bridge girder so that the floor slab can be safely removed. To provide a method.

第1発明に係る床版の撤去方法は、橋軸方向に延びる橋桁上に設けられた床版を撤去するために用いられる床版の撤去方法であって、前記橋桁の上面に固定されたジベルが埋設された床版を所定の大きさの床版ブロックに切断する切断工程と、前記床版ブロックの下方側に、平面視で前記床版ブロックよりも寸法の大きいシート材を配置するとともに、前記床版ブロックと前記シート材とを吊部材に取り付ける取付工程と、前記取付工程により前記ジベルが埋設された前記床版ブロックに取り付けた前記吊部材を揚重装置により揚重し、前記床版ブロックの下方側に前記シート材が配置された状態で、かつ前記床版ブロックの両側面に前記シート材が接触されて当該側面とは異なる他の側面が側方から視認される状態で、前記床版ブロックを撤去し、前記切断工程では、高さ方向と前記橋軸方向とに交わる橋軸直交方向において前記橋桁から離間した位置で、前記橋軸方向に沿って前記床版を切断することを特徴とする。 The method for removing the deck according to the first invention is a method for removing the deck used for removing the deck provided on the bridge girder extending in the direction of the bridge axis, and is a gibber fixed to the upper surface of the bridge girder. In addition to the cutting step of cutting the deck in which the deck is embedded into a deck block of a predetermined size, and arranging a sheet material having a size larger than that of the deck block in a plan view on the lower side of the deck block. The deck block and the sheet material are attached to the hanging member, and the hanging member attached to the deck block in which the gibber is embedded by the mounting step is lifted by a lifting device, and the deck is lifted. The sheet material is arranged on the lower side of the block, and the sheet material is in contact with both side surfaces of the deck block so that other side surfaces different from the side surface can be visually recognized from the side. The deck block is removed, and in the cutting step, the deck is cut along the bridge axis direction at a position separated from the bridge girder in the direction orthogonal to the bridge axis intersecting the height direction and the bridge axis direction. It is characterized by.

本発明によれば、床版を床版ブロックに切断することにより、撤去工程で撤去する床版ブロックを小型化することができる。このため、本発明によれば、床版ブロックを小型化することで、床版ブロックを撤去するとき、作業者等の挟まれ災害や追突災害の危険性を低減させることができ、より安全に施工することが可能となる。 According to the present invention, by cutting the floor slab into a floor slab block, the floor slab block to be removed in the removal step can be miniaturized. Therefore, according to the present invention, by downsizing the floor slab block, it is possible to reduce the risk of a pinched disaster or a rear-end collision disaster by a worker or the like when the floor slab block is removed, and it is safer. It will be possible to construct.

本発明によれば、吊部材を揚重装置により揚重して、床版ブロックの下方側にシート材が配置された状態で床版ブロックを撤去することにより、損傷した床版ブロックのコンクリートの破片が落下した場合であっても、シート材により保護されるため、シート材の下方側にコンクリートの破片が落下するのを防止することが可能となる。その結果、本発明によれば、切断した床版ブロックを撤去するのに際し、損傷した床版ブロックの破片が一般車両や歩行者等が通行する領域に落下することなく、より安全に施工することが可能となる。 According to the present invention, the hanging member is lifted by a lifting device, and the deck block is removed with the sheet material placed on the lower side of the deck block, whereby the concrete of the damaged deck block is removed. Even if the debris falls, it is protected by the sheet material, so that it is possible to prevent the concrete debris from falling to the lower side of the sheet material. As a result, according to the present invention, when removing the cut deck block, the damaged deck block fragments do not fall into the area where general vehicles, pedestrians, etc. pass, and the construction is safer. Is possible.

本発明を適用した床版の撤去方法が実施される橋梁を示す側面図である。It is a side view which shows the bridge in which the method of removing a floor slab to which this invention is applied is carried out. 本発明を適用した床版の撤去方法で切断工程を示す正面図である。It is a front view which shows the cutting process by the method of removing a floor slab to which this invention is applied. (a)は、本発明を適用した床版の撤去方法で取付工程及び撤去工程を示す正面図であり、(b)は、その側面図である。(A) is a front view which shows the attachment process and the removal process by the floor slab removal method to which this invention was applied, and (b) is the side view.

以下、本発明を適用した床版の撤去方法を実施するための形態について、図面を参照しながら詳細に説明する。 Hereinafter, a mode for carrying out the method for removing the floor slab to which the present invention is applied will be described in detail with reference to the drawings.

本発明を適用した床版の撤去方法は、主に、橋梁や高架道路等に適用される。以下では、本発明を適用した床版の撤去方法を橋梁6に適用する場合を例に取り、説明する。 The method for removing a floor slab to which the present invention is applied is mainly applied to bridges, elevated roads, and the like. In the following, a case where the method for removing the floor slab to which the present invention is applied is applied to the bridge 6 will be described as an example.

橋梁6は、図1に示すように、橋脚や橋台等の橋梁下部(図示省略)の上に、橋梁上部7が載置される。橋梁上部7は、鉄筋コンクリート製や鋼製等の複数の主桁71と、複数の主桁71の上に設けられる上部構造物8とを有する。ここで、主桁71の長手方向を橋軸方向Xとし、橋軸方向Xに水平に交わる方向を橋軸直交方向Yとし、橋軸直交方向Yに鉛直に交わる方向を高さ方向Zとする。 As shown in FIG. 1, in the bridge 6, the upper part 7 of the bridge is placed on the lower part (not shown) of the bridge such as a pier or an abutment. The bridge upper portion 7 has a plurality of main girders 71 made of reinforced concrete, steel, etc., and a superstructure 8 provided on the plurality of main girders 71. Here, the longitudinal direction of the main girder 71 is defined as the bridge axis direction X, the direction horizontally intersecting the bridge axis direction X is defined as the bridge axis orthogonal direction Y, and the direction perpendicularly intersecting the bridge axis orthogonal direction Y is defined as the height direction Z. ..

上部構造物8は、主桁71に下方から支持される床版82と、床版82の上面に設けられるコンクリート製等の地覆83と、床版82の縁に沿って立設されたコンクリート製等の高欄84等、から構成されている。床版82の上には、アスファルト等の舗装が敷設されている。 The superstructure 8 includes a floor slab 82 supported from below by the main girder 71, a concrete ground cover 83 provided on the upper surface of the floor slab 82, and concrete erected along the edge of the floor slab 82. It is composed of a high column 84, etc. made of concrete. Pavement such as asphalt is laid on the floor slab 82.

床版82は、コンクリート製のものが用いられ、例えば、主桁71の上面に固定されたジベル(図示省略)等が埋設されて、主桁71に固定される。床版82は、老朽化、交通荷重、凍結防止剤等の散布による塩害等により、床版82のコンクリートが損傷し、コンクリートの破片が落下しやすい状態となっている。 The floor slab 82 is made of concrete, and for example, a girder (not shown) fixed to the upper surface of the main girder 71 is embedded and fixed to the main girder 71. The floor slab 82 is in a state where the concrete of the floor slab 82 is damaged due to aging, traffic load, salt damage due to spraying of an antifreeze agent, etc., and concrete fragments are easily dropped.

本発明を適用した床版の撤去方法は、主桁71上に設けられる床版82を撤去するために用いられる。 The method for removing the floor slab to which the present invention is applied is used for removing the floor slab 82 provided on the main girder 71.

本発明を適用した床版の撤去方法は、図2及び図3に示すように、床版82を所定の大きさの床版ブロック81に切断する切断工程と、床版ブロック81の下方側にシート材5を配置するとともに、床版ブロック81とシート材5とを吊部材1に取り付ける取付工程と、吊部材1を揚重装置により揚重して、床版ブロック81の下方側にシート材5が配置された状態で撤去する撤去工程とを備える。 As shown in FIGS. 2 and 3, the method for removing the deck to which the present invention is applied includes a cutting step of cutting the deck 82 into a deck block 81 having a predetermined size, and a method of removing the deck on the lower side of the deck block 81. The sheet material 5 is arranged, the floor slab block 81 and the sheet material 5 are attached to the hanging member 1, and the hanging member 1 is lifted by the lifting device, and the sheet material is placed below the floor slab block 81. It is provided with a removal step of removing 5 in a state where it is arranged.

切断工程では、図2に示すように、床版82をコンクリートカッター等の切断機により、床版ブロック81が平面視で矩形状となるように、切断線89に沿って切断する。床版82を切断して床版ブロック81とする際、床版ブロック81が床版82のみで構成されるものであってもよいし、床版ブロック81が床版82と、地覆83及び高欄84の何れか一方又は両方と、一体化されて構成されるものであってもよい。 In the cutting step, as shown in FIG. 2, the deck 82 is cut along the cutting line 89 by a cutting machine such as a concrete cutter so that the deck block 81 has a rectangular shape in a plan view. When the floor slab 82 is cut into a floor slab block 81, the floor slab block 81 may be composed of only the floor slab 82, or the floor slab block 81 includes the floor slab 82, the ground cover 83, and the floor slab 82. It may be integrated with any one or both of the balustrade 84.

切断工程では、橋軸直交方向Yで3箇所以上の切断線89を設けて切断することで、1個あたりの床版ブロック81の重量を低減することができる。 In the cutting step, the weight of each deck block 81 can be reduced by providing three or more cutting lines 89 in the direction Y orthogonal to the bridge axis and cutting.

そして、切断工程では、床版ブロック81を、図示しないジャッキ等により、主桁71から剥離する。床版ブロック81をジャッキ等により主桁71から剥離することで、床版ブロック81に埋設されたジベル近傍の床版ブロック81が損傷し、コンクリートの破片が落下しやすい状態となる。 Then, in the cutting step, the floor slab block 81 is peeled from the main girder 71 by a jack or the like (not shown). By peeling the deck block 81 from the main girder 71 with a jack or the like, the deck block 81 in the vicinity of the girder embedded in the deck block 81 is damaged, and concrete fragments are likely to fall.

次に、取付工程では、図3(a)及び図3(b)に示すように、主桁71から剥離した床版ブロック81の下方側にシート材5を配置する。このとき、予め床版82の上面に展張させておいたシート材5の上方に、クレーン等の揚重装置により床版ブロック81を移動させることで、床版ブロック81の下方側にシート材5を配置する。 Next, in the mounting step, as shown in FIGS. 3A and 3B, the sheet material 5 is arranged on the lower side of the deck block 81 peeled off from the main girder 71. At this time, by moving the floor slab block 81 above the sheet material 5 previously spread on the upper surface of the floor slab 82 by a lifting device such as a crane, the sheet material 5 is moved to the lower side of the floor slab block 81. To place.

また、取付工程では、床版ブロック81とシート材5とを吊部材1に取り付ける。吊部材1は、クレーン等の揚重装置のワイヤー9に吊り下げられるものであり、床版ブロック81を揚重装置により揚重する際に用いられる。 Further, in the attachment process, the floor slab block 81 and the sheet material 5 are attached to the suspension member 1. The suspension member 1 is suspended from a wire 9 of a lifting device such as a crane, and is used when the deck block 81 is lifted by the lifting device.

吊部材1は、例えばH形鋼が用いられる本体部11と、本体部11に固定される複数のブロック取付部12及び複数のシート材取付部13とを有する。吊部材1は、2つのブロック取付部12が本体部11の長手方向の中心に対して対称となるようにそれぞれ配置される。また、吊部材1は、3つのシート材取付部13が配置され、そのうちの1つのシート材取付部13が本体部11の長手方向の略中央に配置され、他の2つのシート材取付部13が本体部11の長手方向の中心に対して対称となるようにそれぞれ両端側に配置される。なお、図3に示す形態において、吊部材1は、1つの本体部11と、2つのブロック取付部12と、3つのシート材取付部13とを有するが、これに限定されず、本体部11、ブロック取付部12及びシート材取付部13が如何なる数量で構成されるものであってもよい。 The suspension member 1 has, for example, a main body portion 11 in which H-shaped steel is used, a plurality of block mounting portions 12 fixed to the main body portion 11, and a plurality of sheet material mounting portions 13. The suspension member 1 is arranged so that the two block mounting portions 12 are symmetrical with respect to the center in the longitudinal direction of the main body portion 11. Further, in the suspension member 1, three seat material mounting portions 13 are arranged, one of which is arranged at substantially the center of the main body portion 11 in the longitudinal direction, and the other two seat material mounting portions 13 are arranged. Are arranged on both end sides so as to be symmetrical with respect to the center of the main body 11 in the longitudinal direction. In the form shown in FIG. 3, the suspension member 1 has one main body portion 11, two block mounting portions 12, and three sheet material mounting portions 13, but is not limited to this, and the main body portion 11 is not limited thereto. , The block mounting portion 12 and the sheet material mounting portion 13 may be configured in any number.

本体部11は、吊金具11aが長手方向の中心に対称となるように2箇所に取り付けられ、吊金具11aを介してクレーン等の揚重装置のワイヤー9が取り付けられる。本体部11は、吊金具11aが2箇所に取り付けられることに限定されず、如何なる数量で取り付けられてもよい。 The main body 11 is attached to two places so that the hanging metal fittings 11a are symmetrical with respect to the center in the longitudinal direction, and the wire 9 of a lifting device such as a crane is attached via the hanging metal fittings 11a. The main body portion 11 is not limited to being attached to the hanging metal fittings 11a at two places, and may be attached in any number.

ブロック取付部12は、例えばH形鋼が用いられ、本体部11に対して水平方向に略直交するように配置され、長手方向の中央近傍が本体部11に固定される。ブロック取付部12は、長手方向の中心に対して対称となるように両端側に、それぞれチェーンブロック12aが取り付けられ、これらチェーンブロック12aを介して床版ブロック81が取り付けられる。 For example, H-shaped steel is used for the block mounting portion 12, and the block mounting portion 12 is arranged so as to be substantially orthogonal to the main body portion 11 in the horizontal direction, and the vicinity of the center in the longitudinal direction is fixed to the main body portion 11. Chain blocks 12a are attached to both ends of the block attachment portion 12 so as to be symmetrical with respect to the center in the longitudinal direction, and the deck block 81 is attached via these chain blocks 12a.

シート材取付部13は、例えばH形鋼が用いられ、本体部11に対して水平方向に略直交するように配置され、長手方向の中央近傍が本体部11に固定される。シート材取付部13は、長手方向の中心に対して対称となるように両端側に、それぞれチェーンブロック13aが取り付けられ、これらチェーンブロック13aを介してシート材5が取り付けられる。 For example, H-shaped steel is used for the sheet material mounting portion 13, and the sheet material mounting portion 13 is arranged so as to be substantially orthogonal to the main body portion 11 in the horizontal direction, and the vicinity of the center in the longitudinal direction is fixed to the main body portion 11. Chain blocks 13a are attached to both ends of the sheet material attaching portion 13 so as to be symmetrical with respect to the center in the longitudinal direction, and the sheet material 5 is attached via these chain blocks 13a.

シート材5は、シート状に形成された布製モッコ等が用いられる。シート材5は、矩形状に形成され、平面視で床版ブロック81よりも寸法の大きいものが用いられる。 As the sheet material 5, a cloth mokko or the like formed in a sheet shape is used. The sheet material 5 is formed in a rectangular shape and has a larger size than the floor slab block 81 in a plan view.

取付工程では、床版ブロック81に削孔機等により貫通孔81aを削孔し、貫通孔81aに吊治具81bを貫通させて固定する。吊治具81bは、吊部材1のブロック取付部12に床版ブロック81を取り付けるためのものであり、床版ブロック81に削孔された貫通孔81aに固定される。貫通孔81aは、床版ブロック81に削孔機等により削孔されるため、床版ブロック81は、貫通孔81a近傍が損傷してコンクリートの破片が落下しやすい状態となる。なお、本実施形態では、取付工程において貫通孔81aに吊治具81bを貫通させて固定する作業を行ったが、かかる作業は、切断工程において行ってもよい。 In the mounting step, a through hole 81a is drilled in the floor slab block 81 by a drilling machine or the like, and the suspension jig 81b is passed through the through hole 81a and fixed. The hanging jig 81b is for attaching the floor slab block 81 to the block mounting portion 12 of the hanging member 1, and is fixed to the through hole 81a drilled in the floor slab block 81. Since the through hole 81a is drilled in the floor slab block 81 by a drilling machine or the like, the floor slab block 81 is in a state where the vicinity of the through hole 81a is damaged and concrete fragments are likely to fall. In addition, in this embodiment, the work of penetrating the hanging jig 81b through the through hole 81a and fixing it in the mounting step is performed, but such work may be performed in the cutting step.

取付工程では、床版ブロック81の吊治具81bを、吊部材1のブロック取付部12に取り付ける。また、取付工程では、床版ブロック81の下方側に配置したシート材5を、吊部材1のシート材取付部13に取り付ける。 In the mounting step, the hanging jig 81b of the floor slab block 81 is attached to the block mounting portion 12 of the hanging member 1. Further, in the mounting step, the sheet material 5 arranged on the lower side of the floor slab block 81 is attached to the sheet material mounting portion 13 of the hanging member 1.

次に、撤去工程では、床版ブロック81が取り付けられた吊部材1を揚重装置により揚重して、床版ブロック81の下方側にシート材5が配置された状態で、床版ブロック81を撤去する。吊部材1を揚重する際には、吊部材1に取り付けられた床版ブロック81が略水平となるように、チェーンブロック12aを適宜調整する。 Next, in the removal step, the hanging member 1 to which the floor slab block 81 is attached is lifted by a lifting device, and the floor slab block 81 is arranged in a state where the sheet material 5 is arranged below the floor slab block 81. To remove. When lifting the suspension member 1, the chain block 12a is appropriately adjusted so that the floor slab block 81 attached to the suspension member 1 is substantially horizontal.

そして撤去工程では、吊部材1を揚重したクレーン等の揚重装置を旋回させ、床版ブロック81を積み込むためのトレーラー等に積み込んで、現場から床版ブロック81を搬出して撤去する。 Then, in the removal step, a lifting device such as a crane that lifts the suspension member 1 is swiveled, loaded onto a trailer or the like for loading the deck block 81, and the deck block 81 is carried out from the site and removed.

本発明を適用した床版の撤去方法は、切断工程において、床版82を切断して床版ブロック81を1つ切り出した後に、取付工程と、撤去工程とを行ってもよい。このとき、本発明を適用した床版の撤去方法は、1つの床版ブロック81を撤去した後に、再度切断工程を行って、床版82を切断して床版ブロック81を1つ切り出した後に、取付工程と、撤去工程とを行って、床版82を撤去することとなる。即ち、本発明を適用した床版の撤去方法は、切断工程と、取付工程と、撤去工程とを1サイクルとして繰り返し行ってもよい。 In the method for removing the floor slab to which the present invention is applied, in the cutting step, the floor slab 82 may be cut to cut out one floor slab block 81, and then the attachment step and the removal step may be performed. At this time, in the method for removing the deck to which the present invention is applied, after removing one deck block 81, a cutting step is performed again, the deck 82 is cut, and one deck block 81 is cut out. , The installation step and the removal step are performed to remove the floor slab 82. That is, in the method for removing the floor slab to which the present invention is applied, the cutting step, the mounting step, and the removing step may be repeated as one cycle.

またこれに限らず、本発明を適用した床版の撤去方法は、切断工程において、床版82を切断して複数の床版ブロック81を切り出しておき、複数の床版ブロック81のうち1つの床版ブロック81に対して、取付工程と、撤去工程とを行って、1つの床版ブロック81を撤去してもよい。このとき、本発明を適用した床版の撤去方法は、1つの床版ブロック81を撤去した後に、切断工程において既に切り出した他の床版ブロック81に対して、取付工程と、撤去工程とを行ってもよい。即ち、本発明を適用した床版の撤去方法は、切断工程において撤去すべき床版82を全て床版ブロック81に切断した後で、取付工程と、撤去工程とを1サイクルとして繰り返し行ってもよい。 Further, not limited to this, in the method for removing the deck to which the present invention is applied, in the cutting step, the deck 82 is cut to cut out a plurality of deck blocks 81, and one of the plurality of deck blocks 81 is cut out. One deck block 81 may be removed by performing an attachment step and a removal step on the deck block 81. At this time, in the method for removing the floor slab to which the present invention is applied, after removing one floor slab block 81, an attachment step and a removal step are performed on the other floor slab block 81 already cut out in the cutting step. You may go. That is, in the method for removing the floor slab to which the present invention is applied, even if all the floor slabs 82 to be removed in the cutting step are cut into the floor slab block 81, the mounting step and the removing step are repeated as one cycle. good.

本発明を適用した床版の撤去方法は、床版82を床版ブロック81に切断することにより、撤去工程で撤去する床版ブロック81を小型化することができる。このため、本発明を適用した床版の撤去方法は、床版ブロック81を小型化することで、床版ブロック81を撤去するとき、床版ブロック81と作業員との挟まれ災害や追突災害の危険性を低減させることができ、より安全に施工することが可能となる。 In the method for removing the floor slab to which the present invention is applied, by cutting the floor slab 82 into the floor slab block 81, the floor slab block 81 to be removed in the removal step can be miniaturized. Therefore, the method for removing the floor slab to which the present invention is applied is to reduce the size of the floor slab block 81, and when the floor slab block 81 is removed, a disaster or a collision disaster between the floor slab block 81 and a worker is caught. It is possible to reduce the risk of construction and to construct more safely.

また、本発明を適用した床版の撤去方法は、床版82を床版ブロック81に切断することにより、床版ブロック81を小型化することで、床版ブロック81が取り付けられた吊部材1を吊り下げた揚重装置を旋回させたとき、床版ブロック81が一般車両や歩行者等が通行する領域を通過する危険性を低減させることができ、より安全に施工することが可能となる。 Further, in the method for removing the floor slab to which the present invention is applied, the floor slab 82 is cut into the floor slab block 81 to reduce the size of the floor slab block 81, so that the suspension member 1 to which the floor slab block 81 is attached is attached. It is possible to reduce the risk that the floor slab block 81 will pass through the area where general vehicles, pedestrians, etc. pass when the lifting device is turned. ..

また、本発明を適用した床版の撤去方法は、床版82を床版ブロック81に切断することにより、床版ブロック81を小型化することで、揚重装置に作用する荷重の負担を低減させることができる。その結果、本発明を適用した床版の撤去方法は、揚重能力の低い揚重装置を用いることができるため、より安全に施工することが可能となる。また、本発明を適用した床版の撤去方法は、揚重能力の低い揚重装置を用いることで、揚重装置を設置するスペースを小さくすることができ、限られた現場のスペースを効率よく使用することが可能となる。 Further, in the method for removing the floor slab to which the present invention is applied, the floor slab 82 is cut into the floor slab block 81 to reduce the size of the floor slab block 81, thereby reducing the load on the lifting device. Can be made to. As a result, the floor slab removing method to which the present invention is applied can be carried out more safely because a lifting device having a low lifting capacity can be used. Further, in the method of removing the floor slab to which the present invention is applied, by using a lifting device having a low lifting capacity, the space for installing the lifting device can be reduced, and the limited space at the site can be efficiently used. It will be possible to use it.

上述したように床版82により構成される床版ブロック81は、老朽化、交通荷重、凍結防止剤等の散布による塩害等による損傷に加え、床版ブロック81に削孔機等により削孔された貫通孔81a近傍が損傷している可能性がある。このため、床版ブロック81は、コンクリートの破片等が落下しやすい状態であり、床版ブロック81の撤去の際には、コンクリートの破片の落下に注意する必要がある。本発明を適用した床版の撤去方法は、吊部材1を揚重装置により揚重して、床版ブロック81の下方側にシート材5が配置された状態で床版ブロック81を撤去することにより、損傷した床版ブロック81のコンクリートの破片が落下した場合であっても、シート材5により保護されるため、シート材5の下方側にコンクリートの破片が落下するのを防止することが可能となる。その結果、本発明を適用した床版の撤去方法は、切断した床版ブロック81を撤去するのに際し、損傷した床版ブロック81の破片が一般車両や歩行者等が通行する領域に落下することなく、より安全に施工することが可能となる。 As described above, the deck block 81 composed of the deck 82 is damaged by aging, traffic load, salt damage due to spraying of antifreeze, etc., and is drilled in the deck block 81 by a drilling machine or the like. There is a possibility that the vicinity of the through hole 81a is damaged. Therefore, the floor slab block 81 is in a state where concrete debris and the like are likely to fall, and it is necessary to pay attention to the fall of concrete debris when removing the floor slab block 81. The method for removing the floor slab to which the present invention is applied is to lift the hanging member 1 with a lifting device and remove the floor slab block 81 with the sheet material 5 arranged on the lower side of the floor slab block 81. Therefore, even if the concrete debris of the damaged deck block 81 falls, it is protected by the sheet material 5, so that it is possible to prevent the concrete debris from falling to the lower side of the sheet material 5. Will be. As a result, in the method for removing the floor slab to which the present invention is applied, when the cut floor slab block 81 is removed, the damaged debris of the floor slab block 81 falls into an area where general vehicles, pedestrians, etc. pass. It is possible to construct more safely.

本発明を適用した床版の撤去方法は、吊部材1の長手方向の中心に対して対称に配置された各々のブロック取付部12に、ブロック取付部12の長手方向の中心に対して対象に配置されたそれぞれのチェーンブロック12aを介して、床版ブロック81を取り付けるため、床版ブロック81を揚重したとき、床版ブロック81に固定された吊治具81bに略均等に荷重が負担されることとなる。即ち、本発明を適用した床版の撤去方法は、床版ブロック81に偏った荷重が作用することなく、床版ブロック81を撤去することができるため、より安全に施工することが可能となる。 The method for removing the floor slab to which the present invention is applied applies to each block mounting portion 12 arranged symmetrically with respect to the longitudinal center of the suspension member 1 with respect to the longitudinal center of the block mounting portion 12. Since the deck block 81 is attached via each of the arranged chain blocks 12a, when the deck block 81 is lifted, the load is substantially evenly applied to the hanging jig 81b fixed to the deck block 81. The Rukoto. That is, in the method for removing the floor slab to which the present invention is applied, the floor slab block 81 can be removed without an unbalanced load acting on the floor slab block 81, so that the construction can be performed more safely. ..

以上、本発明の実施形態の例について詳細に説明したが、上述した実施形態は、何れも本発明を実施するにあたっての具体化の例を示したものに過ぎず、これらによって本発明の技術的範囲が限定的に解釈されてはならないものである。 Although the examples of the embodiments of the present invention have been described in detail above, all of the above-described embodiments are merely examples of specific examples in carrying out the present invention, and the technical aspects of the present invention are thereby used. The scope should not be construed in a limited way.

1 :吊部材
11 :本体部
11a :吊金具
12 :ブロック取付部
12a :チェーンブロック
13 :シート材取付部
13a :チェーンブロック
5 :シート材
6 :橋梁
7 :橋梁上部
71 :主桁
8 :上部構造物
81 :床版ブロック
81a :貫通孔
81b :吊治具
82 :床版
83 :地覆
84 :高欄
89 :切断線
9 :ワイヤー
X :橋軸方向
Y :橋軸直交方向
Z :高さ方向
1: Suspension member 11: Main body 11a: Suspension fitting 12: Block mounting part 12a: Chain block 13: Sheet material mounting part 13a: Chain block 5: Sheet material 6: Bridge 7: Bridge upper part 71: Main girder 8: Upper structure Object 81: Deck block 81a: Through hole 81b: Hanging jig 82: Deck 83: Ground cover 84: Girder 89: Cutting line 9: Wire X: Bridge axis direction Y: Bridge axis orthogonal direction Z: Height direction

Claims (1)

橋軸方向に延びる橋桁上に設けられた床版を撤去するために用いられる床版の撤去方法であって、
前記橋桁の上面に固定されたジベルが埋設された床版を所定の大きさの床版ブロックに切断する切断工程と、
前記床版ブロックの下方側に、平面視で前記床版ブロックよりも寸法の大きいシート材を配置するとともに、前記床版ブロックと前記シート材とを吊部材に取り付ける取付工程と、
前記取付工程により前記ジベルが埋設された前記床版ブロックに取り付けた前記吊部材を揚重装置により揚重し、前記床版ブロックの下方側に前記シート材が配置された状態で、かつ前記床版ブロックの両側面に前記シート材が接触されて当該側面とは異なる他の側面が側方から視認される状態で、前記床版ブロックを撤去し、
前記切断工程では、高さ方向と前記橋軸方向とに交わる橋軸直交方向において前記橋桁から離間した位置で、前記橋軸方向に沿って前記床版を切断すること
を特徴とする床版の撤去方法。
It is a method of removing the floor slab used to remove the floor slab provided on the bridge girder extending in the direction of the bridge axis.
A cutting step of cutting a deck in which a gibber fixed on the upper surface of the bridge girder is embedded into a deck block of a predetermined size, and
An attachment step of arranging a sheet material having a size larger than that of the floor slab block in a plan view on the lower side of the floor slab block and attaching the floor slab block and the sheet material to the suspension member.
The hanging member attached to the floor slab block in which the gibber is embedded by the attachment step is lifted by a lifting device, and the sheet material is arranged on the lower side of the deck block and the floor . The floor slab block was removed with the sheet material in contact with both side surfaces of the plate block and the other side surfaces different from the side surface being visible from the side .
The cutting step is characterized in that the deck is cut along the bridge axis direction at a position separated from the bridge girder in the direction orthogonal to the bridge axis intersecting the height direction and the bridge axis direction . How to remove.
JP2017119350A 2017-06-19 2017-06-19 How to remove the deck Active JP6999295B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017119350A JP6999295B2 (en) 2017-06-19 2017-06-19 How to remove the deck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017119350A JP6999295B2 (en) 2017-06-19 2017-06-19 How to remove the deck

Publications (2)

Publication Number Publication Date
JP2019002239A JP2019002239A (en) 2019-01-10
JP6999295B2 true JP6999295B2 (en) 2022-01-18

Family

ID=65004791

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017119350A Active JP6999295B2 (en) 2017-06-19 2017-06-19 How to remove the deck

Country Status (1)

Country Link
JP (1) JP6999295B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111560864B (en) * 2020-01-17 2021-09-14 广东冠粤路桥有限公司 Method for dismantling old bridge
CN111139752B (en) * 2020-01-17 2021-05-11 广东冠粤路桥有限公司 Method for dismantling T-shaped hanging beam
CN113802478B (en) * 2021-10-29 2022-08-02 合肥工业大学 Arch bridge deck structure demolishs device based on arch rib supports atress

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4301565A (en) 1980-03-19 1981-11-24 Irwin Weinbaum Method and system for the removal and replacement of a bridge
JP2012207388A (en) 2011-03-29 2012-10-25 Kurosawa Construction Co Ltd Removal method for bridge floor slab
JP6245804B2 (en) 2012-12-28 2017-12-13 キヤノン株式会社 Image display system, image transmission apparatus and control method therefor, program, and recording medium

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0651961B2 (en) * 1985-08-23 1994-07-06 石川島播磨重工業株式会社 Bridge rebar concrete floor slab replacement method
JP3841958B2 (en) * 1998-07-06 2006-11-08 株式会社宮地鐵工所 Replacement method of concrete bridge to steel bridge
JP3596615B2 (en) * 2002-07-02 2004-12-02 日立プラント建設株式会社 Structure dismantling method
JP6709037B2 (en) * 2015-11-13 2020-06-10 首都高速道路株式会社 Floor removal method for composite girder

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4301565A (en) 1980-03-19 1981-11-24 Irwin Weinbaum Method and system for the removal and replacement of a bridge
JP2012207388A (en) 2011-03-29 2012-10-25 Kurosawa Construction Co Ltd Removal method for bridge floor slab
JP6245804B2 (en) 2012-12-28 2017-12-13 キヤノン株式会社 Image display system, image transmission apparatus and control method therefor, program, and recording medium

Also Published As

Publication number Publication date
JP2019002239A (en) 2019-01-10

Similar Documents

Publication Publication Date Title
JP6999295B2 (en) How to remove the deck
KR20060099484A (en) The use shelf with chemical anchor and high tention long bolt for bridge deck lifting method
JP2013174075A (en) Reconstruction technique for bridge girder
CN106638336B (en) Cross-line continuous beam method for dismounting and dismounting holder
KR100949601B1 (en) Method for broadening width of existing bridge without Temporary road
JP7008477B2 (en) How to remove synthetic girder
JP2017020290A (en) Disassembling method of bridge
JP2003253623A (en) Rebuilding construction method for bridge beam
JP5484983B2 (en) Method for assembling and dismantling bridge moving work device
CN112921838B (en) Method for dismantling suspension line non-hinge rib arch bridge
CN208346656U (en) A kind of hanging basket for the construction of bridge coping prestress wire two times tensioning
KR101095449B1 (en) Bridge deck dismembering method and its equipment
JP2009228301A (en) Elongation method for bridge pier
KR101701220B1 (en) Road expansion structure and construction method thereof
CN209907211U (en) Girder steel beam device that falls
JP6974233B2 (en) Floor slab replacement method and floor slab replacement device
KR101713653B1 (en) Prevent overturning beam and method for constructing bridge using this same
JP2000017618A (en) Replacement method of concrete bridge to steel bridge
KR100808291B1 (en) A safety device for pierces
JPH06136722A (en) Bridge floor plate disassembly method and device therefor
JP4690764B2 (en) Removal method of expansion joint
CN211142816U (en) Construction platform
JPH10280328A (en) Removal and erection method for bridge and pontoon equipment used to the method
CN214497184U (en) Prefabricated bridge deck and trestle
JP7463034B2 (en) Suspended scaffolding equipment and suspended scaffolding operation method

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170727

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200618

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210519

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210525

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210630

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210831

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20211008

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20211221

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20211222

R150 Certificate of patent or registration of utility model

Ref document number: 6999295

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150