CN110259468A - Driving engineering method of the shield machine in full ground consisting of hard rock - Google Patents
Driving engineering method of the shield machine in full ground consisting of hard rock Download PDFInfo
- Publication number
- CN110259468A CN110259468A CN201910469866.XA CN201910469866A CN110259468A CN 110259468 A CN110259468 A CN 110259468A CN 201910469866 A CN201910469866 A CN 201910469866A CN 110259468 A CN110259468 A CN 110259468A
- Authority
- CN
- China
- Prior art keywords
- shield machine
- face
- driving
- hard rock
- engineering method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000011435 rock Substances 0.000 title claims abstract description 33
- 238000012407 engineering method Methods 0.000 title claims abstract description 16
- 238000000034 method Methods 0.000 claims abstract description 26
- 239000002360 explosive Substances 0.000 claims abstract description 15
- 238000005553 drilling Methods 0.000 claims abstract description 12
- 230000003068 static effect Effects 0.000 claims abstract description 6
- 230000005641 tunneling Effects 0.000 claims abstract description 5
- 238000007789 sealing Methods 0.000 claims description 6
- 239000003795 chemical substances by application Substances 0.000 claims description 4
- 239000000428 dust Substances 0.000 claims description 4
- 238000004140 cleaning Methods 0.000 claims description 2
- 239000000463 material Substances 0.000 claims description 2
- 241001074085 Scophthalmus aquosus Species 0.000 claims 2
- 238000010276 construction Methods 0.000 abstract description 7
- 238000005299 abrasion Methods 0.000 abstract description 2
- 238000005422 blasting Methods 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000004880 explosion Methods 0.000 description 2
- 239000010438 granite Substances 0.000 description 2
- 239000002893 slag Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 241001504664 Crossocheilus latius Species 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 239000003721 gunpowder Substances 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/006—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/0607—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/0642—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield having means for additional processing at the front end
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/08—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The driving engineering method that the present invention relates to a kind of shield machines in full ground consisting of hard rock, with tunneling process, also with cutter head of shield machine it is static, stop successively carrying out face under driving state blasthole drilling, load explosive in borehole and ignition charge bursts the process of face global tissue, shield machine carries out broken rock digging to face when which is conducive to tunnel again.Construction of the invention can greatly improve the drivage efficiency of shield machine in full ground consisting of hard rock, while reduce the hob abrasion of shield machine, reduce integral construction cost, for shield machine in hard rock and superhard rock driving, remarkable in economical benefits.
Description
Technical field
The present invention relates to shield driving technical field, driving engineering method of especially a kind of shield machine in full ground consisting of hard rock.
Background technique
The driving of shield machine mainly squeezes rock by the hobboing cutter on cutterhead, grinds the movement such as quick-fried, to carry out
Broken rock driving, but when running into excessive rock strength or tunneling boring hard rock, especially high-intensitive granite driving, shield machine knife
The hobboing cutter of disk just can not effectively realize the movement quick-fried to the extruding of hard rock or high-intensitive granite and stone roller, the rock breaking capacity of hobboing cutter
Just sharply decline, and the wear rate of hobboing cutter is high;The main reason for such case occur is since shield machine pick formation rock is hard
It spends too big, and tunnels that face is in a kind of gentle breeze or when without weathered state, digging face is the entirety of a rigidity,
Hobboing cutter on cutterhead is to carry out a kind of grinding work with driving face, therefore shield machine drivage efficiency is low in this case
Under, it is extremely difficult to effective rock breaking efficiency, is not a kind of ideal driving state.
Summary of the invention
The technical problem to be solved by the present invention is providing a kind of driving engineering method of shield machine in full ground consisting of hard rock, solve
Layer formation hardness is too big, and driving face is in a kind of gentle breeze or without weathered state stratum, digging efficiency is too low to be asked
Topic.
The technical solution adopted by the present invention to solve the technical problems is: a kind of driving of shield machine in full ground consisting of hard rock
Engineering method, have tunneling process, also have cutter head of shield machine it is static, stop driving state under face is successively carried out blasthole drilling,
Filling explosive and ignition charge burst the process of face global tissue, shield machine pair when which is conducive to tunnel again in borehole
Face carries out broken rock digging.
Further, blasthole drilling of the present invention, the process for loading explosive in borehole enter earth material storehouse by operating personnel
Afterwards by the through-hole operation on cutterhead in face.
Or, loading the process of explosive in blasthole drilling of the present invention, borehole by the automatic jig that is installed on native storehouse plate
By the through-hole operation on cutterhead in face.
Further say after filling explosive process also there is filling sealing agent to block borehole in borehole of the present invention
Process.
Further say that also there is the process of dust in cleaning borehole after blasthole drilling process of the present invention.
It further says, shield machine of the present invention, which stops shield machine while driving bursts face process, also to carry out
Spell the work of pipe.
The invention has the advantages that solving defect present in background technique, the construction is on above-mentioned stratum
In, the drivage efficiency of shield machine can be greatly improved, while reducing the hob abrasion of shield machine, reduce integral construction cost,
For shield machine in hard rock and superhard rock driving, remarkable in economical benefits.
Detailed description of the invention
Fig. 1 is concrete technology route schematic diagram of the invention.
Specific embodiment
Presently in connection with attached drawing and preferred embodiment, the present invention is described in further detail.These attached drawings are simplified
Schematic diagram, the basic structure of the invention will be illustrated schematically only, therefore it only shows the composition relevant to the invention.
A kind of driving engineering method of shield machine as shown in Figure 1 in full ground consisting of hard rock is that a kind of orientation presplit blasting adds shield
The construction technology technology of structure digging, have tunneling process, also have cutter head of shield machine it is static, stop driving state under to face
It successively carries out blasthole drilling, load explosive in borehole and ignition charge bursts the process of face global tissue, which is conducive to again
Shield machine carries out broken rock digging to face when secondary driving.
Embodiment 1
Cutter head of shield machine is static, stops driving state, is cleaned out by screw machine or the work of muddy water dreg removing system in Tu Cang
The construction space for orienting presplit blasting, is entered after Tu Cang by operating personnel and does through-hole in the way of manually drilling cutterhead
In face, borehole accomplishes fluently rear, dust, disintegrating slag in removing drilling etc. for (blasthole drilling) operation, send explosive then to filling out in borehole
With filling sealing agent, sealing of hole, ignition is finally executed again, after face being impacted certain crack, shield machine is again started up, extensive
It promotes broken rock again, after certain distance, then shuts down, successively reciprocation cycle.
Embodiment 2
Cutter head of shield machine is static, stops driving state, while shield machine is shutting down segment assembly, by screw machine or muddy water
Dreg removing system work cleans out the construction space of orientation presplit blasting in Tu Cang, by the automatic jig being installed on native storehouse plate
(such as impact gun) by the through-hole operation on cutterhead in face, borehole accomplishes fluently rear, dust, disintegrating slag in removing drilling etc., then
It is filled out into borehole and send explosive and filling sealing agent, sealing of hole, finally execute ignition again, after face being impacted certain crack,
Shield machine is waited to complete pipe sheet assembling link, shield machine is again started up, recovery propulsion broken rock, after certain distance, then is shut down, successively
Reciprocation cycle.
The quantity of borehole can according to the actual situation depending on, explosive can be common gunpowder and be also possible to chemically expansible explosive,
Depending on the power of the explosion of explosive is by actual conditions.
This engineering method is that orientation Pre-splitting Blasting Technique is increased during shield driving, using orientation presplit blasting,
Shield machine needs the face of digging to impact crack etc., and face global tissue is made to form fracture, fracture state, in favor of shield
The broken rock of structure machine hobboing cutter.Also, this engineering method does not need to survey in advance or disposable large area, long range explosion, this engineering method can be
According to actual conditions when being tunneled in tunnel during driving, just implement as needed, it can be achieved that driving-presplit blasting friendship
For process.
It is a specific embodiment of the invention described in above instructions, various illustrations are not to reality of the invention
The limitation of matter Composition of contents, person of an ordinary skill in the technical field can be to described in the past specific after having read specification
Embodiment is made an amendment or is deformed, without departing from the spirit and scope of invention.
Claims (6)
1. a kind of driving engineering method of shield machine in full ground consisting of hard rock has tunneling process, it is characterised in that: also have shield machine
Cutterhead is static, stop successively carrying out face under driving state blasthole drilling, load explosive in borehole and ignition charge bursts the palm
The process of sub- face global tissue, shield machine carries out broken rock digging to face when which is conducive to tunnel again.
2. driving engineering method of the shield machine according to claim 1 in full ground consisting of hard rock, it is characterised in that: the brill big gun
The process of filling explosive is entered behind earth material storehouse through the through-hole operation on cutterhead by operating personnel in face in eye, borehole.
3. driving engineering method of the shield machine according to claim 1 in full ground consisting of hard rock, it is characterised in that: the brill big gun
Eye, in borehole filling explosive process by the automatic jig that is installed on native storehouse plate by the through-hole operation on cutterhead in area
Face.
4. driving engineering method of the shield machine according to claim 1 in full ground consisting of hard rock, it is characterised in that: in the borehole
Load the process that after explosive process also there is filling sealing agent to block borehole.
5. driving engineering method of the shield machine according to claim 1 in full ground consisting of hard rock, it is characterised in that: the blasthole drilling
Also there is the process of dust in cleaning borehole after process.
6. driving engineering method of the shield machine according to claim 1 in full ground consisting of hard rock, it is characterised in that: the shield machine
Stop the work that shield machine while driving bursts face process also carries out spelling pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910469866.XA CN110259468A (en) | 2019-05-31 | 2019-05-31 | Driving engineering method of the shield machine in full ground consisting of hard rock |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910469866.XA CN110259468A (en) | 2019-05-31 | 2019-05-31 | Driving engineering method of the shield machine in full ground consisting of hard rock |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110259468A true CN110259468A (en) | 2019-09-20 |
Family
ID=67916336
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910469866.XA Pending CN110259468A (en) | 2019-05-31 | 2019-05-31 | Driving engineering method of the shield machine in full ground consisting of hard rock |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110259468A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02132295A (en) * | 1988-11-14 | 1990-05-21 | Mitsui Constr Co Ltd | Constructing method for tunnel lining work |
CN101915105A (en) * | 2010-08-09 | 2010-12-15 | 中国科学院武汉岩土力学研究所 | United method for tunneling super-strong or strong rock burst hole section of TBM construction tunnel |
CN102032844A (en) * | 2009-11-17 | 2011-04-27 | 广东***工程有限公司 | Method for blasting closed rock of shield tunnel in complex strata |
CN202012355U (en) * | 2011-02-24 | 2011-10-19 | 闻建明 | Explosive shield machine |
CN103883329A (en) * | 2014-03-31 | 2014-06-25 | 重庆南桐矿业有限责任公司 | Excavation construction method for mine hard rock roadway |
CN105840199A (en) * | 2016-05-12 | 2016-08-10 | 中国矿业大学(北京) | Rock-roadway comprehensive tunneling method for static-blasting-matching tunneling machine |
CN106225618A (en) * | 2016-08-29 | 2016-12-14 | 华北科技学院 | The method split is expanded in a kind of semo-infinite rock mass borehole blasting |
CN109281672A (en) * | 2017-07-21 | 2019-01-29 | 中国铁建重工集团有限公司 | A kind of hard rock tunnel excavation method |
-
2019
- 2019-05-31 CN CN201910469866.XA patent/CN110259468A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02132295A (en) * | 1988-11-14 | 1990-05-21 | Mitsui Constr Co Ltd | Constructing method for tunnel lining work |
CN102032844A (en) * | 2009-11-17 | 2011-04-27 | 广东***工程有限公司 | Method for blasting closed rock of shield tunnel in complex strata |
CN101915105A (en) * | 2010-08-09 | 2010-12-15 | 中国科学院武汉岩土力学研究所 | United method for tunneling super-strong or strong rock burst hole section of TBM construction tunnel |
CN202012355U (en) * | 2011-02-24 | 2011-10-19 | 闻建明 | Explosive shield machine |
CN103883329A (en) * | 2014-03-31 | 2014-06-25 | 重庆南桐矿业有限责任公司 | Excavation construction method for mine hard rock roadway |
CN105840199A (en) * | 2016-05-12 | 2016-08-10 | 中国矿业大学(北京) | Rock-roadway comprehensive tunneling method for static-blasting-matching tunneling machine |
CN106225618A (en) * | 2016-08-29 | 2016-12-14 | 华北科技学院 | The method split is expanded in a kind of semo-infinite rock mass borehole blasting |
CN109281672A (en) * | 2017-07-21 | 2019-01-29 | 中国铁建重工集团有限公司 | A kind of hard rock tunnel excavation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100564803C (en) | Rock lane digging method | |
US5803550A (en) | Method for controlled fragmentation of hard rock and concrete by the combination use of impact hammers and small charge blasting | |
US5098163A (en) | Controlled fracture method and apparatus for breaking hard compact rock and concrete materials | |
CN108708738B (en) | Realize that the pretreated combination type T BM of rock burst and rock burst pre-process driving method | |
CN110439586B (en) | Non-blasting type mine roadway water cutting tunneling method | |
CN110821510A (en) | High-pressure water jet edge cutter and combined rock breaking and trapped-freeing TBM cutter head and method thereof | |
CN106225618B (en) | A kind of method that semo-infinite rock mass borehole blasting expansion is split | |
US6102484A (en) | Controlled foam injection method and means for fragmentation of hard compact rock and concrete | |
CN102966309B (en) | High-pressure grinding material jet flow drill carriage device | |
CN107355228A (en) | A kind of hard rock tunnel construction equipment and construction method | |
CN103790584A (en) | Impact-assisted heading machine for hard rock ore exploitation | |
CN109281672A (en) | A kind of hard rock tunnel excavation method | |
CN111577309B (en) | Multi-hob sectional type wedge cracking hard rock mass method | |
CN110500107B (en) | Shield tunneling machine normal-pressure warehouse opening front maintenance tool changing construction method | |
CN111322076A (en) | Method for forming roadway scour-prevention weak structure through coal rock hydraulic fracturing | |
CN211342922U (en) | High-pressure water jet side cutter and hydraulic-mechanical combined rock breaking and trapped-escaping TBM cutter head | |
CN110259468A (en) | Driving engineering method of the shield machine in full ground consisting of hard rock | |
CN109596022B (en) | Blasting treatment method for boulders in front of shield cutter head | |
CN105863661A (en) | Tunnel boring machine hammer type tunneling method and trenchless tunnel boring machine applying same | |
CN112832796B (en) | TBM cutter head, TBM and hard rock cracking TBM tunneling method | |
CN109882189A (en) | A kind of half section shield machine of the shape of a hoof and construction method suitable for fault belt | |
CN109281674A (en) | A kind of hard-rock tunnel driving method using drill loader | |
RU2282720C1 (en) | Underground mining method in areas having limited dimensions | |
CN113605899A (en) | Tunnel excavation method based on hydraulic impact crushing and static crushing | |
CN113250704A (en) | Hard rock tunnel construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190920 |
|
RJ01 | Rejection of invention patent application after publication |