CN110223028A - A kind of efficient method and its system for formulating building engineering construction scheme - Google Patents
A kind of efficient method and its system for formulating building engineering construction scheme Download PDFInfo
- Publication number
- CN110223028A CN110223028A CN201910327228.4A CN201910327228A CN110223028A CN 110223028 A CN110223028 A CN 110223028A CN 201910327228 A CN201910327228 A CN 201910327228A CN 110223028 A CN110223028 A CN 110223028A
- Authority
- CN
- China
- Prior art keywords
- scheme
- module
- special
- construction
- formulating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 96
- 238000000034 method Methods 0.000 title claims abstract description 69
- 230000004048 modification Effects 0.000 claims description 17
- 238000012986 modification Methods 0.000 claims description 17
- 238000012550 audit Methods 0.000 claims description 9
- 230000008901 benefit Effects 0.000 claims description 8
- 239000000463 material Substances 0.000 claims description 7
- 238000012552 review Methods 0.000 claims description 6
- 230000033228 biological regulation Effects 0.000 claims description 5
- 230000005540 biological transmission Effects 0.000 claims description 3
- 238000005192 partition Methods 0.000 claims description 3
- 230000003466 anti-cipated effect Effects 0.000 claims 1
- 238000011065 in-situ storage Methods 0.000 description 10
- 238000010586 diagram Methods 0.000 description 7
- 230000008569 process Effects 0.000 description 5
- 238000012423 maintenance Methods 0.000 description 4
- 230000001788 irregular Effects 0.000 description 3
- 238000007726 management method Methods 0.000 description 3
- 238000013439 planning Methods 0.000 description 3
- 238000009825 accumulation Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 230000008676 import Effects 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 238000007619 statistical method Methods 0.000 description 2
- 239000013589 supplement Substances 0.000 description 2
- 241001269238 Data Species 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 210000000056 organ Anatomy 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 229940098458 powder spray Drugs 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000004537 pulping Methods 0.000 description 1
- 238000013139 quantization Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Primary Health Care (AREA)
Abstract
The present invention provides a kind of method for efficiently formulating building engineering construction scheme, and this method comprises the following steps: step S101: obtaining user's arrangement and method for construction and works out plan calls;Step S102: selection and the matched career field of arrangement and method for construction establishment plan calls, scheme module and codes and standards from database;Step S103: integrating the matched career field, scheme module and codes and standards, generates initialization special scheme;Step S104: the initialization special scheme of generation is pushed to the user.
Description
Technical field
The invention belongs to arrangement and method for construction to formulate field, and in particular to a method of efficiently formulate building engineering construction scheme
And its system.
Background technique
To ensure engineering construction safety, the biggish part-to-item project construction risk of risk is reduced, national government organ,
Industry and associated mechanisms require establishment special construction plan to determine one after a series of activities such as establishment, demonstration, examination
The whole series meet live practical and operable arrangement and method for construction and ensure the person and property safety to prevent construction safety accident;?
When developing programs, it is desirable that the technical staff to develop programs fully considers execution conditions and construction safety, and scheme is made to comply fully with skill
The requirement of art specification, working specification and safety code;In addition, also to reduce construction cost as far as possible, keep scheme more economically reasonable,
It is very high to the experience of technical staff and Capability Requirement among these, and it is thorough to be difficult to consideration.
Currently, most technical staff different by experience work out, the foundation of reference in preliminary arrangement and method for construction establishment
The generally template of older generation's retention, the experience and similar scheme is voluntarily searched in internet that mouth oral instructions are awarded, on this basis
Then modification and perfection submits departments of examination and approval to be audited, as a result causes the compiling level of scheme irregular, engineering department is difficult to
Accomplish effective accumulation to scheme establishment technique, approving person is in the scheme of audit, time and effort consuming, now a general special scheme
Review Cycle be one month, seriously affect construction efficiency, cause the significant wastage of personnel cost.Secondly, currently existing scheme is compiled
System is by projects portion designer's complete independently, and because authorized personnel's individual skill ability is different, Compilation Quality is irregular, similar
Problem can repeat, and no system scheme is unable to resource-sharing, Synchronous lifting.
Summary of the invention
In order to solve the above technical problems, efficiently formulating building engineering construction scheme the purpose of the present invention is to provide a kind of
Method, this method comprises the following steps:
Step S101: it obtains user's arrangement and method for construction and works out plan calls;
Step S102: selection and the matched career field of arrangement and method for construction establishment plan calls, scheme module from database
And codes and standards;
Step S103: integrating the matched career field, special scheme and codes and standards, and it is special to generate initialization
Scheme;
Step S104: the initialization special scheme of generation is pushed to the user.
Preferably, the database purchase career field, special scheme module library and codes and standards library.
Preferably, according to different regions, weather, the actual conditions of geology and national regulation standard, user select to
Few a set of people, machine, material, method, ring, initialization special scheme module for surveying demand of meeting confirms excellent for approving person's trade-off decision
Select special scheme.
Preferably, initializing special scheme according to audit opinion modification and perfection to obtain preferred special scheme.
Preferably, the preferred special scheme generates account after establishment examination & approval and than selecting outstanding side after modification and perfection
Case generates excellent alternative library.
Preferably, the career field uses hierarchical partition mode, the typing in each subdivision career field module
The advantage and disadvantage of its corresponding arrangement and method for construction.
Preferably, legal basis and standard criterion are included in the codes and standards library.
It is another object of the present invention to provide the efficient system for formulating building engineering construction scheme, which includes number
According to library, processor and user terminal,
Database is worked out according to arrangement and method for construction and is requested for storing career field, special scheme module library and codes and standards library
Extract matching career field, scheme module and codes and standards;
User terminal, works out plan calls by the arrangement and method for construction that user inputs, and establishment plan calls are sent to processor sum number
According to library;
Processor, the arrangement and method for construction for receiving user's transmission are worked out plan calls, are obtained and establishment plan calls corresponding
Career field, special scheme and the codes and standards matched;And it is pushed to user.
Preferably, user terminal includes recording module, inquiry request module and generation module, the recording module is used for
Typing is constructed essential information, and the construction essential information includes engineering type, special scheme title, scheme type, career field,
Whether need to be expounded through peer review and call time on planning;The inquiry request module is used to extract and the arrangement and method for construction from database
Matched career field, scheme module and codes and standards are requested in establishment;The generation module includes that project is basic for generating
Information and the initialization special scheme of acquisition.
Preferably, the user terminal further includes approval module, warning module, excellent alternative library, proposal inquiry module;
Approval module audits initialization special scheme for auditor;
Warning module is for setting the examination & approval time of each link, more than the data of time limit for appraisal and ratification, automatically according to early warning
Grade sends early warning short message to supervisor people, and the examination & approval timeliness of each link is supervised by supervising and manage people;
Excellent alternative library, for storing the excellent alternative selected after examining;
Proposal inquiry module generates initialization special scheme, excellent alternative and scheme statistical conditions for user's quick search.
Compared with prior art, the invention has the following advantages:
1. the present invention passes through building database, the database purchase career field, special scheme module library and codes and standards
The preferred embodiment that library, the current general construction technology of scheme module set and enterprises employee provide, can effectively solve
Certainly programming level is irregular, improves the formulation quality of scheme, greatly improves establishment efficiency, the establishment of arrangement and method for construction
Individual is no longer depended critically upon, but unified system template is used to work out, special scheme library therein is examined by editorial staff
Core typing ensure that the standard criterion of scheme;Personnel is effectively avoided to cause arrangement and method for construction and the stream of other knowledge simultaneously
It loses;In addition, perfect by the continuous iteration of scheme base to enterprise, gradually building forms the owned technical data library of enterprise.
2. being able to solve project checking period longer problem from system provided by the invention, improve efficiency.
3. implementation level of organization establishes unified version, solves existing scheme format disunity, content is nonstandard
The problems such as, advantage is Specification Schema format and content, lifting scheme Compilation Quality.
4. implementation compiling module, selection and excellent can be carried out according to different construction site situations by authorized personnel
Change, meet the needs of programming under different construction environments, equipment, material condition to greatest extent, greatly reduces authorized personnel's
Working strength promotes working efficiency.
5. implementation IT application in management, scheme module text online resource is shared, authorized personnel, approving person other side
Case text quality sustainable improvement and raising, establishment, approving person can information sharing, interaction, the volume of continuous lifting scheme
Quality processed and examination & approval efficiency.
Detailed description of the invention
Fig. 1 is career field manual editing example schematic diagram provided by the invention;
Fig. 2 is that career field provided by the invention imports template example schematic diagram;
Fig. 3 is hierarchical career field example schematic diagram;
Fig. 4 is legal basis and standard criterion example schematic diagram;
Fig. 5 is the concrete operations flow chart of exemplary programming;
Fig. 6 is establishment scheduling example figure;
Fig. 7 is the hierarchical career field exemplary diagram that cast-in-situ bored pile special construction plan marks off;
Fig. 8 is special scheme preferable example figure;
Fig. 9 is that special scheme works out exemplary diagram;
Figure 10 is that special scheme improves exemplary diagram;
Figure 11 is that special scheme improves account figure.
Specific embodiment
Explanation of nouns-special scheme module library
By the variable that people, machine, material, method, ring, survey etc. influence labor and materials machine be refined as cannot divided separate unit again, for establishment
People carries out layout combination according to engineering characteristic, technical logic relationship and writes, these are known as by the system that separate unit forms
Special scheme module library.
Explanation of nouns-special scheme
Special scheme refers to the set of the corresponding arrangement and method for construction of multiple subdivision career fields.
Below in conjunction with specific embodiment, the present invention will be described in detail, it should be appreciated that this field skill
For art personnel, it can be modified or changed according to the above description, and all these improvement or transformation all should belong to institute of the present invention
Within attached scope of protection of the claims.
A kind of system for efficiently formulating building engineering construction scheme provided by the invention, which includes database, processing
Device and user terminal,
Database is worked out according to arrangement and method for construction and is requested for storing career field, special scheme module library and codes and standards library
Matching career field, scheme module and codes and standards are extracted, according to the preferred arrangement and method for construction of career field and are collected
It closes and obtains special scheme, each career field corresponding arrangement and method for construction set current general arrangement and method for construction and enterprise
The preferred embodiment that industry interior employee provides.
The career field uses hierarchical partition mode, in each subdivision career field module typing its corresponding apply
The advantage and disadvantage of work scheme, so that subsequent each project management department can quickly select in drawing up a plan;In the present invention, to professional class
, arrangement and method for construction does not carry out careful division, according to industry development and requirement of engineering, frequently to career field library carry out later maintenance and
It updates, the purpose of this technological means is to facilitate trainee, the project personnel for not editing scheme or the insufficient volume of correlation experience
People processed can carry out Fast Learning, Effective selection to plan content needed for project according to class library.
Codes and standards library includes but is not limited to legal basis and standard criterion, is all made of Newest Law foundation in industry
And standard criterion, real-time update, it is ensured that work out legal basis and mark various needed for special construction plan in projects portion
Quasi- specification is in last state, avoids quoting expired specification, standard;Meanwhile reduce project management department search specification, standard when
Between, improve programming efficiency and quality;When carrying out programming, it is introduced directly into one-to-one codes and standards;This behave
Purpose be: due to special scheme establishment when more quote a large amount of standards, specification and laws and regulations, so setting up standard criterion mould
Block synchronizes the legal basis and standard criterion of each engineering type, and in each scheme module, primary chapters and sections content is profession
Standard criterion carries out selection reference from standard, specification module when carrying out scheme module establishment, in addition, when legal basis and
When standard criterion, interior under corresponding career field file can be updated, the normative content uploaded is with old version
Form is deposited in the database, and data list page table name old version number is to identify;Content can be by scheme module after enabling
It is quoted.
User terminal, works out plan calls by the arrangement and method for construction that user inputs, and establishment request is sent to processor sum number
According to library,
Processor, the arrangement and method for construction for receiving user's transmission work out request message.
In a preferred embodiment of the invention, the user terminal includes recording module, inquiry request module and life
At module, for the recording module for typing construction essential information, the construction essential information includes but is not limited to engineering type,
Special scheme title, scheme type, career field, if needs are expounded through peer review and call time on planning;It is high in time convenient for enterprise
Establishment and declaration work are completed in effect ground, improve efficiency;
The inquiry request module, which is used to extract from database, requests matched career field, scheme with arrangement and method for construction establishment
Module and codes and standards, such as according to the key word of the inquiry of Scenario Name setting or according to search index, extraction is asked with establishment
Seek matched career field, due in career field typing have the corresponding arrangement and method for construction of each career field advantage and disadvantage and
Rationale for the recommendation, therefore during this, user can select multiple initialization special scheme modules according to career field, in order to for compiling
Process authorized personnel processed filters out preferred special scheme according to construction site actual conditions.
The generation module is used to generate the initialization special scheme including project essential information and acquisition;
It is highly preferred that the user terminal further includes approval module, warning module, proposal inquiry module and excellent alternative library;
Approval module audits initialization special scheme for approving person, and approval module has to initialization special scheme
Function is modified, supplements and completes, system automatically records the information such as the location revision of modification people, modification content, modification time,
Facilitate follow-up link auditor to just look at the part of modification, quickly audits scheme;
Warning module is for setting the examination & approval time of each link, more than the data of time limit for appraisal and ratification, automatically according to early warning
Grade sends early warning short message to supervisor people, and the examination & approval timeliness of each link is supervised by supervising and manage people;
Account is generated after establishment examination & approval modification and perfection and than selecting excellent alternative, generation excellent alternative library;Concrete operations are as follows: initial
After change special scheme is worked out, relevant departments is reported to be examined, quantization can be carried out in approval process to scheme Compilation Quality and commented
Point, competition excellent alternative enters excellent alternative library, and the basic material for regularly updating, being promoted as scheme module library forms knowledge
Accumulation, instructs subsequent schedule to work out, the total quality of continuous lifting scheme establishment.It is automatic raw simultaneously according to scheme approval status
At special scheme account, for technical staff with reference to utilization.
Initialization special scheme, excellent alternative and the scheme statistics that proposal inquiry module is generated for user's quick search
Situation;Specifically, system can automatically form scheme categories statistics, scheme career field according to the special scheme process data of generation
Statistics, excellent alternative statistics, scheme fractional statistics, scheme declare lag ranking, scheme declares the multiple angles such as company's ranking
Statistical analysis charts, convenient special scheme of grasping in time examine situation.
System provided by the invention has programming speed fast, and programming quality is high, and review efficiency is high, easy to use
The features such as.
Based on the system of quick preferred building engineering construction scheme provided above, the present invention mentions a kind of efficiently formulate and builds
The method of scheme of project construction, this method comprises the following steps:
Step S101: it obtains user's arrangement and method for construction and works out plan calls;
Step S102: selection and the matched career field of arrangement and method for construction establishment plan calls, special scheme from database
And codes and standards;
Step S103: integrating the matched career field, scheme module and codes and standards, and it is special to generate initialization
Scheme;
Step S104: the initialization special scheme of generation is pushed to the user.
In the initialization special scheme of generation, according to the actual conditions of different regions and national regulation standard, for
The same arrangement and method for construction request selects the initialization special scheme of more set meet demands for authorized personnel's trade-off decision;Simultaneously
For approving person's modification, supplement and perfect information;
In step S101, arrangement and method for construction establishment request is obtained, typing construction essential information, the construction essential information includes project
Title, project leader, contract value, time limit for contract, the plan starting duration, engineering type, Scenario Name, scheme type, specially
Industry classification, if needs are expounded through peer review and call time on planning;Typing essential information facilitates subsequent proposal inquiry and information
Statistics, Information Statistics include scheme categories statistics, scheme career field statistics, excellent alternative statistics, scheme fractional statistics, scheme
The statistical analysis charts of the multiple angles such as establishment lag ranking, programming efficiency company ranking, facilitate manager to grasp in time
Special scheme declares situation;Wherein according to establishment plan calls, multiple career fields are covered in an establishment in the works, and each special
Mark off multiple junior's career fields under industry classification, special scheme title includes that hollow slab girder prefabricated construction, cast-in-situ bored pile are special
Arrangement and method for construction, cantilever bridge special scheme, subgrade construction scheme, bent cap special construction plan, cushion cap special construction plan and
Bridge cross-line construction special scheme etc., wherein corresponding to each special scheme title marks off multiple career fields, referring to Fig. 7 example
The hierarchical career field marked off such as cast-in-situ bored pile special construction plan is science of bridge building-pile foundation engineering-cast-in-situ bored pile-
Convolution, rotary digging, impact, full-sleeve, gas lift reverse circulation and caisson.
Therefore user determines each career field at first, then obtains corresponding construction party by each career field
The arrangement and method for construction module of each career field is integrated and obtains entire initial scheme by method, then that initial scheme is corresponding
Legal basis and standard criterion typing wherein, that is, ultimately generate initialization special scheme.
Further, initialization special scheme is audited subject to approval module, is confirmed after audit according to audit opinion
Modification and perfection initializes special scheme to obtain preferred special scheme;
Still further, the preferred special scheme generates account after establishment examination & approval and than selecting outstanding side after modification and perfection
Case generates excellent alternative library.
In an application example, the administrator of each company or Project Manager provide user account, are divided into enterprise-level
Operating platform account and project level operating platform account,
Wherein, enterprise-level operating platform account, can be according to " at the same level for career field and maintenance special scheme module library to be arranged
The buttons such as new line increment ", " the new line increment of junior ", " deleting row " carry out manual editing to the career field of all types of engineerings, such as Fig. 1 institute
Show, using hierarchical career field, level-one career field is subgrade engineering, and it is soft that junior's career field is arranged by the new line increment of junior
Base punishment passes through the new line increment of junior and new line increment function editor's career field powder-spray pile at the same level, pile for prestressed pipe, plastic draining
Plate, Base with Sand Gravel Cushion and geosynthetics punishment;In addition, import feature also can be used referring to fig. 2, leading for career field is downloaded
Enter template to be edited, be imported after the completion;In addition, enterprise-level operating platform account editor's special scheme module library, and it is real
When maintenance update is carried out to special scheme module library, specific maintenance span includes but is not limited to the modification of chapters and sections catalogue, attachment lattice
The interspersed modification of the upload and modification of formula, table, the newly-increased and modification of laws and regulations;In special scheme module library selection scheme
When, " Scenario Name " first is edited, then corresponding " career field " selection " engineering type ", " scheme type " and " career field ", choosing
It when selecting " career field ", is selected according to subitem level, as shown in figure 3, hierarchical career field is that pile foundation engineering-drilling fills
Stake is infused, lower layer's career field of corresponding cast-in-situ bored pile includes convolution, rotary digging, impact, full-sleeve, gas lift reverse circulation and borehole
Pile driving construction scheme, and the characteristics such as suitable environment and advantage and disadvantage for showing on edit page each arrangement and method for construction, facilitate establishment
Personnel quickly select at least one suitable arrangement and method for construction;Further, the typing about legal basis and standard criterion
It is that the subdivision based on career field carries out selection editor, legal basis and standard criterion illustratively select referring to fig. 4.
As shown in figure 5, illustratively, the tool that project level operating platform account schema is worked out in the present embodiment is described in detail
Body operating process, including special scheme work out plan-special scheme preferably-special scheme establishment-special scheme is perfect-special project side
Case account, specifically comprises the following steps:
Step S201 special scheme works out plan: user is according to project demands, to the special project side of each engineering type and scheme type
Case is confined, and determines the basic datas, such as the present embodiment such as " special scheme title ", " career field ", " plan reports the date "
In project be G228 highway (to the east of Shanghai Zhejiang provincial boundaries-Laolong's spring port ,-Nan Lu highway to the east of the road of bay) engineering, list
Work out plan referring to Fig. 6, engineering type is highway engineering, and the special scheme title listed, which includes that hollow slab girder is prefabricated, to be applied
Work, cast-in-situ bored pile special construction plan, the river Zhang Jing cantilever bridge safe plans, subgrade construction scheme, the construction of bent cap special project
Scheme, cushion cap special construction plan and the river Zhang Jing bridge cross-line construction safety special scheme, wherein corresponding to each special scheme
Title marks off multiple career fields, the hierarchical profession class marked off referring to Fig. 7 such as cast-in-situ bored pile special construction plan
It Wei not science of bridge building-pile foundation engineering-cast-in-situ bored pile-convolution-bit diameter-power (according to geological conditions)-pulping material
Material-technical indicator-detection method-the relevant technologies and operating post capability standard;
Step S202: special scheme is preferred, is divided according to the career field hierarchical of each special scheme title of step S201,
Preferred arrangement and method for construction is selected, the hierarchical career field marked off such as cast-in-situ bored pile special construction plan is science of bridge building-
In pile foundation engineering-cast-in-situ bored pile-convolution, rotary digging, impact, full-sleeve, gas lift reverse circulation and caisson, according to its advantage and disadvantage
Description and preliminary judge to construction environment, as shown in figure 8, selection suggested design convolution, also can choose multiple recommendations
Scheme is selected for authorized personnel;With the corresponding arrangement and method for construction of same operation selection other specialties Scenario Name, then gathered
Initialization special scheme is obtained, the program is sent into approval process progress scheme and is preferably confirmed;
Step S203: then special scheme establishment, preferably confirmation initialization special scheme are edited special to the initialization preferably gone out
Scheme is edited, and with reference to Fig. 9, the 1st chapter basis of compilation is used to record legal basis and standard criterion, and editorial staff can
The efficient each career field legal basis of typing and standard criterion, at the same can also directly in platform editor's other information,
It is preset with schemes generation template within the system, above-mentioned selected career field, special scheme and codes and standards are integrated into
The predeterminated position of above-mentioned generation template generates initialization special scheme, and ultimately generating declaration scheme can be deposited with word version
?;
Step 204: special scheme is perfect: user according to special scheme work out in suggestions made after examination modified to special scheme
It deals with problems arising from an accident, business handling is clicked in this module and enters edit page such as Figure 10, finally obtains special scheme.
Step 205: special scheme account, in the present embodiment, referring to Figure 11, special scheme account is to all special project sides
The whole statistics of case is brought all schemes that special scheme works out plan into automatically, and is carried out according to real-time status to scheme state
It updates, after special scheme, which improves, reports completion workflow examination and approval, it is that " examination & approval are logical that the corresponding scheme in account, which just will be updated state,
It crosses ".
Claims (10)
1. a kind of method for efficiently formulating building engineering construction scheme, it is characterised in that: this method comprises the following steps:
Step S101: it obtains user's arrangement and method for construction and works out plan calls;
Step S102: selection and the matched career field of arrangement and method for construction establishment plan calls, scheme module from database
And codes and standards;
Step S103: integrating the matched career field, scheme module and codes and standards, and it is special to generate initialization
Scheme;
Step S104: the initialization special scheme of generation is pushed to the user.
2. the efficient method for formulating building engineering construction scheme according to claim 1, it is characterised in that: the database
Store career field, special scheme module library and codes and standards library.
3. the efficient method for formulating building engineering construction scheme according to claim 1, it is characterised in that: according to different
Region, weather, the actual conditions of geology and national regulation standard, user's selection is at least a set of to meet people, machine, material, method, ring, survey
The initialization special scheme module of demand confirms preferred special scheme for approving person's trade-off decision.
4. the efficient method for formulating building engineering construction scheme according to claim 3, it is characterised in that: anticipated according to audit
See modification and perfection initialization special scheme to obtain preferred special scheme.
5. the efficient method for formulating building engineering construction scheme according to claim 1, it is characterised in that: described preferably special
Item scheme generates account after establishment examination & approval and than selecting excellent alternative, generation excellent alternative library after modification and perfection.
6. the efficient method for formulating building engineering construction scheme according to claim 1, it is characterised in that: the profession class
Not Cai Yong hierarchical partition mode, the advantage and disadvantage of typing its corresponding arrangement and method for construction in each subdivision career field module.
7. the efficient method for formulating building engineering construction scheme according to claim 1, it is characterised in that: the specification mark
Include legal basis and standard criterion in quasi- library.
8. a kind of system for efficiently formulating building engineering construction scheme, it is characterised in that: the system includes database, processor with
And user terminal,
Database is worked out according to arrangement and method for construction and is requested for storing career field, special scheme module library and codes and standards library
Extract matching career field, special scheme and codes and standards;
User terminal, works out plan calls by the arrangement and method for construction that user inputs, and establishment plan calls are sent to processor sum number
According to library;
Processor, the arrangement and method for construction for receiving user's transmission are worked out plan calls, are obtained and establishment plan calls corresponding
Career field, special scheme and the codes and standards matched;And it is pushed to user.
9. the efficient system for formulating building engineering construction scheme according to claim 8, it is characterised in that: user terminal includes
Recording module, inquiry request module and generation module, the recording module is for typing construction essential information, the construction base
This information includes engineering type, special scheme title, scheme type, career field, if needs are expounded through peer review and plan to report
Time;The inquiry request module is used to extract from database with the matched career field of arrangement and method for construction establishment request, specially
Item scheme and codes and standards;The generation module is used to generate the initialization special project side including project essential information and acquisition
Case.
10. the efficient system for formulating building engineering construction scheme according to claim 8, it is characterised in that: the user
End further includes auditing module, warning module, excellent alternative library, proposal inquiry module;
Approval module audits initialization special scheme for approving person;
Warning module is for setting the examination & approval time of each link, more than the data of time limit for appraisal and ratification, automatically according to early warning
Grade sends early warning short message to supervisor people, approver, and the examination & approval timeliness of each link is supervised by supervising and manage people;
Excellent alternative library, for storing the excellent alternative selected after examining;
Proposal inquiry module generates initialization special scheme, excellent alternative and scheme statistical conditions for user's quick search.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910327228.4A CN110223028A (en) | 2019-04-23 | 2019-04-23 | A kind of efficient method and its system for formulating building engineering construction scheme |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910327228.4A CN110223028A (en) | 2019-04-23 | 2019-04-23 | A kind of efficient method and its system for formulating building engineering construction scheme |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110223028A true CN110223028A (en) | 2019-09-10 |
Family
ID=67820032
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910327228.4A Pending CN110223028A (en) | 2019-04-23 | 2019-04-23 | A kind of efficient method and its system for formulating building engineering construction scheme |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110223028A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111242457A (en) * | 2020-01-07 | 2020-06-05 | 中国建筑第八工程局有限公司 | Construction technology management system and method |
CN112131856A (en) * | 2020-10-27 | 2020-12-25 | 成都建工第二建筑工程有限公司 | Building construction scheme generation method |
CN112749435A (en) * | 2021-01-13 | 2021-05-04 | 深圳国志智慧科技有限公司 | Matching method and device of park space carrier related elements, storage medium and electronic equipment |
CN113298435A (en) * | 2021-06-21 | 2021-08-24 | 中交第二航务工程局有限公司 | Intelligent construction scheme compiling method and system for building industry |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102073632A (en) * | 2009-07-18 | 2011-05-25 | 苏州鼎思科技有限公司 | Comprehensive construction management knowledge base data structure for construction engineering |
CN106897861A (en) * | 2017-02-16 | 2017-06-27 | 龙岩学院 | A kind of project management system |
CN109657911A (en) * | 2018-11-14 | 2019-04-19 | 遵义华正电缆桥架有限公司 | System is instructed in a kind of assessment of power construction |
-
2019
- 2019-04-23 CN CN201910327228.4A patent/CN110223028A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102073632A (en) * | 2009-07-18 | 2011-05-25 | 苏州鼎思科技有限公司 | Comprehensive construction management knowledge base data structure for construction engineering |
CN106897861A (en) * | 2017-02-16 | 2017-06-27 | 龙岩学院 | A kind of project management system |
CN109657911A (en) * | 2018-11-14 | 2019-04-19 | 遵义华正电缆桥架有限公司 | System is instructed in a kind of assessment of power construction |
Non-Patent Citations (1)
Title |
---|
张乐: "网络进度计划辅助生成研究", 《万方数据库》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111242457A (en) * | 2020-01-07 | 2020-06-05 | 中国建筑第八工程局有限公司 | Construction technology management system and method |
CN112131856A (en) * | 2020-10-27 | 2020-12-25 | 成都建工第二建筑工程有限公司 | Building construction scheme generation method |
CN112749435A (en) * | 2021-01-13 | 2021-05-04 | 深圳国志智慧科技有限公司 | Matching method and device of park space carrier related elements, storage medium and electronic equipment |
CN113298435A (en) * | 2021-06-21 | 2021-08-24 | 中交第二航务工程局有限公司 | Intelligent construction scheme compiling method and system for building industry |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110223028A (en) | A kind of efficient method and its system for formulating building engineering construction scheme | |
CN111369158A (en) | BIM-based informatization quality management method and system | |
Goh et al. | Case-based reasoning approach to construction safety hazard identification: Adaptation and utilization | |
CN111080271A (en) | System and method for land batch supervision | |
Al-Bataineh et al. | Using simulation to plan tunnel construction | |
CN105373875A (en) | Intelligent engineering construction project management system | |
McCabe | Monte Carlo simulation for schedule risks | |
Zhong et al. | Theory on real-time control of construction quality and progress and its application to high arc dam | |
CN111810144B (en) | Shale gas well engineering intelligent scheduling method and system | |
Jiang et al. | Lean construction practice: Culture, standardization and informatization—A case from China | |
Diekmann et al. | Project cost risk analysis using influence diagrams | |
Hansen et al. | Factors influencing scheduling activities of construction projects | |
Nguyen et al. | Exploring the adaption of lean principles to highway construction | |
Mkhize | A comparative study of the construction of road formation layers using labour-intensive versus traditional mechanistic methods on road 1264 in KZN | |
Allouche et al. | Software for planning and cost control in directional drilling projects | |
Devaguptapu | Forensic analysis of DWR data for effective prediction of highway production rates | |
Bruce et al. | An expert systems approach to highway construction scheduling | |
Husin | APPLICATION OF PER INTEGRATION ON B | |
Geng et al. | Comparative Study on Simulation of Grid and Non-grid Management Process of Farmland | |
Anderson et al. | Synthesis on construction unit cost development: technical report. | |
CN116739446A (en) | Building rubbish reverse logistics intelligent management method based on BIM-WMS technology | |
Al Tabbaa et al. | Simulation Modules Development to Estimate Activities Duration of Infrastructure Projects During Planning Phase | |
Nugraha et al. | COST AND TIME ANALYSIS USING THE CRASHING METHOD ON THE PROBOLINGGO–BANYUWANGI TOLL ROAD PROJECT PEKET 2: STA 9+ 000–20+ 200 | |
Tinamtu et al. | Decision Analysis of Abandonment and Site Retirement for Sand Plant Facilities Gathering Station | |
Lea et al. | Pavement Environmental Life Cycle Assessment Tool for Local Governments |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190910 |
|
RJ01 | Rejection of invention patent application after publication |