CN110230963A - A kind of underground engineering erosion control noise reduction dust-separation shotfiring safety compound protection method - Google Patents

A kind of underground engineering erosion control noise reduction dust-separation shotfiring safety compound protection method Download PDF

Info

Publication number
CN110230963A
CN110230963A CN201910564269.5A CN201910564269A CN110230963A CN 110230963 A CN110230963 A CN 110230963A CN 201910564269 A CN201910564269 A CN 201910564269A CN 110230963 A CN110230963 A CN 110230963A
Authority
CN
China
Prior art keywords
blasting
flyrock
protection
layer
protective device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910564269.5A
Other languages
Chinese (zh)
Other versions
CN110230963B (en
Inventor
李建强
刘元广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 11 Co Ltd
Sinohydro Bureau 11 Zhengzhou Co Ltd
Original Assignee
Sinohydro Bureau 11 Co Ltd
Sinohydro Bureau 11 Zhengzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 11 Co Ltd, Sinohydro Bureau 11 Zhengzhou Co Ltd filed Critical Sinohydro Bureau 11 Co Ltd
Priority to CN201910564269.5A priority Critical patent/CN110230963B/en
Publication of CN110230963A publication Critical patent/CN110230963A/en
Application granted granted Critical
Publication of CN110230963B publication Critical patent/CN110230963B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D5/00Safety arrangements

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to blasting safety protection fields, more particularly to a kind of underground engineering erosion control noise reduction dust-separation shotfiring safety compound protection method, include the following steps: 1) to arrange flyrock protection stratum reticulare in explosion area edge side, flyrock protection stratum reticulare is used to intercept the blasting flyrock that partial size is greater than 300mm, protective facing, load-bearing skeleton, screen layer are arranged in after flyrock protection stratum reticulare at the position 5-7m, the blasting flyrock for being greater than 8mm for intercepting partial size;2) arrangement of blasting impact protective device: blasting impact protective device is set to after blasting flyrock protective device at about 2-3m; it is less than the blasting flyrock of 8mm for Air blast wave and noise, the protection of blasting dust and interception partial size; blasting flyrock can be intercepted using the shotfiring safety compound protection method completely; effective attenuation Blasting shock wave superpressure and prevent blasting dust from spilling into protected area; the means of defence is used simultaneously; single blasting scale can be increased, blasting cost is reduced and improves Blasting Excavation work efficiency.

Description

A kind of underground engineering erosion control noise reduction dust-separation shotfiring safety compound protection method
Technical field
The present invention relates to blasting safety protection fields, and in particular to a kind of underground engineering erosion control noise reduction dust-separation shotfiring safety is multiple Close means of defence.
Background technique
In hydropower station expansion engineering, newly-increased unit is typically located at former underground power house generating set side, using digging Original underground power house cavern method arranges newly-increased generating set system, and during hydropower station expansion engineering construction, former power station needs to guarantee It operates normally, therefore Enlargement excavation does not allow to influence the normal operation of original unit, must not also influence to run people in Power Plant The normal work of member.
Since the expansion machine Blasting Excavation work surface of underground power house and original generating set and Central Control Room are located at same underground sky Between, bursting work identity distance is closer from protected object, and for the underground space due to its limitation, the ill-effect that explosion generates faces it Nearly working region influences maximum, and wherein concussion of blasting can be controlled effectively using short-delay blasting, blasting flyrock, explosion air Impact involves the ill-effects such as noise, blasting dust, although it is capped to block length, bursting work face big gun by control blast hole Equal measures, available certain improvement, but flow chart is cumbersome, construction efficiency is lower, cannot prevent completely blasting flyrock and It is unable to effective protection blasting impact and involves the influence of the ill-effects such as noise, blasting dust, in Underground Engineering Blasting construction, there is needle To documents and materials such as explosion Propagation Law of Mine Gas researchs in concussion of blasting control, tunnel, but there is no for blasting flyrock, explosion Air-impingement involve noise, blasting dust shotfiring safety composite protective device effective measures, bursting work face with protected Shield electromechanical equipment and staff Operational Zone exist together under the conditions of a underground space, in order to guarantee electromechanical equipment and staff Operate normally safety, blasting flyrock, Air blast wave and noise, blasting dust protective device must have it is certain Impact resistance and erosion control noise reduction dust-separation function and convenient for operation.
Present invention combination hydropower station expansion underground engineering structure feature, designs a kind of underground engineering erosion control noise reduction dust-separation explosion Safe composite protective device, it is therefore an objective to solve hydropower station expansion Underground powerhouse excavation phase under the premise of not reducing construction efficiency Between, blasting flyrock, blasting impact involve the effective protection problem of noise and blasting dust, it is ensured that underground workshop digs quick-fried Broken construction does not influence the normal work of former generating set normal operation and operations staff.
Based on above-mentioned prior art, the applicant has made lasting and beneficial exploration and design repeatedly, and carries out The test of non-finite number of time has finally found the method for solving above-mentioned technical problem and forms technology described below Scheme.
Summary of the invention
To solve problem of the prior art, the present invention provides a kind of underground engineering erosion control noise reduction dust-separation shotfiring safety is compound Means of defence.
In order to achieve the above object, the invention adopts the following technical scheme: a kind of underground space erosion control noise reduction dust-separation explosion Safe compound protection method, include the following steps: 1) include blasting flyrock protective device arrangement: in explosion area edge side cloth Flyrock protection stratum reticulare is set, flyrock protection stratum reticulare is used to intercept the blasting flyrock that partial size is greater than 300mm, by protective facing, load-bearing bone Frame, screen layer are arranged in after flyrock protection stratum reticulare, the blasting flyrock for being greater than 8mm for intercepting partial size;
2) arrangement of blasting impact protective device: blasting impact protective device is set to after blasting flyrock protective device about At 2-3m, the blasting flyrock of 8mm is less than for Air blast wave and noise, the protection of blasting dust and interception partial size, it is quick-fried Broken surge guard device rear portion is by protection zone.
The blasting flyrock protective device is set to blast area side, and blasting flyrock protective device rear portion is provided with explosion punching Protective device is hit, blasting flyrock protective device includes flyrock protection stratum reticulare, protective facing, load-bearing skeleton, screen layer, protective facing It is set to flyrock protection stratum reticulare rear portion, the inclination angle of protective facing and horizontal plane is 81 degree and tilts and set towards blast area side It sets, protective facing side is mutually fixedly connected with load-bearing skeleton, and screen layer is fixed on load-bearing skeleton side.
The flyrock protection stratum reticulare is the annular passive protection net of aperture 300mm, and flyrock protection stratum reticulare upper and lower part is equal It is fixed with flyrock protection net anchor pole.
The protective facing includes protection reinforcing bar stratum reticulare, diamond shape passive protection net, protects steel mesh layer choosing 16 200* of Φ The steel mesh of 200mm.
The load-bearing skeleton is made of I20 I-steel and 10# channel steel, is distributed in groined type.
It is the sieve of 8mm that the screen layer, which selects bore dia, for stopping partial size to be greater than the slungshot of 65mm~8mm.
The load-bearing skeleton end is fixed with skeleton anchor pole, and skeleton anchor pole is fixed on underground chamber palisades, skeleton anchor pole Diameter is 28mm.
The load-bearing skeleton is fixedly connected with girder truss, and girder truss is fixedly connected by wirerope with vault anchoring pile, vault Anchoring pile and wirerope take up reinforcing at the girder truss back side, and vault anchoring pile diameter is 28mm.
The blasting impact protective device includes iron sheet watt layer, support frame, rock wool layer, steel grid, and iron sheet watt layer is set It is disposed adjacent to the one side of blast area, iron sheet watt layer is fixed on support frame, iron sheet watt layer choosing 8# galvanized wire and support frame phase It is fixedly connected, support frame side is fixed in rock wool layer laying, and steel grid is fixedly connected with rock wool layer reverse side, steel mesh Lattice are used to protect rock wool layer and fix, and steel grid size selects 16@400*400mm of Φ, steel grid end and support rib Frame is welded and fixed, and for protecting and fixing rock wool layer, iron sheet watt layer is formed by monolithic iron sheet watt overlap joint, and monolithic iron sheet watt height is 70-90cm, clinch is provided between monolithic iron sheet watt, and clinch length is 10cm.
The support frame is made of I20 I-steel and 10# channel steel, is distributed in groined type, support frame end is fixed with Support frame dowel, support frame dowel are fixed on underground chamber palisades, and support frame dowel diameter is 28mm, rock wool layer choosing With the rock wool of 90mm thickness.
Compared with prior art, advantageous effect of the invention is: the present invention selects suitable erosion control noise attenuation material, effectively solves Blasting flyrock, blasting impact involve the protection question of noise and blasting dust, can be complete using the shotfiring safety compound protection method It is complete to intercept blasting flyrock, it effective attenuation Blasting shock wave superpressure and prevents blasting dust from spilling by protected area, adopts simultaneously With the means of defence, single blasting scale can be increased, reduce blasting cost and improves Blasting Excavation work efficiency.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other feature of the invention, Objects and advantages will become more apparent upon.
Fig. 1 is schematic structural view of the invention.
Fig. 2 is borehole blasting flyrock protection apparatus structure schematic diagram of the present invention.
Fig. 3 is borehole blasting surge guard apparatus structure schematic diagram of the present invention.
Fig. 4 is structural schematic diagram at A in Fig. 1.
Fig. 5 is structural schematic diagram.
Fig. 6 is structural schematic diagram.
Specific embodiment
The present invention is described in further details below by embodiment, embodiment is only used to illustrate the present invention, and unlimited The scope of the present invention processed.
A kind of underground space erosion control noise reduction dust-separation shotfiring safety compound protection method as shown in figures 1 to 6, including walk as follows It is rapid: 1) to include by the arrangement of blasting flyrock protective device 1: arranging flyrock protection stratum reticulare 11, slungshot in 10 edge side of blast area Protection stratum reticulare 11 is used to intercept the blasting flyrock that partial size is greater than 300mm, by protective facing 12, load-bearing skeleton 13,14 cloth of screen layer It sets after the flyrock protection stratum reticulare 11 at the position 5-7m, is specifically 6m, the blasting flyrock for being greater than 8mm for intercepting partial size is Guarantee that its blasting protection structure is not destroyed, expanding the first position by workshop centre of machine workshop excavation, and it is quick-fried to retain first layer About 4m range rock mass does not excavate temporarily on the outside of broken slungshot intercept net, when excavating clipping room floor elevation or less, then using control Blasting technique horizontal slice processed is excavated, and first layer blasting flyrock protective net is extended downwardly installation to clipping room elevation later.
2) blasting impact protective device 2 arrangement of blasting impact protective device 2: is set to blasting flyrock protective device 1 Later about at 2-3m, intercepts blasting flyrock of the partial size less than 8mm and Blasting shock wave, noise and dust and progress safety are prevented Shield.2 rear portion of blasting impact protective device is provided with by protection zone 9.
Blasting flyrock protective device 1 is set to 10 side of blast area, and 1 rear portion of blasting flyrock protective device is provided with explosion punching Protective device 2 is hit, blasting impact protective device 2 is 2-3m at a distance from blasting flyrock protective device 1, to prevent partial size from being less than The slungshot of 8mm, which is flown into, by protection zone, is avoided Blasting shock wave, noise caused by explosion and blasting dust from influencing to be protected Area works normally, and arranges that preventing explosion impact involves the explosion punching of noise, blasting dust at 2~3m after blasting flyrock protective device Hit protective device 2.
Blasting flyrock protective device 1 includes flyrock protection stratum reticulare 11, protective facing 12, load-bearing skeleton 13, screen layer 14, is prevented Armour layer 12 is set to 11 rear portion of flyrock protection stratum reticulare, and the inclination angle of protective facing 12 and horizontal plane is 81 degree and towards blast area 10 sides are obliquely installed, and 12 side of protective facing is fixedly connected with 13 phase of load-bearing skeleton, and screen layer 14 is fixed on load-bearing skeleton 13 Side.
Flyrock protection stratum reticulare 11 is the annular passive protection net of aperture 300mm, and flyrock protection stratum reticulare 11 selects SNS passively to prevent Protective net is the annular passive protection net of aperture 300mm, and effect is the blasting flyrock for stopping partial size to be greater than 300mm, sufficiently benefit With the easy spreadability and high protecting against shock ability of the high tensile metal flexible material of SNS passive protection net, makes blasting flyrock and intercept master Component is wanted, SNS passive protection net is also equipped with light and easy processing feature, and the letter of the lightness installation and maintenance of system may be implemented It is single quick.The TECCO-65 type grid of selection Bruch (Chengdu) Engineering Co., Ltd. (GCCL) production of passive protection net and rule Lattice are the ROCCO ring network of 5 × 3/4/5/6/7m, and TECCO-65 diamond shape grid is currently used high-tensile steel wires grid, Zinc-coated wire for intensity not less than 1770MPa, diameter 3mm weaves without knot, and steel wire end knot is fixed, diamond-shaped meshes Inscribed circle diameter 65mm, ROCCO ring network, the TECCO coil of wire knot number using intensity not less than 1770MPa, diameter 3mm Circle cyclization is simultaneously mutually socketed to form, and annular distance diameter is generally 300mm, disk ring formation number according to the difference of stone blocking net model without Together, finished net block specifications are generally 5 × 3/4/5/6/7m, 10 side of Nearby Blasting area arrangement, using the crown excavated and Palisades, 11 upper and lower part of flyrock protection stratum reticulare are respectively and fixedly provided with flyrock protection net anchor pole 111,111 diameter of flyrock protection net anchor pole For 28mm.
Protective facing 12 includes protection reinforcing bar stratum reticulare 121, diamond shape passive protection net 122, and protection reinforcing bar stratum reticulare 121 selects Φ The steel mesh of 16@200*200mm, the mesh of diamond shape passive protection net 122 are 65mm.
Load-bearing skeleton 13 is made of I20 I-steel and 10# channel steel, is distributed in groined type.
It is the sieve of 8mm that screen layer 14, which selects bore dia, for stopping partial size to be greater than the slungshot of 65mm~8mm.
13 end of load-bearing skeleton is fixed with skeleton anchor pole 131, and skeleton anchor pole 131 is fixed on underground chamber palisades, skeleton 131 diameter of anchor pole is 28mm.
Girder truss 15 is fixedly connected with load-bearing skeleton 13, guarantees the rigidity of load-bearing skeleton 13, and girder truss 15 passes through wirerope 151 with vault anchoring pile 152 is fixed connects, vault anchoring pile 151 and wirerope 152 take up reinforcing, vault at 15 back side of girder truss 152 diameter of anchoring pile is 28mm.
Blasting impact protective device 2 includes iron sheet watt layer 21, support frame 22, rock wool layer 23, steel grid 24,
Iron sheet watt layer 21 is disposed in proximity to the one side of blast area 10, and iron sheet watt layer 21 is fixed on support frame 22, iron sheet watt layer 21 selection 8# galvanized wires are fixedly connected with 22 phase of support frame, and 22 side of support frame, steel grid are fixed in the laying of rock wool layer 23 24 are fixedly connected with 23 reverse side of rock wool layer, and steel grid 24 is used to protect rock wool layer 23 and fix, 24 ruler of steel grid Very little 16@400*400mm of selection Φ, 24 end of steel grid is welded and fixed with support frame 22, for protecting and fixing rock wool layer 23。
Iron sheet watt layer 21 is formed by the overlap joint of monolithic iron sheet watt 211, and 211 height of monolithic iron sheet watt is 70-90cm, is specifically 80cm, clinch 212 is provided between monolithic iron sheet watt 211, and 212 length of clinch is 10cm.
Support frame 22 is made of I20 I-steel and 10# channel steel, is distributed in groined type, 22 end of support frame is fixed with Support frame dowel 221, support frame dowel 221 are fixed on underground chamber palisades, and 221 diameter of support frame dowel is 28mm。。
Rock wool layer 23 selects the rock wool of 90mm thickness, and rock wool has the characteristics that fire prevention, fire-retardant, compressible and impermeable dirt of breathing freely, The energy of Blasting shock wave generation can be eliminated, noise of blasting and barrier blasting dust etc. are reduced.The rock wool main performance of selection Index: thermal coefficient tests 70 ± 5 DEG C of mean temperature no more than 0.44w/m.k(), 650 DEG C of maximum operation (service) temperature.Preferred rock The cotton back side is fixed with galvanized wire net cover, to guarantee that rock wool is not torn or destroys under the action of multiple Blasting shock wave, in rock wool The back side add galvanized wire net cover, guarantee that rock wool layer still keeps globality after repeat impact.
The use condition of shotfiring safety compound protection method:
The present invention is based under underground space bursting work environment, for explosion dispersion, Air blast wave and noise, explosion Therefore the security protection of the Harmful effects from blasting such as dust need to meet the following conditions using this shotfiring safety compound protection method.
(1) bursting work area with same underground activities space is in by protection zone, and bursting work area with protected There is no the shelters such as other buildings, works between area;
(2) bursting work area has nearby formed construction channel or ventilation smoke exhaust channel, guarantees that Blasting shock wave superpressure can be released effectively It puts, and compound blasting protection structure cloth postpones the ventilation smoke exhaust for not influencing bursting work area;
(3) there are other construction channels in bursting work area, will not influence applying for bursting work area after compound blasting protection structure installation Industry and traffic is logical.
Application examples:
Zambia (Zambia) Ka Liba (kariba) power station north bank expands machine engineering and is located at what Zambia had a common boundary with Zimbabwe On Zambezi, expand the underground power station that machine engineering is installation 2*180MW.Expansion machine workshop is connected with former underground power house, and shares original The clipping room of workshop, wherein expanding the long 51.9m of machine underground power house, width 25.8m, high 50m, the 4# unit distance in genuine room expands machine workshop Edge Distance about 40m, expand machine workshop and excavate about 60,000 sides of total side's amount.Expansion machine workshop arch has 1# access tunnel to be interlinked to the outside with hole, is Ventilation smoke exhaust and Blasting shock wave overpressure release provide channel;Genuine room can be directly entered into factory's access tunnel by genuine room Clipping room provides construction channel for this composite protection structure.
In this project, compound blasting protection method uses at the clipping room position expanded between machine workshop and genuine room, the One layer of blasting flyrock interception structure is arranged in explosion area edge, and second to the 4th layer of blasting flyrock interception structure is arranged in first layer The position about 6m after blasting flyrock protective net, the blasting flyrock for being greater than 8mm for intercepting partial size.First layer blasting flyrock intercept net The main blasting flyrock for intercepting partial size and being greater than 300mm expands machine workshop and excavates first to guarantee that its blasting protection structure is not destroyed By position among workshop, and retain about 4m range rock mass on the outside of first layer blasting flyrock intercept net and do not excavate temporarily, wait open When digging clipping room floor elevation or less, then using Controlled blasting technique horizontal slice excavation, later by first layer blasting flyrock Protective net extends downwardly installation to clipping room elevation.
Blasting impact involves noise, blasting dust safeguard structure is arranged in after blasting flyrock interception structure at about 2 ~ 3m, Intercept blasting flyrock of the partial size less than 8mm and to Blasting shock wave, noise and dust and progress security protection
During expanding machine engineering Underground powerhouse excavation, the blasting safety protection method, blasting flyrock, explosion air are used for the first time Impact involves noise and blasting dust has obtained effective control, and Blasting shock wave superpressure attenuation rate reaches 95% or more, not to original The normal work of the operation of Power Plant electromechanical equipment and operations staff impact.
In conjunction with comprehensive vibration reducing measure and the application of this blasting safety protection method, compared with conventional blasting method safety prevention measure, The blasting scale of single is increased, drilling amount and explosive dosage are reduced, decreases total explosion number, it is more conventional About 67.5 ten thousand dollars of construction method save the cost, expands machine workshop and excavate duration quickening about 2 months.
The above described is only a preferred embodiment of the present invention, being not that the invention has other forms of limitations, appoint What those skilled in the art changed or be modified as possibly also with the technology contents of the disclosure above equivalent variations etc. Imitate embodiment.But without departing from the technical solutions of the present invention, according to the technical essence of the invention to above embodiments institute Any simple modification, equivalent variations and the remodeling made, still fall within the protection scope of technical solution of the present invention.

Claims (10)

1. a kind of underground space erosion control noise reduction dust-separation shotfiring safety compound protection method, characterized by the following steps: 1) Including by the arrangement of blasting flyrock protective device: arranging that flyrock protection stratum reticulare, flyrock protection stratum reticulare are used in explosion area edge side In intercept partial size be greater than 300mm blasting flyrock, by protective facing, load-bearing skeleton, screen layer be arranged in flyrock protection stratum reticulare it Afterwards, the blasting flyrock for being greater than 8mm for intercepting partial size;
2) arrangement of blasting impact protective device: blasting impact protective device is set to after blasting flyrock protective device about At 2-3m, the blasting flyrock for being less than 8mm for intercepting partial size, blasting impact protective device rear portion is by protection zone.
2. underground space erosion control noise reduction dust-separation shotfiring safety compound protection method according to claim 1, it is characterised in that: The blasting flyrock protective device is set to blast area side, and blasting flyrock protective device rear portion is provided with blasting impact protection dress It sets, blasting flyrock protective device includes flyrock protection stratum reticulare, protective facing, load-bearing skeleton, screen layer, and protective facing is set to winged The inclination angle of stone protection stratum reticulare rear portion, protective facing and horizontal plane is 81 degree and is obliquely installed towards blast area side, protection face Layer side is mutually fixedly connected with load-bearing skeleton, and screen layer is fixed on load-bearing skeleton side.
3. underground space erosion control noise reduction dust-separation shotfiring safety compound protection method according to claim 2, it is characterised in that: The flyrock protection stratum reticulare is the annular passive protection net of aperture 300mm, and flyrock protection stratum reticulare upper and lower part is respectively and fixedly provided with winged Stone protective net anchor pole.
4. underground space erosion control noise reduction dust-separation shotfiring safety compound protection method according to claim 2, it is characterised in that: The protective facing includes protection reinforcing bar stratum reticulare, diamond shape passive protection net, protects steel mesh layer choosing with 16 200*200mm's of Φ Steel mesh.
5. underground space erosion control noise reduction dust-separation shotfiring safety compound protection method according to claim 1, it is characterised in that: The load-bearing skeleton is made of I20 I-steel and 10# channel steel, is distributed in groined type.
6. underground space erosion control noise reduction dust-separation shotfiring safety compound protection method according to claim 5, it is characterised in that: It is the sieve of 8mm that the screen layer, which selects bore dia, for stopping partial size to be greater than the slungshot of 65mm~8mm.
7. underground space erosion control noise reduction dust-separation shotfiring safety compound protection method according to claim 5, it is characterised in that: The load-bearing skeleton end is fixed with skeleton anchor pole, and skeleton anchor pole is fixed on underground chamber palisades, and skeleton bolt diameter is 28mm。
8. underground space erosion control noise reduction dust-separation shotfiring safety compound protection method according to claim 5, it is characterised in that: The load-bearing skeleton is fixedly connected with girder truss, and girder truss is fixedly connected by wirerope with vault anchoring pile, vault anchoring pile and steel Cord takes up reinforcing at the girder truss back side, and vault anchoring pile diameter is 28mm.
9. underground space erosion control noise reduction dust-separation shotfiring safety compound protection method according to claim 8, it is characterised in that: The blasting impact protective device includes iron sheet watt layer, support frame, rock wool layer, steel grid, and iron sheet watt layer is disposed in proximity to The one side of blast area, iron sheet watt layer are fixed on support frame, and iron sheet watt layer choosing is mutually fixedly connected with 8# galvanized wire with support frame, Rock wool layer laying is fixed on support frame side, steel grid is fixedly connected with rock wool layer reverse side, steel grid be used for pair Rock wool layer protection and fixed, steel grid size selection 16@400*400mm of Φ, steel grid end and support frame welding are solid Fixed, for protecting and fixing rock wool layer, iron sheet watt layer is formed by monolithic iron sheet watt overlap joint, and monolithic iron sheet watt height is 70-90cm, Clinch is provided between monolithic iron sheet watt, clinch length is 10cm.
10. underground space erosion control noise reduction dust-separation shotfiring safety compound protection method according to claim 9, feature exist In: the support frame is made of I20 I-steel and 10# channel steel, is distributed in groined type, support frame end is fixed with support rib Frame dowel, support frame dowel are fixed on underground chamber palisades, and support frame dowel diameter is 28mm, and rock wool layer selects 90mm Thick rock wool.
CN201910564269.5A 2019-06-27 2019-06-27 Underground engineering anti-impact noise-reduction dust-isolation blasting safety composite protection method Active CN110230963B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910564269.5A CN110230963B (en) 2019-06-27 2019-06-27 Underground engineering anti-impact noise-reduction dust-isolation blasting safety composite protection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910564269.5A CN110230963B (en) 2019-06-27 2019-06-27 Underground engineering anti-impact noise-reduction dust-isolation blasting safety composite protection method

Publications (2)

Publication Number Publication Date
CN110230963A true CN110230963A (en) 2019-09-13
CN110230963B CN110230963B (en) 2024-02-13

Family

ID=67856506

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910564269.5A Active CN110230963B (en) 2019-06-27 2019-06-27 Underground engineering anti-impact noise-reduction dust-isolation blasting safety composite protection method

Country Status (1)

Country Link
CN (1) CN110230963B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113739654A (en) * 2021-09-04 2021-12-03 北京伊拜科技有限责任公司 Data acquisition and detection method for industrial detonator in blasting operation field
CN115200442A (en) * 2022-06-30 2022-10-18 北京住总集团有限责任公司 Shaft blasting flyrock and shock wave protection device and method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005083679A (en) * 2003-09-09 2005-03-31 Aoki Corp Method of reducing blasting vibration and blasting sound
CN102419140A (en) * 2011-11-25 2012-04-18 中铁十二局集团第三工程有限公司 Multielement three-dimensional safety protection method
CN202869377U (en) * 2012-09-02 2013-04-10 中铁十二局集团第二工程有限公司 Multi-element three-dimensional protective device for existing line stonework controlled blast
KR20140072529A (en) * 2012-12-05 2014-06-13 한국남부발전 주식회사 Device for decreasing blasting noise
CN204924072U (en) * 2015-09-04 2015-12-30 贵州新联***工程集团有限公司 Nearly body of side slope blasting rolling stone blocks protector
CN105823385A (en) * 2016-04-08 2016-08-03 中钢集团马鞍山矿山研究院有限公司 Protection method for decreasing blasting flying stone distance
CN208440998U (en) * 2018-05-25 2019-01-29 中国电建集团成都勘测设计研究院有限公司 Composite protection structure based on steel-wire stone in conjunction with passive soft protecting net

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005083679A (en) * 2003-09-09 2005-03-31 Aoki Corp Method of reducing blasting vibration and blasting sound
CN102419140A (en) * 2011-11-25 2012-04-18 中铁十二局集团第三工程有限公司 Multielement three-dimensional safety protection method
CN202869377U (en) * 2012-09-02 2013-04-10 中铁十二局集团第二工程有限公司 Multi-element three-dimensional protective device for existing line stonework controlled blast
KR20140072529A (en) * 2012-12-05 2014-06-13 한국남부발전 주식회사 Device for decreasing blasting noise
CN204924072U (en) * 2015-09-04 2015-12-30 贵州新联***工程集团有限公司 Nearly body of side slope blasting rolling stone blocks protector
CN105823385A (en) * 2016-04-08 2016-08-03 中钢集团马鞍山矿山研究院有限公司 Protection method for decreasing blasting flying stone distance
CN208440998U (en) * 2018-05-25 2019-01-29 中国电建集团成都勘测设计研究院有限公司 Composite protection structure based on steel-wire stone in conjunction with passive soft protecting net

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
姬学军,刘元广: "水电站扩机工程进水口围堰拆除设计与施工 ———赞比亚卡里巴北岸水电站扩机项目", 价值工程, vol. 37, no. 26, pages 178 - 180 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113739654A (en) * 2021-09-04 2021-12-03 北京伊拜科技有限责任公司 Data acquisition and detection method for industrial detonator in blasting operation field
CN115200442A (en) * 2022-06-30 2022-10-18 北京住总集团有限责任公司 Shaft blasting flyrock and shock wave protection device and method

Also Published As

Publication number Publication date
CN110230963B (en) 2024-02-13

Similar Documents

Publication Publication Date Title
Li et al. Roadway stagger layout for effective control of gob-side rock bursts in the longwall mining of a thick coal seam
CN105157493B (en) A kind of explosion expansion tube and blasting method thereof
CN110230963A (en) A kind of underground engineering erosion control noise reduction dust-separation shotfiring safety compound protection method
CN103277114A (en) Non-sprayed-concrete anchor net supporting method of underground construction broken surrounding rocks
CN103017620A (en) Controlled blasting construction method for rock foundation pit
CN204007366U (en) A kind of flexibility is adjustable blasting flyrock protection network
CN105865276A (en) Efficient shock absorption blasting and excavation method adopting fishbone-shaped construction guide grooves for large rock deep foundation pit in dense building area
Wu et al. Rock mechanical problems and optimization for the long and deep diversion tunnels at Jinping II hydropower station
CN204495211U (en) A kind of blasting hole arrangement system of tunnel open excavation section
CN101672613B (en) Vibration-reducing blasting construction method of air spring
CN210441759U (en) Underground space scour protection falls dust removal blasting safety composite protection device that makes an uproar
Durrheim Functional specifications for in-stope support based on seismic and rockburst observations in South African mines
US20240044740A1 (en) Method and system for blast-induced vibration monitoring of tunnels in high asymmetric in-situ stresses
CN109488309A (en) High-ground stress, basalt underground power house cavern con struction method
Iannacchione et al. Safer mine layouts for underground stone mines subjected to excessive levels of horizontal stress
CN210570272U (en) Elevator shaft to-be-blasted area structure capable of reducing earth surface vibration
CN104034219A (en) Control technology for preventing damage caused by blasting of rolling stones
Badger et al. Hybrid barrier systems for rockfall protection
CN204001985U (en) A kind of protector that stops explosion Rolling Stone
CN100543402C (en) The iron and steel link network in broken slungshot control method of a kind of ore deposit rock burst and covering big gun hole
BALIKTSIS et al. Blasting vibration limits to prevent human annoyance remarks from some case studies
CN215064150U (en) Comprehensive protection structure for preventing backseat and harmful effect in blasting demolition of building
Varun et al. Underground nuclear power plants: The seismic advantage
CN108708755B (en) Underground rock burst prevention and control method
RU2046948C1 (en) Stratum main drifts protection method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 450001 No. 59 Lianhua street, hi tech Development Zone, Henan, Zhengzhou

Applicant after: China Power Construction Eleventh Bureau Engineering Co.,Ltd.

Applicant after: SINOHYDRO BUREAU 11 Co.,Ltd.

Address before: 450001 No. 59 Lianhua street, hi tech Development Zone, Henan, Zhengzhou

Applicant before: CHINA HYDROPOWER ELEVENTH ENGINEERING BUREAU (ZHENGZHOU) Co.,Ltd.

Applicant before: SINOHYDRO BUREAU 11 Co.,Ltd.

GR01 Patent grant
GR01 Patent grant