CN102419140A - Multielement three-dimensional safety protection method - Google Patents

Multielement three-dimensional safety protection method Download PDF

Info

Publication number
CN102419140A
CN102419140A CN2011103801652A CN201110380165A CN102419140A CN 102419140 A CN102419140 A CN 102419140A CN 2011103801652 A CN2011103801652 A CN 2011103801652A CN 201110380165 A CN201110380165 A CN 201110380165A CN 102419140 A CN102419140 A CN 102419140A
Authority
CN
China
Prior art keywords
sns
steel pipe
protection
steel
slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103801652A
Other languages
Chinese (zh)
Inventor
汪晓臻
郝亚伟
李建军
郭英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority to CN2011103801652A priority Critical patent/CN102419140A/en
Publication of CN102419140A publication Critical patent/CN102419140A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention relate to a multielement three-dimensional safety protection method, which is used for rock blasting in chasm expanding and excavating in the existing railway and highway, and solves the problems that in the traditional protection method adopted by the existing rock blasting, the construction is complex, the cost is high and the protection effect is poor. The method comprises the following steps of: a, surveying a cross sectional drawing of a blasting point; b, determining chasm expansion thickness, slope height and rock orientation; c, covering a cannon quilt on each porthole, and sealing and pressing each cannon quilt by a sandbag; d, fixing an SNS (Soft Net System) active soft protective net by a side slope surface, and fixing an SNS passive soft protective net by a side slope platform; e, fixing a steel pipe bamboo raft rack on the back side of the SNS passive soft protective net, wherein the steel pipe bamboo raft rack comprises transversal steel pipes and longitudinal steel pipes which are crisscrossed and connected, the longitudinal steel pipes are buried into an underground protection layer, the back side of the protection layer is fixed with an inclined support, and the front side of the protection layer is fixed with a bamboo rack plate. The invention has the advantages that the design is reasonable and reliable, the protection units have respective pertinence and are mutually linked, so that the protection effect is greatly improved, all protection materials can be turnover for many times, and the economic benefit is outstanding.

Description

Polynary stereo safety means of defence
Technical field
The present invention relates to roadbed rock blasting means of defence, be specially a kind of existing railway, highway expansion moat excavation rock blasting with polynary stereo safety means of defence.
Background technology
At present; Along with developing rapidly of China railways, the existing railway reconstruction and extension project is a lot, much increases and on former cutting basis, directly expands the moat excavation when building two wires, three-way, four lines; Must take the controlled blasting excavation in cubic meter of stone highway section; But the security risk of Blasting Excavation is very big, and when complicated as if surrounding enviroment, difficulty of construction will be bigger.When bursting work, general single covering, the framed bent retaining of adopting of traditional safety prevention measure protects scheme, and the cost height is constructed loaded down with trivial details and protection effect is relatively poor.
Summary of the invention
The present invention adopts traditional means of defence to have the problem that construction is loaded down with trivial details, cost is high and protection effect is relatively poor in order to solve existing rock blasting, and a kind of polynary stereo safety means of defence is provided.
The present invention adopts following technical scheme to realize: polynary stereo safety means of defence, adopt following steps: a, landform, landforms and blasting engineering quantity according to blow-up point, and survey out the sectional drawing of blow-up point; B, verify blow-up point soil layer, geology and rock mass situation, confirm to expand moat thickness, slope height and strike; C, each aperture cover a big gun quilt, and big gun is pressed a sand hill by last envelope; D, side slope face be SNS flexible anti protecting wire net initiatively fixedly, and the fixing passive flexible anti protecting wire net of SNS of plain stage of slope; The dorsal part of e, the passive flexible anti protecting wire net of SNS is fixed with steel pipe bamboo raft frame, and steel pipe bamboo raft frame comprises horizontal vertical steel pipe cross-join and vertical buried overcoat of steel pipe, and the dorsal part of overcoat is fixed with diagonal brace, and the front side of overcoat is fixed with the bamboo frame plate.Cover big gun quilt, sand hill through aperture, quick-fried district, side slope face SNS is the flexible anti protecting wire net initiatively, effective link of a plurality of unit protection such as passive flexible anti protecting wire net of side slope pin SNS and steel pipe bamboo raft frame, the protection system of formation associating interaction; More than the blasting harm that produces under the corresponding different explosion environmental condition of polynary associating protection system; On solid space, rationally distribute;, form three-dimensional, protection effect comprehensively, completely and efficiently from top to bottom, easy construction, cost is low and protection effect is better.
Existing railway contact net bar front side is fixed with the underground and I-steel that connect through horizontal angle steel of some embeddings; The front side of I-steel is provided with auxiliary sand hill; The rear side of I-steel is provided with diagonal brace or earth anchor rod, when protecting for existing railway contact net bar, adopts the measure of I-steel wall rigid protection; Thoroughly take precautions against the generation of severe harm, further improved protection effect.
The SNS of plain stage of slope is passive, and the flexible anti protecting wire net replaces with the low bank of earth between fields that sand hill is built, and when the plain stage of slope limited space, the artificial low bank of earth between fields is set, and can gather materials on the spot, and is simple and easy to do.
Reasonable in design of the present invention is reliable; Set up quick-fried " the big gun quilt+sand hill " of distinguishing the surface and cover combination, can effectively prevent punching, slungshot, had distinctive flexility through volume rubber big gun and stand bigger blasting impact; And, cover effectiveness and improve greatly through in the sand hill pressurization; Set up side slope SNS initiatively flexible anti protecting wire net, the passive flexible anti protecting wire net of toe SNS and steel pipe bamboo raft frame; The effect of strengthened flexible protection; Can give full play to the self-stable ability of rock slope through distinctive flexibility, science prevents the Rolling Stone spring, tackles Rolling Stone, prevents slope failure; When the plain stage of slope limited space, the artificial low bank of earth between fields is set, can gather materials on the spot, simple and easy to do.Adopt the rigid protection measure to special object,, thoroughly taken precautions against the generation of severe harm like " I-steel wall " protection that catenary mast adopts; Each unit construction technology for protection is simple, and the speed that performs is fast; Each protective unit promptly respectively is directed against, and interlock has each other improved protection effect greatly again, and all protective materials can repeatedly have enough to meet the need, and economic benefit is outstanding.
Description of drawings
Fig. 1 is a structural representation of the present invention;
Fig. 2 is the structural representation of steel pipe bamboo raft frame among Fig. 1.
Among the figure: the 1-aperture, 2-big gun quilt, the 3-sand hill, 4-side slope face, 5-SNS is the flexible anti protecting wire net initiatively; The 6-plain stage of slope, the passive flexible anti protecting wire net of 7-SNS, 8-steel pipe bamboo raft frame, 9-overcoat, 10-diagonal brace; 11-bamboo frame plate, 12-existing railway contact net bar, the 13-I-steel, 14-assists sand hill.
The specific embodiment
Polynary stereo safety means of defence adopts following steps: a, the landform according to blow-up point, landforms and blasting engineering quantity, surveys out the sectional drawing of blow-up point; B, verify blow-up point soil layer, geology and rock mass situation, confirm to expand moat thickness, slope height and strike; C, each aperture 1 cover a big gun by 2, and big gun seals sand hill 3 of pressure on 2; D, side slope face 4 be SNS flexible anti protecting wire net 5 initiatively fixedly, and the fixing passive flexible anti protecting wire net 7 of SNS of plain stage of slope 6; The dorsal part of e, the passive flexible anti protecting wire net 7 of SNS is fixed with steel pipe bamboo raft frame 8, and steel pipe bamboo raft frame 8 comprises horizontal vertical steel pipe cross-join and vertical buried overcoat 9 of steel pipe, and the dorsal part of overcoat 9 is fixed with diagonal brace 10, and the front side of overcoat 9 is fixed with bamboo frame plate 11.Existing railway contact net bar 12 front sides are fixed with the underground and I-steel 13 that connect through horizontal angle steel of some embeddings, and the front side of I-steel 13 is provided with auxiliary sand hill 14, and the rear side of I-steel 13 is provided with diagonal brace or earth anchor rod; The SNS of plain stage of slope 6 is passive, and flexible anti protecting wire net 7 replaces with the low bank of earth between fields that sand hill is built.In the practical implementation process, aperture 1 cover big gun by 2, sand hill 3: big gun is utilized junked tire to make by 2, and specification is 1.0m * 1.0m, presses a big gun by 2 on each aperture 1, about 1.0 square metres of area; Big gun seals 1 sand hill 3 of pressure on 2, each sand hill 3 nearly weighs 20kg; SNS initiatively flexible anti protecting wire net 5 combines through wire cable anchor, supporting rope, stitching rope and steel wire grid, and adopts anchor rod anchored on side slope face 4; The passive flexible anti protecting wire net 7 of SNS be by wire rope net, high-tensile steel wires grid, anchor pole, steel I-column, go up drop-down anchor line, pressure-reducing ring, base and up and down parts such as supporting rope constitute, connection constitutes an integral body to steel column with steel rope net; Steel pipe bamboo raft frame 8 is made up of steel pipe, fastener, bamboo raft frame, iron wire etc.Steel pipe adopts ф 42mm steel pipe; 2.0 meters of vertical steel pipe spacings, laterally steel pipe spacing 1.0m, the connection of steel pipe intersection employing fastener in length and breadth; Vertical steel pipe is imbedded and undergroundly is not less than 0.3 meter; And with the concrete cast, whole steel pipe bamboo raft frame 8 every separated 1.5m add a diagonal brace 10, to guarantee the stability of steel pipe bamboo raft frame 8; Lean on the inboard of circuit completely to spread 11 sealings of bamboo frame plate at steel pipe, No. 8 iron wire colligations of bamboo frame plate 11 usefulness are firm, form to block the stone fence; To the protection of existing railway contact net bar 12, adopt the protection of " worker 16 " I-steel wall, the column spacing is not more than 1m; Be no less than 1m apart from contact net shaft tower exterior bottom, every long 3m embeds the underground 0.5m that is not less than; And fill with the c20 concrete; I-steel 13 adopts horizontal angle steel to be weldingly connected, and seam crossing is pressed related request both sides full weld, sets up diagonal brace in the line side or earth anchor rod is set up in the outside; High slope location, and grade of side slope has sudden change sets up at quick-fried area edge that platform is wide to be not less than 2 meters, adopts artificial filling sand hill, and assembling and forming a bottom width is 1.8 meters, and the high 1.5 meters artificial low bank of earth between fields is done protection.

Claims (3)

1. a polynary stereo safety means of defence is characterized in that: adopt following steps: a, the landform according to blow-up point, landforms and blasting engineering quantity, survey out the sectional drawing of blow-up point; B, verify blow-up point soil layer, geology and rock mass situation, confirm to expand moat thickness, slope height and strike; C, each aperture (1) cover a big gun by (2), and big gun is gone up envelope by (2) and pressed a sand hill (3); D, side slope face (4) be SNS flexible anti protecting wire net (5) initiatively fixedly, and the fixing passive flexible anti protecting wire net of SNS (7) of plain stage of slope (6); The dorsal part of e, the passive flexible anti protecting wire net of SNS (7) is fixed with steel pipe bamboo raft frame (8); Steel pipe bamboo raft frame (8) comprises horizontal vertical steel pipe cross-join and vertical buried overcoat of steel pipe (9); The dorsal part of overcoat (9) is fixed with diagonal brace (10), and the front side of overcoat (9) is fixed with bamboo frame plate (11).
2. polynary stereo safety means of defence according to claim 1; It is characterized in that: existing railway contact net bar (12) front side is fixed with the underground and I-steel (13) that connect through horizontal angle steel of some embeddings; The front side of I-steel (13) is provided with auxiliary sand hill (14), and the rear side of I-steel (13) is provided with diagonal brace or earth anchor rod.
3. polynary stereo safety means of defence according to claim 1 and 2 is characterized in that: the passive flexible anti protecting wire net of the SNS of plain stage of slope (6) (7) replaces with the low bank of earth between fields that sand hill is built.
CN2011103801652A 2011-11-25 2011-11-25 Multielement three-dimensional safety protection method Pending CN102419140A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103801652A CN102419140A (en) 2011-11-25 2011-11-25 Multielement three-dimensional safety protection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103801652A CN102419140A (en) 2011-11-25 2011-11-25 Multielement three-dimensional safety protection method

Publications (1)

Publication Number Publication Date
CN102419140A true CN102419140A (en) 2012-04-18

Family

ID=45943669

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103801652A Pending CN102419140A (en) 2011-11-25 2011-11-25 Multielement three-dimensional safety protection method

Country Status (1)

Country Link
CN (1) CN102419140A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103424045A (en) * 2012-05-15 2013-12-04 中国二十冶集团有限公司 Supporting method for blasting preventive facility of deep-foundation-pit lithosphere
CN104034219A (en) * 2014-06-05 2014-09-10 中钢集团马鞍山矿山研究院有限公司 Control technology for preventing damage caused by blasting of rolling stones
CN104634198A (en) * 2014-12-13 2015-05-20 中铁十九局集团第二工程有限公司 Controlled blasting construction method in mountain excavation close to expressway side
CN104848753A (en) * 2015-04-20 2015-08-19 中铁二十五局集团第一工程有限公司 Rock blasting control construction method implemented near existing railway line
CN105115373A (en) * 2015-09-04 2015-12-02 贵州新联***工程集团有限公司 Slope blasting rolling stone nearby blocking and protecting apparatus
CN107421405A (en) * 2017-09-20 2017-12-01 中铁十九局集团矿业投资有限公司 A kind of blasting integrated protector of high gradient slope and method
CN108086981A (en) * 2017-12-01 2018-05-29 中国水利水电第十工程局有限公司 With the construction method of more than the 100m high slopes of national highway zero distance
CN108332628A (en) * 2018-03-29 2018-07-27 武汉***有限公司 The individual flying protective devices of explosion
CN109470102A (en) * 2018-12-27 2019-03-15 上海绿地建设(集团)有限公司 A kind of Tunnel Blasting protection bamboo raft reinforcement wall and preparation method thereof
CN110230963A (en) * 2019-06-27 2019-09-13 中水电第十一工程局(郑州)有限公司 A kind of underground engineering erosion control noise reduction dust-separation shotfiring safety compound protection method
CN110285911A (en) * 2019-06-26 2019-09-27 湖南省航务工程有限公司 A kind of pressure monitoring device for underwater demolition
CN113431575A (en) * 2021-06-11 2021-09-24 中铁六局集团有限公司 Construction method for assisting excavation of stone cutting by plunger type rock hydraulic splitter
CN115164655A (en) * 2022-07-20 2022-10-11 中铁广州工程局集团有限公司 High slope brushing construction method for broken surrounding rock at tunnel portal of high-speed railway

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101430180A (en) * 2008-11-03 2009-05-13 徐建勇 Security protection system used for steel reinforced concrete support blasting engineering
CN101532807A (en) * 2008-12-18 2009-09-16 湖北白莲河抽水蓄能有限公司 Pumped storage power plant tail water retained rock step blasting safety protection method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101430180A (en) * 2008-11-03 2009-05-13 徐建勇 Security protection system used for steel reinforced concrete support blasting engineering
CN101532807A (en) * 2008-12-18 2009-09-16 湖北白莲河抽水蓄能有限公司 Pumped storage power plant tail water retained rock step blasting safety protection method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘玉兴: "SNS柔性防护***在隧道进口高边坡防护中的应用", 《铁路建筑技术》 *
王学楷: "浅谈湘黔复线K541深路堑石方控制***技术及安全防护", 《路基工程》 *

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103424045B (en) * 2012-05-15 2016-03-30 中国二十冶集团有限公司 Deep basal pit lithosphere blasting protection utilities support method
CN103424045A (en) * 2012-05-15 2013-12-04 中国二十冶集团有限公司 Supporting method for blasting preventive facility of deep-foundation-pit lithosphere
CN104034219A (en) * 2014-06-05 2014-09-10 中钢集团马鞍山矿山研究院有限公司 Control technology for preventing damage caused by blasting of rolling stones
CN104634198A (en) * 2014-12-13 2015-05-20 中铁十九局集团第二工程有限公司 Controlled blasting construction method in mountain excavation close to expressway side
CN104634198B (en) * 2014-12-13 2016-06-22 中铁十九局集团第二工程有限公司 Close on controlled blasting construction method in the massif excavation of highway limit
CN104848753A (en) * 2015-04-20 2015-08-19 中铁二十五局集团第一工程有限公司 Rock blasting control construction method implemented near existing railway line
CN105115373A (en) * 2015-09-04 2015-12-02 贵州新联***工程集团有限公司 Slope blasting rolling stone nearby blocking and protecting apparatus
CN107421405A (en) * 2017-09-20 2017-12-01 中铁十九局集团矿业投资有限公司 A kind of blasting integrated protector of high gradient slope and method
CN107421405B (en) * 2017-09-20 2023-05-09 中铁十九局集团矿业投资有限公司 Comprehensive protection device and method for high-steep slope blasting
CN108086981A (en) * 2017-12-01 2018-05-29 中国水利水电第十工程局有限公司 With the construction method of more than the 100m high slopes of national highway zero distance
CN108086981B (en) * 2017-12-01 2019-12-17 中国水利水电第十一工程局有限公司 construction method of high slope with zero distance to national road and more than 100m
CN108332628A (en) * 2018-03-29 2018-07-27 武汉***有限公司 The individual flying protective devices of explosion
CN108332628B (en) * 2018-03-29 2024-03-08 武汉***有限公司 Individual scattered matter protector during blasting
CN109470102A (en) * 2018-12-27 2019-03-15 上海绿地建设(集团)有限公司 A kind of Tunnel Blasting protection bamboo raft reinforcement wall and preparation method thereof
CN110285911B (en) * 2019-06-26 2021-11-30 湖南省航务工程有限公司 Pressure monitoring device for underwater blasting
CN110285911A (en) * 2019-06-26 2019-09-27 湖南省航务工程有限公司 A kind of pressure monitoring device for underwater demolition
CN110230963B (en) * 2019-06-27 2024-02-13 中电建十一局工程有限公司 Underground engineering anti-impact noise-reduction dust-isolation blasting safety composite protection method
CN110230963A (en) * 2019-06-27 2019-09-13 中水电第十一工程局(郑州)有限公司 A kind of underground engineering erosion control noise reduction dust-separation shotfiring safety compound protection method
CN113431575A (en) * 2021-06-11 2021-09-24 中铁六局集团有限公司 Construction method for assisting excavation of stone cutting by plunger type rock hydraulic splitter
CN113431575B (en) * 2021-06-11 2024-04-26 中铁六局集团有限公司 Construction method for assisting stone cutting excavation by plunger type rock hydraulic splitter
CN115164655A (en) * 2022-07-20 2022-10-11 中铁广州工程局集团有限公司 High slope brushing construction method for broken surrounding rock at tunnel portal of high-speed railway
CN115164655B (en) * 2022-07-20 2023-12-19 中铁广州工程局集团有限公司 Construction method for brushing broken surrounding rock high slope at tunnel portal of high-speed railway

Similar Documents

Publication Publication Date Title
CN102419140A (en) Multielement three-dimensional safety protection method
CN202329444U (en) Multi-element three-dimensional safety protection device
CN106638340A (en) Combined energy dissipation shed frame structure for preventing rockfall of high and steep slope in earthquake region
CN104762980B (en) The anti-liquefaction hard and soft antislide pile of energy-dissipating and shock-absorbing and constructional method
CN205776347U (en) Novel cover for subway station digs against making structural system
CN105155558A (en) Combined retaining structure and construction method thereof
CN103255771B (en) Method for excavating super-deep foundation pit engineering piles in graded mode and graded composite supporting of supporting piles
CN102031760A (en) Anti-rockfall method for subgrade in rock deposit zone
JP5779734B1 (en) Shock absorber
CN104846840A (en) Shallowly-buried soft soil integrated trench reinforcing device and construction method
CN111608707A (en) Rock burst dangerous roadway support method based on double-cylinder protection theory
CN203007958U (en) Protection system for eliminating sliding mass
CN203594035U (en) Multilevel combined protection structure for shallow hole blasting excavation bridge foundation pit construction
CN107419734A (en) The netted retaining structure of deep welding with filler wire
CN104727324A (en) Support construction method of irregular basement
CN102720218A (en) Deep-hole inverted-T-shaped pile based high-rise earthquake-resistant building structure
JP4987652B2 (en) Reinforcement structure and method of embankment and linear embankment
CN105241320B (en) A kind of both sides, Gao Dou valley, scenic spot bridge abutment controlled blasting and means of defence
JP2012117360A (en) Protective surface structure
Wu et al. Slope reinforcement for housing in Three Gorges reservoir area
CN110004948A (en) A kind of landslide reinforcement system and its reinforcement means
Yamamoto et al. Seismic design for immersed tube tunnel and its connection with TBM tunnel in Marmaray project
CN203270588U (en) Mini-pile antiskid structure
JP6233769B2 (en) Rock fall prevention fence
CN110725708B (en) Structure and method for reinforcing integrity and stability of tunnel surrounding rock by using cable

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120418