CN110247358A - A kind of deicing of high-voltage wires machine people crossing split conductor conductor spacer - Google Patents

A kind of deicing of high-voltage wires machine people crossing split conductor conductor spacer Download PDF

Info

Publication number
CN110247358A
CN110247358A CN201910619702.0A CN201910619702A CN110247358A CN 110247358 A CN110247358 A CN 110247358A CN 201910619702 A CN201910619702 A CN 201910619702A CN 110247358 A CN110247358 A CN 110247358A
Authority
CN
China
Prior art keywords
mounting rack
deicing
mounting
cross
machine people
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910619702.0A
Other languages
Chinese (zh)
Other versions
CN110247358B (en
Inventor
辛开兵
辛光亮
何加忠
彭广云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Ruixin e-commerce Co., Ltd
Original Assignee
Hefei Anli Electric Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Anli Electric Power Engineering Co Ltd filed Critical Hefei Anli Electric Power Engineering Co Ltd
Priority to CN201910619702.0A priority Critical patent/CN110247358B/en
Publication of CN110247358A publication Critical patent/CN110247358A/en
Application granted granted Critical
Publication of CN110247358B publication Critical patent/CN110247358B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/16Devices for removing snow or ice from lines or cables

Landscapes

  • Manipulator (AREA)

Abstract

The invention belongs to electrical equipment technical fields, and in particular to one kind can cross the deicing of high-voltage wires machine people of split conductor conductor spacer.Mounting plate including bottom, installation board ends are connected with the first mounting rack and the second mounting rack, and the cross bar both ends of the first mounting rack are respectively equipped with driving pulley and auxiliary pulley, and driving pulley controls motor driven by traveling;Auxiliary pulley is fixedly connected by telescopic device with the first mounting rack;The first monitoring device and the second monitoring device are also set up on first mounting rack and the second mounting rack, and deicer is equipped between the first mounting rack and the second mounting rack, multiple vibration devices are set on the outside of deicer, vibration device front end is fixedly connected with ice-breaking needle.The type deicing robot is good except snow and ice effect, and it is very high to cross barriers, the working efficiencies such as the conductor spacer on conducting wire automatically.

Description

A kind of deicing of high-voltage wires machine people crossing split conductor conductor spacer
Technical field
The invention belongs to electrical equipment technical fields, and in particular to the high-voltage line that one kind can cross split conductor conductor spacer removes Ice robot.
Background technique
Power grid is the general designation of the facilities and equipment of connection power generation and electricity consumption in the power system.Belong to conveying and distribution electric energy Intermediate link, it is mainly formed by being coupled power transmission sequence, electric substation, distribution substation and distribution line into the net.Usually by defeated The connection power generation that electricity, power transformation, controller switching equipment and corresponding auxiliary system form uniformly is collectively referred to as power grid with electricity consumption.
Power grid is the guarantee for guaranteeing huge numbers of families' normal electricity consumption, and in winter, due to weather cold, sleet or fog etc. can again Condensation forms icicle on the conducting wire of power grid, is covered on conductive line surfaces, these ice cubes are smaller on the influence of the transmission performance of power grid, still The quality that conducting wire can significantly be increased, even can be by electric power tower be collapsed when serious.Annual winter can all occur because ice and snow is led Send a telegraph the impaired accident of net;In order to solve this problem, some power grids use electrically heated mode, and generating heat using conducting wire will Accumulated snow or floating ice melt, and this deicing snow removing mode will cause huge power consumption, and in the weather condition of extreme severe cold Under, electrically heated effect is poor, and the heat that conducting wire generates can lose rapidly.It is removed by manual work in other area Ice, this need of work are completed in high-altitude, again very wet and slippery on conducting wire, therefore the environment very severe of this work, danger system Number is high.High-voltage conducting wires are efficiently carried out for greater safety and remove snow and ice operation, and technical staff has developed dedicated deicing machine People, these robots include the product of the several working ways such as conducting wire hanging type and unmanned plane floating type.
Chinese utility model Authorization Notice No. CN205646730U discloses a kind of deicing of high-voltage wires equipment, which can be with It is suspended on conducting wire, is driven and walked by gear, and removed the ice and snow on conducting wire using ice-breaking disk.Although the equipment has Good deicing operation effectiveness, but in high-voltage fence, in order to mention power transmission efficiency and safety, it will usually be led using division Line.The every phase of split conductor generally comprises 4 to 8 intraphase conductors, and intraphase conductor will divide at interval of one conductor spacer of a distance setting leads Line separation, avoids conductive contact.Deicing equipment in the utility model is during the work time if encountered among split conductor Conductor spacer, is just difficult to cross conductor spacer and works on, and needs manually to be dismantled, then reinstall, this greatly reduces deicing The working efficiency of equipment.
If it is possible to develop a kind of deicing robot that can cross conductor spacer automatically, can greatly promote The working efficiency of high-voltage conducting wires deicing snow removing.
Summary of the invention
For the problems of the prior art, the object of the present invention is to provide the high pressures that one kind can cross split conductor conductor spacer Line deicing robot;The type deicing robot is good except snow and ice effect, and the barrier such as can cross the conductor spacer on conducting wire automatically Hinder object, working efficiency is very high.
In order to achieve the above object, the present invention is achieved through the following technical solutions:
A kind of deicing of high-voltage wires machine people crossing split conductor conductor spacer, the mounting plate including bottom, installation board ends connect It is connected to the first mounting rack and the second mounting rack of vertical mounting plate plane, the first mounting rack and the second mounting rack are T-type frame, first The vertical bar of mounting rack and the second mounting rack is electric telescopic rod, and the vertical bar bottom of the first mounting rack and the second mounting rack passes through respectively First transfer and the second transfer are rotatably connected with mounting plate;The cross bar both ends of first mounting rack are respectively equipped with Driving pulley and auxiliary pulley, driving pulley are fixedly connected on the first mounting rack, control motor driven by traveling;Auxiliary pulley It is fixedly connected by telescopic device with the first mounting rack, telescopic device is for controlling driving pulley and auxiliary pulley to the folder of conducting wire Tight and release;Second mounting rack also be provided with driving pulley identical on the first mounting rack, auxiliary pulley, traveling control motor and Telescopic device;
The first monitoring device and the second monitoring device, the first monitoring device are also set up on first mounting rack and the second mounting rack It is slided in front of high-tension line with the presence or absence of lead spacer, and observation driving pulley and auxiliary with the second monitoring device for observing Whether wheel correctly clamps conducting wire;
Deicer is equipped between the first mounting rack and the second mounting rack of the mounting plate, deicer includes in semi-circular cylindrical The first deicing portion and the second deicing portion, the connectivity port side of the two is rotatably connected by hinge, and electromagnetism is arranged in the other side Fixed card buckle;First deicing portion and the second deicing portion surface are uniformly arranged multiple through-holes, outside the first deicing portion and the second deicing portion Multiple vibration devices are arranged in side, and the direction of vibration of vibration device is to vibrate up and down along through hole, and vibration device front end is fixedly connected Ice-breaking needle, ice-breaking needle run through the through-hole in the first deicing portion and the second deicing portion surface, extend into inside tubular structure;The deicing Bottom of device is fixedly connected by lifting device with mounting plate.
Preferably, the first transfer includes the rotate gear for being fixedly connected on the first mounting rack bottom, rotate gear with It is fixedly connected with the gear engagement of the first steering motor on a mounting board, by the first steering motor drive installation plate along the first peace The longitudinal axis rotation shelved;Second transfer is identical as the structure and function of the first transfer.
Preferably, driving pulley and auxiliary pulley are the fluted recessed pulley of Intermediate Gray, the trench bottom surfaces of driving pulley The lateral gear teeth for increasing friction are set.
Recessed pulley can avoid deicing robot from falling from conducting wire in order to by conductor clamping;In driving pulley groove The gear teeth can be further improved the contact action power between conducting wire and driving pulley, avoid beating in deicing robot walking process It is sliding.
Preferably, opening is equipped at the first deicing portion of deicer bottom and the second deicing portion connectivity port, in opening Equipped with air-jet device, the airflow direction of air-jet device is upward.
The trash ice after deicer internal fracture can be blown off rapidly by air-jet device, or by the product on conducting wire Snow is blown off, and improves the working efficiency of deicer.
Preferably, telescopic device and lifting device are electric expansion cylinder.
Preferably, deicing robot is driven by electricity by what battery provided, and battery is fixed on mounting plate upper surface, peace Shield is set above loading board, and shield surface is equipped with opens for what the first mounting rack, the second mounting rack and deicer exposed Mouthful.
Shield can protect the precise electronics components such as battery and control module in deicing robot, avoid the occurrence of The problem of immersion, to improve the safety and stability of deicing robot.
Preferably, deicing robot is controlled by way of remote control, the first monitoring device and the second monitoring dress The image for setting shooting is real-time transmitted to manipulation end by wireless communication mode.
Under this management mode, deicing robot can pass through remote terminal remote control, robot deicing operation Journey and effect can be observed and be controlled in real time, to be conducive to improve the deicing effect of deicing robot.
The present invention have it is following the utility model has the advantages that
The type deicing robot completes the deicing snow removing of conductive line surfaces using vibration device and ice-breaking needle, and jet is cooperated to fill Set the deicing effect for improving conductive line surfaces;Deicing robot passes through first mounting rack at both ends and the fixed function of the second mounting rack It being suspended on conducting wire, driving pulley can be not only used for clamping cables, and it helps equipment to move ahead, cable can also be tensioned, Trash ice processing is carried out to facilitate deicer, and guarantees that cable is located at deicer centre, avoids ice-breaking for cable Structure causes to damage.In the deicing robot course of work, when encountering the obstructions such as the conductor spacer between conducting wire, first can be passed through The steering of mounting rack and the second mounting rack, clears the jumps, to increase substantially the working efficiency of deicing robot.
The type deicing robot improves the effect of deicing operation compared with the product of the prior art, and increases monitoring Module observes barrier and deicing effect in real time, and realizes oneself in robot operational process by cleverly design Dynamic avoidance, has better performance and practical value outstanding, is appropriate for large-scale promotion application.
Detailed description of the invention
Attached drawing is used to provide further understanding of the present invention, and constitutes part of specification, with reality of the invention It applies example to be used to explain the present invention together, not be construed as limiting the invention.In the accompanying drawings:
Fig. 1 is the overall structure diagram of deicing robot in the present embodiment;
Fig. 2 is the structural schematic diagram of the first mounting rack in the present embodiment;
In the figure, it is marked as 1, mounting plate;2, the first mounting rack;3, the second mounting rack;4, deicer;21, the first transfer; 22, driving pulley;23, auxiliary pulley;24, the first monitoring device;34, the second monitoring device;41, the first deicing portion;42, second Deicing portion;43, vibration device;44, lifting device;45, electromagnetism fixed card buckle;5, battery;210, rotate gear;211, first Steering motor;220, traveling controls motor;230, telescopic device;430, ice-breaking needle.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described.
In the description of the present invention, it should be noted that unless otherwise indicated, the meaning of " plurality " is two or two with On;The orientation of the instructions such as term " on ", "lower", "left", "right", "inner", "outside", " front end ", " rear end ", " top ", " bottom " Or positional relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description of the present invention and simplification of the description, and It is not that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, therefore It is not considered as limiting the invention.In addition, term " first ", " second ", " third " etc. are used for description purposes only, and cannot It is interpreted as indication or suggestion relative importance.
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally connect It connects;It can be mechanical connection, be also possible to circuit connection;It can be directly connected, be also possible to through the indirect phase of intermediary Even.For the ordinary skill in the art, visual concrete condition understands the concrete meaning of above-mentioned term in the present invention.
As shown in Figure 1, a kind of deicing of high-voltage wires machine people that can cross split conductor conductor spacer, the mounting plate including bottom 1,1 both ends of mounting plate are connected with the first mounting rack 2 and the second mounting rack 3 of 1 plane of vertical mounting plate, the first mounting rack 2 and Two mounting racks 3 are T-type frame, and the vertical bar of the first mounting rack 2 and the second mounting rack 3 is electric telescopic rod, the first mounting rack 2 and second The vertical bar bottom of mounting rack 3 passes through the first transfer 21 and the second transfer respectively and is rotatably connected with mounting plate 1;First The cross bar both ends of mounting rack 2 are respectively equipped with driving pulley 22 and auxiliary pulley 23, and driving pulley 22 is fixedly connected on the first installation On frame 2, driven by traveling control motor 220;Auxiliary pulley 23 is fixedly connected by telescopic device 230 with the first mounting rack 2, is stretched Compression apparatus 230 is used to control driving pulley 22 and auxiliary pulley 23 clamps and releases conducting wire;Second mounting rack 3 also be provided with Identical driving pulley 22, auxiliary pulley 23, traveling control motor 220 and telescopic device 230 on first mounting rack 2;
The first monitoring device 24 and the second monitoring device 34, the first monitoring dress are also set up on first mounting rack 2 and the second mounting rack 3 Set 24 and second monitoring device 34 for observing in front of high-tension line with the presence or absence of lead spacer, and observation driving pulley 22 Whether conducting wire is correctly clamped with auxiliary pulley 23;
Deicer 4 is equipped between the first mounting rack 2 and the second mounting rack 3 of mounting plate 1, deicer 4 includes in semicircular cylinder The the first deicing portion 41 and the second deicing portion 42 of shape, the connectivity port side of the two are rotatably connected by hinge, and the other side is set Set electromagnetism fixed card buckle 45;First deicing portion 41 and 42 surface of the second deicing portion are uniformly arranged multiple through-holes, the first deicing portion 41 With multiple vibration devices 43 are set on the outside of second deicing portion 42, the direction of vibration of vibration device 43 is to vibrate up and down along through hole, 43 front end of vibration device is fixedly connected with ice-breaking needle 430, and ice-breaking needle 430 is through 42 surface of the first deicing portion 41 and the second deicing portion Through-hole is extend into inside tubular structure;4 bottom of deicer is fixedly connected by lifting device 44 with mounting plate 1.
Before type deicing robot work, operator is first by the first deicing portion in the deicer of deicing robot 4 41 and second deicing portion 42 open, deicing robot is suspended below conducting wire, then conducting wire is put into 41 He of the first deicing portion Between second deicing portion 42, it is closed deicer 4 and by the electromagnetism fixed card buckle between the first deicing portion 41 and the second deicing portion 42 Then 45 lockings control telescopic device 230 and move, clamp conducting wire using driving pulley 22 and with auxiliary pulley 23, and at this time first Mounting rack 2 is in front, and the second mounting rack 3 is at rear.
When starting deicing operation, the vibration device 43 in deicer works, and drives the ice-breaking needle inside deicer 4 430 constantly hit the ice cube wrapped up on conducting wire, and ice cube is broken into pieces, fall after ice cube is broken from 4 two sides of deicer;Driving pulley 22 travel forward under the driving of traveling control motor 220 along conducting wire, are gradually completing the removing operation of accumulated snow and floating ice on conducting wire. In deicing operation process, the component on component and the second mounting rack 3 on the first mounting rack 2 is operated synchronously, and passes through first Monitoring device 24 and the second monitoring device 34 observe front respectively and deicing work are completed to the situation of the conducting wire of deicing and rear The deicing effect of the conducting wire of industry.
When encountering front in deicing robot operational process there are when conductor spacer, traveling driving motor 220 shuts down, and connects Electromagnetism fixed card buckle 45 in deicer 4 unlock, the first deicing portion 41 and the second deicing portion 42 open, by intermediate conducting wire Then release is fallen deicer 4 by lifting device 44;Then it is transported by the telescopic device 230 on the second mounting rack of rear 3 Dynamic, driving pulley 22 and auxiliary pulley 23 on the second mounting rack 3 discharge conducting wire, and are stretched by the second the electronic of mounting rack 3 Contracting bar falls driving pulley 22 and auxiliary pulley 23;It is rotated again by the first transfer 21 of 2 bottom of the first mounting rack, it will Mounting plate 1 and the second mounting rack 3 turn to 2 front of the first mounting rack.At this point, the second mounting rack 3 is in front, the first mounting rack 2 At rear.Then deicer 4 is risen by lifting device 44, and re-closes package conducting wire, the second mounting rack 3 stretches Bar increases, and utilizes 23 rechuck conducting wire of driving pulley 22 and auxiliary pulley, next the first mounting rack of adjustment 2 and the second installation The rotation direction of traveling driving motor 220, moves forwards deicing robot on frame 3, continues to complete deicing operation.Afterwards In continuous work, when crossing conductor spacer every time, as long as deicing robot all completes a steering procedure.
As shown in Fig. 2, the first transfer 21 includes being fixedly connected on turning for 2 bottom of the first mounting rack in the present embodiment Moving gear 210, rotate gear 210 are engaged with the gear for the first steering motor 211 being fixedly connected on mounting plate 1, pass through One steering motor, 211 drive installation plate 1 is rotated along the longitudinal axis of the first mounting rack 2;Second transfer and first turn Structure and function to device 21 is identical.
Driving pulley 22 and auxiliary pulley 23 are the fluted recessed pulley of Intermediate Gray, and the trench bottom surfaces of driving pulley 22 are set Set the lateral gear teeth for increasing friction.
Recessed pulley can avoid deicing robot from falling from conducting wire in order to by conductor clamping;In 22 groove of driving pulley The gear teeth can be further improved the contact action power between conducting wire and driving pulley 22, avoid in deicing robot walking process It skids.
In the present embodiment, it is equipped with and opens at 42 connectivity port of the first deicing portion 41 and the second deicing portion of 4 bottom of deicer Mouthful, air-jet device is equipped in opening, the airflow direction of air-jet device is upward.
The trash ice after 4 internal fracture of deicer can be blown off rapidly by air-jet device, or will be on conducting wire Accumulated snow is blown off, and improves the working efficiency of deicer 4.
Telescopic device 230 and lifting device 44 are electric expansion cylinder.
In the present embodiment, deicing robot is driven by electricity by what battery 5 provided, and battery 5 is fixed on mounting plate 1 Surface, shield is arranged above mounting plate 1, and shield surface is equipped with for the first mounting rack 2, the second mounting rack 3 and deicing dress Set the opening of 4 exposings.
Shield can protect the precise electronics components such as battery 5 and control module in deicing robot, avoid out The problem of now soaking, to improve the safety and stability of deicing robot.
Deicing robot is controlled by way of remote control, and the first monitoring device 24 and the second monitoring device 34 are clapped The image taken the photograph is real-time transmitted to manipulation end by wireless communication mode.
Under this management mode, deicing robot can pass through remote terminal remote control, robot deicing operation Journey and effect can be observed and be controlled in real time, to be conducive to improve the deicing effect of deicing robot.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, although referring to aforementioned reality Applying example, invention is explained in detail, for those skilled in the art, still can be to aforementioned each implementation Technical solution documented by example is modified.All within the spirits and principles of the present invention, it is made it is any modification, equally replace It changes, improve, should all be included in the protection scope of the present invention.

Claims (7)

1. the deicing of high-voltage wires machine people that one kind can cross split conductor conductor spacer, it is characterised in that: the mounting plate including bottom, Installation board ends are connected with the first mounting rack and the second mounting rack of vertical mounting plate plane, the first mounting rack and the second mounting rack For T-type frame, the vertical bar of the first mounting rack and the second mounting rack is electric telescopic rod, the vertical bar of the first mounting rack and the second mounting rack Bottom passes through the first transfer respectively and the second transfer is rotatably connected with mounting plate;The cross bar of first mounting rack Both ends are respectively equipped with driving pulley and auxiliary pulley, and driving pulley is fixedly connected on the first mounting rack, control motor by traveling Driving;Auxiliary pulley is fixedly connected by telescopic device with the first mounting rack, and telescopic device is for controlling driving pulley and auxiliary Pulley clamps and releases conducting wire;Second mounting rack also be provided with driving pulley identical on the first mounting rack, auxiliary pulley, Traveling controls motor and telescopic device;
The first monitoring device and the second monitoring device, the first monitoring device are also set up on first mounting rack and the second mounting rack Deicing robot front and back is respectively facing with the monitoring visual field of the second monitoring device;
Deicer is equipped between the first mounting rack and the second mounting rack of the mounting plate, deicer includes in semi-circular cylindrical The first deicing portion and the second deicing portion, the connectivity port side of the two is rotatably connected by hinge, and electromagnetism is arranged in the other side Fixed card buckle;First deicing portion and the second deicing portion surface are uniformly arranged multiple through-holes, outside the first deicing portion and the second deicing portion Multiple vibration devices are arranged in side, and the direction of vibration of vibration device is to vibrate up and down along through hole, and vibration device front end is fixedly connected Ice-breaking needle, ice-breaking needle run through the through-hole in the first deicing portion and the second deicing portion surface, extend into inside tubular structure;The deicing Bottom of device is fixedly connected by lifting device with mounting plate.
2. one kind according to claim 1 can cross the deicing of high-voltage wires machine people of split conductor conductor spacer, feature exists In: first transfer include the rotate gear for being fixedly connected on the first mounting rack bottom, rotate gear be fixedly connected The gear of the first steering motor on a mounting board engages, by the first steering motor drive installation plate along the vertical of the first mounting rack It is rotated to axis;Second transfer is identical as the structure and function of the first transfer.
3. one kind according to claim 1 can cross the deicing of high-voltage wires machine people of split conductor conductor spacer, feature exists It is the fluted recessed pulley of Intermediate Gray in: the driving pulley and auxiliary pulley, the trench bottom surfaces setting of driving pulley is used for Increase the lateral gear teeth of friction.
4. one kind according to claim 1 can cross the deicing of high-voltage wires machine people of split conductor conductor spacer, feature exists In: it is equipped with opening at the first deicing portion and the second deicing portion connectivity port of the deicer bottom, is equipped with jet in opening The airflow direction of device, air-jet device is upward.
5. one kind according to claim 1 can cross the deicing of high-voltage wires machine people of split conductor conductor spacer, feature exists In: the telescopic device and lifting device be electric expansion cylinder.
6. one kind according to claim 1 can cross the deicing of high-voltage wires machine people of split conductor conductor spacer, feature exists In: the deicing robot is driven by electricity by what battery provided, and battery is fixed on mounting plate upper surface, mounting plate top Shield is set, and shield surface is equipped with the opening exposed for the first mounting rack, the second mounting rack and deicer.
7. one kind according to claim 1 can cross the deicing of high-voltage wires machine people of split conductor conductor spacer, feature exists In: the deicing robot is controlled by way of remote control, the first monitoring device and the second monitoring device shooting Image is real-time transmitted to manipulation end by wireless communication mode.
CN201910619702.0A 2019-07-10 2019-07-10 High-voltage wire deicing robot capable of crossing split conductor spacer Active CN110247358B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910619702.0A CN110247358B (en) 2019-07-10 2019-07-10 High-voltage wire deicing robot capable of crossing split conductor spacer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910619702.0A CN110247358B (en) 2019-07-10 2019-07-10 High-voltage wire deicing robot capable of crossing split conductor spacer

Publications (2)

Publication Number Publication Date
CN110247358A true CN110247358A (en) 2019-09-17
CN110247358B CN110247358B (en) 2020-11-10

Family

ID=67891585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910619702.0A Active CN110247358B (en) 2019-07-10 2019-07-10 High-voltage wire deicing robot capable of crossing split conductor spacer

Country Status (1)

Country Link
CN (1) CN110247358B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110492422A (en) * 2019-09-26 2019-11-22 国网山东省电力公司商河县供电公司 A kind of overhead cable deicer
CN111244868A (en) * 2020-03-19 2020-06-05 中国矿业大学 Cable deicing robot and deicing method thereof
CN111541214A (en) * 2020-05-09 2020-08-14 冯晓丽 Cable deicing robot
CN111987679A (en) * 2020-09-03 2020-11-24 广东电网有限责任公司东莞供电局 Detection processing device for icing of power transmission line
CN112003224A (en) * 2020-09-04 2020-11-27 湖南理工职业技术学院 Robot is patrolled and examined in electrified deicing of high-voltage line

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0898379A (en) * 1994-09-22 1996-04-12 Hokkai Bane Kk Snow enduring device for lateral for electric pole
US6660934B1 (en) * 2002-01-11 2003-12-09 Aep Entech Llc Power line ice-shedder
DE202005019422U1 (en) * 2005-12-09 2006-06-14 Kalinna, Klaus, Dipl.-Ing. (FH) Remote controlled snow and ice removal car for overhead power and communication lines has two propelled wheels, electric motor, radio receiver, pantograph and snow slider firmly attached to hard plastic crossbar construction
CN105826891A (en) * 2016-06-15 2016-08-03 国网四川省电力公司宜宾供电公司 Wire deicing device
CN206685857U (en) * 2017-04-08 2017-11-28 国网浙江省电力公司丽水供电公司 Oscillatory type cable de-icing device
CN206820435U (en) * 2017-06-30 2017-12-29 王文生 Device is avenged in a kind of hand-held distribution line ice-melt
CN109212381A (en) * 2018-10-31 2019-01-15 南昌保莱科技有限公司 A kind of route regular visit equipment based on GPS

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0898379A (en) * 1994-09-22 1996-04-12 Hokkai Bane Kk Snow enduring device for lateral for electric pole
US6660934B1 (en) * 2002-01-11 2003-12-09 Aep Entech Llc Power line ice-shedder
DE202005019422U1 (en) * 2005-12-09 2006-06-14 Kalinna, Klaus, Dipl.-Ing. (FH) Remote controlled snow and ice removal car for overhead power and communication lines has two propelled wheels, electric motor, radio receiver, pantograph and snow slider firmly attached to hard plastic crossbar construction
CN105826891A (en) * 2016-06-15 2016-08-03 国网四川省电力公司宜宾供电公司 Wire deicing device
CN206685857U (en) * 2017-04-08 2017-11-28 国网浙江省电力公司丽水供电公司 Oscillatory type cable de-icing device
CN206820435U (en) * 2017-06-30 2017-12-29 王文生 Device is avenged in a kind of hand-held distribution line ice-melt
CN109212381A (en) * 2018-10-31 2019-01-15 南昌保莱科技有限公司 A kind of route regular visit equipment based on GPS

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110492422A (en) * 2019-09-26 2019-11-22 国网山东省电力公司商河县供电公司 A kind of overhead cable deicer
CN110492422B (en) * 2019-09-26 2020-09-01 国网山东省电力公司商河县供电公司 High altitude cable defroster
CN111244868A (en) * 2020-03-19 2020-06-05 中国矿业大学 Cable deicing robot and deicing method thereof
CN111244868B (en) * 2020-03-19 2021-01-05 中国矿业大学 Cable deicing robot and deicing method thereof
CN111541214A (en) * 2020-05-09 2020-08-14 冯晓丽 Cable deicing robot
CN111541214B (en) * 2020-05-09 2021-06-08 上海维亥实业有限公司 Cable deicing robot
CN111987679A (en) * 2020-09-03 2020-11-24 广东电网有限责任公司东莞供电局 Detection processing device for icing of power transmission line
CN111987679B (en) * 2020-09-03 2021-05-14 广东电网有限责任公司东莞供电局 Detection processing device for icing of power transmission line
CN112003224A (en) * 2020-09-04 2020-11-27 湖南理工职业技术学院 Robot is patrolled and examined in electrified deicing of high-voltage line
CN112003224B (en) * 2020-09-04 2021-08-03 湖南理工职业技术学院 Robot is patrolled and examined in electrified deicing of high-voltage line

Also Published As

Publication number Publication date
CN110247358B (en) 2020-11-10

Similar Documents

Publication Publication Date Title
CN110247358A (en) A kind of deicing of high-voltage wires machine people crossing split conductor conductor spacer
CN207926145U (en) Deicer for power transmission line
CN110233462A (en) A kind of high-altitude power transmission cable deicing robot
CN105207158A (en) High-voltage electric wire deicing robot
CN107826246A (en) It is a kind of with road surface is anti-freeze and the unmanned plane of electric wire snow removing function
CN103560467B (en) System for removing ice and snow on electric transmission line
CN205666589U (en) Wire deicing instrument
CN106898986A (en) To aerial cables deicing except the unmanned plane of accumulated snow
CN108767794A (en) A kind of cable winter defrosting device
CN103269049A (en) Power type ice removal device of electric power line
CN109449855A (en) A kind of power transmission cable Snowremoval device
CN107947090A (en) A kind of rock type electric power overhead transmission line cable deicer
CN108110715A (en) A kind of unmanned plane for the snow removing of high-altitude circuit
CN107689599A (en) Snakelike wound form inspection robot mechanical structure and its obstacle-detouring method
CN201388029Y (en) Impact de-icer
CN104984934B (en) Cleaning equipment
CN108963935A (en) Facilitate the cable de-icing device of installation
CN210326941U (en) Ice and snow removing device for high-voltage transmission line
CN205128453U (en) Can clear away cleaning device of power equipment snow and dust fast
CN108110717A (en) A kind of Split type power transmission line deicer
CN109728561A (en) A kind of high voltage cable deicing equipment
CN103490345A (en) Upper clamping obstacle crossing travelling mechanism for high-tension cable
CN103515910B (en) A kind of high-voltage line deicer
CN106410678A (en) Single-conductor light rapid barrier clearing device
CN206619891U (en) The unmanned plane removed the snow for high-altitude circuit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201020

Address after: 230000 yaxia automobile building 903-2, intersection of West 2nd Ring Road and Wangjiang West Road, hi tech Zone, Hefei City, Anhui Province

Applicant after: Hefei Ruixin e-commerce Co., Ltd

Address before: 230000 Room 13-106, Kangli Community B, Hefei Economic and Technological Development Zone, Anhui Province

Applicant before: HEFEI ANLI ELECTRIC POWER ENGINEERING Co.,Ltd.

GR01 Patent grant
GR01 Patent grant